HomeMy WebLinkAbout03-05-18 City Commission Packet Materials - C10. Resolution 4895, Guaranteed Maximum Price Amendment No. 6Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Carolyn Poissant – Manager of Trails, Open Space, and Parks Design and Development Mitch Overton – Director of Parks and Recreation SUBJECT: Resolution No. 4895 - Guaranteed Maximum Price Amendment No. 6 for Maynard Pipeline Re-alignment MEETING DATE: March 5, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution No. 4895 for Guaranteed Maximum Price Amendment No. 6 with Dick Anderson Construction, Inc. for realignment of the Maynard irrigation pipeline for an amount not to exceed $129,610.95, for a total contract amount $4,565,663.00 for Amendments 1, 2, 3, 4, 5 and 6 (Attachment A). BACKGROUND: Resolution No. 4521 was unanimously approved by the Commission April 14, 2014 for the allocation of Trails, Open Space and Parks (TOP) bond funding in an amount not to exceed $7,500,000 for the acquisition of park land and development of the Bozeman Sports Park Project (“Park Project”), which requires the assistance of a professional design and engineering team. The resolution allocated up to (i) $2,100,000 for the acquisition of approximately 80 acres of park land; (ii) up to $1,788,000 for infrastructure improvements as stated in the Commission motion adopted April 7, 2014; and (iii) the remainder for park design and development. The land purchase was completed in 2014 for $2,022,413 leaving $3,689,587 for design and construction of park improvements, reserving the $1,788,000 for infrastructure. An additional $917,000 was in TOP bond funds was allocated to the project with the adoption of Commission Resolution 4844. The Commission approved Resolution 4680 authorizing the use of an alternate delivery contract for the hiring a General Contractor/Construction Manager (“GCCM”). The Bozeman Sports Park Master Plan has was approved by Commission July 11, 2016. Dick Anderson Construction, Inc. was approved by Commission as the GCCM for the project May 23, 2016. Guaranteed Maximum Price Amendment Nos. 1 - 5 were previously approved by Commission for a total contact amount of $4,436,052.05. GMP Amendment No. 6 serves as a change order to the existing contract with H&H Earthworks for additional work to re-align the Maynard pipeline on Bozeman School District property to satisfy the requirements of downstream irrigators who manage the pipeline. A temporary 70 construction easement is scheduled to be approved by the BSD Board of Directors on February 26, 2018 (Attachment C), which will be recorded with the Gallatin County Clerk. UNRESOLVED ISSUES: The City is in the process of finalizing easement documents with the irrigators for the relocated Maynard pipeline on the Sports Park property. ALTERNATIVES: Per Commission. FISCAL EFFECTS: The Agreement will allow the project to proceed as previously approved. ATTACHMENTS: Resolution 4895 Attachment A – AIA A133 Exhibit A - Guaranteed Maximum Price Amendment No. 6 Attachment B – GCCM Proposal Attachment C – Temporary Construction Easement Report compiled on: February 26, 2018 71 COMMISSION RESOLUTION NO. 4856 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, AND APPROVING GUARANTEED MAXIMUM PRICE AMENDMENT NO. 5 TO THE CONTRACT WITH DICK ANDERSON CONSTRUCTION, INC. FOR THE BOZEMAN SPORTS PARK WHEREAS, on May 23, 2016, the City Commission approved the “Agreement for General Contractor / Construction Manager (“GCCM”) Services with Dick Anderson Construction, Inc. for the Bozeman Sports Park” ("contract"); and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any alterations or modifications of the specifications and/or plans of a contract be made by resolution; and WHEREAS, portions of the work were previously approved under Commission Resolution Nos. 4754, 4793, 4805 and 4836 (GMP Amendment Nos. 1, 2, 3, and 4 respectively, to the GCCM contract); and WHEREAS, bids were received on December 12, 2017 for the remaining portions of the work to complete Phase I of the Sports Park site improvements; and WHEREAS, the work to be performed is to be awarded to the lowest responsible bidders in compliance with City of Bozeman Purchasing Policy and the executed GCCM contract. 