HomeMy WebLinkAbout02-26-18 City Commission Packet Materials - A9. Commission Direction for a Parks and Trails Special District - SUPPLEMENTAL MATERIALS BOZ E MAN mT
Parks & Recreation
CITY OF BOZEMAN
PARKS & TRAILS SPECIAL DISTRICT
FEASIBILITY STUDY
PRESENTATION TO
BOZEMAN CITY COMMISSION FEBRUARY 26 , 2018
Parks & Recreation
Peaks to Plains Desi n� consulting
Ln NDSCAPE ARCIII`ECTDRE r PLNNNINC/CIVIL ENGINCERING
General Fund
Capital Improvement Plan
Financial Summary Current Year Projected
FY18 FY19 FY20 FY21 FY22 FY23 unscheduled
Projected Beginning Balance Dedicated to CIP S - S 236,000 S (356,664) $ (755,568) $ (552,920) $ (11,771)
Plus: General Fund Revenues Dedicated to CIP $ 1,284,996 S 919,412 S 1,083,374 $ 1,094,207 S 1,105,149 S 1,116,201 S
Plus: GF231-Cem.Irrigation Project-Reserve Used for Grant Match $ 200,000 $ 200,000
Plus: GF231-Cem.Irrigation Project-Grantfunding DNRC and BOR $ 425,000
Plus: GF286-Veterans Cemetery Project-Reserve Used $ 88,000 $ 40,000 S 45,000
Plus: GF280-Story Mansion Sewer Repair,from Story Mansion Fund $ 18,000
Plus: GF052-Police Non-Patrol Vehicle,from Donation $ 18,000
Plus: Intercap loan•GF260,GF261 Sports Complex Imps. S 431,500
Plus: Bond Issue: GF263 L&J $ 10,000,000 S 20,000,000
Plus: Bond Issue: GF305 Fire Station 1 S 6,500,000
Plus: Bond Issue: GF306 Fire Station 2 4,S00,000
Plus: Bond Issue: GF056 Indoor/Outdoor Aquatics Facility S 16,500,000
Plus: GF137 Swim Center/GF238 Bogert Bond Issue(with Aquatics facility question) S 1,432,300
Less: Scheduled CIP Project Costs S (1,284,996) S (12,656,576) S (8,522,277) S (21,669,560] S (19,154,300) S (5,119,000) s (11,346,9331
Creation of Citywide Park Maint Dist.CIP projects moved to own fund Creotion S 500,000 $ 733,000 $ 658,000 S 203,000 $ 3,395,000
Projected Year-End Cash Dedicated to CIP $ 236,000 S (356,664) S (755,568) S (552,920) S (11,771) S 688,430
BOZ E MAN MT
THE MOST LIVABLE PLACE.
Parks & Recreation
Mrs
NW IM
. - -
rid IN '-f':
limits
(-Map
I'Milliled66 In
a.
I OrW Y..
f � 1"6
Park Maintenance eon �t
i city
i HOA
County o os i
mile
BOZ E MAN MT
Darks R Recreation
• SOME ISSUES OF CONCERN
• Deferred Maintenance
• Quality Park No Matter Where You Live
• Fairness of Payment/Usage
CITY OF BOZEMAN
PARKS & TRAILS SPECIAL DISTRICT
FEASIBILITY STUDY
PRESENTATION TO
BOZEMAN CITY COMMISSION FEBRUARY 26 , 2018
MT
Parks & Recreation
/ prosonsu :
,,Peaks to Plains Design clting
11 D5 CAPL NRCIII'LC IJRE I PLAN N III /CIVIL LV GAVE I RIhG
PROJECT OVERVIEW BOZEMANMT
Parks&Recreation
Project Goal
Prepare a planning-focused feasibility analysis for a potential parks and trails district.
Project Scope Project Outcomes Deliverables
■ Research information Provide citizens with ■ Updated HOA contact
Pertaining to privately- high quality park information
maintained parks experience Lifecycle replacement cost
■ Update City's GIS ■ Manage risk for the Asset inventory
■
database with respect to Parks Department and
HOA contacts & City of Bozeman Conducted five (5) staff
inventory of park Ot Identify the true cost of Workshops
amenities ownership ■ Define total cost of ownership
■ Develop system-wide
Lifecycle replacement
costs per acre and/or
other applicable ■ Operations & Management
parameters New development
■ Prepare report
■' Development of options &
documenting the report
alternatives
7
BACKGROUND BOZEMANMT
Parks&Recreation
■ Mid 1990's
■ City experiencing rapid park land development
■ Property Owner Associations required to maintain parks
Language included on plats and in subdivision improvement agreements
■ Intended to be a temporary stop-gap measure
■ 2007
■ PROST Plan 10.3.4 Recommendation
"Continue to require that homeowners' or property owners' association maintain
newly dedicated parkland and trails within their development until a City-wide
parks maintenance district or some equivalent alternative is created."
