HomeMy WebLinkAbout07 - Traffic Impact Study - Knolls at Hillcrest East & Highland South MENGINEERING INC .
A Consulting Engineers and Land Surveyors
es
es
TRAFFIC IMPACT STUDY
i
FOR
THE KNOLLS AT HILLCREST EAST
& HIGHLAND SOUTH
JUL. 2 007 �.
DEPARTMENT OF PLANNING
AND COMMUNITY DEVELOPMENI
PREPARED FOR
BOZEMAN DEACONESS HEALTH SERVICES
(/0 PC ENGINEERING, LLC
3991 VALLEY COMMONS DRIVE,SUITE 200
BOZEMAN, MT 59718
MARCH 2O07
BOZ-06052.02
1300 North Transtech Way
Billings, Montana 59102
Phone 406.656.5255
Fax 406.656.0967
info@enginc.com
www.enginc.com
The Knolls at Hillcrest East& Highland South TIS
TABLE OF CONTENTS
Page
INTRODUCTION 1
SITE LOCATION AND DESCRIPTION 1
EXISTING CONDITIONS 5
Street Characteristics 5
Traffic Volumes 8
Intersection Capacity 11
TRIP GENERATION 12
TRIP DISTRIBUTION 16
TRAFFIC ASSIGNMENT 20
TRAFFIC IMPACTS 20
Traffic Volumes 20
Intersection Capacity 31
RECOMMENDED IMPROVEMENTS 34
Highland Boulevard& Painted Hills Road/Hillcrest Access 35
Highland Boulevard & Knolls Lane 35
Highland Boulevard & Kagy Boulevard 35
Kagy Boulevard& Mixed-Use Access 36
Kagy Boulevard& Bennett Drive 38
Kagy Boulevard& Painted Hills Road 38
Kagy Boulevard& Street"G" 39
Kagy Boulevard & South Church Avenue/Sourdough Road 39
Painted Hills Road 41
INTERSECTION ANALYSIS FOR FUTURE DEVELOPMENT 41
Highland Boulevard & Ellis Street 41
Highland Boulevard& Painted Hills Road/Hillcrest Access 42
Haggerty Lane & East Main Street 42
CONCLUSIONS 42
Appendix A—Traffic Volume Data
Appendix B—Capacity Calculations—Existing
Appendix C—Capacity Calculations—Existing+ The Knolls at Hillcrest West
Appendix D Internal Capture Worksheet
Appendix E—Capacity Calculations—Existing+ The Knolls at Hillcrest West+Ph 1
Appendix F—Capacity Calculations—Existing+The Knolls at Hillcrest West+Ph 1-2
Appendix G—Capacity Calculations—Existing+ The Knolls at Hillcrest West+Ph 1-3
Appendix H—Capacity Calculations—Existing+ The Knolls at Hillcrest West+Ph 1-4
Appendix I—Capacity Calculations—Existing+The Knolls at Hillcrest West+Ph 1-5
Appendix J—Capacity Calculations—Recommended Improvements
ENGINEERING, INC. ii
The Knolls at Hillcrest East& Highland South TIS
LIST OF FIGURES
Page
c-I
Figure 1. Site Location 2
Figure 2. Proposed Site Layout 4
Figure 3. Existing Peak Hour Volumes 9
Figure 4. Existing+The Knolls at Hillcrest West Peak Hour Volumes 10
Figure 5. Trip Distribution—Phases 1-3 Residential 17
Figure 6. Trip Distribution—Phases 4-5 Residential 18
Figure 7. Trip Distribution—Phase 2 Commercial 19
Figure 8. Traffic Assignment—Phase 1 21
Figure 9. Traffic Assignment—Phase 2 22
Figure 10. Traffic Assignment—Phase 3 23
Figure 11. Traffic Assignment—Phase 4 24
Figure 12. Traffic Assignment—Phase 5 25
Figure 13. Existing+ The Knolls at Hillcrest West+Phase 1 26
Figure 14. Existing+ The Knolls at Hillcrest West+Phase 1-2 27
Figure 15. Existing+The Knolls at Hillcrest West+Phase 1-3 28
Figure 16. Existing+The Knolls at Hillcrest West+Phase 1-4 29
Figure 17. Existing+The Knolls at Hillcrest West+Phase 1-5 30
Figure 18. Recommended Improvements—Highland Blvd & Kagy Blvd 37
Figure 19. Recommended Improvements—Kagy Blvd& Church/Sourdough Rd 40
LIST OF TABLES
Table 1. Land Use& Phasing Scheme 3
Table 2. Trip Generation, Mode & Classification 13
Table 3. Summary of Capacity Calculation Results (AM Peak Hour) 32
Table 4. Summary of Capacity Calculation Results (PM Peak Hour) 33
Table 5. Capacity Calculation Results—Recommended Improvements 38
ENGINEERING, INC. iii
TRAFFIC IMPACT STUDY
THE KNOLLS AT FIILLCREST EAST
& HIGHLAND SOUTH
The Knolls at Hillcrest East& Highland South TIS
INTRODUCTION
This traffic impact study summarizes the potential impacts of the proposed development
of The Knolls at Hillcrest East and Highland South. Both developments are included in
the adopted Sub-Area Plan prepared for Bozeman Deaconess Health Services. This study
shall be considered a supplemental study to the impact study performed for the entire
Sub-Area by Robert Peccia and Associates in July 2006. The Knolls at Hillcrest East and
Highland South developments would encompass approximately 217 acres of the total
485-acre development. Additional traffic impact studies will be required as other areas
within the overall Sub-Area develop.
The purpose of this study is to assess the impacts that these developments may have on
the surrounding transportation system, and to provide recommendations to mitigate any
impacts identified. The methodology and analysis procedures used in this study employ
the latest technology and nationally accepted standards in the area of site development
and transportation impact assessment. Recommendations made in this report are based
on professional judgment and these principals.
SITE LOCATION AND DESCRIPTION
The proposed developments would be made up of the southern and western portions of
Tract 3 of Certificate of Survey 2047, situated in Section 17, T. 2 S., R. 6 E. The site is
bordered by Kagy Boulevard on the south, New Hyalite View Subdivision and Highland
Boulevard on the west, and the remainder of Tract 3 of Certificate of Survey 2047 on the
north and east. The site location is illustrated in Figure 1.
Aside from a 6-acre mixed-use lot, the proposed developments would be entirely
residential. The proposed developments would build out over five phases as shown in
Table 1 and Figure 2. A conceptual plan for the 6-acre mixed-use lot includes 65,340 SF
of commercial space with 48 residential units. For the purpose of this study, it was
assumed that the commercial space would be made up of a 13,756 SF restaurant, a 4084
SF convenience store, and approximately 47,500 SF of general retail space.
ENGINEERING, INC. 1
The knuds at Hillcrest East& Highland South TIS
�_ a r � p.r o � y/�r. -tr+.Y' 14 �^ it'- (���.; .J. t•-I.��wn• �'r r - �i:v,t�y• �l?<•- i�•..AT-'r'• '-'+X' My"- -'' �' _ �0-�nr� J., ,.Z~i- ♦
(, � ,r' I r �. �[1,�-, r :jj' !ti:•''r � !k. ��'W.:+, •;�s�t:-'f 1 c`f 1:. •� •j",
/•' _ r i :'a 1_ i �i`� - „[A^ •11 pfi� FF__�..t •rr•.... 1 - s• ..,-�1f _ �.- _ i.' �r. .*.-. w'ly., _ y�,7'ai�"• S 3 �• `�
1' - C r![ f'•�i-- _ I ' ` i!� ,w. "�7 - ��•' 7-��� ''�`•t1{Mij`•1" ,, �� b `-' ~. s_Y�'.a!` "- r`1 _
I '"! f- •e {d �"a- i r b.; r�- r •;� .,�' r �Ir:. 1,�4•�w �i�7i •r+.'- _ 'f ••y�� �t }� ?r.� ` �-' "''�� ��,
jjj � .s t - .o-.....t - 'fV G 'S-- - � - _ Y��rr=3_ta(:°� �• �, ? .'�'i.• �)� > _ :.3�
,,
t , - o- ,p _ �. __ �• �,�,pTn. _�-' 1�'_- �..R •�•l r• 'r p �- 7�s •e.. �:�, r ♦-
r+Y"•'�:Lj 1' 'Y':` �,T�t'l+ ''b`: r, I� t _+• ri :J ''•/yy�.�• !f.. •�5. - ♦ :> \ ..�, ^ S.'. Y� - •`I1'-• •.
.7 •„ tY. � •L 1,,aY� _� �\ r% � / / . —';�.�F •��� - ^L.. .�. �«-�' lf.L.- ��.� �,• Y
' ':•� rr: _ •'�' .tr,r�i:• �.�i.r. 1 _ ,e{ei�.. --- -.;i-- ��• +R' '�"�'ai• � t�t ti �'�ti -- - jir�_ �"l �.'' ..:A�, - :�` _c`� :.�
•ft W - y:: — c..�i.,.. .j .IIr`` i'_'�, s .N� 'r ra '�•;'PZ`\. `' - _`^+`+5•w? �. G,G'• '�•w� 'Ys/ _
Rsy' `1e {(( •YI F• iJ tL. '.L..r _ u1r i .L� rr: _~•LYC ! r.71.., - (ry. ��� N Cf '1.r. - ��•_ _ ?+J: mot.. - r •F - .� t•v• Fl•-'.
�� +• (( it' f+> fh• "af 5�'�" .3 .4 '` -l.;'C't '; (' - r.i� - e•• v. R'.A: _�" � - :?/�]q. �_�•.�
-.r C *C - Y•r 1-rJ ''T'�. l--•� � � ,+. t'R-:..' n. :) IT" .. .1- t'r Via+. cy. :..'+C, __� s �
F 'b F: R `t%+'� r+!• r. y��.i 'R4 ✓ - - \,,,.,-r�, '•rG7' _.'•v.. `�+ �t"-- ,.`.�..'t�,}
a.`• Ff- fr, - � 1 ut'' '.raw _ .le•� 1.� f .rr � `� '� �'1n.a :Gz Vr• s"t.. '�.ti 7i� - r
ti .N• (. tW �: ♦fit: Tr: r ;-f '.; f + ,a. . . \ � - +� 'P7� -
tt',c I� F t { � '1 ;,,� � "' r.. _�. •i �", r 4:, i� �:.,.� �jl .. '� Imo,_ - _ - - �•Z:/r+� .r. i-S+ti�.
I'` f Y� !. r• j`~ N' _ v �;;�� '�' ,�`',-; �•! �y�:tf. 0 - \�IA �wr - __ } •�:i:. �>_..-.. .,^'cam �.
'-jc i- �'' .��s '�. ' !!� '�' x''�,:r r �•• r,._ u��r � '.r �rr?.i' �-"'mac � ..� �+>r f t � ��� �` •4\`� -_ i i �•�� �'- _(_ !�i�c'-w �=c'
.�a ! X� C•. _w �'�• {: y w � .h i= d �,, 1' ,R�MIF
i
� F �•r. � �.'• t; P' '' ^� ?;•;. 'w Rey., Y.,. ' - - >�.T.'. � /�.AJ-i IJ _ \ D _ �, ;;.'/Pali _ -� '-r, •• t:-�`" •
.• .� (�: .,• ,.a i' 'C+► � IF _ A TI�t6� -c...y' t 1�� + �., _ r ,�_ •�.�_- � _`; y�, .
- FLUg SIRE :
R- 1 i/ - '' i y 1:. i .jf •► a" ,r,; }ss.' �/iv"^i'1,/� ,Se ��+g' i _ _ - _ `�+�':.,-.i y� v �<e ,�: �?_. • .,f � .;.. al'
,Z n air ..' �, _ d• � bra .:}]^_.� 'r. - -'��W.�, _ >.K - .r .atr -
'f' Y1. - - -fr,� • t •��J,f' .!:,. •(:.. �', 'r„� } ,L3� _M ..�C j+�` '4t r �-',;, "Ii'drttS, '�
• `r ,.t � 7 �. � •�• ''1 wir f � . '.1 r• =�tY'.:r +�,' `f? - - _�, y ._L.,. •rr'. 'I� i: '' T. Y�•;,�'-• w•_'�J. O.._e� _ �� - ,�• _ - _
' � L - c`R �i. �. _ '� 'S-' i:l � f •y'f •:)��� ]`�-,"t ��• �, �►i ,,:� c:,"!,��I_Y :� y ��, �.. C� -..j.AI. + ', '� � -�"
_ :.`' ,��3 t• tr P. t� '_,"a'.. Tr '':i. .� •�' A- .-1 `j.'•�'r -SZ�" .,�; a •'�.. •�:Ok, -'�. .;• F,.y�=,
..•.,.. Iry,_�,• �' - t .7 �': a ,t a.-G _. -`� r r,Pr,�•.. .:-4'. F. �1 � ati ^y f' '�� r/�%�` -r ,� �` � ''t,/• .Z�-. ,p � r';;r� �-�, _ •i; •S• C��L/�
-�I "* ..•-��� 'Lt �� �' ..A hF _• � � ,� ��r � ,S�js, ;��. +- ��' �'_5,-,� � �'� \TL.M J` R'• _.t; �.
!rr.r-^FF�' r.-(�- ..i `' .r R1= .'+ •+r j�.�. •, .�,r- f.�s, ,111''' .,'� ' - Y�G'� - y .�-�i }- 1.�+` a.. -SITEt' '4
e �1�I .il �I , R• 77�. `�-u�r(,, y- ; ' 'k�� .v,
_Kc.f'�l ,h •. _ .G •. r ai $r t- i.1c,��i '-S !t }
Ct' rR.lG' r!•. t.', +� '''.c-.- - - 'r,-,.rn:,"-,y'.. '7_ '� :st. _ _ -.J!
;1- LOCATION
I {. ��^�. r.�it-+ ' � y- - C ♦ � �S.i q `�r tr- - 'W'kx�;,,,. � �c, �� r '� i �j �' -�• �.�w 1 .� •f��r
:rit�1. - �1 f'_" t �c ,L: '� r_ ,� �. ': Y. �i'[ �:/ r ru.•fcr,{ 4 �/ i� � %' / j/ i � �_ �k:•: ,
�i�� ., r'�i-z _ �' r r Est mac. /' /� /.�� ./� r� 3—�-'�`r '}-,:. .:i� ♦, �t t
�7'�`�ri�� s+ •+.F��Yi 1!� � �j: . � ,�
tk.!"ts � r kr � .; �. +•L� :.r,; w .fi,•:�,5� t •y�. ': _ ,/ i�ME IA
- _�' .♦ - `` 't '' ti� '+ iJj3� «A .�J iz't!! `+� .,ei » r i� �/ % .>r �1 h u y, f_ tcc
• n-_� i /7 1` o'•r. ... .,t� ��!._f� �a {JJ ,es K.. e.r:�,� - i / - _ r'. 4wft
• '�H_LI •1 :. - l ''' _ iw'•=f.w4y'f'Y' -re"�.`T'•?a' �e / / Z�i�-�• -
ire
- . � k" •a+ ..-y .�,. �' ee� -- .cif". �Y' - j /' /' �.� Q:£ .'�- �' j-_-_ � /fb+ t�
.-na s-'i�-.• - :". �ti �%°�`'r y?=`F� t. ��rti•�,,, �l��C'!. C, _ r�,•-".�3,� .. '��q,, r�' �� •�' ,r, � , / � �..�-• _' m __ .- - - a►.i.. s,:�
i• "e r: w t. rc��r y _I .- �4•. o �f1.� r• / / �'r.{• - �� _ .. p {1 �� ra, fn. V•� _
_ �� �` � �'s`•��"1'''i. �>E: - � ri-e• "tia�-' <�.. ;{. -,uM'•/• .�� '/ // _/ yam_ - 1 .-rr._ -_ _. rt __ ! i"—..r.. ''t-
f b �K J
�I
p'�' _ -;^ri s: -e/"A � �• :ter J } •V,:+�,`.¢•.r j. :.i l� r. _�/- _— _ r.�r _ ,�
1t� p �� ".� r !�i �, _ � ".o, j'' ,; .u,{: •fit. �. .r .,,
-I � 'M. / try _t•�','.
f
s: .fir"•' ... _ � � .� /
•- ►• _ J. -._ �]r• 'o �_ - ,:/ / �Vic., ;�:' .r
/:Ti
l+ � - - - .. - .'�,-.t.�- ��.�:�' 4.�:: .r.: r.. <�- .�� \ ,•�J. �.a.11 '� r ,�'T'�,��-_•' � /"' /r r �' �_�� �� '••�_-. 1.,. _ _ - It_
Y. ,� ` - - :-inai ' �\� ' .•1.'r'a .41y:,. , >! - ••;;'„ , ` kt r KAGY"BLVD
1 ' lJ��ls � ` �tJ+t .'�;" s.+ �;, t; ! '- t�,,M, �Q 'fir�� r,�- �� _ Z � '�`�_ ,�•. � s ���
Lai
ts
FIGURE 1 : SITE LOCATION
The Knolls at Hillcrest East& Highland South TIS
Table 1. Land Use and Phasing Scheme
Neighborhood Phase Land Use
Highland South 1 85 Single-Family Lots
12 Condominiums/Townhouses
126 Single-Family Lots
6 Condominiums/Townhouses
2 30 Apartments
6-acre Mixed-Use Lot with
48 Condominiums/Townhouses and
65,340 SF Commercial
3 53 Single-Family Lots
6 Condominiums/Townhouses
The Knolls at Hillcrest East 4 72 Single-Family Lots
5 36 Single-Family Lots
The land use types and number of units currently being proposed were compared to those
assumed for the Sub-Area TIS. Other than the addition of the proposed apartment
building, the overall number of dwelling units assumed for Highland South has decreased
from 295 units to 288 units. Assumed land use and square footage for the commercial
developments on the mixed-use lot are consistent with the assumptions of the Sub-Area
TIS. The Knolls at Hillcrest East is currently proposed to include 108 single-family lots,
while the Sub-Area TIS assumed 110 single-family lots and a Bed & Breakfast/Motel.
This change in land-use and reduction in number of dwelling units would result in a
minor reduction in the number of trips generated by this development. Overall, it can be
assumed that these developments would generate traffic on the same order of magnitude
as the calculations performed for the Sub-Area TIS.
As shown in Figure 2, access to both developments would be provided via the proposed
extension of Painted Hills Road. The new segment of Painted Hills Road would run from
the existing intersection of Kagy Boulevard and Painted Hills Road to the existing
intersection of Highland Boulevard and the main access to the Hillcrest Retirement
Center. This new segment of Painted Hills Road would essentially act as a neighborhood
collector for both Highland South and The Knolls at Hillcrest East. Secondary access to
Highland South would be provided to Kagy Boulevard via Bennett Drive and Street "G".
Secondary access to The Knolls at Hillcrest East would be provided to Highland
Boulevard via Knolls Lane.
ENGINEERING, INC. 3
The'.wolls at Hillcrest East& Highland South TIS
THE KNOLLS AT
•
, t : ' HILLCREST EAST
y"I'�' ylj• ,� .C. <'t • f u S Fr. 'f i •� rC t �•''••
•tr � «r"' - kr +tt � _ f y�=>��,Yti�ri�Jp/.�.:��P;yrr�Y7•.�. i �.-- •J s.��.. z � : ••° '^. - �
I _'` ~ .k'�t! rr ti_. A' •+ ``i` 7---1- -_--- •'( —_ -) ////% ` � rT t-a�•t•� • fT. t
r ••� t' �1•�•/,.' y�• �\ PHAS
ti t _ _ r+� I
_ q���•f �a .� t �NL'k�'�."�. -� �
.�":. !�1 tr - ^+• -_s._ � iQd*-"`.ZS L+Jt4£ j ! ►' � � - y•.�� �,i '= .FX
PHASE �,.r PHA
-
'r��, �. _ H I G H LA N D
li'7 l�- ! � � ( � - S, .� '..wr�r I .r i I��r- r.�.....-_•�l'•_ I .- _ ,. �•`
' t t1,mow. # ! ` I 'i �' � .l N' - ^r.y } •1 � • SOUTH ,:
� '_! _-_l➢$ 11f�E1�1Er-�_j' A 1 IY• �v.r'�• �r ♦ T C �F --J� �r -' �'� �V ♦/✓ �\ y.: Q
rJ • 1.1 -.ti.� --_;���,��� _ •,� I _ e J� \'.�Y_•� .�• •�-•i f.. . '). -' .l•t
f,`_ = -., J7. �- !',._. ,•..-. !► Rom(_, �r1Rt�.yy�a•• - _•'. r „�.,t�l
,`��•J._ •] .. -?r y.� _ _ a. Per 1' .. 1+�C�! wJ�• .L;,•� yt ♦ T R �r-� .l_• i y�
.�%�p'y d'~V� !' t• .. -` ,���a^r•-.r_f..,f^.,�- �l i��� •,.y,+7• �',�' •r+-�f �. - � :I' _ �,.ir'' �'�!;� ���7�: t �/• �� ` •_� ` - . ��'y ..�Y i.. --..
'00
�1 tr:•i 31. 'l�"ti t.�''s T � _ _--�...-•--• •f►-+--y.s.e..a_-+.•K.r• �l '�, • - Y i- .c" �. •'- -
ASE
4�1 - { r r •ter 1 ytL +' R y� :#
Lt i :Ar�"j F - "'• 1_v \
r � _ . �' ---�. '� � '� a'•. 3_�y,�Z =-s..•,. .� I ��=tom '•�
•�f .�.,, � •t .•,1. � r Ir I S� r •{7� r-1 �r' 1T _ _ F!