72 NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modification to the contract between the City of Bozeman, a municipal corporation, and Dick Anderson Construction, Inc. as indicated on Attachment A (“Exhibit A: Guaranteed Maximum Price Amendment No. 5”), attached hereto, is hereby approved; and the City Manager is hereby authorized and directed to execute the contract amendment for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 29th day of January, 2018. ___________________________________ CYNTHIA ANDRUS Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 73 COMMISSION RESOLUTION NO. 4895 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING THE GUARANTEED MAXIMUM PRICE AMENDMENT NO. 6 TO THE CONTRACT WITH DICK ANDERSON CONSTRUCTION, INC. FOR THE BOZEMAN SPORTS PARK WHEREAS, on May 23, 2016, the City Commission approved the “Agreement for General Contractor / Construction Manager Services with Dick Anderson Construction, Inc. for the Bozeman Sports Park” ("contract"); and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any alterations or modifications of the specifications and/or plans of a contract be made by resolution; and WHEREAS, the first portions of the work performed included the initial relocation of the Maynard irrigation pipeline, which have been approved by Commission Resolution No. 4754 (GMP Amendment No. 1) and Commission Resolution No. 4793 (GMP Amendment No. 2 to the original contract; and WHEREAS, additional work beyond the scope of what was previously approved needs to be performed, which includes re-alignment of sections of the pipeline in the Sports Parks and on Bozeman School District property with additional pipe and fittings, as delineated in GMP Amendment No. 6 to the contract; NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modification to the contract between the City of Bozeman, a municipal corporation, and Dick Anderson Construction, Inc. as indicated in Attachment A – AIA 133 Exhibit A - Guaranteed Maximum Price Amendment No. 6, attached hereto, is hereby 74 approved; and the City Manager is hereby authorized and directed to execute the contract amendment for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 5th day of March, 2018. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 75 AIA Document It A133™ 2009 Exhibit A Guaranteed Maximum Price Amendment for the following PROJECT: (Name and address or location) Bozeman Sports Park 4600 Baxter Lane Bozeman, MT 59718 THE OWNER: (Name, legal status and address) The City of Bozeman Montana 121 N. Rouse Ave. PO Box 1230 Bozeman, MT 59771-1230 ("Owner") and the Construction Manager: (Name, legal status and address) Dick Anderson Construction, Inc. 4498 Jackrabbit Lane Bozeman, MT 59718 ("Construction Manager") ARTICLE A.1 § A.1.1 Guaranteed Maximum Price Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work, as that term is defined in Article 6 of this Agreement. § A.1.1.1 The Contract Sum (No. 6) is guaranteed by the Construction Manager not to exceed one hundred twenty-nine thousand six hundred ten dollars and 95 cents, ($129,610.95), for realignment of Maynard irrigation pipeline for a total contract sum of four million five hundred sixty-five thousand six hundred sixty-three and 00 cents ($4,565,663.00) subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, allowances, contingencies, alternates, the Construction Manager's Fee, and other items that comprise the Guaranteed Maximum Price. (Attachment B - Proposal from General Contractor.) § A.1.1.3 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. (State the numbers or other identification of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.) « » § A.1.1.4 Allowances included in the Guaranteed Maximum Price, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item «NIA» Price ($0.00) § A.1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price is based: The work is a a continuation of the Maynard Pipeline re-alignment portion of infrastructure improvements for the project as per the approved Bozeman Sports Park Master Plan. § A.1.1.6 The Guaranteed Maximum Price is based upon the