* 2012
■ City Parks staff began inspecting privately-maintained playgrounds due to risk
management concerns.
■ Trails, Open Space & Parks Bond overwhelmingly passed by voters (73.4%)
■ Did not include funds for maintenance
8
BACKGROUND BOZEMANMT
Parks&Recreation
■ 2015
■ Post-recession housing development increasing along with new parkland
dedications
■ City implements asset & work order management program ("Cityworks")
■ First TOP Bond projects under construction
■ 2016
■ Mayor & Commission goals place high priority on Parks & Trails District
■ The Trust for Public Land provides "Conservation Finance Feasibility Study"
white paper
■ Funding allocated for study
■ 2017
■ Parks Department hires consultant to conduct feasibility analysis
■ One full year of Cityworks data
■ Two TOP bond projects completed
9
RESEARCH & INVENTORY BOZEMANMT
Parks&Recreation
Bozeman Park System Acreage by Park Classification
Park Classification Acreage
■ Total city-owned park land: 906 ac 0 200 400
■ Current park maintenance
Community Park 200
responsibility:
■ City-maintained: 672 ac Natural Area/
Lands, Linear Parks. . . i�o
■ HOA-maintained: 235 ac
Mini-Park . 40
Neighborhood Park 312
Special Use Park , 36
Athletic Fields 146
10
RESEARCH & INVENTORY BOZEMAN"
Parks&Recreation
Trail Length by Land Ownership
Bozeman Trails System
Miles
0 50 100
Length of trails: 61.1 miles
r Paved: 2.2 miles
Total Trails 61.1
n Unpaved: 58.9 miles
Length of sidewalks: 16.8 miles
Trails in city parks 35.3
Trails in easements 25•8
11
RESEARCH & INVENTORY BOZ E MANMT
Parks&Recreation
Property Owner Association " It would be great if the City took
over maintenance of the
Information subdivision parks
-Surveys mailed out HOA manager
Direct phone calls
37 out of 49 contacts updated
(continuing to update)
7 T
s7d
FERSANDAN PARK (HOA) OAKS SPRINGS PARK (HOA) NORTON EAST PARK (HOA) PARK (HOA)GUSON • D• 12
RESEARCH & INVENTORY BOZEMANMT
Parks&Recreation
1 —
Park Assets
■ City GIS data as starting
'r point
• - - ■ Field visits
s - -
r Added missing data:
Sidewalk SF
I -- - ■ New structures
Y _ --� �-1� ■ Public Art
r ■ Trail material & widths
- . ■ Privately-maintained
•` JJ park assets
13
TOTAL COST OF OWNERSHIP BOZEMANMT
Parks&Recreation
CAPITAL
rppp INVESTMENT
OPERATIONS
' •
MAINTENANCE
LIFECYCLE COST
REPLACEMENT
TOTAL COST OF OWNERSHIP
14
DEFINING MAINTENANCE STANDARDS BOZEMANMT
Parks&Recreation
Task Frequency Time of Yr
Playgrounds
High Frequency-Inspection Weeklv Spring/Summer/Fall
Installation As Needed
Investigation Daily Spring/Summer/Fall
Low Frequency Investigation Monthly Spring/Summer/Fall
Maintenance As Needed
Miscellaneous As Needed
Repair Within 24hrs of notice
Vandalism As Needed
Retaining Walls
Investigation Daily Year Round
Miscellaneous As Needed
Re air lAs Needed
Sidewalks/Shared Use Paths
Investigation Daily./Weekly Daily./Weekly Year Round
Miscellaneous As Needed
Plow Within 24hrs of snovi Winter
Repair As Needed
Sand As Needed
Sweep As Needed
15
OPERATIONS & MANAGEMENT SCENARIOS BOZ E MANMT
Parks&Recreation
Current Practice :
$2,?112,F760
Level of Service t
Standard Practice
Level of Service $3,?658,p291
Best Practice
.�
$4,p6el of Service 61,019.
*FY18 O&M Budget: $1,693,234
16
LIFE CYCLE REPLACEMENT COSTS BOZEMANMT
Parks&Recreation
BEST PRACTICES
LIFE
ASSET CYCLE Unit Cost/ Unit 2017 Life Cycle Asset Replacement
(years)
BENCHES: WOOD 10 EA $ 1,500.00
VS.
