HomeMy WebLinkAbout02-12-18 City Commission Packet Materials - C5. Payment Agreement with Capstone for S. University DistrictCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Shawn Kohtz, Project Engineer Richard Hixson, City Engineer SUBJECT: Authorize City Manager to sign the Impact Fee Payment Agreement with Capstone Collegiate Communities LLC for South University District/Cattail Creek Drainage Basin Sanitary Sewer improvements to be installed in Lincoln Street, Willow Way, and South 14th Avenue. MEETING DATE: February 12, 2018 AGENDA ITEM TYPE: Consent Agenda RECOMMENDATION: Authorize City Manager to sign the Impact Fee Payment Agreement with Capstone Collegiate Communities LLC for South University District/Cattail Creek Drainage Basin Sanitary Sewer improvements to be installed in Lincoln Street, Willow Way, and South 14th Avenue. BACKGROUND: Attached is a copy (original to City Clerk) of the City of Bozeman Impact Fee Payment Agreement for improvements to trunk sewer in Lincoln Street, Willow Way, and South 14th Avenue. Engineering and Legal staff developed the proposed agreement in conjunction with the Developer, Capstone Collegiate Communities, LLC, who executed the agreement and returned it to the City for signature by the City Manager. Funds for improvements to the South University District/Cattail Creek Drainage Basin Sanitary Sewer are in the approved capital improvements program as wastewater impact fee project number WWIF27 in Fiscal Year 2018. Per the attached agreement, the Developer will construct and pay for the Developer’s portion of the improvements, and the remainder of the improvements to the trunk sewer will be paid from the wastewater impact 102 fee funds in WWIF27. The Developer will not be reimbursed until the project is complete. FISCAL EFFECTS: Defined in the approved Wastewater Impact Fee item WWIF27 in the Capital Improvements Program and in the attached agreement. ALTERNATIVES: As suggested by the City Commission. Attachments: City of Bozeman Impact Fee Payment Agreement Attachment A: Trunk Sewer Plan Attachment B: SUD Trunk Sewer Reimbursement Estimate 4/20/17 Attachment C: SUD Ph 2 Subdivision Revisions Plan Set Report compiled on: 2/1/18 103 104 105 106 107 108 Attachment B. South University District Trunk Sewer Reimbursement Estimate 4/20/2017 West Lincoln Street, Willow Way, and South 14th Avenue Capital Imprvement Plan project WWIF 27 Schedule 1B Impact Fee Share Item # Trunk Sewer (Lincoln, Willow Way and 14th ) unit Unit Price Qty Price Unit Price Qty Price Unit Price Qty Price 2001 Mobilization, Bonding, and Insurance lump $50,000 1 $50,000 $50,000 0.5 $25,000 $50,000 0.5 $25,000 2002 SWPPP Conditions, BMPs, and Aministration lump $15,000 1 $15,000 $15,000 0.5 $7,500 $15,000 0.5 $7,500 2003 G.C. Conditions lump $10,000 1 $10,000 $10,000 0.5 $5,000 $10,000 0.5 $5,000 2004 Construction Staking lump $4,000 1 $4,000 $4,000 0.5 $2,000 $4,000 0.5 $2,000 2005 Traffic Control lump $10,000 1 $10,000 $10,000 0.5 $5,000 $10,000 0.5 $5,000 2006 Dewatering lump $7,155 1 $7,155 $7,155 0.5 $3,578 $7,155 0.5 $3,578 2007 Bypass Pumping lump $20,000 1 $20,000 $20,000 0 $0 $20,000 1 $20,000 2101 Connection to Existing Sewer Main ea $1,500 1 $1,500 $1,500 1 $1,500 $1,500 0 $0 2102 10" Sewer Main - 14th Ave and Campus lf $45 1042 $46,890 $41 1042 $43,097 $4 1042 $3,793 2103 10" Sewer in Park lf $40 1298 $51,920 $36 1298 $47,195 $4 1298 $4,725 2104 10" Sewer Main Under Kagy lf $45 207 $9,315 $41 207 $8,562 $4 207 $753 2105 10" Sewer Main Willow Way lf $45 1349 $60,705 $41 1349 $55,795 $4 1349 $4,910 2106 Existing Utility Crossing ea $1,000 10 $10,000 $1,000 8 $8,000 $1,000 2 $2,000 2107 Existing Water Crossing ea $1,000 5 $5,000 $1,000 2 $2,000 $1,000 3 $3,000 2108 Existing Storm Sewer Crossing ea $1,000 5 $5,000 $1,000 5 $5,000 $1,000 0 $0 2109 Standard Manhole 5' Depth ea $2,250 14 $31,500 $2,250 14 $31,500 $2,250 0 $0 2110 Extra Manhole Depth - 48" Dia. lf $300 89 $26,700 $300 89 $26,700 $300 0 $0 2111 Remove and Disspose of Existing 48" Manholes in Lincoln ea $1,000 5 $5,000 $1,000 0 $0 $1,000 5 $5,000 2112 Remove and Disspose of Existing 10" AC Pipe in Lincoln lf $80 1153 $92,240 $80 0 $0 $80 1153 $92,240 2113 Connect to Existing Manhole - 15" Sewer Main ea $3,500 1 $3,500 $3,500 0 $0 $3,500 1 $3,500 2114 Reconnect Existing Sewer Main ea $2,500 4 $10,000 $2,500 0 $0 $2,500 4 $10,000 2115 Reconnect Existing Sewer Services ea $1,000 3 $3,000 $1,000 0 $0 $1,000 3 $3,000 2116 60" Manhole (Lincoln St. replacements) ea $3,500 5 $17,500 $3,500 0 $0 $3,500 5 $17,500 2117 Extra Manhole Depth - 60" Dia. lf $500 30 $15,000 $500 0 $0 $500 30 $15,000 2118 15" Sewer in Lincoln Street lf $50 1153 $57,650 $50 0 $0 $50 1153 $57,650 2119 Landscape Restoration and Seeding ls $10,000 1 $10,000 $10,000 1 $10,000 $10,000 0 $0 2120 12' wide Sewer Access Trail lf $20 1590 $31,800 $20 1590 $31,800 $20 0 $0 2121 4" Bollards (2 removeable) ea $1,000 6 $6,000 $1,000 6 $6,000 $1,000 0 $0 2201 Trench Flowable Fill in Kagy Blvd cy $100 240 $24,000 $100 240 $24,000 $100 0 $0 2202 Pavement Restoration - 4" lf $120 1359 $163,080 2202a Pavement Restoration - 4" (Kagy Blvd) $120 206 $24,720 2202b Pavement Restoration - 4" (Lincoln) $120 1153 $138,360 2203 Pavement Restoration - 3" (Willow Way) lf $70 1349 $94,430 $70 1349 $94,430 $70 0 $0 Construction Totals $897,885 $468,376 $429,509 Contingency (10%) lump $89,789 1 $89,789 $46,838 1 $46,838 $42,951 1 $42,951 Engineering Design lump $65,000 1 $65,000 $65,000 0.5 $32,500 $65,000 0.5 $32,500 Engineering Inspection, Testing and Certification lump $61,000 1 $61,000 $61,000 0.5 $30,500 $61,000 0.5 $30,500 Total Project Costs $1,113,674 $578,214 $535,460 10" upsize cost for new sewer is based on material prices of 3.00/ft for 8" SDR 35, and 6.64/ft for 10" SDR 35 from HD Supply. Total Cost Local Share 109 Attachment "C" 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151