(� Y`- �. T � 1 •.-fib. -�' • _ - '� j ! :r
10
��, _y !• !� •� �'i��1 � . C •'r•_`i+'" _ � i r � •r' - y~ter •�" S�• 1 '� yr•1� r {+'yJJ j♦�; � i� 'r' � _v✓�
-'Ir `�%�.-II.I.}J ,i ri•. '�.1� > r. fill
',-- '[, + '••� � 'i} "r _ •Yt• -"�' , r }-�y7/ .` _ ,L \ - -_ •L •
o.
V-J.
l ,. �Q{ ^•� _ 1�„• rr� - �+�, .`•- r 4•t; �5� i+ i�" ;�. 1 ">(F _ 7
i11�• l •1�.• yw _ r _ ,<r _••' Tf14
"�', �y�" ` .e ('l_ Y. •�i .r. Ord,• f�•_ i f \ �►k '-.-�•il�,
f.;.r�'' J��,�•�... � - 1,.� r. py��_�f�l� !I'f I�t��` ;-•!'�••'1 �'1 -�t �)-� 1 ^,-y,�•. ••:�� -� � I :/l.:T� -
Tw
=S. �d - _,+lr• t�►'' .�'! _� V rt►Ain ir: v -4• d�. ►4 p ♦,� i /\ tr a �'
�+�1';�t�t�i• -� i T + _ Mf l .F !.it !` Y • i f• r '� �rJ �'�yr }' �' x s �i
' - J,{ L r • + 4 � '�_� ' _ � 1. r fir' � F tl Y
ti= 7t r` i i; %' �h; �. t_• ': J
-��t� Y� � .�\' tt` �" +r•'A •� - •rt.�• J • _ i;• f:•-_ - f - • �_!:` j- _ � =��, /, .._ •.• �F `�� � �S , - .1•� •�_:';
.f� � 1 'i � to�. .•�'r.''� _ t.�.•t �.{ 1 r'�1 t �L�t ;� •A�S �• _�t. / / •_ � - \`• ' 'j��• _ �_ .{)
'�• � .L��iA � f�. �'z. � t. � �� . � r"" c=�g- �' �". ;�.�, J/`�'a-f �<'-- s. rr�•�.J, :Y •: 9 r•` .y�►1r]
.Y. •� \-f ` r • _ •f.'�^ t •�,r� tr •• t/r- / 'F t• _ >� _ 1�` '1 •r3 Zr a-• ✓ ••r.� '-!--a
y.�. ,y,; _, '�- t t - :fv: z. ,• { IT:; : �• : . , '; �� HASE �u PHASE •. ... �x :,
p ., i ,1• •v : - �: Alt y�_� Y /! i .fir '• r J'F,� tr •� u
( 'i�1• .�. ���.�� l`//Il.s"^�•'�i.�� 'L J� '1 -'- --` 1-j r � �.� rr,• cy.' � �I i�� +� ��C, __ �-!r+'• M►.
+c♦. r, 1 ! .'`! `% .•�. .cqf •t'fA ff �, ^7r "i' C .J•- C N I 1 ] ( Y • \\\\
.r~ y - f•7• wIW
i1�• -r': I'y f.�.'. •. _�i-- RLaL7X___ +_^,- _ :"tpnD-G
f+ .1 •li.a• ;' '{.�, '� �ti^� f .K .1, 1� _ ► -•�..� �- _ `?.j - .1�;1 i L G C) - ''� '* ,. ,\�
r PHASE 2
MiXED—USE. °
t. �i.1lYrF��y([• L. k ~ ..r+ - - _ -_r...�•�.,' am-• --^',!'A h... •~_ -
SOURDO` K RIa), - �•< { - _
l KAGY 8t. _
� W` ,_ e��tN�rTT FIVE - 1
t � tat
' st �� _' •�-r .-- -;PA)N7ED_ H(Lt S_ROAD
FIGURE 2: PROPOSED SITE LAYOUT
ENGINEERING, INC. 4
The Knolls at Hillcrest East& Highland South TIS
Access to the 6-acre mixed-use lot would be located off of Kagy Boulevard. Although it
has not yet been determined, for the purpose of this study, it was assumed that a single
access would be provided to this lot. No internal connections between this lot and the
residential phases of the two developments would be provided. Therefore, all trips to and
from the mixed-use lot would be external trips accessing the site via Kagy Boulevard.
Just east of the proposed access to the mixed-use lot on Kagy Boulevard, an additional
access would be provided to a parking lot to be used for park access. This particular
access was not analyzed as part of this study because ITE Trip Generation data shows
that parks generate very few trips during the AM and PM peak hours on the adjacent
street.
EXISTING CONDITIONS
STREET CHARACTERISTICS
The development of The Knolls at Hillcrest East and Highland South subdivisions could
directly impact the streets adjacent to the site. More specifically, the proposed
development could affect the operations of the following intersections:
■ Highland Boulevard & East Main Street
■ Highland Boulevard & Ellis Street
■ Highland Boulevard & Painted Hills Road/Hillcrest Retirement Center
■ Highland Boulevard &Knolls Lane
■ Highland Boulevard & Kagy Boulevard
■ Haggerty Lane &East Main Street
■ Haggerty Lane &Bozeman Trail Road
■ Kagy Boulevard & Bozeman Trail Road
■ Kagy Boulevard& Bennett Drive
■ Kagy Boulevard& Painted Hills Drive
■ Kagy Boulevard& South Church Avenue/Sourdough Road
These intersections will all be analyzed as part of this study, consistent with the study
area requirements of the City of Bozeman Unified Development Ordinance (January,
2004).
ENGINEERING, INC. 5
The Knolls at Hillcrest East&Highland South TIS
Highland Boulevard is a north-south, two-lane roadway that provides access from East
Main Street to its terminus just south of Kagy Boulevard. It is classified as an MDT
Urban Route (U-1215) and, more specifically, as an urban minor arterial in Bozeman's
functional classification system. South of its intersection with Kagy Boulevard, it is
classified as a local street. Highland Boulevard is approximately 28 feet wide with
dedicated left-turn bays at key intersections (Ellis Street, hospital accesses, etc.) and a
separated 10-foot wide bike/pedestrian path that runs along the west side of the road from
Kagy Boulevard to East Main Street. Data collected by Robert Peccia and Associates as
part of the Sub-Area TIS indicated existing traffic volumes of approximately 7200
average daily traffic (ADT) on Highland Boulevard. Data from the Sub-Area TIS also
showed that 85th percentile speeds were approximately 37 mph in both directions,
compared to the posted speed limit of 35 mph. The intersection of Highland Boulevard
and Kagy Boulevard is currently two-way stop-controlled with the right-of-way assigned
to the Kagy Boulevard approaches.
As recommended in the TIS performed for The Knolls at Hillcrest West (located directly
across Highland Boulevard from The Knolls at Hillcrest East), the signalized intersection
of Highland Boulevard and East Main Street is currently being redesigned to include a
northbound left-turn lane. As an interim improvement to the intersection of Highland
Boulevard and Ellis Street, the eastbound approach will be reconstructed to prohibit the
eastbound left and through movements. The existing access to the Hillcrest retirement
facility will be reconstructed to provide an eastbound dedicated left-turn lane for exiting
vehicles and northbound dedicated left-turn lane for entering vehicles. A northbound
left-turn lane will also be constructed at the intersection of Highland Boulevard and
Knolls Lane. All of these improvements are expected to be constructed during the 2007
construction season and were therefore included in this analysis.
East Main Street is classified as an MDT Primary Route (P-50) and a principal arterial in
Bozeman's functional classification network. It provides direct access from I-90 to
downtown Bozeman via the East Bozeman Interchange. At its intersections with
Highland Boulevard and Haggerty Lane, East Main Street is four lanes wide with
dedicated left-turn lanes and parking on both sides of the street. The intersection of East
ENGINEERING, INC. 6
The Knolls at Hillcrest East& Highland South TIS
Main Street and Haggerty Lane is currently two-way stop controlled with a stop sign
located on the northbound Haggerty Lane approach.
Haggerty Lane is a two-lane roadway that provides access from Bozeman Trail Road to
East Main Street. It is classified as a minor arterial in Bozeman's functional
classification system. Haggerty Lane is approximately 28 feet wide and carries 2300
ADT just south of East Main Street and 1650 ADT just south of Ellis Street. As
discussed in the Sub-Area TIS, 85th percentile speeds on Haggerty Lane south of Ellis
Street were recorded at 55 mph (northbound) and 52 mph (southbound). These speeds
are much higher than the posted speed limits of 25 mph and 35 mph, respectively.
Bozeman Trail Road is a two-lane roadway that provides access from Kagy Boulevard to
Haggerty Lane. It is classified as a minor arterial in Bozeman's functional classification
system. Data collected as part of the Sub-Area TIS indicated traffic volumes of
approximately 880 ADT just north of Kagy Boulevard. Speed data showed 85th
percentile speeds of approximately 47 mph (northbound) and 38 mph (southbound),
compared to the posted speed limit of 40 mph. The intersection of Kagy Boulevard and
Bozeman Trail Road is currently two-way stop-controlled with the right-of-way assigned
to the Kagy Boulevard approaches.
Kagy Boulevard is classified as a principal arterial in Bozeman's functional classification
system. It provides access from Bozeman Trail Road to South 19th Avenue and runs
along the southern boundary of the Montana State University campus. West of its
intersection with Highland Boulevard, Kagy Boulevard consists of a two-lane roadway
separated by a landscaped median with dedicated left-turn bays at major intersections.
East of Highland Boulevard, it is a two-lane rural roadway with a pavement width of
approximately 24 feet. Traffic volume data collected for the Sub-Area TIS indicated
volumes of approximately 7400 ADT and 2700 ADT west and east of Highland
Boulevard, respectively. This data also showed 85th percentile speeds of approximately
40 mph west of Highland Boulevard and 45 mph east of Highland Boulevard, compared
to the posted speed limit of 35 mph.
ENGINEERING, INC. 7
The Knolls at Hillcrest East& Highland South TIS
South Church Avenue is classified as a collector in Bozeman's functional classification
system. It is a two-lane roadway that provides access from Kagy Boulevard to East Main
Street. Sourdough Road is classified as a minor arterial and provides access from Kagy
Boulevard to several residential neighborhoods to the south. The intersection of Kagy
Boulevard and South Church Avenue/Sourdough Road is currently two-way stop-
controlled with right-of-way assigned to the Kagy Boulevard approaches.
TRAFFIC VOLUMES
Existing peak hour traffic volumes for the study area intersections were obtained from the
Sub-Area TIS performed by Robert Peccia and Associates. All counts were conducted
during February and March of 2006. According to the Sub-Area TIS, raw count data was
adjusted for seasonal variation in accordance with count data from MDT's annual count
station located on US Highway 191 near Four Corners (Station A-106). Peak hour
turning volumes at the intersection of Kagy Boulevard and Bennett Drive were estimated
using ITE trip generation data for the 15 single-family lots on Bennett Drive and count
data at the nearby intersection of Kagy Boulevard and Painted Hills Road. Figure 3
summarizes the AM and PM peak hour turning volumes for existing conditions and
traffic count data obtained from the Sub-Area TIS is included in Appendix A.
Prior to or during the same timeframe for development of The Knolls at Hillcrest East
and Highland South, it is expected that The Knolls at Hillcrest West would also build out.
This subdivision, also part of the Bozeman Deaconess Sub-Area Plan, is located directly
across Highland Boulevard from The Knolls at Hillcrest East. A separate TIS for this
specific development was performed by Robert Peccia and Associates in May 2006.
Because it is expected to build out within the same timeframe, traffic generated by The
Knolls at Hillcrest West must also be considered in this analysis. Figure 4 summarizes
the AM and PM peak hour turning volumes for existing conditions combined with traffic
generated by The Knolls at Hillcrest West. The traffic assignment figures from The
Knolls at Hillcrest West TIS are also included in Appendix A.
ENGINEERING, INC. 8
The nnolls at Hilltrest East& Highland South TIS
F. Ir r',• '' i. i '�J_ jrr :i; YiC. Y jjv�. t S �j
' t•• r,-r �r !1 -i,nt. .f.r �� ����. `_�'�<,1: :�- .yi •/' ....•-.i.. ,_� .c' 'r' �. `1..aw.. �.� `L• r � u•``.`^:�,;- i;-
_
w '� --•- ,•� i r :ro �� � s!7 ft -- .��. at'yt•i� K.r',£t�':;d J, �Y "yi,M� � t � �,-�,:K ^ +�,+a - _
r _" _ .J r� f J ^'r f —{ r.•-� t -°� ,,ii�� r__ as i K �sOt ,� 'r`-� '+'- ti'���f.. '� t, H�' "b� r. Ts-
'� („�,Y r - 4. 'e ���t. (�'� i"h�r11',. .L,`5: (r �'�� ��':�S'��JT ,r•L�J�,r �a�— y' ;ritt-s;`7C�"'a '�:�`?�r•-
+__ - . r.-ram• "p.''� 'rt' �' J-. "t' '� t. ,{' �'f�t!'a, r - '`:. - _ I�+.. �* � F• .cam',
s��'��'G. f t x;r•...sr r G f. � L - 'ry_ r.�- � y,. {, •:t .e •� I � _ f- ±�. 't.'....�' .i a .�. ./_,.
Q. ,.. � � ',F 'i�. �r. 7 ..l .l�ii'�� (?1�1 _ i � �t��� !1c�•H1 ry.� � :f, C,f"• 'I. ` '.tt .{,�{t 1 r.4�t:,;�r�\, � .-�`�l :,a. _ .��,;.� �•_.at '�y.���._
.+ - ram: \�X:` t •e ,+ `fy - "� '!�r... - f •� '�-..•. `;'' _ S� .uu_ '� i�y" _�'� �r,7" .�.�
"'" pr ♦• f A 'l-/t- nS ,� _ :h.. Y_ _.�'w •1,• 4 A,�.� ..4 '_1T, � -\ .. ., - k =:,A "k'.:'"F� ;\,:• � �: �� .� �'�
M,t �, a -� r. •.v M r , ''r' r,,. � �-�'• t �`� � �Jc. ,7. ,� __ 'y�'e"ty�"4- `a�=--4." r `a � =`.
-¢ ��•_ r h t: rr , e .. �: h/• _ '^' '/, - .y. .#.. �. ''"6,' �• -�`•Z r• -r.. �.: ' t;,t ..r. .ys -.�.... +' :S�v.
r° •� . .;7, !g/a t 1
� t� .T•!• ��•4 �..." 1 � -r, h• '�5-.-. � =r.:'�'� .�,. �-ram. �=�^-'�--""r-- - ^`y"
`��'�' t. Fz•. 'f - af_ s: ��. �• :�y / o 'c .�a t � j' 1 -,r� E
i= •`' t`i .1�Y. -rS i� g- !r/ 11 � �-- ,.,�. .'� ,tr,__�•�� C; ,.4, .dG� - ,�. ^r
Y• • v a .atY` .� •:f_ .. 'Nc !3 g r i J
T� _ '� r �.� �, >, '.� w. � N,Yy �r f!r•T, ..r !?erg?off \>► t t \ � �. ..\� `•°'•^ `', `�-�- r�., ia,r _� T-l ,� s_."•.-, � �i
17
.1, Jr• tK _r •nw.�r_ ��1 �if t tr- .lt ,rdct �f ."ao �► �'.,,� -.t- � "�, ��_ .\ �' �;Y °'i° ], �
,•�:' r ,'T i '`� �q ,IP'f_ y�`X'; !j7w Y � a - :.4
_ rtrt .r•.:.' - - J _ 77•'^
�f r ,S R� •s � 'g ��� �) ,:� .r.:l. _ � :�... + t � ��,r �Irl .,•' :- ;1:L� .- ./!•,. - - '`'d'�• wW- � _ •f� '�+' _ :..�"
:.r r- ,r s. w � .i ' +r,
- g
: =I p ( t .� �;a. t 1 a 2+� adri.,r�r 'r�ti 7 /1 noy�
` a J- r Yj ri, - :�F y r-.,a 7. - S.� 1[' 1:: og �/ l.+.n _ _ _ _,.r.• S,.t - $ r .. _ - j' - I • _
c t t: - .•`M. P r _ .Y 'r % 7 •it rS".. rr - '?j ? C'3 t - ,7 "•-�. - -,
-..' - '� - t `y 1 jib• ,• rgraZr —
a
90
.._ - .Y•r. '/r �..r ,y^ r.'r•�,�<"t. f- 'L'+« � ! 03)f3<0) C< _ _ � C .'.e.•7�..' .t - 7• - L r•
r:4 ` �- to r73 s- i .T '..`� ��.• rxkle'�• �''° t� �..r�,9„ -'R. t ,3y# �'t-L� -_� n
r- K• '; f f 1"�.�5.1'f• - 1 --_ __ :• _ (' (15)(345)pb) ---
2.. J . 1'jt• �' C _ A f d 104 380 SB - •�'YV r.. « y� _
¢a •r ,.� k •r K. �-,.•,� � _ 3- � `�y J >. F• �-•-,tom,,,= ter- - ,.
^t�. Ii c�it r ;s R% v,` 27)a �1� / JI I w;Z.fie R'_ r -•e n -n
r••r. !'�•':.r �•R.i �•. '� •r1' ,t •;r• - 1 I l,.' --1 C ♦ �
ey . .yt ; (66)s ,_ ti.. Z• �;,>r. zs
�, 19(55) 't ,•
(5)0 t • ' l �7y� i/ s , �r /--
r ?t '�F-•. - ic�FdM 'R F .f _,ti.', _ S' ii Y�O� '\ C` •• ` i (3)
4 4 7
r / R ♦ Mom` 39(26)
r +8 0 1-' .r s: 'µ ! C � ua• t7 � f. � � (16) 301 i. 112
E;r.o-1r_,'y'',t '• , . t>_tt((�+S }c� E:, 1T�'Jom .L.tt y�!Ti-�ra r..r f tyj3.. •,f�' f ; t-so�:- R-,xr • 't• . ) 1 - , gjf�asl
y ()
oAl4Tff )' 142 s3 — Bs)
1 y (53)1� (3)z 1
S
h
-
{2B1 ) 'A
F J" :{ E ��t+ • f Ll
74-�' A ' ,iy•? \Y .��c' a j"t tll�Clr��- -✓� ,_ r"j .r.jt. � - {R= "rw� .- - - " r21) (1)
f161 19)l2e
, Y' -X •�� /., .l {- .7{�d'. t -� + V_„ ��-'. _-�: +L' t •t�. 31 D - 7
4� - i` \Al.• It_ o, c.�. `s.+s-J} •-�
.rl a.� - _ r x - Y4:y O IC ♦ w i
•' a
1 /' , � fi 16B)ti661 t25) '�♦ - Y . r :-�. 304 1 7 {E
!�- _ i /S f s/ 0• J 30 30 9 r r n 1 �- r^h JI Iy I` LLJ (20))l, •` 13(9)
S - +C ,�_•� 1 L t' ,f-.1 _ t L ♦ i N 133 0)
a -� S'� y r • I[ ♦ /ui =d � � (24e)zsa �� 14(191 „- cn 1�
xx�
p,r
� 1. • 1-t.-, L' r �• (2s)21 1B(19) -�. ` _ (i'3)7s �•1 E� 2BB(Bs) t-i,_1 1� ��Y��?• y •.
—- Y o�..: D �— o(o)
�r r.• .f— [ . ,,r (384)2B0 F—sos(3ao) �j �'
10 (Bs)zs 24(so) 4
` a .. �. K (1) {)
,r\ '• W o) 1 (o) f 1:- 1 ��
. -
63 (25) -� ...r.� -l. y: . P - ♦� y ,�+�
��..•II _;. � �'. ..`.Y �f E! S•✓.• !.1 �N !� .4_ I I•a•• ^... r:/ _t" ti ~•�. �', t" �• _ rL 1 _
Iry
. ��",:"� r _r ..� ,Y!'� 1 _7 Z.t !�i: rt •° l."^, r ((y\\ '•,_J^vb�''f yam • �• r - ----U• f� 1- T � - - �•� •^ Y�<
- �, t ^t' t -��;rw '.s�,•r�.3 j );•� ;r5"a°{Y., `� ! SSI..'� i y f p -f f �'f, •- KAGV BLVD < '.,�.� r '1
w ` ( _ Z A IL',.•� .�'r.; !' �.. L.1
r? f r
<F —
�� 034)54- ! `• �)• �'� 1B S(6(p)2)
(9)3 0
FIGURE 3: EXISTING PEAK HOUR VOLUMES P X= MPEAKHOURVOLUME
(6) (0) (X) =PM PEAK HOUR VOLUME
ENGINEERING, m .. 9
The miolls at Hillcrest East& Highland South TIS_
E �v
F:r 41 W__r
,,0
7.
VIA-
A"
VON`
.f0e, 4-1- R". �; ,P� �! � s 'w. ;, 0,4_1-7'
�A'
104 284 59
(34)19 0
(81)28
19 55)
4(2, 74
0 _S4 je-- 1 (37)
315 39(26)
12(2)
(18)(429) 0,53
ie. 1 2 9 39
(53)17 2(3)
142)53 191 1051
t r
�71 I
" w 55
(6)14 (7)
28)
(16)22
74
W yk
"I"! :or,
16) (9)01
-Fi�if. 7 •L•
4..
�2 2)
r pt.