Supplementary and other Conditions of the Contract included in the project specifications. § A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications: previously issued specifications dated Nov. 11, 2016. § A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings: May 1, 2, 3, 4, prepared by DOWL and C 4.0, C 5.0 prepared by C&H (Exhibit B). § A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information: all other applicable drawings and specification of the original contract under GMP No. 1. ARTICLE A.2 § A.2.1 The anticipated date of Substantial Completion established by this Amendment: April 20, 2018. OWNER (Signature / date) Andrea Surratt Bozeman City Manager CONSTRUCTION MANAGER (Signature / date) By: _____________________________________________________ Name / Title Dick Anderson Construction, Inc. AIA Document A133"' - 2009 Exhibit A. Copyright , 1991, 2003 and 2009 by The American Institute of Architects. Al.l rights reserved. WARNDiG: This AL:...- Dvcu..,r,ent is protected by U S Copyright La·n and Ir,ternational Treaties llnauthor.1.zed reprcduction or d1str1.but1-on of this AIA.i.. Document or any portion of it, may esult 1.n sever,e civil and crimirial penalt.1.es, and will be prosecuted to the maximum extent possible under the la;.; This draft was produced by AIA software at 14: 45: 40 on 12/02/2015 under Order No. 7109973622 which expires on 12/01/2016, and is not for resale. User Notes: (3B9ADA1F) 2 77 DICK ANDERSON • CONSTRUCTION, INC. March 16, 2017 Carolyn Poissant, MLA, MPA, AICP, Manager of Trails City of Bozeman- Department of Parks and Recreation 415 N. Bozeman Street Bozeman, MT 59715 Re: Bozeman Sports Park- Irrigation Main-GMP Amendment #2 Dear Carolyn, As per section 5.2 and 5.3 of our Agreement for the Bozeman Sports Park Project, we are requesting an amendment to increase our Guaranteed Maximum Price (GMP) for the Maynard Irrigation Pipeline Realignment portion of the project. This request is based on design changes and owner additions which are detailed on attached exhibits. This amendment is a request for an addition $31,489.82 for a new GMP of $335,250.89. This request includes using $12,600 of the contingency budget established In amendment #1. Please note that applying a portion of the available contingency is outside its intended use in this case, (see section 2.2.4) but this portion of the project nearly complete. There remains $10,000 in contingency for potential future items. Please reference the attached exhibit for additional clarifications and cost breakdown for the additional items. The date of Substantial Completion of April 17, 2017 does not change with this amendment. If you have any questions or required additional information on the items above, please give me at (406) 360-6673. Louie Miller Dick Anderson Construction CC: Josh deVos, Dick Anderson Construction Zachary Lowe, PE, Dowl 3424 HIGHWAY 12 EAST, HELENA, MONTANA 59601 406-443-3225 FAX 406-443-1537 4610 TRI-HILL FRONTAGE ROAD, GREAT FALLS, MONTANA 59404 406-761-8707 FAX 406-761-3134 4498 JACKRABBIT LANE, BOZEMAN, MONTANA 59718 406-586-0889 FAX 406-388-4263 PO BOX 31511, BILLINGS, MONTANA 59107 406-248-3700 78 • Contract Change Order Maynard Irrigation Pipeline Realignment Location: Bozeman Contractor: Dick Anderson Construction Address: DAC Project#: 02-16-238 Chg. Order #: 1 Date: 3/16/2017 Phone: 360-6673 The Contractor is herebv directed to make the followlng chane:es In the Contrect uoon recelot of an aooroved coov of this Chanr.e Order ITEM NO. DESCRIPTION/ UNIT BREAKDOWN/ UNIT COSTS COST SEE ATTACHED BREAKDOWN (Indicate+ or-) 1 Modify Southern connection $ 9,443.73 2 Upsize 6" pipe to 12" Pipe $ 20,319.81 3 Added inline drain tee/valve $ 5,299.29 4 Added future irrigation pump connection tee/valve $ 13,361.77 5 Removed seeding from contract $ (1,858.40) 6 Contractor donation $ {6,000.00) 7 $ - 8 $ - 9 SUBTOTAL (Labor & Materlals) $ 40,566.20 10 Overhead & Profit @ 5.5% $ 2,231.14 11 Subtotal line 9, 10 $ 42,797.34 12 Bond 1% $ 427.97 13 Insurance 1% s 427.97 14 Subtotal line 11, 12, 13 $ 43,653.29 15 State Gross Receipts Tax 1% $ 436.53 16 TOTAL COST (This Change Order Only)= $ 44,089.82 17 