Loading...
HomeMy WebLinkAbout02-05-18 City Commission Packet Materials - C4. Westlake and Martinen 5th Ave Path EasementsCommission Memorandum REPORT TO: Mayor and City Commission FROM: David Fine, Economic Development Specialist SUBJECT: Authorize City Manager to sign Memorandum of Easement Agreement and Public Use Easements and Temporary Construction Easements with George E. Westlake and D.K. Martinen LLC for the 5th Avenue Multi-Use Path. MEETING DATE: Monday, February 5, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the easements and memorandum of easement agreement. BACKGROUND: The Midtown Action Plan and the Transportation Master Plan prescribe a mixed-use path in the 5th Ave. right-of-way from Oak St. to Tamarack St. While right-of-way exists for a local street section in this area, installation of a multi-use path requires additional right of way. Construction of the proposed path would occur in place of a standard sidewalk on the east side of the right-of-way. The new path would provide for safer multi-model connectivity adjacent to the N. 7th Ave. corridor, especially in the absence of a local street between Oak St. and Hemlock St. UNRESOLVED ISSUES: None. ALTERNATIVES: As determined by the City Commission. FISCAL EFFECTS: The cost of the easement is $10. Additionally, the City is required by the terms of the memorandum of easement agreement to cover maintenance costs for the path and to construct a wire fence adjacent to easement. The cost of constructing the path improvements would be included in a future Work Plan and Budget request for the Midtown Urban Renewal District. Report compiled on January 29, 2018. Attachments: Public Use Easement, Temporary Construction Easement, Public Use Easement, Temporary Construction Easement 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57