-7—
W
7 !7
(68)(66)(25)30
1319 L
217)12 13,,(62)
c[o
(7�1
1292)273 14(19)
(173)75
(25)21 1 a(19) 285(89)
(1)0 o(0)
428)307 550(371)
09)29 oe— 24(60)
CIO
+_h
>
101 54
Lj
>
< (471 I'll
v
Ar
7.
r
ozf-mpj
KAGY BLVD
5,1 185 185(B
X
b
-4. 16)
1 1, 14 . ry Orr = It (0)
e-
y 2w
1.
X=AM PEAK HOUR VOLUME
•
FIGURE 4.w EXISTING + THE KNOLLS AT HILLCREST WEST M =PM PEAK HOUR VOLUME
PEAK HOUR VOLUMES
'10
The Knolls at Hillcrest East& Highland South TIS
INTERSECTION CAPACITY
Unsignalized intersection capacity calculations were performed for the study area
intersections using Highway Capacity Software (HCS+), which is based on the
procedures contained in Chapter 17 of the 2000 Highway Capacity Manual (HCM2000).
The HCM2000 defines level-of-service (LOS) as "a quality measure describing
operational conditions within a traffic stream, generally in terms of such service measures
as speed and travel time, freedom to maneuver, traffic interruptions and comfort and
convenience." LOS is described using letter designations from A to F, with A being the
most favorable operating condition and F being the worst.
Capacity calculations for the signalized intersection of Highland Boulevard and East
Main Street were performed using SIG/Cinema, which is also based on the procedures
contained in Chapter 17 of the 2000 Highway Capacity Manual (HCM2000). As
previously discussed, the intersection of Highland Boulevard and East Main Street is
currently being redesigned to include a dedicated left-turn lane on the northbound
approach. This improvement will be made regardless of the development of The Knolls
at Hillcrest East and Highland South. Therefore, capacity calculations performed for
existing conditions were evaluated with the northbound left-turn lane, instead of the
existing single-lane approach.
The results of the capacity calculations performed for existing conditions are summarized
in Table 3 (page 32) and Table 4 (page 33) for the AM and PM peak hours, respectively.
These results show that under existing conditions, capacity issues are present at the
following intersections:
■ Highland Boulevard &Kagy Boulevard
■ Haggerty Boulevard & East Main Street
■ Kagy Boulevard & South Church Avenue/Sourdough Road
In particular, the northbound approach to the intersection of Highland Boulevard and
Kagy Boulevard currently operates at LOS F during the AM peak hour and the
northbound approach to the intersection of Haggerty Boulevard and East Main Street
ENGINEERING, INC. 11
The Knolls at Hillcrest East& Highland South TIS
currently operates at LOS E during the PM peak hour. The southbound approach to the
intersection of Kagy Boulevard and South Church Avenue/Sourdough Road currently
operates at LOS D during AM peak hour and LOS F during the PM peak hour, while the
northbound approach currently operates at LOS F during both peak hours. Results also
show that the addition of traffic generated by The Knolls at Hillcrest West would result in
increases in delay at the intersections along the Highland Corridor and at the intersection
of Kagy Boulevard and South Church Avenue/Sourdough Road. Detailed capacity
calculation results are included in Appendix B for existing conditions and Appendix C
for the combination of existing traffic and traffic generated by The Knolls at Hillcrest
West.
TRIP GENERATION
An accurate estimate of site-generated traffic must be made in order to analyze the
impacts of a new development. This study utilized Trip Generation, 7`h Edition,
published by the Institute of Transportation Engineers (ITE), the most widely accepted
source for determining trip generation rates. One-way vehicular trips generated by the
proposed development were estimated using the following ITE land uses:
■ ITE Land Use No. 210 (Single-Family Detached Housing)
■ ITE Land Use No. 230 (Residential Condominium/Townhouse)
■ ITE Land Use No. 220 (Apartment)
■ ITE Land Use No. 820 (Shopping Center)
■ ITE Land Use No. 932 (High-Turnover Sit-Down Restaurant)
■ ITE Land Use No. 835 (Convenience Market with Gasoline Pumps)
Table 2 summarizes the trip generation rates and calculations for all five phases of
proposed development.
ITE trip generation data provides an estimate of the total number of trips that would be
generated by the proposed subdivisions. However, in order to estimate the net number of
new external trips made by personal vehicles, adjustments should be made to account for
internal capture trips, pass-by trips, and trips made by alternate modes.
ENGINEERING, INC. 12
The Knolls at Hillcrest East& Highland South TIS
Table 2. Trip Generation,Mode&Classification
Average 1A'eAA n AM pe mk Ilmrr PIN4 Peak(lour
Phase land C:,t lntmsity total rater exit total enter exit total enter exit
1 SnOt Family F,,,tadiFA Housing(1) 95.0 995 449 447 69 17 52 93 59 34
Internal Capture** 00/1 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 98 49 49 8 2 6 10 6 4
Pass-by Trips*** 00/. 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 40 20 20 3 1 2 4 3 1
New External Personal Vehicle 757 379 378 1 58 14 44 79 50 29
Residential Catdominiurn/Townhouse(2) 12.0 106 53 53 9 2 7 11 7 4
Internal Capture** 0% 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 12 6 6 1 0 1 1 1 0
Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 5 2 3 0 0 0 1 0 1
New External Personal Vehicle 89 45 44 8 2 6 9 6 3
Pharr I Total 1001 501 500 78 19 59 loll 66 38
Total Internal Cylxare 0 0 0 0 0 G 0 0 0
Totatlnter-Zonal Trips 110 SS SS 9 2 II 7 4
'rota)Pnev-In Trigs 0 0 0 0 0 0 0
1WnlAltesnnlsmiulu{R-xtcrnnll 45 2-1 73 3 1 2 3
Total No.1Sxrrrunl Persrmal Vehicle F46 424 411- 66 16 50 a8 56 svL
2 :Single-Family Detached Housing(1) 126.0 1296 643 643 98 25 73 132 83 49
Internal Capture** 0% 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 141 71 70 11 3 8 15 9 6
Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 57 29 28 4 1 3 6 4 2
New External Personal Vehicle 1088 1 543 545 83 21 62 111 70 41
Residential Condominium/Townhouse(2) 6.0 59 30 29 5 1 4 6 4 2
Internal Capture** 0% 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 6 3 3 1 0 1 1 0 1
Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 3 1 2 0 0 0 0 0 0
New External Personal Vehicle 50 26 24 4 1 3 5 4 1
.Apartment(3) 30.0 202 101 101 15 3 12 19 12 7
Internal Capture** 0% 0 0 0 0 0 0 0 0 0
1.
� Inter-Zonal Trips** 11% 22 11 11 2 0 2 2 1 1
o Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 9 5 4 1 0 1 1 1 0
New External Personal Vehicle 171 85 86 12 3 9 16 10 6
Mixod-Use Cmdornirnkm✓Townhouse(2) 48.0 344 172 172 29 5 24 33 22 11
Internal Capture** 18% 62 31 31 5 1 4 6 4 2
Inter-Zonal Trips** 0% 0 0 0 0 0 0 0 0 0
Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 14 7 7 1 0 1 1 1 0
New External Personal Vehicle 269 134 134 23 4 19 26 17 9
Shopping Center(4) 47.5 2040 1020 1020 49 30 19 179 85 93
Internal Capture** 38% 775 399 397 19 11 8 68 32 36
Inter-Zonal Trips** 10% 204 102 102 5 3 2 18 9 9
Pass-by Trips*** 17 11, 180 90 90 4 3 1 16 7 9
Alternate Mode(External) 5% 44 22 22 1 1 0 4 2 2
New External Personal Vehicle 837 419 419 20 12 8 72 35 37
High-Tumover(Sit-Down)Restaurant(5) 13.756 1749 875 874 158 82 76 150 92 58
Internal Capture** 41% 717 359 359 65 34 31 62 38 24
Inter-Zonal Trips** 9% 157 79 78 14 7 7 14 8 6
Pass-by Trips*** 21% 184 92 92 17 9 8 16 10 6
Altem ate Mode(External) 5% 35 17 18 3 2 1 3 2 1
New External Personal Vehicle 656 328 328 59 30 29 55 34 21
Convenience Market w/Gasoline Pumps(6) 4.084 3453 1727 1726 196 93 93 249 124 124
Internal Capture** 27% 932 466 466 50 25 25 67 33 34
Inter-Zonal Trips** 10% 345 173 172 19 9 10 25 12 13
Pass-by Trips*** 31% 675 337 339 36 18 18 48 24 24
Alternate Mode(External) 5% 75 38 37 4 2 2 5 3 2
New External Personal Vehicle 1426 713 713 77 39 38 103 52 51
Phase 2 TOuI 9789 4396 4393 511 234 —77 733 400 33$
TOW Inttsnal Capture ?474 1213 1211 134 70 m 107 103 94
Total lntet-ZannlTrilts 87-5 439 436 52 22 :tJ 75 39 36'
'rntat Pate-by Tripe My 519 52E) 57 X, _7 80 41 J9
Total Mneroate Mode(Externah 3 112 111 13 6 7 19 12 7
Total N"ps[smd Pe-veinal Vohiele 42-lk I 2il3 ?115 255 1 10t+ 149 361 205 157
ENGINEERING, INC. 13
The Knolls at Hillcrest East&Highland South TIS
Table 2. Trip Generation,Mode&Classification(continued)
Ave a Weal v AP1 P,sk Hour ISM Penh Hoar
f lit Land owe intensity total J enter eml total enter exit total cuter exit
' 'Single-Family Detached Housing(1) 53.0 580 290 290 47 12 35 61 38 23
Internal Capture** 0% 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 64 32 32 5 1 4 7 4 3
Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 26 13 13 2 1 1 3 2 1
New External Personal Vehicle 490 245 245 40 10 30 51 32 19
Residential Condominium/Townhouse(2) 6.0 59 30 29 5 1 4 6 4 2
Internal Capture** 0% 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips" 11% 6 3 3 1 0 1 1 0 1
Pass-by Trips*** 0% 0 0 0 0 D 0 0 0 0
Alternate Mode(External) 5% 3 1 2 0 0 0 0 0 0
New External Personal Vehicle 1 50 26 24 4 1 3 5 4 1
Phase 3 Total 639 320 319 52 13 39 6; 42 25
Torn!Internal Capture 0 0 0 0 0 0 0 0 0
Total Inter-Zonal Trips 70 35 35 6 1 5 8 4 4
'fatal Patwln Toils Cl 0 0 0 ^ 0 0 0 0
ToLA Alugmatr.Mode(Exti-ruA 29 14 15 _ 1 1 3 2 1
Total Aiew rxtumal P.rmnal Vebir3e 540 ^.71 269 44 11 33 56 3b
4 Single Family Detached Homing(1) 72.0 769 385 394 60 15 45 8o 50 30
Internal Capture** 090 D 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 85 42 43 7 2 5 9 6 3
Pass-by Trips*"* 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 34 17 17 3 1 2 4 2 2
New External Personal Vehicle 650 326 324 50 12 38 67 42 25
a 5 Single-Family Detached Housing(1) 36.0 406 203 203 35 9 26 43 27 16
Internal Capture** 00/. 0 0 0 0 0 0 0 0 0
Inter-Zonal Trips** 11% 45 22 23 4 1 3 5 3 2
Pass-by Trips*** 0% 0 0 0 0 0 0 0 0 0
Alternate Mode(External) 5% 18 9 9 2 0 2 2 1 1
New External Personal Vehicle 343 172 171 29 B 21 36 23 13
TOW.All phlwes llvltil 5Fo.)5 5199 _136 290 446 1Ci77 58`• '1
Taal lux anal Capuwt 42424 1213 1211 134 70 64 197 1(.!,;
Totallnia-Zonal 1185 593 592 75 28 So 1(6 59 t"
Total Poor-In Triln 1039 519 5:30 57 ;u) 27 8o 41 30
Total Ahetnate Mode(Extexnnp 349 174 1115 23 9 14 33 2G 13
TotalNe-EcWtud Perenoal Vettick !kT, 1 3306 33DI 444 153 291 6C9 362 24;
(1)Single-Family Detached Housing-ITE Land Use 210* Units=Dwelling Units
Average Weekday: Ln(T)-0.92LnOQ+2.71 (50%entering,50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: T=0.70(X)+9.43 (25%entering,75%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Ln(T)--0.90Ln(X)+0.53 (63%entering,37%exiting)
(2)Residential Condominium/Townhouse-ITE Land Use 230* Units=Dwelling Units
Average Weekday: L k(T)-0.85LnQQ+2.55 (50%entering,50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: La(T}_-0.BOLn(X)+0.26 (17%entering,83%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Lu(T)=0.821.n(X)+0.32 (67%entering,33%exiting)
(3)Apartment-TTE Land Use 220* Units=Dwelling Units
Average Weekday: Average Rate=6.72 (50%entering,50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=0.51 (20%entering,80%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=0.62 (650/,entering,35%exiting)
(4)Shopping Center-ITE Land Use 620* Units=1000 Sq.Feet Gross Leasable Area
Average Weekday: Average Rate=42.94 (50%entering,50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=1.03 (61%entering,39%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=3.75 (48%entering,52%exiting)
(5)Higb-Turnover(Sit-Down)Restaurant-ITE Land Use 932* Units=1000 Sq.Feet Gross Floor Area
Average Weekday: Average Rate=127.15 (50%entering,50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=1152 (52%entering,49%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=10.92 (61%entering,39%exiting)
(6)Convenience Market w/Gasoline Pumps-ITE Land Use 853* Units=1000 Sq.Feet Gross Floor Area
Average Weekday: Average Rate=845.60 (50%entering 50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=45 58 (50%entering,50%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=60.61 (50010 entering,50%exiting)
*Trip Generation,7th Edititiotn,Institute of Transportation Engineers,2003
*"See Appendix D for Internal Capture and Inter-Zonal Calculation Worksheet
***Trip Generation Handbook,Second Edition,Institute of Transportation Engineers,June 2004(reduced by 50%due to low existing volumes)
ENGINEERING, INC. 14
The Knolls at Hillcrest East& Highland South TIS
Internal capture trips are those that are made from one on-site development to another
using internal roadways. Developments like the 6-acre mixed-use lot often have a fairly
high number of internal trips made between the various on-site commercial
developments. For this study, the internal capture trips were estimated using the
methodology outlined in Chapter 7 of the ITE Trip Generation Handbook, 2"d Edition.
The resulting internal capture rates are included in Table 2 and the worksheet used to
calculate these percentages is included in Appendix D.
Even though an internal connection would not be provided between the residential and
commercial areas, it is still expected that they would generate a high level of inter-zonal
trip capture. The inter-zonal trips were calculated using the standard methodology for
estimating internal capture trips, as discussed above. Although the calculations are very
similar, the inter-zonal trips were calculated independently from the internal capture trips
because the inter-zonal trips would need to be assigned to the external roadways and the
internal capture trips would not. The resulting inter-zonal rates are included in Table 2
and the worksheets used to calculate the percentages are included in Appendix D.
Pass-by trips are trips made to a development as a secondary destination, but the primary
trip path is on the adjacent street system. Commercial developments often generate a
significant amount of pass-by trips. As shown in Table 2, pass-by rates were estimated
for each of the proposed commercial land uses using data summarized in the ITE Trip
Generation Handbook, 2nd Edition. The pass-by rates obtained from the ITE Trip
Generation Handbook were reduced by 50% to account for relatively low existing
volumes on Kagy Boulevard adjacent to the site. As with standard practice, it was
assumed that the residential portions of the development would not generate any pass-by
trips.
Typically, it is also important to estimate the number of trips that would be made by
alternate modes of travel (pedestrian, bicycle, and transit). These trips would not involve
external vehicles accessing the site. The proposed development would incorporate an
extensive trail system that would provide multiple connections to existing trails and an
on-site connection between the residential and commercial developments. In addition,
ENGINEERING, INC. 15
The Knolls at Hillcrest East& Highland South TIS
there are several existing Streamline bus stops in the area (timed stop at the Bozeman
Deaconess Hospital and flag stops at the intersections of Highland Boulevard and South
Cedarview Drive and Kagy Boulevard and Sourdough Road), as well as several proposed
future stops within these developments. Therefore, it was assumed that approximately
5% of the total trips generated by The Knolls at Hillcrest East and Highland South would
be made by alternate modes.
Table 2 shows the breakdown of each of the trip types expected to be generated by the
five phases of development of The Knolls at Hillcrest East and Highland South. As
shown by the results, it is estimated that the proposed developments would generate
approximately 6600 new external personal vehicle trips during the average weekday.
Approximately 444 (153 entering and 291 exiting) of those trips would be generated
during the AM peak hour and 609 (362 entering and 247 exiting) would be generated
during the PM peak hour.
TRIP DISTRIBUTION
Trip distribution is an estimate of site-generated trip origin and destination locations,
which can be determined by several methods from computerized travel demand models to
simple inspection of existing traffic volumes. For this study, separate trip distributions
were assumed for the residential portions of Phases 1-3 and Phases 4-5. In general, the
trip distributions at the site accesses for the residential developments were based on the
distribution of existing traffic volumes at the existing residential accesses on Kagy
Boulevard (for Phases 1-3) and Highland Boulevard (for Phases 4-5). The resulting trip
distributions for the residential phases are included in Figures 5 and 6.
The trip distribution for the commercial portion of the mixed-use lot was based on the
location of the proposed development relative to nearby residential developments, as well
as other similar commercial developments. In general, the distribution was based on the
locations of existing dwelling units within a one mile radius of the proposed mixed-use
lot. The resulting trip distribution for the commercial portion of the mixed-use lot is
shown in Figure 7.
ENGINEERING, INC. 16
The Knons at Hillcrest East& Highland South TIS
_ _ �� rr} '7- �..e_ �7 y�,j ` i' ' J� -,[zt. .3 •� i. �y�!,. -7l:' _ -, •171 - _ -
..ri. t..:.u•r l r _ .}S'� Yr• /•- Yr "`p :ti •w ''yy 6r• ',A .••'+Y �" L 3 :-.,t :;•� i-- " e v.r:•" 'rt•" r: �?S'r1: s.c.-
1<'•I'(- j'i' .hr 'l' rr '; �1 ;;p �, " ��• .. ` t� 'iy`�. _� t- ..,>- -7' - �,c. ^ - . fit rt=• Lyp_ n
u Oux; a r i ►K s'Fr'•j a 1,.S6f.'� '1 •:a- -�"e'
-.i� .;j :ic __�-• -gym rrt ) * _ r{.• .�'TFI ~ I ,,.t'r-i' e •f 7.�. H <... Jr,• -'•9' - ..S r,
� :V!• � 'XY� i �. - _ �` ' 'd -C.' tj��Y-Y �,+'' .�r:� ��J,� •�a� r,, i 4 � -�.:� -�. �;�-y`r, it -
vs� �f' s - r f i 'j j{Jg..hf.• -^w •s tit
.�vYY Y'- l ;` y� t{� .lp•'w T -+• „A - •v - Y' ''�{ Y • �
' F
•7!'r•'• •r. ��- ' � '• L � — _ ,� s ,$•+A- _ Jf .I,.+.y. r � �� /� 1... N. z p--•P`��.=.��. �
f�r � I r � .1.• r "•!. �' - -v: .r. `..r'I ���� � �r.«r _ ..:,\ ..�„ �.1� � .�. s. w. -:< • b �i _�_�:
'� � � t• ..J F:iY /•- ._� �i �'y��'i,', r '!s �•. 1>0!- _ •I _, ar•. E`. r ,l 1�,1,,,..• � --_'- -
..t h .�'.-.� t '\ � L - S7 �- .7 �}•t ,6..: J •� R�.
.w �• .F C .�. wr•; i ,i rt, !`�� rt. ._�.�. � _ \'M'-9is"•'�•d .yN�. --r --�•i� tip•-�'' C__.�_i• ,4� _
� .S I FS R' •7 i- t -•r•.... -<:' Y i�' g !'•7. `/4. ►. :cf (( .. „� >�' ,l. it c.. -..�'y?�".T'•{ =t, _
Mr,
e F� i ♦ 1 f �.:t. :M:•1 '�• l�:1. .r Mi>r�'► �•�v� .��_. _�• I - \ l Y - .�� r :., ♦/ :;4' -T `). -:.`.'ij•_•- 2 G4;r•Sti_ - v�y1a y-!
� -�` r~ d S;` l3yyj, i � J • � zM1• (,'� iI s ♦: �. Ir 1C..-.. f ' � �T i., f! _-.•-.Fa� ft _ .1��y�._�.?. \.. .��''! 'r,-e'.,rq~ .L q,.. _r - 1:�,,p��
•t, 1': _ ./' r• ;�J N' •' '1:.1' � - ,t. y :fS1• � •`• '�6 r 1 - _ I t^S') - �Y ��� _ _y. - ..iit-,"". ar w'+T� r•—•Ri � F"
c�. T ;.t'' at'a♦� A`. Sa•.r-'Y �� - F^• �!' ^„r• N a .� ' ♦ �, � � `��:,.
