REPORT TO: Honorable Mayor and City Commission
FROM: Shawn Kohtz, Project Engineer
Richard Hixson, City Engineer
SUBJECT: Authorize City Manager to sign the Impact Fee Payment Agreement with
Capstone Collegiate Communities LLC for South University
District/Cattail Creek Drainage Basin Sanitary Sewer improvements to be
installed in Lincoln Street, Willow Way, and South 14th
Avenue.
MEETING DATE: February 12, 2018
AGENDA ITEM TYPE: Consent Agenda
RECOMMENDATION: Authorize City Manager to sign the Impact Fee Payment Agreement
with Capstone Collegiate Communities LLC for South University
District/Cattail Creek Drainage Basin Sanitary Sewer improvements to be
installed in Lincoln Street, Willow Way, and South 14th
Avenue.
BACKGROUND: Attached is a copy (original to City Clerk) of the City of Bozeman Impact
Fee Payment Agreement for improvements to trunk sewer in Lincoln
Street, Willow Way, and South 14th
Avenue. Engineering and Legal staff
developed the proposed agreement in conjunction with the Developer,
Capstone Collegiate Communities, LLC, who executed the agreement and
returned it to the City for signature by the City Manager. Funds for
improvements to the South University District/Cattail Creek Drainage
Basin Sanitary Sewer are in the approved capital improvements program
as wastewater impact fee project number WWIF27 in Fiscal Year 2018.
Per the attached agreement, the Developer will construct and pay for the
Developer’s portion of the improvements, and the remainder of the
improvements to the trunk sewer will be paid from the wastewater impact
102
fee funds in WWIF27. The Developer will not be reimbursed until the
project is complete.
FISCAL EFFECTS: Defined in the approved Wastewater Impact Fee item WWIF27 in
the Capital Improvements Program and in the attached agreement.
ALTERNATIVES: As suggested by the City Commission.
Attachments: City of Bozeman Impact Fee Payment Agreement
Attachment A: Trunk Sewer Plan
Attachment B: SUD Trunk Sewer Reimbursement Estimate 4/20/17
Attachment C: SUD Ph 2 Subdivision Revisions Plan Set
Report compiled on: 2/1/18
103
104
105
106
107
108
Attachment B. South University District Trunk Sewer Reimbursement Estimate 4/20/2017
West Lincoln Street, Willow Way, and South 14th Avenue
Capital Imprvement Plan project WWIF 27
Schedule 1B Impact Fee Share
Item # Trunk Sewer (Lincoln, Willow Way and 14th ) unit Unit Price Qty Price Unit Price Qty Price Unit Price Qty Price
2001 Mobilization, Bonding, and Insurance lump $50,000 1 $50,000 $50,000 0.5 $25,000 $50,000 0.5 $25,000
2002 SWPPP Conditions, BMPs, and Aministration lump $15,000 1 $15,000 $15,000 0.5 $7,500 $15,000 0.5 $7,500
2003 G.C. Conditions lump $10,000 1 $10,000 $10,000 0.5 $5,000 $10,000 0.5 $5,000
2004 Construction Staking lump $4,000 1 $4,000 $4,000 0.5 $2,000 $4,000 0.5 $2,000
2005 Traffic Control lump $10,000 1 $10,000 $10,000 0.5 $5,000 $10,000 0.5 $5,000
2006 Dewatering lump $7,155 1 $7,155 $7,155 0.5 $3,578 $7,155 0.5 $3,578
2007 Bypass Pumping lump $20,000 1 $20,000 $20,000 0 $0 $20,000 1 $20,000
2101 Connection to Existing Sewer Main ea $1,500 1 $1,500 $1,500 1 $1,500 $1,500 0 $0
2102 10" Sewer Main - 14th Ave and Campus lf $45 1042 $46,890 $41 1042 $43,097 $4 1042 $3,793
2103 10" Sewer in Park lf $40 1298 $51,920 $36 1298 $47,195 $4 1298 $4,725
2104 10" Sewer Main Under Kagy lf $45 207 $9,315 $41 207 $8,562 $4 207 $753
2105 10" Sewer Main Willow Way lf $45 1349 $60,705 $41 1349 $55,795 $4 1349 $4,910
2106 Existing Utility Crossing ea $1,000 10 $10,000 $1,000 8 $8,000 $1,000 2 $2,000
2107 Existing Water Crossing ea $1,000 5 $5,000 $1,000 2 $2,000 $1,000 3 $3,000
2108 Existing Storm Sewer Crossing ea $1,000 5 $5,000 $1,000 5 $5,000 $1,000 0 $0
2109 Standard Manhole 5' Depth ea $2,250 14 $31,500 $2,250 14 $31,500 $2,250 0 $0
2110 Extra Manhole Depth - 48" Dia. lf $300 89 $26,700 $300 89 $26,700 $300 0 $0
2111 Remove and Disspose of Existing 48" Manholes in Lincoln ea $1,000 5 $5,000 $1,000 0 $0 $1,000 5 $5,000
2112 Remove and Disspose of Existing 10" AC Pipe in Lincoln lf $80 1153 $92,240 $80 0 $0 $80 1153 $92,240
2113 Connect to Existing Manhole - 15" Sewer Main ea $3,500 1 $3,500 $3,500 0 $0 $3,500 1 $3,500
2114 Reconnect Existing Sewer Main ea $2,500 4 $10,000 $2,500 0 $0 $2,500 4 $10,000
2115 Reconnect Existing Sewer Services ea $1,000 3 $3,000 $1,000 0 $0 $1,000 3 $3,000
2116 60" Manhole (Lincoln St. replacements) ea $3,500 5 $17,500 $3,500 0 $0 $3,500 5 $17,500
2117 Extra Manhole Depth - 60" Dia. lf $500 30 $15,000 $500 0 $0 $500 30 $15,000
2118 15" Sewer in Lincoln Street lf $50 1153 $57,650 $50 0 $0 $50 1153 $57,650
2119 Landscape Restoration and Seeding ls $10,000 1 $10,000 $10,000 1 $10,000 $10,000 0 $0
2120 12' wide Sewer Access Trail lf $20 1590 $31,800 $20 1590 $31,800 $20 0 $0
2121 4" Bollards (2 removeable) ea $1,000 6 $6,000 $1,000 6 $6,000 $1,000 0 $0
2201 Trench Flowable Fill in Kagy Blvd cy $100 240 $24,000 $100 240 $24,000 $100 0 $0
2202 Pavement Restoration - 4" lf $120 1359 $163,080
2202a Pavement Restoration - 4" (Kagy Blvd) $120 206 $24,720
2202b Pavement Restoration - 4" (Lincoln) $120 1153 $138,360
2203 Pavement Restoration - 3" (Willow Way) lf $70 1349 $94,430 $70 1349 $94,430 $70 0 $0
Construction Totals $897,885 $468,376 $429,509
Contingency (10%) lump $89,789 1 $89,789 $46,838 1 $46,838 $42,951 1 $42,951
Engineering Design lump $65,000 1 $65,000 $65,000 0.5 $32,500 $65,000 0.5 $32,500
Engineering Inspection, Testing and Certification lump $61,000 1 $61,000 $61,000 0.5 $30,500 $61,000 0.5 $30,500
Total Project Costs $1,113,674 $578,214 $535,460
10" upsize cost for new sewer is based on material prices of 3.00/ft for 8" SDR 35, and 6.64/ft for 10" SDR 35 from HD Supply.
Total Cost Local Share
109
Attachment "C"
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151