BENCHES: CONCRETE 25 EA $ 1,500.00
BENCHES: DUGOUT 20 EA $ 1,000.00 Deferred Life Cycle Asset
BIKE RACKS 20 EA $ 600.00 Replacement
LEACHERS 35 EA $ 4,500.00
BOLLARD: LIGHT 20 EA $ 1,200.00
BOLLARD: PARKING 30 EA $ 1,000.00
BOULDER CLIMBER 15 EA $ 15,000.00
Capital Investment
RIDGES 25 EA $ 15,000.00
17
LIFE CYCLE REPLACEMENT COSTS BOZ E MANMT
Parks&Recreation
■ General Park Name (only city-owned parks)
■ Asset broken down by park phase on plats
■ Maintenance Entity
■ City or private property management association maintained
w Item Description
■ Dog station, sidewalk, playground, etc.
■ Quantity/Unit
■ 2,200 linear feet, 0.50 acres, etc.
■ Year (Asset) Acquired
■ Life Cycle
■ Years & 2017 cost to replace
■ Inflation at 3%
■ Replacement Year
is
LIFE CYCLE & CAPITAL COSTS BOZEMANMT
Parks&Recreation
FY 2023
MW
Current PractX1
ice
Level of Service
$526,600
Standard Practice
$2.oO70.9172
Level of Service
Best Practice
$3.oO66.9620
Level of Service
Deferred asset replacement need ending FY18: $6,goo,476
19
LIFE CYCLE & CAPITAL COSTS BOZ E MAN MT
Parks&Recreation
Asset Life Cycle Replacement Costs
LOS Comparison by Year
$20,000,000
$18,000,000
$16,000,000
$14,000,000
$12,000,000
$10,000,000
$8,000,000
$6,000,000
$4,000,000
$2,000,000 UM
$_ min M01 OWN M 00. 0
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Current Practice LOS Standard Practice LOS �Best Practice LOS
Current Practice Def,Asset Replacement Value Standard Practice Def.Asset Replacement Value—Best Practice Def.Asset Replacement Value
Deferred asset replacement need ending FY18: $6,goo,476
20
SUMMARY: FUNDING MODELS BOZEMANMT
Parks&Recreation
SCENARIO #1 (CURRENT PRACTICE LEVEL OF SERVICE)
Operations & Maintenanc $2,112,760
Capital/life Cycle
$526,600
Replacement
TOTAL $2,639,360
. Residential Lot 750 $92.36/yr
[ax Residential Lot $184.7;;
21
SUMMARY: FUNDING MODELS BOZEMANMT
Parks&Recreation
SCENARIO #2 (STANDARD PRACTICE LEVEL OF SERVICE)
Operations & Maintenance $31F658 291
p
Capital/life Cycle
$2.v070?172
Replacement
TOTAL $5,,728..463
Avg. Reside $200.46/yr
Max Resid $400.91/yr
22
SUMMARY: FUNDING MODELS BOZEMANMT
Parks&Recreation
SCENARIO #3 (BEST PRACTICE LEVEL OF SERVICE)
Operations & Maintenance ��4;661,019
Capital/life Cycle
$3,pO66,p620
Replacement
TOTAL
Ohm. Residential Lot 7500 $270.41/yr ,
elax Residential Lot 1 $540.83/yr
23
OUTCOMES : OPERATIONS & MANAGEMENT BOZ E MANMT
Parks&Recreation
Operations & Management per Capita Spending
$120
$106.77
$103.00
$100
$80.115
$8o
National Average $65
$60 $55.65
$52.65
$46.69 $44.42
$40
$34.10 $35.39
$32.51
$25.23
$20 -
$0
Bozeman Great Falls Helena Kalispell Billings Missoula* Butte Whitefish
■FY 17 ■Scenario 1 ■Scenario 2 ■Scenario 3
Based on 2016 US Census Estimated Population: Bozeman(45,250),Great Falls(59,178),Helena(31,i6q),Kalispell(22,76i),Billings (110,323),Missoula(72,364)
24
SUMMARY: FUNDING MODELS BOZEMAN"
Parks&Recreation
TOTAL AVERAGE ANNUAL COSTS (FY19-23)
Scenario #1: $2.64 Million
■ Current Level of Service
■ Avg. Residential Lot
$92.36/yr
Scenario #2: $5.73 Million
■ Standard Practice Level of Service
■ Avg. Residential Lot
$200.46/yr
■ Scenario #3: $7.73 Million
■ Best Practice Level of Service
■ Avg. Residential Lot
$2 70.41/Yr
25