-� � .� r R. o „� �: t r, >'fl• Y �• s :e ,�'i; '+.�� r�:y� f�'' '�F �c iGs; � ti .� ��'�` \ � i �' � � "'� _
1t n- ''.4+ = i $ ��, .� '} k $+•r':j dI :♦ h•'.l:. wi�,.>I.
i,-r $--• �:L' � \ � t - __ _ - - ``� ��ry' -S
�.! •I f •!: v : •1 (' t $ i,f 5--1. !.. ! k tp w "
r� r .•," i' r; ta y iida'� - �Ilt is l r � \` j -
�' '`:_ '}' y'• a „ '�� 9 tt! , - •-.t- ��� R� „ `,,;;,.,.� A. .! f•At ti'e>r•:!e. - - �•�.._\ •*� I^- J �. - - _ 'ems_ •r . -
.} � / � �•� a� �:f' �.,. P. .�. ,ds S%. 4- ..Ism.. •a. � .�• •' � .. 1 ` - - D ..�'44 - _ tj•1_ =Y� ►• �.�.A
J f _ ores 1 STREET
-
:1>� �, �= n•` �: 3' � �
p. �. � ' ?- � �• � t: ri ,. '�' i�� - 1 ELL_. :..,,., _ _ __ rr �. �s• , ;.
I •:k' � '� T' ^� r, �� '`� �r� �` :.- 1 ;.� o� [y:s- i�'a� "��:� -�, j.=�"a-. ' , _ - �y - �4'. •Ise - `�s'L �
G. 7� �,- -.��, T:r i� �_�� t v _ ��' •S �p _ ..L,v.••�-'S . . - - •r,. '.�`,�/y -.n.S�Y! �• �"�`.1 ^t. _ - `�
{':i r 1 '�. � 'i.� it 71 ! �.. �i w�G ��. r, r•�. Y _� ,' _ ..7 ;��,•r' - f ,� :� r �.��_ � - --�f r.. � - \.'i1,t - 0
r--a B rr ? f7 f� �4�r X It •r:• �a/7/ �•+ ir- C yr..
Lo
Igo
:��..7t.ta • •.i/ M•. 3 � ��,A%, F-.�'�..� ; - �� - •!' _ -j 'V � / -r.Y � it .��. - -t �,. � ��`�. ''' i _
•w ,} - 'i •.I - .a �z �., „/,•. /a 3�i 1 _�"..- x � -rCC:.• i - - � �� - 1_�... i�;-a ��. t
y.,3a - ..l;=k t•�• . 1 9 .i. ;tY x7 y %7.'�f �.0 �y,i! `,j:� +_ c 'G 2:: - �'e._ '. ,l�.r,- - r•.
,,..w — ,w- -s •• �� r •�„ •fit`• •It. .�' •• t � � - ,�Q.. z7"Alg
1 -r-'ter � - ►�hU �: r, •6. r�� r .;i�I �'' `p� _• .r��' ••i .j� L't- d� • q�'..
LAN
jr
icl ,,r K !' �•d '� k t• �-' ,;�. .t ! Sy'I� �' t� - i• 'i+ �.�f� �( �'C t' `�``W. - .;� ;• � sy.- _ { ,' - '�
-1 - ((♦••.� .,, it i' i•f 'i. S_]. -fl[(. -�` _ __ ��/' i. I~ - '; t
�rVa{iy►- let '�i •� �'- ,i1=.K ) 'yi�...�.r}.2 _ _ -
t"`Y. , tie1 .j• }.. -ry f ijf7 .;e: !' . �• •--•-a - - 1- -'h.'��;'r., ,~' - '�3 - t r -
.I�'� �� •' .1 • ,My w ;Ft. it•F. ,�,(�_ E• f - 1: - - ': i ,j�-.. +' !t,• - {t -
i�� ��. I_"��'t�•i•�,i�� � :* ;'%i_ f �• f_ r� �JdC: :�. Y fit". �.r� �„',-y-''�Y.' _ .� ��. �. - _ .1 -',k. �7•{'aK,y f �. �.�.' ,.�. •t'Y- F�=, f �
\,����. - �, •I� � r� � .�t�.r., ,Ii ��dr,`•� t? -t (It _ -SKC.fMB�?` - ` ''t��:er", 'F` ±� � "�2"�'• _
. . , ,,; 7 •t,' :� tra .�, ti+"�',.•. ,v,! � • ��a lP •-� In'�StEs_y f� I ,,: - - - n: � .r,+� , _ .Sl�r
eY['.i-.;Y3�•� C (�.•7�'•! •r,,,'� �C F'1 ,r: t � •Y,U'. r., i'' -1, r-� � ~•• 4 .�t� .e�- _
; -
�: ,_ 's..,, - ..' •� �/ '.O[ .;rj' r:, �C- .,t ,:,- � i �\ ,a tii- -rr - 'i'- F •'T. - •'1 >' ��'
• _ 'rii !i// e i_ c _f1�-=- /J -j ,r v. .,ar.��u .�iA... "� y. 'z� 'ti'r; -
'r,. --- 4' ,\ � -,17: •LL�l• "t .p..Lt.:i' -�. T�n�'r�.r'G'� -_ _ _ r - ..''•S- ��'�` d.. .f`" .�:wi '��. tr, - - '� - _
' •'W - F., ,. -- y :`� y� - ..►, 'Y :♦
�'-� - _ �� :`_ +� ✓' .:•P •,¢�, -r-eY_ r; ^"r_• T I `. -I• II�+} ��.•"y.,'' � n e•�J� "-+a ,l' �'
i([,,`��a.�n�-r �'r'r �1 i �• Y -'�"'. .rli,- � E f , �f� { ..!!r` �•�: iS 1' 'ry i "�f i! ;`
,f.t"rsr' s�. .��- '. �,;;� • 1Srs- G �ryw;•a .�-� j•.�••.' -� e� `\�'. _ l ;�- .sue:— �_ '.'. .,�`,. •'.[v` ,#f: .� � � 1�,�1 4l': r
�cr,~- •lN.r.J -1 a •` X y.'f••'!. _' .\ ra>� Y E 'y a' R t •.�.,. - a • r'f..�' - ..
Ni
���w 2 � •--^'sue ,f- (�Q►w/r - ,�{'r � • '� ;,''n c'S: r `fir,'+�,p�ry'�`- - �::� '"�.��'` _ d-•� i.r:,� � ,• i
'N�. 7\ � ` # 7i;'^'•t �17, •�'� � �..r.,�' .\�. f. G_.�..� _pK K� s Qp� ire <� r J�• t.-�. � ~� ,f.,�>. t���,^ �• i
]
O�4
AW.;; rifA!/,• xi• •T'a' .'tat: - `�' / I - 1 � r• - _.•r' _ u�.....
-sQ' •r, �..f J �. •t•i. .-< T j-�W y f •r• - r �_ �N 7 ,_ ,! �� IO�7-1� _ 'tip ~
�'- [.'ems ..s..F r• � 5�'.. .�t ?;t •r_ r..'`"L. ss .•.-. ! ► ( _ �- �.n ,r'•
O`
f +Y �r',! � /w1r �� / \• l --' �. ,', G- •,,C r? - -,�- .•'' - KAGY-BLVQ _c w"-�• L __ �Za
4111
Ln
L i+l t,l ;:i � �,', �,,� a r.. -�1 r c-• - •"s r .4_t � <+,- •'' �Q � ��t. 1� L -t' -� �.
BOWL
FIGURE 5: TRIP DISTRIBUTION - PHASES 1 -3 RESIDENTIAL
ENGINEERING, INC. 17
The Knurrs at Hillcrest East& Highland South TIS
'i �- .•l S�r 1 7� }.'�',�•�,�!i' r� r � rs�� �;`s .:•. +y. J ri �7t'�. ,.�- ...,,�_ •,R - _ - - - - �vf•,yr:.y� � s _ r �. -z� -
it
r' �� 1� , 3 r 7 r + .A• i� t__ ,��^ - '� ,� .,�t�'- 'a `r'Sy'y� : s!e f r
,I. t.I l� .v r� _ ( :�L: _J f'' ->•' ='��� ^i '/� n' t - �.-�..'- � ���9 �'^.•� i .�i. y'ia•�.1• .. :n ` --1
Ir r
HE
L���� '(•Z. � ��. -s ♦ a� �..' _r;� P _': •y�?•rr �•• 7C' ,,.,c �•r_„c :7r / �{I ,�.� a
a -�yi.- , uj-: •�:'t --fit'- � - - x _ •a.
p.'1• :� � 1.��;;i�., �r .A T •,•. .. .Y�ii' - ��,�' _ j�> s. �,�! •-f'�';€~ v-
•:'l. ,,..,' �•,� 1`. - r- z,
2._').,•�� ..t��f1
P F L �: k - ♦ -'r"' yq a �J. - -rt'�,.•1'S'��..� �Y.y".•-'rid R ^vC- Y �:�_�',- ._i
:..�.�r. � .r r� +, l 1 rf r- tl�): �• - YY d•' r.•ik.- -�` �,. .� - n - .p /._ ' i' _ ._.'_',+." F-�•-�!?�� � a��'-"'
y .c' 1'X• T• ,�• � Y:' •�rii. I. r.. ,1'.- -`�. '�� -�� �_ - _ f '.'ir`.`.v.''cTti
'�i ;f' { 'r. i' - !�^ -•! I .s t'_ r .�:' _ �� ,:� :�> _r. A`,t•• r •;.�� `+'-�.•.�a,." .L y:. .sr _ - .�
Tj• .a y.^fir a. � -7• %a /S' i" � �.J, ^ t'c'�A:'• w4{t �'j'.`i hal' - :..mod..- L�_ � y 'A•;-'�.-.. - X - _ �,a-'- t - {_�f �; L '.��' F ♦ 1r{- nt wr � '�''�� w � xw •'t� t J- t �_ ?' - �„6 ..yR _ ♦'M: 'r
?f' ,r•Ir r r:_ !� (' f.- }r1_i !F �' »r: - t.. ,C� - .�, i r�`•?^ --!S. I
.=1• r ..t � �� 1'' � �! swc-- •gwL�. s." .,�.^ �, '\ � • �-- _ `t ,-.,r �,Y t � ty41R, �
r i. sr '✓ r �i ,/ 'tY1C. �. lfht, ,-f"• �k �. •-j - _ - I Y. .- ��, :'b'i: ; ', F'
r. 'T i� � r• .P'�`' /1'� � •' / '-i.+ r�e •i _ /~• j � .,r ..c w .^.�s .n� r ^7�if� �_.. Ck -- :t - '���-pb� '�'
.{:. ��L .L s_ �r.. 6 1'E ( yc: ;( ♦�w.. , r .I..•t •' .t�' u' r�. - .F �i. - .t•� �_\ � , _ � ��'�� �3.+ �.�..li e'�w
I,, ).'• .:r -. - .r:. r• � I�' a3J<' f Y�!"►).Y-. v � _ � - __ `-' T \ ��, a �'rt;„,`- T� `' <' :r'�"•".:t 'b+i.: �? r �"•..�
'I'S s •i^..�y`7.. � �2• �n t'L. a ,�• t:l .� _ «,� �� Rd r n T 'f4-� � .T.eif I•J.ttj��it./.�'M�- ,a - - \ - - -}y'.�'- •� _ - _ �y�~ _
.i �. � -t- J t'2 i'. 7:, y��'/ `1 ,�{, c�'` ..5 ..� r j • � _.tY` --_� ,^ a'�'�.•-`�'•lR,t, - - I u -' Ir�� � �v.
t. • i f .� :i- •J .7 • � J' .y. �,, -rc/t ^�-r�p+�, _- t`•sue• •t'
( r' r .t tJ16 ."h + �: . gTREET ,�;; `" ..,� �+�"�•.•: --: �.-r'r. :.,T.Z' - _ �"
r' a.r:; ,i• s Y t=±+ ?I' r 4 .� f: ^•+ �^� � - - 1,/ ,�^� C. *•� -- Y �v,t. � �: lQ j
iJ•tr• rI .t Ir•'I�:�a+ y� �f: ir, r; � r :t✓:. �''j r rAY^•a.r, � _ y �-' -.�� Fj� �`� '��..-t. _ r .. -,q�- _ _
"�i � ��:7. 4 T �.� ; a t:r .r _�:, �i � "`1�: _I .r _ �. 'it`d.' .`` `r"_e�•"i' ��� `a 'r_•• - -
<' e _ .2''X1 '� •,wf�' '� ,a., f, + � _•>, _ -- Q7 ' ,:, I �.Q�•�� e :5� .;�; sue.:^�.. � - 's� :�:• - h
r•a�r !'" a r� i� ¢ '? !�. "f'r - "Ir _ i'� ,?d"'=� p _/ A.'r _ �._ "Y�� w`• '?•'- 'C.- �•� c
a.•• '��.a t'' I +// a'.'.i�" ,f r. �� IF`''7a - :T _ ,R r - t ..�- 'z_-
.••••c �� •^w ` j~A'.oa,r-�'�. t. ,A- •ary:. .a .a .-t;/KM_ r � ,Vt( � * ..�, _ - - �yti •'f. -'•' .:cyi`_• ~I
1 .. t •Z M1 .,,•r rr _ ,r.it •Va •1 -e'' ,t - . +. - 'J• - 4 �
.�..i. L.��� ...11,�-jr. .r� '�.rl 1� ,. ,s r:. jcaI •'�' �y. .y'•� ',7'r, ♦• .'!!tics, -�.,�.� .,��: - •�� '`�=r.�r - <, �eJ�', _ .t -f�- - ':y�..t3�t _
�~ -� / �'•'tr� .� - .r~M' i,'w• � �h ♦l��■ .r.� .'� a � I ti '� c� �'� - .1 :S' - r.
S'wws �(� P K... � F r I f !f=': •F. •,k -1� I �'r',_r1 _ �'.•- 'u..�i {�' l•
'� _ts !'� 1. j+' p- '•t }} ��,y�q d r'�i;Y'` •, ��.� ?.� �:1 i -I � - '•'>.'� ��
�• .(� -- 1r J,n�_s.r•__ y f f' .0 .. .a ::r r r ''� :, 3, �"'fi.` � r{{ __,.'�' � � �. ♦ K.' t ,, �_ --�,=
FCC. �.L G '; ;• , { +Tr f 'i Fl., ;. , !.'" f• f ' ;�-� .rt'� -�:• �h' -
�'••�l�n..` '',i• 'jCF '/ ;• - � �G.if,.F !:� J. �a- �• .'r. - ,-r.' `,•� x: '^=•: - _ ,6, - .ti -
t>••� I .O l�i. - /� a•- � ..1_ 'r/ i� +4 (. ,,� .•i� 'i' - '�I - 1 t -.�- l' .IL
j' �. .�'.� .y �9.L• 1 'f. r `� P.Y r J-. �'�ed�.-•� :r `�F.`•��' -
Wit
i
! -IL
a
•`�' a-: r � � r-1` (!r' •� afl', y � sr�',f,.. K y' �y.:,,F
_- 7- �� - ., t{ -''Y -vti► y rY': :'ht '1.r•:ti : I �:' _i �r�::h- � -. �_ 'J c .c1M' �-. �r_,��� y/[�..• •:� s�+ _
('` - q -a .L :. �' -♦ - 'r yr. • .tir ..57.a1"'.r Y r: .ter n
1!• rl i 't .'�c. LL>y'�' c.--y.� F� ;c �4:{ i''i _ s .� ♦r
. _� _-�{ ;,• �4fk. :i'' '' � '-.'K�fr� *`'ma's�L✓'- r S"Y� _ ~ _�R.,,•r •�y� _��.. ��' 6 \ � �•.� `-_ I
�^r: '�-. R 4t� . -'_ �,�', + �i�; !rt^� '�r+,Ly. �r,.I �t�i;�F.. .s • �: �.�± _'�`•^ „'f-�, � t 1'` i. .slr .. � � .�i`J- tf -
�-' __ ?••� 'r` � -�` �,r 'i'`" 'c i�Ei�.�.�.` �Iyf�:,t,'�.Y�`t�� •�_�TM.��:;ai•e .r jl�' - i(R �w 4.•,e �._� .�rR F" - �r>,�i -:x Yy I s r C o ;�',:�.
= °e'`{.°� r• ` •a •. - r�:: 't sr'' _ � -q'. -- ,� 9 .f'T'` r-,.u�•- � 1y,�: S.
[��?� 1 A.t. � i. it.�,1•• - -7', R '• 1 � �!'" 'Y'�:': � - ys.,, t � j. ' fir•• �}`,
ry., � ,,,/,..1--!r' . i�r 1r' .i.+► :�`�t •fi a 'fir. :r- `� - '.:+ 2+., , 1
.�, :�:¢ `%� � ;4 .. Q �"-'i: �rf7.: r.?br:' .0 �.��•��Y c `. 1`. r � r .�•� � � �.? •A.,�. a.-� r -
'1 s�.r �-s.� - �. +� r♦r je�� ,. ,gr•y. ,�7 .'l_�. .•r; �' i' R. '._s :a' �! I .I'lr, ',��r`•���_ "'4e,`r •-.-„ '.1'•` �1, - .;',
- �` l `_M' _ S }•f S[' �t. �s a ,>• i•�. :r•••,r+l�sk� �-�V /J .:��r I�i1�E� '1+. �•.L �-r �.'_� c
�� - ''lam-•� yw r' � -r �'� My F:Y - �'- l •5 K'Y^'�; _w� f,•.' IOFD•'�. „O'�'� s �..• •c. .'� nS►"r 'i.
r r"-n_� aa'JR-' -1. r—:_J T.•` 3 :n. iiy� fit..! 1 .i� .'N �`'- - `c aw/ _ _ • f ., 1•w:� -.+c _
KAGY-BLV[3 . t .
_ '�e1t • �,�ftr' �" 4 ��� s1� .� S f /Y r/. ate? �j l_ ��. r' r :X r�-' til .� -e '_
i -. .i t'�►. c`�%� �ryr` Yf {•',v'��Y r� - � .fjr
� .. r �� - r- Q � -4 +._ + -•'•
._ s R 7 "t _ i•` 1 ,.. (y/p.'i r T i e^�p��. - s' .1 L..
.alp .f' �' '� ^L .. �; r.,q7 a. ..�- a'� r_ I - s � � s��t l.$ .r a'-a_ �'µ :sr --- �-_• _. __ '-! ����"Q_.. - -:. --
FIGURE 6: TRIP DISTRIBUTION - PHASES 4-5 RESIDENTIAL
ENGINEERING, INC. 18
The Knons at Hillcrest East& Highland South TIS
AinumA f
HEL
n
:Sz,
A
' •y ' ri. '1..f .�•,f ,«i,. - '� >. -- _ _ r xx �44'•� - :\+.`• \.. - I 1 / �.. r�' �'_� .,-v-- -'�T :�',c•.:t..-:_^v� to ,`�- '�p5- r•+ _
Olt �j
Ji'. �A'7111911;71—'frui 44
V. A
14
4
ro
-UjS STREET V
k46 W5 k.
t
a
-Y-
4.sh! fi--� ,r�Eli �, 1• •-?. "'k i r�•'f f�{"' '. ��,�. '� Y 'r •/ r' - i `W1
U ift—9
g
e'-:� "n
64ji • W,
it
f,p
Cl.
-7
A
Vl&
•
Z04
c"A o
D KAGY BLV
;A
Jw
FIGURE 7: TRIP DISTRIBUTION PHASE 2 COMMERCIAL
ENGINEERING, INC. 19
The Knolls at Hillcrest East&Highland South TIS
TRAFFIC ASSIGNMENT
Assignment of site traffic to the street system and site access points is dependent upon a
number of factors. In this case, the directional distribution of primary purpose trips and
the physical attributes of the surrounding street system were considered to arrive at the
total site traffic assignment. Traffic was assigned for each phase independently in order
to determine the required roadway improvements that would be triggered by each phase.
Figures 8-12 show the respective AM and PM peak hour traffic assignments for full build
out of each phase.
TRAFFIC IMPACTS
TRAFFIC VOLUMES
In order to determine the level of impact at access points and intersections, it is necessary
to combine existing background traffic with site-generated traffic. As previously
discussed, because it is expected to build out within the same timeframe as The Knolls at
Hillcrest East and Highland South, existing background traffic was combined with traffic
generated by The Knolls at Hillcrest West. In order to determine the level of interim
improvements that would be triggered by each of the five phases of The Knolls at
Hillcrest East and Highland South, traffic generated by each phase was consecutively
added to existing background traffic and traffic generated by The Knolls at Hillcrest
West. The resulting AM and PM peak hour turning volumes for each scenario are
illustrated Figures 13-17.
ENGINEERING, INC. 20
The :.. As at Hillcrest East& Highland South TIS
•ram. J 'y* ili ...VC .�� R, iCr. r(�'' ••L = .�i Ar 4 i, fl. ;r'•..'r1.-.,y 4 _ s y -?74" ~— -'Tyy - �"`:�i
Fiji
�.. ,• :,1,''•�y, ;• •y,1.',,y� -'fY"'•::2r ,` . ,l ,� '�' _ 1',:; _ ►- .ice v - '-
r, t rr•R,` a;•-{ t` iv t' ;r ,: .� �1 :;� - ,..,'�'lr t s r• •o!- ;'I. - `t-�r��s `f. ?<" ro. •�• '� �i ;c, y� �.j: i!
tS `- ~ •a• ((• �.♦ _ :s _. '`fit. � ,, � *�,�'m �'`� yf' !,��a'i ".+7
f i >;t��;:. ..�' _.� �� 1.J1►: _ J�. J ;;.�fttE1-'fie - >, 3� �,�� t � ti.� �•F' ,t:k":h.Q• � �;,r-''� -
�C � ' JE3 •_ ' , '2:..:4 `'. _ ( .': ,1- �.r• ;K`_ i �,ti�S`if►,�• 11 HLL �,,' �'1y7� -,� - _ �• _;i.� ��c1
�`�� •� :�){C" '��LZ� !� •, ,� - `,•�_: :F..w� •.ram•- %-+-,�. (' h1,+r�. =) •r t:. '`�. :i-I - •-~;v a•. t' y_
��i.. #� '�� �. �,,tiK Z"a� x� -}: - '��' a .i�,K�.pr J��y�"M.t�� •.Y' �,9h�_'�' - r .fit '(' i •�>�.i. �•Y �r '.n : !''
