Loading...
HomeMy WebLinkAbout02-26-18 City Commission Packet Materials - C4. NOA to Omdahl for 2018 Stormwater ImprovementsCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Kyle Mehrens, Stormwater Program Coordinator Craig Woolard, Director of Public Works SUBJECT: Notice of Award to Omdahl Excavation and Utilities, Inc., Manhattan, MT, in the amount of $229,055.00 for construction of the 2018 Bozeman Stormwater Improvements MEETING DATE: February 26, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign a Notice of Award for construction of the 2018 Bozeman Stormwater Improvements to Omdahl Excavation and Utilities, Inc., Manhattan, MT, in the amount of $229,055.00. BACKGROUND: In 2014, the City Commission instructed Staff to proceed with the implementation of a Stormwater Division to manage public infrastructure, improve local waterway health, protect public safety, and comply with regulations. Since, Staff has constructed projects, implemented programs, and developed processes focused on achieving the City Commission’s goals. On January 30, 2018, the City Clerk opened four (4) BIDs for construction of the 2018 Bozeman Stormwater Improvements (Project). The Project includes installation of three (3) stormwater treatment units (units) located one-half block south of the following intersections: W. Mendenhall St. and N. 3rd Ave., W. Mendenhall St. and N. Grand Ave., and W. Mendenhall St. and N. Tracy Ave. Staff selected the locations because the roads, parking lots, yards, and driveways contained within their watersheds have a direct connection to Bozeman Creek, meaning no removal of stormwater pollutants currently occurs. Once constructed, the units will treat stormwater flowing from 160 urban acres, and collect approximately 30 tons of sediment, litter, and oil annually. Omdahl Excavation and Utilities, Inc. submitted the low BID of $229,055.00. City Public Works Staff reviewed the Contractor's BID and found that their itemized prices were reasonable and consistent with local supply costs. Staff has attached a copy of the certified Bid Tabulation. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the Commission. FISCAL EFFECTS: Staff will pay for the Project with Stormwater Enterprise Funds approved in the City’s FY18 Budget. Specifically, Capital Plan Projects STRM 42, STRM 45, and STRM 46. Attachments: BID Tabulation Notice of Award Project Overview Map Report compiled on February 14, 2018 25 26 NOTICE OF AWARD Dated:___________________ TO: Omdahl Excavation & Utilities, Inc. ADDRESS: 659 Morning Mist Rd. Manhattan, MT 59741 PROJECT: 2018 Bozeman Stormwater Improvements CONTRACT FOR: Installation of three (3) stormwater treatment units (units) located one-half block south of the following intersections: W. Mendenhall St. and N. 3rd Ave., W. Mendenhall St. and N. Grand Ave., and W. Mendenhall St. and N. Tracy Ave. The 2018 Bozeman Stormwater Improvements (Project) generally includes: 1. Traffic control 2. Excavating and uncovering existing storm mains within project extents 3. Adjusting existing utilities to accommodate work 4. Setting and connecting three (3) units to existing storm mains and manholes 5. Backfilling, compacting, and restoring disturbed areas 6. All related work incidental to construction You are notified that the City (Owner) has considered your Bid opened on January 30, 2018, for the above Contract. The Owner has determined that you are the apparent Successful Bidder and is awarding you the Contract for the Project. The price of your Contract is: Two Hundred Twenty-Nine Thousand, Fifty-Five Dollars ($229,055.00). Four (4) copies of each of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions within fifteen (15) days of the date of this Notice of Award, that is, by________________________________. You must deliver the following to the Owner before the aforementioned date: 1. Four (4) fully executed counterparts of the Agreement, including all Contract Documents and Drawings 2. Executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders and General Conditions 3. Certificates of Insurance as specified in the Supplementary Conditions (paragraphs SC-5.04 and SC-5.06) Failure to comply with these conditions within the time specified will entitle the Owner to consider your Bid abandoned, annul this Notice of Award, and declare your Bid Security forfeited. The Owner will return to you two fully signed counterpart of the Agreement with the Contract Documents attached within ten (10) days after you comply with these conditions. **End of Notice of Award Except for Signatures** CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: __________________________________ (CITY MANAGER) (CITY CLERK) DATE: ________________ 27 28