Contingency $ (12,600.00) 18 TOTAL $ 31,489.82 CONTRACT STATUS 1. Original Contract Amount $ 303,761.07 2. Net Change by Previous Change Order(s) $ - 3. Current Contract Amount {1+2) $ 303,761.07 4. This Change Order Total Amount $ 31,489.82 5. New Contract Amount (3+4) $ 335,250.89 6. Total Cost of All Change Orders to Date {2+4) $ 31,489.82 79 80 81 82 83 84 85 86 87 88 Page 1 of 4 TEMPORARY CONSTRUCTION EASEMENT THE GRANTORS, Bozeman Public Schools, whose address is 404 West Main Street, Bozeman MT 59715, for and in consideration of One and No/100 - Dollars, and other valuable consideration, in hand paid, conveys and warrants to the GRANTEE, City of Bozeman, a municipal corporation of the State of Montana, whose office address is 121 N. Rouse, Bozeman, MT 59715, its successors and assignees, an unrestricted Temporary Construction Easement, over, and across the following described real property located in Gallatin County, Montana: LEGAL DESCRIPTION Commencing at the southeast corner of Tract 1A1 of COS 2554B, from a 2 ½” found aluminum cap at the 1/16th corner marking the intersecting rights-of-way for Flanders Mill Road and Oak Street in Section 4, Township 2S, Range 5E, N89 50’12”W 53.71 feet, to the true point of beginning (POB) of easement: Thence S 141’39”E 233.86 feet, thence N 50 55’ 22”W 372.10 feet, thence S89 50’ 14”E, 281.95 feet to the point of beginning, and containing 0.756 acres, more or less as shown on Exhibit A. delineated as to said tract of land on the exhibit attached hereto and made a part hereof as Exhibit A of this instrument. Said parcel, containing approximately one acre (4315 square feet), more or less, is hereby provided to the Grantee, for the purpose of constructing an irrigation pipeline (re-routed) as indicated in Exhibit A, as necessary for the Bozeman Sports Park Project. Upon completion of said project for which access is hereby provided, the Grantee shall restore the property as nearly as possible to its original condition, including removal of the abandoned pipe. The Grantee agrees to hold Grantors harmless from any and all liability that may result or arise from the exercise of the rights granted hereby. The Grantors hereby covenant with the Grantee that the Grantors have good title to the above-described tract of land, and covenant that the Grantee shall have quiet and peaceable possession thereof and use thereof during the period of the Temporary Construction Easement. This Temporary Easement is in effect for six months form the date of execution, at which time this easement shall expire and be of no force and effect. GRANTOR – BOZEMAN PUBLIC SCHOOLS BY: _____________________________________ (authorized signature) _____________________________________ (printed name) ACKNOWLEDGMENT OF GRANTORS STATE OF __________ ) ) ss County of ___________ ) 89 Page 2 of 4 On this ____ day of _______________, 20__, before me, the undersigned, a Notary Public in and for the said State, personally appeared the Grantor, ___________________, known to me to be the identical individual who executed the foregoing instrument, who acknowledged to me that the individual executed the same as the free and voluntary act of said Grantor, with full authority to do so and with full knowledge of its contents, for the uses and purposes therein mentioned. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal this day and year above written. Notary Public in and for the State of __________ My Commission Expires: ___________________ 90 Page 4 of 4 91 AIA Document A20l--2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. ELECTRONIC COPYING of any portion of this AIA' Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document. AIA Document A133'8' - 2009 E.z:hibit A. Copyright ,-. 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Dcci..LT,ent is protected by U S Copyright La· .. · c1nd International Treaties Unauthorized reprod,-1ction or d1stributicn of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the la\,{ This draft was produced by AIA software at 14: 45: 40 on 12/02/2015 under Order No. 7109973622 which expires on 12/01/2016, and is not for resale. User Notes: (389/\DAlF) 1 No.6 ATTACHMENT A 76