..� ,^. -
.,�; a 'I �n �r t N
- /:er � (, .-�, - .�� J. _ �-1= �r n: � � '?f. �• tf_. '•� t. -.',G 't "' il ,
.1 IT',I.�S y i• e,� .� v1�i t: .'71 �C.1` � ..• f.•.-.,;�-_ i:. .ro-`• f` '>..a
cr z n. '(. 4M , - 5 i f 6 'TEv( ;� _ t f.e. c a.r. C ya �a r` .b`
1 1, � ht c �r f 'v
of .� •l � c• �� :!!. ti'L..��,, .�, .+lo•4`_• -�.-.• _ .��
f^ { �;, ' .'`• R .v � n- _ � �.t_ - y. '�i..:• '1 \\y' _. '>,' - ,�-: +�.«. `� •�14'�r•: ^.•
�h, . ,. t i' f�, � f ,:` '►.. �- i �' :.*'. � r `.• -� Taw. ..,...y.�i.gib- -�tcd�_ Y '� �..,
r .tl 1'r'� . .!' 1 f ;i }• - '.'r ><� r• •�?,•,� :�.. ''1•j=.' � .y '�.__ - � - __ s• - �•ys-a",.�s'-..`�.'��.2.v^•�..��J1 ���o�
F ' I� a , i ,' �-• T y ,. ��
r,. �� ' i- 7 ' .tea' q �-� ask ? +rtt„ •.r• .�..1 :�� ���-_-'7. 1 y .�
t� •" � o'L,r r..i. d � - f: _.R k -•Y -fir_ � - .- _ - o
-F •�; If'�: „ r � a �• �. I'yc. .tt it ,i' �_ r{.' ,ll•: ,.:. �� 4 �� ` �'- - ma's _ .6,` l- ,�'. v'vi0•.. �_. ;•r� _ r,- �:7>�Z"
.a', I f t .�i.�. �YY' .`.t: 1' �it. �, +l L.• � (S1 p �A t _ a -- '"� �"" "/ .i_.._.. s -.S 'C_�
-iL t .te` � � ti l• � .i�+ :�3,J r - ! .i f � ..r �':, � �tca�"a a .r, � - -t- {
r..� Y � �1. �. 'r�..{� .y. S' a �,� ,� ✓ .b ` l{�'`. r <ti•, .Jt$ ��� + •� ( I r:' .'• ,/ /' �•;'. � r t�� �� � I � 7T � 't: _
143
4
'1"'. ' .1±.~i� 4� id.' - `� i,• r;!� ...3 1', � � !i/ t,� ri« �' rn �-� �F 5 � -t �����7'�._. _ � .- �. � __ •� -1 `. :'``$VS� :-k ;y t .� 4
STREEZ..
k -k. 1.�r�. 7_- s.,• r-' Vic
s !+ •• r' ;� �. to )1 s r.:^f - 'r. EL_S
+--+�'-.'y
�'' �' 's+l: ; f:� 1. s1,'� s� ! °' F� ,..; - - _ ry ,',, ..Mt'�b, .�, 3+e",t. - '�0- .�' '` -r•, `'� •:Y- ?�I -�'
• '.0 •'�tom' I' � �" ` •F. - t' L2siit -- p _ _ - r� - -_ .._ ._—_ r '- �+
rt �' I((I (J } ♦`,.� y `- fj ' 3) Zl S ? t f-- F.Q y` �r4` '�!'� j� Nm
a� ► _ we-=_�'" r„1.,
�''n. j 1 iT ?.,:-14ir, J d• ry+•• - _ - - _m ( �r ` i - fB) `t �9 ,/ ,,�3,.7: �,i-: iY,,,,_ - 1�7/i(2,s �%, - _ '� _ T ;r.,;i^.i `•"•s: «
-'- IPA+' 'L:, ' ', 'F..!/ ta.. l-/� 4�.'.�° w J�Z;� +/ •/,'R �.� / 3 �� Y `", ..,,c`� 1✓:. "'` �J -
'i 5(3)
Y w a aM4 i!WL
...+.• _ _.tj•.. ���a��,y�.�,',•P+ }t f Rp3• 4 r. '� ts. �—.5(3) - N� Z L _- .i _ i.•�\... - • ;', 'Y f i. �.� _ - i t;
S..
r
'1' (3) (3) (2) (G
�'•( �1-�.� 1 1' ;` s , ;.z
/, -,�"i�c,%:�,I •j• l �. l � f t ,,�,., .r � psi �!V .t t '� _ � '�y ('< '
. Si ` ��« .a.1.�i -' � '",' � �•� { � � 1 fi ''�71•� _ !!• �,_.( a.- ` �f. �-�' _ •L�. C •. 9tt _ �. c
[''.� 1 1� � ��� ! ,yr " -, 1!ffn.., '1: Cd y° _ .,i •rr' . •• '�. �L 4� J
� �� T�� .t { -✓ .` a(z) }�. - 0,�5-�. A:• '� t!�:reESr. r.� r � c�e ��''{�`: :a: 1tr`:, c. a '�.,t,:� • --
�P�i��� y�:y� arl�� / .�. � ♦ [� � ,per. B(5) 1{.ti�a: -�Li h' � A111� ,ice •-••.� \ lA�'. - -ir`.'.S -�'�:' �. ~ ..
Lu
Jr Ar� ,i �: ,. l,.'- s ' f.,. ! i ..•� '.i. t1__,.i .t •�• �• - R.• - _s. - -
�.`?'i+•t:; a -��� fr�a}IOI ,t � s-.�.. t E E� w.... .�.1��l-'}._:1 ' •
_ •' t '' _ , �'tr,r4_'' ,! +� .fi e. '� - - (15)5 —$ -
' —•e. - to ?�. ,, --_ _ ��. i.. (15)5 13(8)
LJ
rp
3'bs
M. r - - `ems -? Nt7• , ��,� � "f r tY`: (i~'.. w 1 _ ry9� ems_._. �5�_.+ "_ "_.� t Y — r t7��Lm .+4a 'I� t1tY.•- l_-3i1'
�- `;(� Jr'' •r` \ i n'^:•{ ; Set - - —- _
rx 'fix r '�k '' KAGY-aLVE) a t41
= •/, �,p t'�'.y'Y .Jy,Y��o rN \ .+ :
Z
�{;-. •16 f 1 • ;, ). _¢� � ^.•� i; � r, �:: �y,• C� .- __, ��, t� N� .,� •�•,: 1 �..F'� �-' it
rn
:_ + -S .✓�°'�J•i yYf •: � T .ri' +' �'..'`< '� �!,, ..Y � �+�.i -S� t ( O� � I ;„l •.st,i� :1A7�1�j�',�.�£..- 'ie �..�Yam:.+ ,•q�i•
e s- y rJ., _ _J r� f. rj 11 _ .. j e it." - :� '�'"` Av
.0 •i
FIGURE 12: TRAFFIC ASSIGNMENT - PHASE 5 K X_AM PEAK HVOLUME
=PM PEAK HOOURUR VOLUME
ENGINEERING, INC. 25
The 1.••,,IIs at Hillcrest East& Highland South TIS
UL' �i :j�vH• '7+'( +' .�~.." S Z '- --- - — Y y4. tr•,y�;J''v_�:'�' _ _ r. "_`_-_ .�_, _ ,, t.;
)r - ,aJ4 .•�5 ..�, ♦- 4: .- - +w ;" •�7 - r - 1 - '''�t.• ."� _ J - �.1` t• ..y•_,n -
- � 4.•.•7• t t, ./�� )a s - _-. \ ,�_ - rt •� •1^=��r� T�,. {` .rL_ _�..Y:. ,�y,•t,
i _ r 4• ,.r , .'tfl- a..�� yam, - .�^ '.
7 -'�_...ae. �-�/a�.�•� ,. �_,�,r r- - _ i=,
I.w 4�- + ��:: /�1 •1 1+ _ � iR�� w` rw�,'- I�a.�1.1 ,�.l:�tEj�R� - ..�•!�� .`( t �. •� -- r 7,��.� '�f_f �:�-..� -
J w• Z' a. .si �i 'ri . 0 r'! e� •L5r Y• Y.� •l;^ "1 -5;" �,. - .:... �1;,.s .
OF 'Air
ir
r r• / - .1 i wT r` �".�Y 11F rr �i •.T•. ~ s GT.:c�_ a �' •, FJ__ r
• -.w.Ji� t'-2rT� r ►:.{. n ri'i:- L�:- - r. - - - ,� .1 ri ':7 x• �^tii. .' \ _.•� -� Yr
�� _t - tr.. .� .� �.0 ��'�'�, 1• �,w-�'t, d •emu �`1 (Sga� � .��. a- _ .b�_-y.!'T ".+ i,� �. •rY&.-.t
{}}r(({ .f ><L •r• �.. p• i; { ", 'kkr["r, a,; �' � P I� t','R�„�V• -�). - .+'�'• - �l IBgje�S +. - �•.��- - -'?;'t-'- .F� yG.�'.• 'Y4.�:'�•'7�•-`e
�' •�• 6 - 4' 1 Ll ^► a1 } f _'•�ti _ •s .+. LtF ^ _ I_ P � .if •y ��n�..rf�:i``�,,
�:• _ .6• _ �� a. � t -.. i y'ii- ;!,� , >• "t. q �\ Ili ,p
..i 't� �rr !fir � t �,)• ": Y. - •..S'r• ,�.•- a ����4��r 7';
N .�•` .-X •- <. -� tse ��7 -- ��•�?.w S� � l / �<r d, � _ �+�;�r{, .�w � .- fit.'_� ... ...s :_ +-. s.�
,+i 7ti,>- �' '. � �'_ •„'�. _ ✓ '� �Y f,� i r I l: "�i• of(f0J �� ..rnN .k '.kl .... • F - ' � '��.. ,r�' Q-. 7". ._t`{�Y{ A.1►w"e.,�.•Y3•.'-.�il ':;-Sty.=4 eTr_�. ��•+ -- ...�
4 � A - t, >' f:� n JG , r ray � \ �' ep -4?s - - ,.s ^?• -.� �'�=�
•H -�7 i. ✓ rK, •y � 7e• '�. _f. ts' p r• t^t>* .. " G� �:; ^ J4,.�.�. ,.I�M1. :F�a .I� ✓ *` - �.. � _
_ � :'I. ) f.. !c ><. I- :�- rr rtS; .y , .�, J o :f• - ' �`� f,, (60) �' �� _ �� _�( a [- r' +�` = �-•. � ,.
r• _1 .1- :S s; 4a F. / i •r9 "' Lr I, !) ;,y�, rJ) - '•�\ �_( -r` `yam __.FY ,Ir,.- { _ {• r..;�. .. �:T
�� t- -'� .r' ;_ o ':v' v' k,�• r ,.}l .�� '�"'f+f-.Jr'• +r��29s mil► �I o , .r.-: :��.� _ _ ``_ _ ,*a. `��.-:'rc - ',✓•�-"}i" � .4
n „� f,, e � ;tr '�•[- L' � r rr�. d'(i• �•:t fit`. l �` .47.4 .r.',�--;n�� C �� •j `=ice -� '•.` '��- 4'•^f� _ '� '•�.t�y - � � '�=- -.;.`
•4. � A F t. fK �r .ra w; �.- - _ - \ .:r `_ �'_�_ a 7fd6�4► `�` . •.:+
11,
'CLOW
. t •IL'„ �l. LfflC ,r' ff_/ Jl{e.. p 4 sir �1 (3.9n. ? , - - - - - -- }` ', JG• _
- •�• .. - ... - .,ir1R: :.� - ':� �v . Al - -
'7-�- M� .,. - r, _ fir• X 'Y - ..0 ) ?/ - wS S.1RE — a.- - _ "cam`"�+�t-'_C *a. `kf.'M!r• - $�•..
N � �'� 7 'I.• r• y�is .�,.rt•�1', s �-- `�;,' r.., 7)s a• ��z �,
.': ti .a: r ,i ,,,., L •� i Jar.,�! - •N'` '� +•�• - --,_r�r :3 .� _
1 t .
'� (_ � , ��.. =r (30)(37B)(5) -- �� 'f .�.',aY �`.,• r - 'STD Lj• t�. _ s - _
I �:i:. � � i '' { >.av I '` ,y e _r',. S' 21 17e ti! � ( x f 1 ,� '-,/�"�. �''aT..` __Q�/s,_ 't: i• �.2.,. �.
-�""'1' l.:a •t Y 1:. �.._ .�"g 1<i �f: - I' •'r _ I �`.-�-� - ---- - m ,'. ;Y•-.: , + +'�Y .._i', vl7 _ �:- �uY.
—� •Zw + �J 1 � T 1 r�-.� >}' 'a � -_�•J C ♦ � (.1'-, 1 i -- A - - 104 309 :•F1 •� W.�y^ `-.•.. J � _ __
am_�
.R s. Y P".'S 1 b .r' !_• a �S' (34)1s _/' (3)
•,�(_ .? wr ,L +1 .,y>'♦ �• ^ 4a• (6)6 �' F� 0(0) - �.f I - Bt Y _ .1- 30 5 n'•••'�r.
h 1j t iJ 31y 7t (61)2e '�
,- - - _, h. �:.d' • _ .I. ",' 17 11 I •. _�, \.]�. (5)0 �� 4(z) h1)(o)
• r •�'�-J����� LL l�S.7 11�� . [• i/�• 14(37) 0
Il.)(441)(0) I W►
p•jI , 2 204 039
;JI1. _ .f, �~� ',.• f .` ( �- 7 T' 12 2 -
r 1'�� ; J�_I �. JI I 9•_;y t -' �.v.•` � I -�r t - —`, rz s�t�fici d+'" 119)5 �� �— 1(2) �k' .rf""-*.• `:t .i: __ 3R '�
ter•. •`• =-c..+-�(. •[ �'� '►:�` 't��� �4 IC ♦ �r +� � �_ �� �� -( I cY "' `' '>i;t,,,, (�5�)15a �)► E� r Zt 36si ram. �-. � _9►' � � F• ix•�•
vo
(6)14 �/• 0(0) `ads."C' 1 - (7) - ,• ry 0 0 1
_ - I t ,1 •i' () ®1 �� p(0) l} '4:: '7 _ �- 1'-.•- w.. p• 0 'V-#�f] c �• , rr", + - "�..
(1 s)22 () f tt•; ,:. ;'I- I ,a l
• r r -• 0 0 - S 74 O 4
'.a.i• _ -� I _ 1 •� ,�,«�c .J •� u ,-m;, 1 >� - .r• _ 1 �21110)l11 -..:.�i
�)( 1 's "•+.;r .Y,•!��!►'��' - - + \ - ro6t (9)f251 �•�+.`A_...��::c:.�['- b r,�::+r
`alLrff'�f�r*• .� ti..+ r n•'r t'- 'r' 32 0 10
C
•'. '
R _ _{ : 0 ,�3`- .1 - 3-tx• f.- ° r{e�' ..°T. 1rr - ♦ y t~'
' - -�_ e ^T - ' C�(•x)I 7 •� -- .1'_ •� �I .E._3e4_. (383)(3)(31) �� •'Y - .� _
1 30 9 - ! C [ F JI I I 21 12 3 9 w
Ir.rs �n:§t [ . t► - [' r �,. �C Y �i - I [11e)44 —► -k— 133(63)
rt t •,, i'+Lfr7y'> S' ,It, I`� A• i /' ;� ^ •.- R , ♦ (7)1 "� 0(0)
1 3.:: „', T t- -K 1 r ♦ i �'S( '�� =� _ - - - - -_ �_'/- - �'��{•:f��'��' ( _ iS -_r� �«'�'-7��>�I r�- �':r 1ZWw,w-T..a•'F•.-1292))2 73 i, a 24(26)
_yw - (209 65 320(109)1s o)(zs)21 r O(o)
('(69)2 '� 24(60)
^
0 •' k _ I. -_t (1)(4)(0)
v ���:'�. `"�-• _ i-J?'��ap1,.�.-r.1r _. � :1 � 'C �-% I��� � � d -.•jj� >e r � � - - 1
1 r\ '�, '.. ,'':�M LJ �' �j,.•T�vr-M`: c ,.r x k3l •�raaa. lo) 1 -
:.Li3��' -
j�;� 4'. zs 1
'; J � ar• -ti, rn T jl,l' _ ter. o, �, IR![ �,� .. .� � 1
•
43
(214)75 262(117) 't rah:.�a s AGY f3LVD
57
•�li
11361
Y _ 41m!it J D� 186(65)
vr
- ._r_, - � - _• .t _�� ., _.,..L. a. •• :rL?_4_Ifi�^,': i' �LIn
FIGURE 1 m. EXISTING + 'FIE �� A 6 X= PMPHOURVOLUME
° (X) =PM PEEAKAK HOUR VOLUME
HILLCREST WEST r-Mr, PHASE Y"li
� �i 11 PI[i fi�fl `i'"�7 fi FlCii t3�o 26
The ....ills at Hillcrest East& Highland South TIS
i-,
_ ..1, i` ♦.14' "AU I�
T' � _ ' a'I.'C � �r�I• �. �.• - �Y, ! ;/C _L: 4R'�i rYr_ )'' g, h' i S. ^'r f... •• •f y; .fir.. �'T1'.. -
1 ;.r T I-. I 1. �, !~i. :•' �:j r ..! :.•�._,.i.• 'siM � � �- - fF�_'t >t+b� .�... ••1_�-•Sa.•� N�{.f�+rM!C,._r',�• w.. -
tr, .S � �' ' ' 1°•f b. if�'r �a .f .�' r.� 7 .�•-o� .,Y � �, r!7e::(k :Hhsr;an- - � .,t' ..a'1 I
_ ��• I� ''r, a►- � .*:dam_ r, -!:, _ ,;�, :f
1..V �" _ � - 9 / i ry yY - v�: -. .�� '• �i�f .�.r t -y. t.
[ k� Y I _ � r'���-k,� ',t .. �C� --:.r- �v .+S��:,•ice•;, '`�ry,��
IN�: .b}. ., - :7-'y+( -;,Y€ •' r;- /b(�1tl.. 1 rt.• _ �, r+•..: -� 1 -, .� H
'!, ..e ( �>.. T: s+l.sa.:t� _ sr i't ^Y .. r r, � �� •.•t��tTf .�3.
•( �'1-.2- •„•I SY .Y' l.s!'a - - - - - f .k .,�ti _.[=i+r-. 'yc`: r.J__:..r
♦. ..! [' i{ .ram ' 1 0 77 i; V � j• •a >. ` .
�..r,nv �=rti: .�s� ! `� _,.,. f' � ��,�• is . ,� xf U'�•}.�� '"e`' ��� /. � ,R'' ,�?s,Y'' Y`+•r � =. .ry.
Q .-n� �� .� � - �� 1• � � ;,1a;}r r'1''ra w'ti 6,;Ln L� :.•ii,;r• .1 '�� p1�'1:�« �• � I lRg960 � ..cr r •��f,,.�- - rn of
.a r�� .w: 1_. � r r +L+`•�.: � ,',t- M� w+. :r 1 r ., ra w_ ,� ��!�,y;� �1�y.a.r::1�:�� -�'• 1� i.�-
-� .J- r- p'�.Ir �`r'� �q: • '• x• ly.6 r .� >.;-' 'YJ ..i_� f �s �. .ry. � ��:�"�Y-.. _ ,J�.._
'1..' �' L i i Il r• •Y ''� '1 a r .. - - .... A 'r� •� 41. 9
(3s �' yti. -y S�' - _-+r A`" - _•
Mr( �' •t' AF • 1 •' � �• `•' .^ i SS ) Y. - .r .1� ?:i-- -+1'.•i+5�'. �'-
r m>. .y r. -rc.•. ,�, 1`F rr �- s•.. r (0 '�`'�; `"l - _ ,'t E y t'r.' _ lj.I-. -..r,,..,•. Y� c'.�) r '1 Y� ,, cv+' +^•
'Nrs ;R` • r, ai� f. F,• rl e - ;!• •" �'- 0 /!a 1 e� � .a, -'• -.><ir.. �„• _' ��.. ,i�-`�••-' a. �' •--�r;�-..
,.,E�'�; �•. r• `P: *., t� f' a r ., �:• ✓=r• , .y' ° � .\ ;:;~ ,, '? •' '�� �1.,•-' �.:4.�! rP'`..::a �y�� ,�+•_...«,r,\
f. .v Q � j•_Ir•1 ^ 3 .t` � r - ♦e►4: .c. :(.. �Sr• iV• (57h/r i (/ nji - �'`\ `, � _ - _ .}�1_ ��c'. •-. ,j .::y-T � t�,�
it �.� �• ,� f �" �.�• f, ♦ ..�. � ♦, )tw}, �� �-1���.1. (3rp�ZE; �� i v r ` - "-v •\.. - `h•,a - .w._. '•• �" - �I
_ X � _ y�g •�,� r
";'� ,. _ y✓ ♦'': 1 r� J ,� � r��:r � � r •r.• .r •-Y � �` .Ct�'1Q� ,. � � � ` \ \.�o.�,„ - - � fi.. �� 0 .w=*.
_�. r 1•: d' r 6 I�•! 1� 'iM 1. !f �• •t• � f- ?F' � .� .i•.�.j i��l`•'t fr;i •.'iJ1z � ..tl - � - \ ' to- .:' r�- --k
� �/} Gs,roOs� •.S - `�� � -_ � '1 _- .. -..����, _ ....t• r:•vra, _ _ � '"-, �;:
7 ! •, Y�♦, n � f• ?.: • tt •'. �... r _ _ D 41 f_ --_ - !y .'� a •.�.
� J !•. `. � k •- 2' �� -1'.- ••� '� - rl:.i ♦��• �- '�t� (3c 7 y.. � �� t. ,.+^�` �- _ _ _ a<Y�Y' _ - _ _ Yin_ ,ir +�i1+_•
r. !C• t ♦.. .� _.►c ��_, .� .,;,..�rt -- J '4_.� r'i,�1a, STREET. .�,} •�,..�l,�.;r,�• -.� ti 4 A -��.� ��'>tj. -� '
` -k; � 'f; ,E; .j •tF� ..`_�` • `�'Y�'�'tiw s: E- - .- -'^�'7?.i r,:�_ „'_sue �}
F i ��� ''- t� r �• ',cr• T `�. � ��I;ri'�v."o ` '.P � '�•� 'fir.(, �'`•-_ .J- /� -_ �•A�• i
•
Y' ,.t -,j,1,� ^ �i� .�,y Y r ,a.-, `` 9•-i'r ,,. .`v"^f, •�''.•'.� __.. .,. .k�`' n 'd•:*�a•c�_• �..�``' wCU - --- 1,.Stt'c� Is1)�a11
''� ':gip t•l :r 'if J d j �i- .K_, r�, ;• t•• G`�f 1 -L '(30)(393)(20) {• �. _ - - .FjQ _w Ma; 'j �1-�.-cF-_ _ ._ i• 31 5 -
21 ,02 7 ` ✓ y� fin- �'1
• C 7� _ -_-- _ / -. (18)1427)(18)
' --JJ�� �.' .r'•?� r 4, +r • l•7 tS .� �'/ ►- •i� 104 39B 56 l '•.t �(i �' �rr. �L:- J .` 39(26)
1u s r *�«��•.�'�.Jt . .Ld•,�, -•.// 6�`� j � �r r '',�.f 1 - •� -:'fir ,� - - _
we •i. 1 %-T �'S ,1a.. Y i- (34)1s E 16(11 ��, ) 1 J _'` :.� C ♦ - - •�� .4' �� _ .'^A i 12(2) • -�
o.• .. -k i� •' •s �J `l') .. ,� ' to. (81�28 —! °(°) t l_ t- '� '>, -t.. •R"!- t� y y1f are 4'
:•..""e. ,' i r: •Pr' -s. F. F `Z i tc. + {. `` "` 1 1 r- 14(z))
F'_ (37)(0)(20)
* '��'e•l f.E. Pmt�,,••�- ) Iy_ .f:' '•t TC! i-• �/J C`�• (5)0 14(37) 56 0 16
i ` �Rir. _ •' r� • ,�' 40 ° ..• ` _ T ''.•� i
0B)(456)(0
a (32)
88 3 (7)
V'r J�r J.f"d.,!'�R • I_ ,C [ - �� `" " ) t381 11(�
:.� � • - j .. N •� T-, t r 2 208 0 �F-;,y _ '_ :(. 1. t. - 39
;fN�� rt �y7 s •- ,� �(p ,•:' t• r.. .aR�=-�-�-•• 332 �' (64)18 � 13(22) •
I1 ` S;c : (r'�,) .Tr L• •7
W.
�� .•1=�.f `ram: ':i ' - a� (2)(ISilry� (z54)115 ' 272(17z) P F... '. - {f. r.i-. •��` `-
�1. {{ N4 +v.fF •.t � .I •••iii..•°°° f� ''�- 741•L ! •r ri7 - .� _ _ (53)17 �0
l . F-
- (6)14 0(0) • • `S i 1 rt' t71057. ri' .. �',. ,S r' DI r --'"- •'�' A. r�:4� '> +
_ s r s t F,• (16)zz
�� °(o) -`�. .,' '•r'.i. S '--! - .i' 74 0 11
a,_.;• + ei ..1 � _ ' `r it " D
•1 _ ,�..b-• i ,�ti 1+,Y- ( . ;' ) _ r (21)(0)(11) J
-L-- tf �S '�•7'f- "<-„~ _•-, .. v _•-r-.iL... ) - _ - ---- - ; --�- ` "•1' .: ..1_ 4 (110 30 '=F
Y-•:iiM� l 1( r } `'• r'o
. ;3 A�) , •~ $ i_ it ( 414(0) -T _, > I' t
' . w 1a •.F � • r .y 4 - �.T."1•'" (383)(3)f97) � J �:.
.O ,f:.�' �.. I i 340 1 4B • _ i153)55B6 4B{55)
_j' : ) J_ ,.l vk��-[ .1 1.Y ' (0�(66)(30) �r t-• x +• .t rl. 1 I ''a `� 1114) �► f� 164(74) (u
r 30 30 12 ►• f-,ye i ! ( C r I[ ♦ ' - N. - (3r) (s)(25J
r �.._. r•: (292)273 •` 71(87) _ ♦�,' /�F •
(262)110
~ - -- - - (25)21 21(23) - `, 1 r!!}'o wr �r•y�• (1)0 i i 3B7(9)2) _ \ .�_' - ` -
(526)335�mil►I t—637(424) *�i.. l w•! w. 1 _- (36 24 13(9)
s.. r'' (89)29 a 28(66) t, e t v 4 {{ / . .') f1_'s 58 1 t� 148(B�
f ?� `� i i r t- -r �' ^� 0l3 �) ►�— 0(0)
7
:.5�-• - .\ "11�� .. > t;. �'r� to1 5s [ � - 1 - l l0)1:3)�,1� .. ' •'� Y _ - � -(� _ .- ,.
e ' (47) s3 31) t f werw� {
j>_ •.l _ - •., a (16) 17) r (s°){ f. - 1 .�' - .yr - !� r, �.., 14 B 1
�1 fl 25 5 J: •N�.'" ti •` t' F t w► .r ✓ 11� r..Z ls� ` I"r i. Is)(a) (0)
�'.• ♦.� /_] - �. .y.i• "-�'� - r Y•L .c.�% T.^ �',, PtUI�7 y --_ I �:-- Y - - 1 _ � • :1
P.' •� .� ) v .T- ,f•-:- - ` - rri -� •,Ir/^• .w f, _ 4 �•�- y IciEa-UE t 'rf': y"�-; �E :.- t .r
' �Mw.T•r 1364)145�i I�39B(224) ( -�i•> ♦_j1. C .` I .:L �•-- A{jY.-©L YL,' ! NI Y _r•^�tij
LU
•� __
ry. sn •�l!{t. Tat e_,,,,Q! f 1 1 ! 'ram •I KL� iT1 J (19 s 0-� 4(8)
-; 't'•! ,{:rr -•0 Y1 - d257)133 E—26B(190) -
666 •t a �c.+.s�•.i'�y rl VV�L" . ..a_ ,_ �r k.- �..y � �- ft ! "�. (9)3 ..•1i• �e— 2(2) -
1�E 1�1�®A�1�S �� X=AM PEAK HOUR VOLUME
FIGURE 14: EAIS I�NG (` ° 2 (X) =PM PEAK HOUR VOLUME
16i 10)i31
HILL,CRESTt WEST + PHASE 1 -2
ENGINEERING, INC. -- 97
The L—is at Hillcrest East& Highland South TIS
71
.jA7
..... .....11
-17
- ? ,-1. '. H EL
3 0
Wif.
.. ...... P
1:7 4 • • 41
YW#'
60
27 1
jf
I mw .14
0,
Al
E F-T I
IIAXT 3a 4
�4Q
4-- '
(6211411
21 183 9
7�
401 5 39 Q
(34)19 N--
(0)0 Tl� 12(2)
j (81)28
.-T -*.! 1, .- I
0(0)
19(55)
-
4(2)
7 W
0 14(37) 0 18 62 1
4 (� "_-F3. tF .� ' • � • �• i.r ..; LAN 7)
R 0
138)(233)(0)
342 39 (90)26 ---f* 14(24)
Z
254)115---- 272(172)
(53)17 a(13)
(6)14
0(0)
(0)0 0(0) r
1 (16)22 1 t r
Oro) ( 11
74
o
110 30
mob" 4
10 417 0
22 2 5)(0) JG �171(3)11("'1
3)86 48(55) orb
5)57 165(76)
RRI� Ise (9 6)(m
0
Y�- 74 183)
29 M
402,�165)
7r 17
22(24))(25)21 (1 0 7(9)
2---0' 657(436)
25 13(9)
28(6u) 14B(88)
e7,
LLJ o(o)
(7 1 7 10!3
>
16) (7)
(a7) 63(31)
25
(4)(01
(29)8 4 -KAGY-BLVD
(390)153 422(239) oo
;07
269(192)
(9
2 511,31
X-AM PEAK HOUR VOLUME
FIGURE IS: EXISTING + THE KNOLLS AT (32) X)=PM PEAK HOUR VOLUME
HILL CREST WEST + PHASE 1 -3
ENGINEIEP'lNew, INc, 28
The R—:Is at Hillcrest East& Highland South TIS
}�- ., -I {C � - •r 1 _T_ �y� �'��J�-vr C�• »-,�..''=' :df..». �r� t Y� :Y .p".. «r+N`ih_ '�� ji � '.� -R.7'�-`�' - - - s:- �. — _ -�.r•- -
� r• �.' r � r .. 1 ">.ryr r� •w} ,� - ,� ► '1.'<btir I.n�R�..l^ _ �;{k�a•) �'r4r.. � r Y ''>L,_" 1
i�i'��. v_ e b 1. '..�. � �� _ �•_'` �:. _ '�' 4.}'j(p y'.• - _ � ..g'd�•{ - I�� 0 ,=!1,r.� �� 1'
I•rY ^1 IlY•j - _ ��avwI� t.�_ Tt 11 l.•=•-• S ,� _ ' f�_- "4 .1 -
Cr. �U - "L. t :r�.7 _ 1s t1i'Ih't�M`•T•�t r - - -c
:r t A•j= _ ♦. .. G��. 1 t�^1` 7�. -r J-.Y i`. ,'► i-,�,•"{'.s�, 4' �`� '��II 1� Y-nti ' .� ')�` ��.. •L'.- •N ==�
'�• N r •s t' f f:•r •r - .►; 'r.. -y. '• -.- ,`Y•J; j+ '`., `t s _ .Y - 4 .y
�_;�9 �;.�! :r y. iL -•r, �. �.- �i 1C. t.•. ::S _ +.a.. Aj;.-..1 '���.Y � ._ �, 1� :.'f-. �,;-- � _ _ _ r �r�•"-
r: 1�%• y. :V' >A �. J.'*e{ -1 r,-.1J,. �� _ ' !'�5+ ?��• R.rt S+.ice f•`"T. }, - .l._ r� \`
� •$ >a .=, � �r•� r '-:. �• Cy.. �1 �'i�.., i.(4�.�j"1" .fit _ ':J� � w eg.` -
y. 7 (y =•' 1 X' f .1:' 1 :"t7. - F�� h2Js +t: ,.'` ` ^ •_ r..__ �: - ,�. ..r•
-� dr- •'o <p• a: <L '} f r l�;if '�;-1' Fn .a o- ♦ �/�;. \\ e _ �. •t r. Y..t '
•q - f>I`� CC;; t •'}�'� <ri-� ea•1::.F. - i .l. "1 ��$�, �J f_ \ `:�� � _ �� - "- � � _ .� �- -
::� .Sc''�.: If. 6• 'fK y _ '=r�i t.wt;! �_ �,r.� j a.. r� -
.1,. V; lC r •'L i +a 3` . r n ( •t. J` 7(S/ -___ � 3. y�, '1 ,_ :/Y'r' _ _`-� '.'� r, •q
�. �" .r, :tr• �"= a`.'-*�1 t a; �q ,�.. 1 is i •u� � � �. an. S. .!",.. •;*`•tt' - i \ '��' _ _ _ - - 't" _ <` ♦ ,+�
R, ys�. I T 1• r_ g J ri ...E - .6 t. _ t 70 2..!}tte. _ '1Z' r' .�-'.r _ •,r,,. \. _ i '.'_ '- - I t_
r'� � r. "r t. �' F.i �' ram= x 7. wi t _ "r :, k�Jl. r.- (➢ s ..F...: =-.M'tc - ��. '.+ - _ :� >'''�ui. .__ - �. _ � _2
C, .J_ '7-. r�J _ •` !rff
L J. 1,: 1 • - J - C US TREEL.
� -K. r � ,y. . •f� �' .i.j t. �' {. 1` f` ..� to �/7•nr•..� � - _ �. L�.-_-
•I�-i. .'i. i� - 4. rr. .r. ,' � I. ;�• Imo:' aG_ �. 5... _- - -. � . - \.
.a r t •:, �. ,- ._ j � ��- � r �r,,/ �_ '•r - d �`�':�„-t,w.1T" C� , `;_ �� .m.•,,,. 17.�r,
c, yyasirG 12 9
ice.'L•... :1 ( ) (s)
-fir •f t � 1•',l �I-i .f.���i ,�� � 1' �'. �� _ +•Y�•�- 3 2 t.._ � 1 .:.�.' 'r it ��, '� `' �.-,L�� 'Q,''`' �� _ • ����
-� �(�'"•t�T' ',. � fr.S� �,c !�� '- '_f f_ - •r . _ �� (,7) �.' ,9� 2a�» •.sir - ("T.T31 SZ ,�J_• �+�"�Ai..r
.J .� ..s..t.•'r'�. ;I]r" 1 =� ^!i _^.rb' � ri. � r� ��R.y � � z Jr r .' � _ ti/� s tom' F :aE'.'�`p,� ,�'o � y 'r.""� i
' 'I'� - .!cI i '2 `� '� .•! _ r I .fI r t 5(3) --
";.i. .i=� k 1- i;r. ''.,>f•3' t 7 ,�`y7' °�1'� 7=T - �. O c i8z' r ' '
r ` is• Y !'�,, y• � T 17
�s r i J° ii it r ` z A to
.. ,o
-.w (12)
L 3 ';t!
.r �- ,f� _� f.: S (1 - (21 a -
� ., !��-�e„l.�I ��• � � � `�t ii(�o�i �� �� '.. �;�• _ ��f (9,, —► t•—o(,( � `�,d`: it c'rY
2
17r'�I i -4.r, f � i,, 7:S - L:o±[sl;. _ '' r„1 + , �' - r,. - c f11 '�' G}•
.F�,sue; �: I t,_ - wI '��`';l�t:. ;` F � ,�• �- •r` _� r__ - y� ,�.� � -�',�'�Jir
* .,�c.ijS �•� t - :"'C�..- -� s i `t Ca r -ti S2 ';- - L (2, - -
x'r _ 1 1/}- Y -1''� I s _ ` =yy] 3' x•�.:-'�. ;/ v' - - 1 •V�.
'.�' itS A -�•` l ' /' f7) rA .. , rl^i ,.l.. '.'�.�,1,•I•�"fP.Jo,;r�r'. •Jr hj�=:-: � �.- 71�_ i.. J='f I r'"""�� -
to
td-. 4 r .r �+- •�. ( i - _ 4 nn,.�t (t2k `r ' L:?'i 1. _, J 'i}
JIM
M.,—Jf
.•r -'F—.r.. _ t /jf,1 ,3,,^•'•la. r „`• '.•�r ,r �i - r..ia..: .,F-ir. T. � M1..r tIT �yy1' - :•
y. + - 1- `..,t�Ji:G� • [1� ... (_I.."�.' F+i- �;' 1 ' �J�' 0'n r.- "'�1•:} .Cry_.'-;
�_ - __ 1 / - 1�*• R..� ,(11 zA.: r. •ter. * tt (36)10 �1 E� 3z Izo)
(35)10
��..'d' .1 't1 I�.fu..� Y ��*t?� T� ( 1 � f< � �� �^ r` � � ' '��' s ,'.r.`t r :e? - _ ' �•�'_.y-a�
I _ Q25
R' _ 1 ' t'Q. ,c ! ,'cL�e�r�r�� •+�.-_ '.c+=•j.Rw- - �' - f •.1°�'-_•.X'•� '•,a' y;" - , , .
11 I F. 't.r'`. 1� I. _ _ �:` "•�M 1.v"• _ _
y ✓ r Y- f?3 +.`' rr r L t f +y'ut+ +�LU' r �' 4' S �.► E .S' •� r a i
129)s o(1) =:,. - �f` i- - ! •' -3..�- ---- - _ d- - - -�- --
ns)s t--- ,�(„� / i�'. �avr ' ''' t v LM r � AGY BU�D Ej
7�-
a,
r
i0_ ti 23�1 !'
(Yt �i O /'� 1(3)
1
FIGURE 8: TRAFFIC ASSIGNMENT PHASE 1 (�X= PM PEAK HOUR VOLUME
■ = PM PEAK HOUR VOLUME
ENGINEERING, INC. 21
The Kn—,of Hillcrest East& Highland South TIS
r'' .i •.: ~ __ f -f T � .,i�a j� - ♦ltif•_ .:�1 y�• �: •� l •1 ../ �7��� .i-.+A' P'�K~ '� y._�.
1' s O S_ .U` �F9NhM .� .
A ff.*rty-*t-1 W,
T..
Q%�7;a,.*y
7
el
I%
k ti-
Ktril I.
C. ly
7
(
gn
4 4)
j.
qr
13
17*
(2:!
15 L 4
;
go?,Wi�`j
2E 2(2o)
(e6)
..tv
%*
7
ok 1 of
lio 30
JIM
J6
48 zlf (55)
(4)
((3-2))--T 221-1 1)
It
2(3) (73)25 62(431
(63)16 V— 7(9)
56(34)
4(6)
2
14 --- 15(24)
4.4r f3'1 2
7
4 c -a
< 6)
o 4
17. A
4(5) ki A
(o)o IF
-
(1 5C))70 116(107) • • AGY B LVD
(11) (7)
Al
17 6
z
-j-
�4
Z- Ln
'76 82 i1051
3:
2 Y (2)))
0
Y.
X—AM PEAK HOUR VOLUME
FIGURE 9: TRAFFIC ASSIGNMENT PHASE 2 N=PM PEAK HOUR VOLUME
ENGINEERING-, INC. 22
The Il,.—d at Hilltrest East& Highland South TIS
t- ,.i' f .'�!v'r �t :t; r irr. -r .: r,s� ••�• ,''`: ",, ✓ry; '7�" -,,•� - ♦S'` -r: -1 _ f �.;ffir.,y Sy ,, „ '-'�
•tom �`i i_ `• •�R'I' ?` • i' �1 i;;+ :�' f� r�r ,o t S' ".yr. ,+'I `_y��Cl-t*� Y,7 r;'
�. f. •� k� { �i!� �,,, :�; rtDY•., r� .a'} lt� . '�'K,l�d::. �. .'- r-�. 'a�� r ���,-�
r+K` -� M' !.'rs r. • �t�� _ - = - r� �.- �a:.� j f'�hiri..,+�t�'�' �- t� �.; _ I - �- - •`=''.� _
'fi :*��#� ,:�'! `' + 4,I ' t"r�5,� ) r � '�i � '�� '� � t?i�4'"�"�jG r: .i.. y-.<i•r °* � �� I ,�'. ' � �-6,`r ��
r!, n r F' •it' C t,� •r, .1..� r• i• _. "-"a l' � � �'i6t�i: :-c. �:.• �,.
♦, _c. t '4 -t :�,mac, w r •.
= •r? fti i , .t. .t, '('
�Q "j• .�wr � ��. �xt: 1i 't '�Y' i. �'., Y� .w_ ` .:nip•. '�. �...,� � M � s _i�' ,�.•• �l -�'!
= � '-� T ,F '►-r?.A '�_ ,_r s� •-x� F. �1�,., ,x. .3- !� -� R �•n, � -T ,:� •sc 'y � 't '... - ._.i1.. �� :Y • �+-
M4 :ti�. j ...a» .•, _. �T j \... ` �_ 1 _,•-���� +eve 4._r. w_►.�-T>' �� y�- .. �.�- �'7
r•. 'Y,.� _ .tf-'7 �L� 3 O,! �» _ /1 ., ���`��. ,`\�___� � - - - ♦ �,` ,�(, •�-• +Eat• .:�� -
_ . "f .,- F 9 " l_X{' r`;rF' Mr �d` •, ' '+ ` is ?.' .�,el�i:• .r�i :►- •..sue. _r r�r, ''`' , ..a,. �' - --',- -'- •�' #_
-Tr
a '. � f a• � • r' f rr'. .,fit IT rr � -i �'. �.:., i 1� � `.. - _l `��:_ '\ - �- iJa'-'' '7�„� f - T' � -
FF �6
d
✓ it `Vf' ka, r - f, 4 ,: * dal: r
•�fir:+f- * ;p'L` '�' „�,. Y - '�.i°- w' � ;v � -•�! l'r� � ���� "• -
. to ter, i ,.r y ..c�
� • s.f � •r Ar: yr t >f' !•� It f �� 't _ i � `�``
.{., ♦'.� ss r: irrF i ").'4 .» A l ., F+ �.d, 4 � KaK� � :�f• 'f:/ �` �]•��� \: ;\ a ; -- - _`'\� •',{...., �_ � �_ ,� >,tr-,
•�� r.1�vr i R` .t�-'�. � -r., �' P. :i y� r ;C % �' �- 'I�} � .t,�'rt l.•'*t� � _.-�" ..\ -_ +J Q �?'.' -- ,.f` • ;•
f_ .,T .J Ir". _ A •f i I'!, i`. ! _ '.�''r �1i la i ..\.. T - �� � - -•_ �t _ _ �� _
S1 rtEE Jy, -"�",�`� `�Z r:r ��`�«i�,.- _ .-ttt`'�•3f•• ✓. t���.. ,
t ., 1 .• t����, .r. ,, �• '�. � .'` �:a�s►� /y.�s, _ ��,� fin: a t,_c�� �q- _ _"-.• ^• ':'t
tt - {{, i•� _ •r r�. .r.r r. et yt •n .� �.f :F'�, .�=.�7^4�. .��"- �-..•w /�. ��, '- i" � .. �'� '��'y��:. ..
FL 1" Y�'. 1' i^ .( r r- - •�,.t �r ,�Y'�t - 1.'d�t•-,+'•Q• ,�ii.'. +e[. - - Qor. .• r .r,• _
�:x '�y,'�a f }�•� T f, '!- �.Kr rS.i.l'rl' r a^�; �;:r (3) (tl1 _�,�,t:`S_ � � - _ �-•-��FjQ .^r•. .�7 �n.ai" �'�-1 •.''11� '��.' _ (1)
=t;. 4 1 '�•_ � ,� i�• 'Y }� r J.fw l - .�.' � .f �'�' 1 2 � .� ..r ., a r 1 � •'� p ��'�,- .� 'V� !•. 1 �
""��i I r, � • • J ^ .,I/ AIR
•�- � r?� -^'�7.J � n..t''~ �'1�- � �.` t' - {. 3 ��F`~ 1�'.- `•1 1;� +'`'-
r..•.� "'c.1..'h!•! ` ^q- ,r' A 7(4) Q � J .'� J ' I .NF j ,Lt =f - •'R . ..t.'.. -i
� ?a._y 1 �.. + hh,`. r ;�, 3•J^ !!� i'` 'e .+ y� C9 r_ �Q � _ r
'_ r ,� r t r•• ;rt
r P rr' w�2 ��%•r j C . +1 + 3 f S r'.....� -4J �C Z t~� ��•a, ! 4
•� ' ' ,i� r _ � r �J� �1 lit.(. 1` .ii. �. i' :�:, '�' =.q •r.; ()
� 'r .� , ! �•� �. �,l r�' + j_,j,• � ;� ,� -- �-�-.-_�;._' •o Ize s� ��1,-� ■, ,:_ +tt `1, _ µ�
•r1�5.t�•. �• ��_ 1��!�'�..� 't .:._r 7 .�. ..r rr;* �sdr t+r �Y�V -. a„ .�r 1x ` - ♦ 2 :t' �alty�c _
rr wi��, ° _ { .�, � � tr��'•� t¢�:'�'t. u � JT�- � i � • ryt � �,. •,�. - .� r �., ;Y,�7r w ��'-? � f
��',y,,'y�{-•�. +� 1 1 --r. :» 1' r ./'�. rr'� .J`Y .�M` ;f." - I �- - .i:. ^�� ` ,.✓��{-+t.�;i � - s �.� 'i
�•�rr•W .. ,r ;t• -a~' r 'rr.x' -.�.''a�• r K J_ ,
. 1-..1M� 1 1/ �� F'^1_I� �, 7'.7t .<r'_ c � _ 'ri '� �.`r _ ^� _ "�•�— jai; - - , � - �v. �'r t
' •7 x�p _ Yf�� '�y?S� 3 - �`., -�r.- � �y l '-_Y f ;_�.1'-` •r , �, `'�., _� -- - .f`ir�r•�� ��r• - •�+,
1'Y'•, j i�j.-v a-- y.t.`:.a�. e'• _
. .. .y'. - - �_ .� �d+-• 17r 7�t� ��-..�� t,� - �t .r 31
fie"-. +..�.-r. �. S„�� 7'�-r7+,- ; � �r � ! - •s' c.r •.. f •� '° :- ':; dr. •• '..,: (1)
r ''`,>,^' - Jr. 1• i l - , �� ft i- +4 •sue r�
:' C„1:i. ..:C _ t^ .,• '!- 1(1) ♦•` U f✓ } l�.- (z3)7 �1 z1(13) •', �• :i•" C(zz)7 —1 !-- zo(12)
in
f�.�_ '-,� !�.'�y 1` !•• q' 'r+ .r f � �.e �j*'.ntFk - S �,.r �.,. (oJ1 �1 /� 0(1)
+ r�•1 fir,r' : •�^�"" �:��� l�,:; f•�rt3�, '!. � C. �, <- w. //�
] —,K 1._ .%� , �.•.�` Q
V. .z-6 .+ . _ t.{+, rr r.� a t �.In _ - _ _ - } i r I -i -z ( ,N _ _ __t'w.r _ "'+1•l
?r� l�'�c�.r zs)e �> t� 24(15) f ��/ ` di S f'; _ I. J ••- AGY- 1 LL LL
7.
f r r r• a rj�, :� .
- t t 11i2 1(2)
X=AMPEAKHOURVOLUME
FIGURE 10: TRAF ' ASSIGN ENT � PHASE -3
(X)-PM PEAK HOUR VOLUME
The )....,)Is at Hillcrest East& Highland South TIS
K $.!% r�'.�!1 i� '��'}' ,�f%�:7. .r,. .rr��., •... T, , NG#.�. tf• 7 .! .'L -t: «i'^ff�' ;.. • � '1 x �'�':-/� r ! 4�.� ��� �s;,r- +.j t .'C ?�� �1
�. _ -:� .i t'v .,� 4 ����;r � �,rfl 1� fig_ :..'�� �...�,• •r f' - •:`� ...'� .J .'.^o,�- f;;.
r ; �: ��!-• 1'�'' _s t 'yayf '� -�k ' r f �_,- ''� 1 X� ',�. • 'f ,ps,,, �'��li:>n �' �✓ -`'•' •w' �1t.' '>t.�- ,>f
��a��g� ,� ��)`•` t. gyp/ Yrr• �'f 41�-.•rj.1
yr. • , � � rl�' ��. t" ,y,�" :.�:: �MMlll`_.r - ••`_ ,x,�� V ,.^ �"
� rrr �r� ���f'glC(a'' .` (�',F -} '� ��'r �'.��� I� ~��•x, .', .�T" �-- •�' _ �.� �:�3•?)-=- r 'Y�•-_-'?r_
� .:'S�•a^`' t• r, 'r'^� yr, •,,���.��,���i _ in- i•S �_ �Y'*- it r, 'i r,;: -��1 � ;�•W.'x, <• 1. �-•.�-••�-l' Z-•
4�., � � ,F t4 t. rs z ^1 ;�7t"r ! � 0� J r�� r•1 `>"•- 1'�-r�� 'w't;' 3_ 'Y _ �• C'r F-•''�.'r _• ',K; '4 Tom. � c �- _ f'`/�< �+�cJ�•,t�.,xi.>. �'"
+R ._ at •'• lt� rf �, - .4 .1 �. it '-.;. K .t -r,- -� "�. _ —:'1.• ` �• :.� - •:i �. _ �� L•.`r'l_•�r.•ai'-.��
,- T �� if � 7,r � y' •I •, r. _ � _ �` ..'� � �:rj �_ ?rcr :-c '�� '�c��i, �•. t::;. •�''�:���t• 7f �'- '� _ice_
w6. F� -(r F ♦' �` ;!��_ £'�"� r+• r9.T.. '--�•�•.tee• --•,'_24. •������ ,�y� :4- _ .�',rw�` ..'..w'�is: '1';• i..:ay
}f �,.>"+• •� `t, 'Xr'. +! •CJ ^r (;, �r( ,�.J 4.; _ .. _r, `•... C 4 4-. rr..�f' q -:;:r'•.�.'�� �c,s a' -,s-',�' ��' - ;r• -
`r ..t•* 1�. Lin ,1' T 4 t' 1 f ri r it •!r• 'µ' f. '.• •.._ - - _\. \- ''} - .. .' i:.�r .. _ .n_.}.]s< Y.t- •' _ ter..`,
'�F 7• >• k "�. tl•'` :r �i ' �' '� '%S',y f:- � .Arf ••7 - - •. _(. _ �-�� 1}`,..�• t 't,.".> �:r' �,, rG„�',•.� . 1C's.'" '.•r -
>• .� - l• s• } "f� :.4 'C-' �7- •, �% �• \� \�. - � .e. vti� ,:� S••�..-.Jd'+ 'w__�?_ o-^�.•aai:at•..,.� '(. ;t}_f
ie f� ;> �.i rfi. fi �4 r9) ! . _ p 1 _ + 1- .r 34
%A i. f ..p J�. •9!.. L R♦' `k ^t •* 'w '�G• �i. r?i} F• it
`l tY L t a`, !:i �- �� - •.>�ti .r>-trL' --. <. ,� - ^I••.
K- �f �=TI- - is: Y t �•j r .. �`1 __ r�_ , •'1i v+/•• - __
.r ,' S 1„ 1 ;>iM• �g .w k� r.►-' :7; r.•�•� 17i. •Fr_' - ��:' - �` -_- `� - - - - •q �?.
.�• .!: t •:}• �. S it - !a- i �\ 2(6' ••"r"T, • 'f` _ t i ... _ _ - 1� - - - - •1_
ON
_ ... �� Tff 7� "�• '"1' r4J ' ' � ,_ -
E
r;jr• T; ' h i: .", W S STR b.;` c :Z '�.sr r:,;,• ��
gill,
.f� r: - 7 r •.• :a• :.Cy •,'. .�) — - _'r. Q�r �- S�!<. 'i'r.:+ - - _ •ir.
!Z •�:' fy !r p'Y. rJ�' T, ' r.Y °• J I/, Y.•r'-i.t !'. '.._ - �..;•7>�.°,1. ... i✓(1 +T ••. -_ _ P J .
..r. v n r •t 7.,J- F. •�,. t,- - y .- -- _ - M.. 7O •� __- �d�j!._ .�' __ -_�-.._ -
-�.t 'y^$c� t^ K ���M �•. .K 1, •Sr .r..« ei (s) (s) - i�� , FjQ ,¢'� ti .K .', -10 �,� --; —vi •`.
J r r z
`�-
- 'f'7- r;,c:fO•'f'X �. ` r? -i.•ra .i ( A _' < �` ..w. •r• - _ .� - -:; �-
•_ •.R rs-*.2Z f.• C� r n•{ 1r. R B(5) f - � .� �. fr 7: .��,'•�bs _ _ i�J, -,r,� yl/�" - -
1 �+' "r° �� .r• �! r.•a . l L�` tea•_- t �
/^,.N. � �7 �_k �7 i�� •, r7 t� '� � � ;� �- '� ', ��to(sl r � x' �.'�• '� �.3 �.'-
I:_ '_'"_ _T'4'" /r � i• >i .w_ =' 6,; lt;sir: i' s .. �;- - jt'� - (, .:. r! `:t:
E' •1 �,rj'"-•► (-,� f.�•. [' rj]..iK 'rf fs) !61 k� tly' N) (t7) t�., .ram F � -._ _ - , r•wFk
14
. rJ 1� t 0. c„r•�•I �' t .,.r' l .L-: 1 I 'lI F S• ."/Qti.'!�" -R
17
�• � - '� �4:i�.:' If't� F�_ _ ` 6(a) ` t 7 C» R� • �C �. �i 1 r���qs? � _�Ir_"� W G - .-„�i _
�• i :-:- v ��ta(to) ? •.+��� fr.. .h. i-.1 •.� �..—,r -_.-F,r''�• � •t' '`( .i ,J�v
�' ( .,7{r'lf `:( _ �+. —_ - .ry v: ',--cl '- _ y .— _ —_,..___ '__ - -?: _. ._�•�_. -- -._ ..QI .• -.� _ - ""rlr.�G. � '• ��.., i r,�'• .�.�7't"y�. �.
• y-irrii fj • �.11 'X- � i � � - •a J _�.. ;- � .. ,� _ � ��,_1 a '� - � i_-
x�r� - 1•wv � _`'1 3 5 �,7� iS;. J.-- r t..� ..._f__1_...rl._i_•, - ♦ 7 �' t,ys r �'.�.
. _i s, - .' !7 f ;,of �• - 'lylZ` � •�, ' - ` •.•_)
!. 2„ .�#.i
s - _ p!• i- 7 � Y •'' ,y T (z7)e S_ { w ••J ?a7' '7
x�
v s —' ^, i4 +J:.-e,•.� ,fir.<_ ip -. 9
o�i1 ( K• t' 1 V
W ,tJ7r� �+raaf.sy7, 10 r,• .. {, �as�>. .� i.
,o>c��a y - _ � s t :..... > lam. -.S'>:••r! -.1,�: r, � \' ;,t s rR�.}' .' 1r +�''
rr• ./ ,e' '>•a7wi'�•' 0 ..h,�r.. .:� y,:. . -,� �j ° .�. R' �j... r, �,,,� }L'F_ - - 4,,,•
ti +`3 ' . / �. - t 1r �f t " . - f, y' ^, ": �':. a t•7+Nc 7IL
1� *` / r s �.. < .;, W:. ,+�. f:^,. �, 1�i• [ �e K ,�_ ""�Cl' :! - _ v � rl
_ t.r (! � '-'3' K i
S, !+'. 3, r."Ti.'- - ",�.N.t� .lam• _ J�(.-f. s�': �� �' � ti ..s�{'�� •-1 - - •e>n.�a� _
r.jr, `�;zr'`•r.,2�` �j� ,.�; I � • _' ,,:�'�� »', r:._ KAGY-BLVD
`j •T a r ( �} 7 � '1� � [/fir/ 'f r�, iiJ ►. - - 3 �1 y,_ _
q+ Z
r - 1x3,• ; �•-
cz
min p
FIGURE 11 : TRAFFIC ASSIGNMENT - PHASE 4 (XX=)=PM PEAK HOUR VOLUME
PM PEAK HOUR VOLUME
The K..,,is at Hillcrest East& Highland South TIS
Awr
�71�4'
if..IL7
k,,'-' if"LET:, 0 1 �q
111 F 7 .,W7
�_:i - `T'. .•yrf''� -I 'F 't+: {. f� !-"�i � e iC"..Ili. Fill ;./ tJ .T IKr+C'+. � .� A",�� r T � .�_ � _ __ �R�--•' �•.
E ; laT 60 � >St� J r(.�I.. � �� .2 �= �-xd
W
�-'6) 3,
'Jolr.'rS'r,14:1 9
I {-' •' .H - V s _ ta' i ., . 1 n?y aid .� 1 '�.�l � ices �G r - •�c-j
Pr - ` `•- - - - C jjt�,, _- - w L '�- -7
us
(41)
21 185 11
ro
104 405 58 39(26)
:T (34)19 .(20)
(0)0
0(0)
10(6)
1�— 19(55)
07
4(2)(5)0
It. 1 (37 BO 0 18 AN 62 1
'33)(7)
7(465)(6)
2 9 2
(90)26 "— 14(2,
--$
(254 115
----0- 4—272(172)
(4)
,am (0)a 0(0)
16"M 16)22 14(10) 74 0 11
ale V
P
10 5
(3)fl;K
10%(66)13 (153 B 6 4B(55) i:
�o 0 12 )
(115)57 165(76) 1 (9)
2 0 6
14
_J1 74(B3)
14- (319)281 4--403(165)
5)
(25)21 22(24) 7t:'I-i (1)0 7(9)
(5 5)350 4-681 45 3 (36)25 13(9)
(89)29 t oe-
1138)59 148(88)
Y
C, (1013 o(o)
r-
7 1 7
"T
t 16 T - r
>3.
63 14 8 1<
(5)(4) (0)
mum 2
MDMD-M
J
6 4(6))
17 F,
(390)(29)153
422(239) ` _r' ` - f _ .:at - AGY-BLVQ ` ,,}_ fw�.rrras `•,�'-
0'
z
s•� rf� � -.S l r1 - • (�9'G � 418) :'F
L 12,11,:11 269(192)
2(2)
-7r ---7
A
FIGURE 16: EXISTING + THE KNOLL XAM PEAK HOUR VOLUME
S AT 11 o (2 K PM PEAK HOUR VOLUME
3)
HILLCREST WEST + PHASE 1 ®4
29
The i, .ts at Hillcrest East& Highland South TIS
f'r. I• i .t'�.•jl. 7" I^'d f•.` �.�.',�.C��rr'�} r T» �;i u;, �.i . r1',1i� - � �•"-4, ` - Cr•1 1
'.:�i
e f t c F wy t f• v. '
�' c• ff t "��• �c'+ .{ ' ,.sue ;'� )r ` I .. r� t1 •"�1 - ,& �f• -Gr►5��� �' �� ��_ _ � �i`� yy. ,}c - w•;y, �R. _
HEt
'�. _ .'i '' � 1' (i�>� • •. g � �_iz..wi _..�:twy- _ e'er`. ,I. r v�3•G I�;�tr,��' ♦s' �t�,.�1�1 �\ � ` - - � � -4 �:
v :'•5- �' ..P t`�1. j ♦ - _ _ - !, -t' �-- rf•_ - ,'•• _' ' •r .1 ` m ., _ �- '"'fir'-`r .� 1..
rr`i T.� .I+i4.11iR- .' `X'�SY= ' i ,_ry� �1'!`• A - �.y^•� !°"�j.•,. ,{��-`', .4• '1' •}' 57-
7 .♦ „ v .p' a .' ;.0 '� •^�:- ry�, 'r� r'. Itt� ;m[� I ,' ��' i� 'rYZ� f•_ -.�_ �'�ar �••t• 3'V 'a4
�y�c ` x r • - 1.rr 1 . i :z ( u �.,» ;T} u f .At �' rspy� .` > :.1 ° r�' 7�,• �: -
$• � r;, ;� } t� , Z1 s '! �....� •1 i� 'J FT4r'-TC7a r•7�61 � `t "�-''.t' _ L- C`. c:. itf •'r-� �- 780 �t� `f.'�Y r ,� y��. .�i� .''•�4'`�
:':qf� .?_ _.•{ !" Y',i'r - ,: -1 Yr •�. �. ,t:'. j;�pj^��'a��f yrr ,�-_ 'o�• +�'^'" ". ��'. `�1�, `r, r. y S r,�`� �A__ .L k•�'�k.'�E 4(t�'�/�':.'I�F••�.'i
,'rq k'J'. n r'•: �' ,.I' C -♦. �'y'` - {' Cj - .i . .�..• - /!\
o�c. y'e. >•. 1'--: ?- - -r''
•e .F- -ice yr 1 1. .1... y:� :j.. a' •�.., _ y,. , 'I.A � lurr �A. _ -._•�.. :^ -{rr.. s� ,y:`cl -
r� � � �.� -j t• .t:. i'�' �' 1 I { � ;r; �.. �- 0 plr4 .n.... •ti.. _� .; Gp � •�M .j2 _ t )dat ,i: 1.•k' -•-..''"1'-^-•.« .�� �'"�R•-,..�'�:F � `r..,,�
y? �:r T' 1 ? �• /r� tY 0 Or r� f. @- i I> 3, +.., _ y'; :jw ; fi.R CA. � �K•� �rYj T., w. r s
,y 'c - ,yr Y � n � ` .4 yam' feuj �� _'�,,�� r.�` .�%� t• `� ..ap , �-.•R .;`:.'t, ..-�'T`F 4 ;t... -�
�" ar. •+i '3'"r .J t !� -Rs.
('r R. .;r .f'. f5> J; � �1 - � ..! '.�'cr..•i. �`7'.Iba.- _ ��` �'�a
! r.' •�w t•:tr r �2g5 \J► � °��'• •:il� - - - -� ,.1c:lh' .`', �.�yy����Y ,._...,... ,,.}-
ltsr s..; ? j •` tf- 1 , ; i st'i'° r�'' y f 7
t•�� pt rLL j.I.. � '� � w �.': .R• d '�]• 9t � � -r4 y�1 � - � .� � -- __ .f ti.-,:.� ��.��`��y � _
T -L:.!- /• Ms �I. fir •:! s.' .Y � Y r ! � � '� { '•� - - - � r ��_ Z`v- `t71.'� - -
.h '; >K f S4. •� ly' W tii a 1 ,r ��•'"P/s� F' -. _ _ _ ri• �!.. x v-. 'W:-' _ -- - _ +' ''4 ...Y':':c4 �.� '�.. _
Win
.a .T� _ - •�-"' u�0:�`�
- _ ;r_r_ ♦,.1r a.
t r- ,r 'r•�` �!: p, :✓ r. �' - -�>,. � _ .�,,` � ;tom �='-"F`-'w+< - �• 1�:,:: �. '.�... -�c
�� 1� :r• ! ,� �'; r f'...L'o, 4 - .r I �SOj r� ..�'..: - -,. 'b. � - �Y - - •tr...� sZf
_I;• �`�� �:', _ ,mac �• ,, �•w:,�.r� �.��• - - '" . _ �'s. ti;,:� ,-` ,'" ,Oh:� ,!� ,r•, .a
�_ ,,,„ .• '� - ��_r��.yj~ � et`r Y cr•;� �,':-D s_•.,�=d�� - r %. �I'^t. ^t �^r.'
_ '! �` .- J'�, lr' (( - - - - �' - -:��wr�'• t '��/y� .�.-.a. _ -•--� '�Q F�� = � r t6211a,1 I
r' '� L.A 'r. fF r t f. !1 �.. �` •�. tr
F. i•n '.�- 'St .i' r-. r!•�. rr -'�.. _ .-?�,'�+f^ 32 5 _
�•• I d r,z� I~- a �i.. - .:�%.. Fr (301140s)l42)• -:.�- - .f::- - _ F .-•..� rL....�e l .��� ?'• � �~ f ,• ,lt. -
'-:1. ` i '1 �I � '� +St .Ja f 21 :Dt• 13 {��ji��, � ..Y _- � _ � _ � 7�a, .C- �••.P
•i _ a.�-J t � .t:'Y! I 1W 'r �I !� - '1 _d, � t sY'.i "} Fr.r .r.-" '�^6� •_ s i R /r•"'�S'M.! �•..',.,�'_.._ � fl�f�aY r ,`. -
•. - ♦ - sr�' !] ,. , t R� 'r ., r r�- �i-� ,` , �� � .._- ?` •'1s)MtintlQ x iV ..A. •^-.,.�`,
rr +fv ♦ G.� - !� 04 408 5B ' -
I .1r f+• r -, H-^1/ ie .� . a�'Ar < s / JII` G f `, 39(26)
l.. ' n .. .•. . 34)19 ILA 38
0(D(231 4� �1• •� I.. K ♦ /le, :Y
,..... _ •L ! r" ', -ly .f ♦' iP `?. ,3' ((0)D —► a ) -r• .:� U�. 1' ` `._ »� �- 12(2)
•n.....:1 ..1_k �, i:.le'; �.h 1 J 7- A� y :+ e1)ze
� 15(9) a
t f r t r • l. jS .t C«: r. r _ ti'� Z 4(2) �5:1(0)(21)
+s* ( ,. ¢ :. .d� •Sl � ' ,�/ Y p '• \ \. (5)0 �� 14(37) 60 0 ,B - � .Y s2 1
rI ^` ,. BB (33)(7)
d-!'rf `{ 11 e1(4se)fs) ,..' - •`%' A=Y'y.y�� ir� ♦ -
t' �' ,• c.. I _ z z2a 3 - �.m . : `-• S' -. a 1j .
t, p, rY r fvr r 1 R "y 364 39(tsl (90)2s 4(za) r , 1
_,r r. :1 -14511 (254)115�I E—272(172) ,-
c)T� � t�1 �' rf.. r 53117 �� •.r _ A
Y�+ (6)14 9(6) _d' ti, 3l uar>�asy T
74 0 11
•.• 7A. , .. •i .� ._'° } v •♦ Pe (21)(0)(11) `� -•
- •��� 1 �J , - Y -t ...--•••— fir.. - (126) (59) '�.
t Lam, s -� f' 'Kr'1 rr__s i 1 1JI0 30
' _ 10 422 B C ]►
f22)t282,(�''rl ,.}[ ..-n'2 - •'�,t A '.y., `�,per ,w .:'•r ..
. \C � ./l ���f ✓-b y- F'��♦ rF'� { �^'.�r' •p10
_ - " • - •rtx•.f-� ��� 16M(30(3Z1 yr,Y". t�, �r i� ,, )~Gs!'r►1 365 1 49 (153)B6 48(55)
30 dtfr i
( s)s7 �-► 1s t35) ls)(Z6)
..'!*}• 1. ,r%r^•� i^ �f:- ,-n F. wa,,,4, J I Il '. r \. _.�. N �• s(7s)
- r. 4 K ♦ L � O,I 4z o s
,r'•- .f1K ! y� _� ^ 1�1 C� �� '1 • �•,�-^' f•:'. -r 1� k 'Yc_ 40374(B3)(334)286 5)(305)117� 16(25)21 /` } m I .`t • ^•
~ L
(1)0 �y 9 �'._
- 1e'.a�' ,.Y'• (90)2s5—' F 694 i460) a `Y �-b' 4- O i;, t' (36)25
_ 1138)59 1 �� 146(BB
• ,*sf� !Yr� 'Y c 0)3 —�I 1�— 0I0)
t\, �'t 1 ! W 1r� t tay;�w'�a` 1• �. rt�' )� T �`� lo)(3);11) < f� 00, - ( `
`• _ - Q e•_ i 101 (7)
Y l ! <l
EPP
dV > (�..0, '7� 5Ir"...v-�- c _ �.. -�. / ! I�FD-11Q� a •i _ s�' _ .�-' V.
(390)153— t--422(239) ( . ... .t 1. C yi (� : t_ l AGY..BL VD (• -
�R - bwd►!r nrs. `� is�; 'i _�7 �� S` U.,
t r r- r , •. F. r➢ t,t
4(6) �...
t 33s zs212)z�9)
rl
•y I _- _ ` rt .... -{ 4 1,rlri. rM1 �)• '� S. lRr > _ __ _ - - 8 '. �L^1. - K
FIGURE ff�: EXISTING THE KNOLL AT 111,)to)i3i X=AM PEAK HOUR VOLUME
° 2 (X) =PM PEAK HOUR VOLUME
HILLCREST WEST PHASE 1
FNGINEERINGF INC. 30
The Knolls at Hillcrest East& Highland South TIS
INTERSECTION CAPACITY
After traffic generated by each phase of development was combined with existing
background traffic and traffic that would be generated by The Knolls at Hillcrest West,
capacity calculations were again performed for each of the study area intersections.
Results of all the capacity calculations are summarized in Tables 3 and 4 for the AM and
PM peak hours, respectively. Detailed capacity calculation results for these traffic
volume scenarios are included in the following appendices:
■ Appendix E—Existing+The Knolls at Hillcrest West+Phase 1
■ Appendix F—Existing+The Knolls at Hillcrest West+Phase 1-2
■ Appendix G—Existing+ The Knolls at Hillcrest West+ Phase 1-3
■ Appendix H—Existing+The Knolls at Hillcrest West+Phase 1-4
■ Appendix I—Existing+ The Knolls at Hillcrest West+Phase 1-5
Results show that the addition of a northbound left-turn lane at the intersection of
Highland Boulevard and East Main Street (to be installed during the 2007 construction
season) would provide adequate capacity to accommodate traffic generated by The
Knolls at Hillcrest West, The Knolls at Hillcrest East and Highland South. Although no
additional improvements would be required at this intersection for these phases of
development, the recommended improvements from the Sub-Area TIS should be
considered and re-evaluated as other developments within the Sub-Area Plan build out.
The eastbound right-turn only restriction at the intersection of Highland Boulevard and
Ellis Street, planned for the 2007 construction season, would provide for acceptable
levels of service on the eastbound approach, even with the addition of traffic generated
by these developments. However, the westbound approach would drop to LOS D during
the PM peak hour with the addition of through volumes generated by Phase 2 of
Highland South. The PM peak hour delay on this approach would increase slightly with
the addition of through volumes generated by each subsequent phase of Highland South
and The Knolls at Hillcrest East, but the approach would not drop below LOS D.
ENGINEERING, INC. 31
N CV
� M
s_
Q
0
cn
•� 0og �oo�oo ; oho o gQo$ g oyo� omc-. �Oom Oo N Oo o� GrnOGm,c�+ro;
cGoo 0 0 0 g* � �oo1
+ C400oo o oSo
is �=h
02 i $ ; rJ Q I-) Q EA U¢¢ U Pq¢¢ ,�'U Q-4P4 d�W G>~ t d KJ Q I ¢ d¢ PP d 4 t W -4 W w Q Q U ip Q I iS Q d w iw
pO�' Vi Q O m "O a [� N ..� �D r', im n
.� t bo a l� r r �i O; m ( .N. OG t- ti'.y r» [-
N i� O; m d0'�
A D
i✓
�•'� m 0 O O_+ Op0 0 BOO O_'OO O O O O O r' O OO O O O OQ O O o Q O
N p^' �O oo S �c 8 •m f�vi 1� p In co O •�p O O O O•M��SS�liil O m O�-11 If��,
iO ` N O .r O,C;"J'• G O C try O l'�, i O 1+� O I O O ( N O,�J t
_ TJS OOC 0 0 000 COOO o000 00'O C O O o oG O o 0 o OG 0 6 0 000 O G o oN�o
C °'� U¢V ¢ W:�¢! Ut944 S:UQ¢ mH-rl
t ¢U ¢ ¢ Q¢
Y 3
N1'y t� O Y,•O�p in .r m O•-+ Yt m h1 b In .. 1"t to c' M O C .�i N
� ��•,�, A C 'NO oG�o �N CO Jo .fir�,qD 90 � �[�SG 0 n�N t oo� � � �n .r a DO I .N+ oo� ,my,�: nG [�N� eo t �' Oa m Y1,�
i�Vt 1�O O pp O pp O O C o O o O•O O O o G p o^ O O O O O O p O O O O,O O
O G O+• V m O m �N YI �� [� O N$ Y, co o � G mi � m �p r �m m o
Vl•�O� C•r.�OO •~OY�o• �O� mO �O[� I OM O O OO O _' t N OO OO �� p�m f�`Y1 O I C �� O,O,K`
00G O O o o f o 000 c -o0 0C. ^• Oo o o 00 O o o O o0 O o.O o'o0 o C- O ONO
83 5
r
i d �G UQU Q PgUQQ a1W'd4
^ „r, o ry o •^.wt o.. oo In '^In°O OppO�� v,�: o rn �o n, ni • .."o r m �o'�— m r r m•e
y m N O .-.r N 161,16
o Co ti So tb ti p.f�Do 0 r N O t w,�� �� I K� I• .-r p. m I „4y oo r ,_, y o0 ly oo I �T W N h
.i
«� ao• op00 C' Go (off 08 0000 Zoo 0 pp 0Co oc• o c• ppG o 0 00� 0 c. 0 oo0
+ v, h d O ly O O O•C;'O O �1 N f�+ �O O O G O G t N HIED
O O O C�•rn O •7 O O�b
o oC 0 0000 'COO O o 0 o 6c—'+ G o 0 o G0 O C O OF 0 o o C. O r o o o _ O o•--�o
dsr:�
O VQU4 POUQ<. �m GQ¢¢ RI�QQ F1<Ww I <U Q < 4 < W < ¢ t ca mPP QQJ= Q l = 4QWW
a=
v�o m p r o.o< a e o.. o m r., cn v,•°rn o; <+•? •o v. �? r t, r; •c K`!
rA2 0 N�r�iO .�.�oo rii �omai ",,,�nm or�� ooN T � �r o; m t oo tr ^'•'; ro [�•'p .
n
n m T O opO G 0000 k o O o O •Oy M m m +O ;t` pG N.^ O O'O'• O 0 0,rJ, N N r ? It O O O O, '` a O�� C; ? O O O O 0 0 bo0o O o o 6 0 0 0 0 0 C O o O 1=o O o 0 O O C. 0 0 0 0 O O o 0 o 4 o 0 0-a o
43 —
+ ffie0UQU4 �U¢Qww44mQdQdwA t ¢rJ444Qw4 _� Q4c� � 4 ¢wcu4 : W '4 ¢ww
w
9 S- Oro O m r .O, Y,
0 00 qo N�'r�w O;t-N N t Do N a
a
N V'1 O Cp,pp O O CC p O O oMo
pp O pp O O O O C G O O O G O O T
_ � ` N b p 0 O�O� W 6• m n r N 7 N l� O V�pc __ O � 1�N N `0 tO I f��11 O O O O t 6 p - O 7 Z - O? O
G C O G o 0 0 O O O O 0 0 O 0 0 O o 6 c; o 0 0 0 O o O o.-4 6, ,p c
aC°i yrdg±3 E 17
+..��t; J rJ Q U Q a7'U Q Q im-Q m Q ¢d W U t Q U Q t Q Q¢ P4'4' : d PG".�. I d W ``' ?' 'Q Q W W as
'N A 4 M G rr�.= rn!An N �`• O O m N� �� ��"�•7 rr, �D rn r Yt � 7 r w V r ..r p O!C! O
x Q �mNo �••o6m �Zod I � 2 � a ;aN to6N ° trrr �o; =22 r �� I � 22a-=
N o �
C ry
ppp...icn 0`O ro��op p O O Opp 0 0 OpN O 8 00O O pO O 00 O•00N0
�+•O O O�O t :�i�_� - N O Sri�V�i 1 O f�1 � t O O O, O O ��1O _ 1� �?� O�O N V O F
OO 0 0 0 O000 0 O O C o O o O O 'o0 00 O o 0 0 O O O O'+O
a VUQU4 :QU44md a'>?ZQQw'U 4U '414Q4cA4 'ia� QPp ¢aa }�Z ¢ 4wA �
U -
a _ v �m .. ? P• - ^.t H:'? a�'? •� n �o m r h a m eh r a.p C N
cl
0
° w x �mw m m PPaPm � m im
fl-v
Entr�3zv 3tnQ� zt� w3zv � v W3 v Fo z
n Q -
•O� v¢ a a �
�
U b
yy C F �L , o 'R r p a m 9 cOi W a, i, Pq O •V._
oo0n W E, °D m F:, m•K Q m v a �' vi m r 9
x � x W
W
Z
Z
W
M
1— Cl)
O
1/f
M0- `J O O " ry . Oo�i O � OC�! OC
00C� 000 000'o GONO'OO O$ o0 0� o - 000
O
'_00 •-' O G O CJ 00 OOO O O o'O OG O OOC O C 0 ON.�
1
CSJ
L �� Vu7U:nq 9AQ'¢ vea44 wV44 44uw I dw 4 14 a4 ww d I r� dd m,� d au Q x Q 4ww
r
L a
V
H
o r�
� . �'[�N IM• �p t�O h m N T V'i P °° " .p � .-.O m .r O.,p [� i � 1n .p '-'G: IT 'Oo l�C9 b�.� T O k`0` o` '� ✓ N M.
O,
N G N N •�N � C o0 M
N
V bOC� O O O O pppp Oop O
Q I�cqo O O Q O O NO,O O O O• '` N O Oq0 I O O 0 0O O 1 00 O O 0 0 C) 1 OO O O O
C) 0 0000 OOOO O O 000*+ GC O 0 0'O 00 0 'O 00 00 0 000 0 0 00 Nam+
E r� umuwcoaa � aacn aaa < � x ¢ , aaaawm ¢ laaa ¢ coca 'aar�w ¢ , wa <ww
y C 0 l� a b D M N oD b N G 1`O r iy m O O
4 C .D ti r OD •fir M 7 m : n D h:- •O -1-1 O 1 N N N OS I 'u'1 Ni
lb Q N•.•N r N'o0 00 ,,,�W r ,_, b0 l� T oG o; y 'ai I[� [�(� ,., P ,,, r ,y; r oO,._,,_, ice• 00 J• b O
O
ry '7 N pp�qq Y=i O N N 8 to [n
r Ki bo O O C)O N O'O�b O i? O CJ O O O O
000 C.
'0000 OO 0 O OO'O�+ OC O O 00 C 0 O OOO O'O O 00o O
.-i
+. V4umR1AQQrU4 ¢ax? a4aa�Uw f4w ¢ ; da4r�� 4 : coa4cGraQ4uCQa w ¢ aww
�• y
O;O' Nm •'•'0 O, O^ Ot�.
co I I� bo^ol'O.O
rNt A
« ` O�p O�v Okk
0G02 4FOG Vf - IR f�� 8 NO 'N O N' M N < m mOb h'rn m � Oh• 1 G KOO �O00 0 00 +'_+G OO 0 0 0 0 C)'D•--� 00 o 0 0G 00 G C O0 0^ 0 OOO6 0 0 0 0•--'
+ � u ¢uxwAaauaaamaa : ar, � : awe aaamm ¢ : waawmaau ¢ waaww
�. C N O•N am' .'-'-�N ro m O�W I� `L oo i;� J [�„�.�N S CS 7 W l� !• .N-i Or A ' •N r K� ,N�,.~ M� oC.�i_ [� ,� m O+ N
On O�� OO O �ppO rOr�� O'^.� ppQ pppp OO O O O pO O8 88O O_ O pOOO_ O O 0000
�N o�0 G M O .••�O O"J• O f`]OO b S q'Da, 0 O O O^'•' �!G C Ov 0�,� •� O O O O 0 0 001T
C O o O o'O o O O O O O O O O o 0 0000 O O o O o'O o O , L� o O•�ti"�
� Z _ uau.�a S Vaa ma¢ ¢ ts1� 4 a ¢ aArJ � aw Q Q aQCCr� i�� da cat Q alcaQ d I ¢ Q awts,
7f
4,�
cn C . ' NNr �-. NDD�b O� ti � �� O. 'DO O�mO b
L
O •-'!' f QF pO(O� O a G� O 6 pq O O '�O O O p O O 00 0 0 + 00•� O O�0.7 O C
�! �w O O M O O .nr'�O O a'� S O,O Vi, I q AD O I O O'O O p 1 p'�2. �L'} G 'O O
O G O O O O O O O O "JO O O O O O O Cl O 0 O o O O O y y
+ j U! Jcowuaaco�a � aaa Q¢Au tawa � aQQWw -2 ii H
a-" 4wii� aQn.w�.�
G a
°, +Wf 0 c�°O�..JOi .�. ' 'o0 00 'r, �00 1 M., ��0 0o t�,"��,•^ rn,o„ goo e� t�t� o o G c� o. Z I t�;� ? 2 ��o o;e4i 't aiOi
cx S
G' dO
O N"��� 1 �7 iN O V�i I G b O O O.•+ ^t.�a.. O O i pZ 7�Z i C,O O _ '7 Om t o o O o 0 0 0 0 0 0 0 0 0 0 0 0
u v,
U 04 0uQu1= mri mid a� � dduW : aw 'd iaaamm2 '$ 4a I <gm daww
.0 Ltl ; mo o C
yy - .O O� G •a75w d v1P
C.
'
_ u
r' 3zvmiw3 �°i �3 � z � �3!z� z3zrm °�3zv �mi � iz�� w �z� w�� w �z�ng Z
_r_ Q
au
Q ' �•� Gov' � _ H �v= �� •W �,, E � E� >� N � A GA � - jL a � Z
-r vd C x U pd O aTpP.
O Dr
gp
lax - �� � W
Z
Z
W
The Knolls at Hillcrest East& Highland South TIS
The northbound approach to the intersection of Highland Boulevard and Kagy Boulevard
currently operates at LOS F during the AM peak hour. With the addition of traffic
generated by these developments (Phase 2, in particular), the southbound approach would
also go to LOS F during both peak hours.
The northbound approach to the intersection of Haggerty Lane and East Main Street
currently operates at LOS E during the PM peak hour. Results of this analysis show that
the development of The Knolls at Hillcrest East and Highland South would add a small
amount of traffic to this intersection that would slightly increase the delay on the
northbound approach, but would not affect the existing LOS.
The southbound approach to the intersection of Kagy Boulevard and South Church
Avenue/Sourdough Road currently operates at LOS D during the AM peak hour and LOS
F during the PM peak hour. The northbound approach currently operates at LOS F
during both peak hours. If significant improvements are not made at this intersection, the
delays on the northbound and southbound approaches would get progressively longer
with the addition of traffic generated by each phase of development.
All other study area intersections currently operate at acceptable levels of service and
would continue to operate at acceptable levels of service with the addition of traffic
generated by The Knolls at Hillcrest West, The Knolls at Hillcrest East, and Highland
South.
RECOMMENDED IMPROVEMENTS
Analysis of trip generation estimates, traffic assignments, and capacity calculations show
that the development of The Knolls at Hillcrest East and Highland South would have
significant impacts on traffic operations on the surrounding roadway system. The
following interim improvements are recommended to mitigate the impacts identified:
ENGINEERING, INC. 34
The Knolls at Hillcrest East& Highland South TIS
HIGHLAND BOULEVARD & PAINTED HILLS ROADMILLCREST ACCESS
Based on the recommendations of the Sub-Area TIS, and in order to be consistent with
current construction plans for the access to the Hillcrest Retirement Center, the
intersection of Highland Boulevard and Painted Hills Road was analyzed under the
assumption that dedicated left-turn bays would be constructed on all approaches to the
intersection. This intersection would operate at acceptable levels of service with two-
way stop control and dedicated left-turn lanes on all approaches. The westbound left-turn
lane should be further evaluated during the design process to determine the required turn
bay length, which should include analysis of traffic generated by other developments
within the Sub-Area Plan.
HIGHLAND BOULEVARD & KNOLLS LANE
Current construction plans for The Knolls at Hillcrest West include a northbound left-turn
lane and a single-lane eastbound approach for the intersection of Highland Boulevard and
Knolls Lane. In order to be consistent with these construction plans,this intersection was
analyzed under the assumption that the westbound Knolls Lane approach would also be a
single-lane approach and that a southbound left-turn lane would be constructed on
Highland Boulevard. With stop control on the eastbound and westbound approaches,
these lane configurations would provide adequate capacity for traffic generated by The
Knolls at Hillcrest West, The Knolls at Hillcrest East, and Highland South.
HIGHLAND BOULEVARD & KAGY BOULEVARD
The intersection of Highland Boulevard and Kagy Boulevard currently operates at
unacceptable levels of service and delays would increase significantly with the addition
of traffic generated by these proposed developments. Therefore, this intersection was
evaluated as a signalized intersection using SIG/Cinema. Assuming eastbound lead
phasing, dedicated left-turn lanes on eastbound and westbound approaches, and a
southbound dedicated right-turn lane, all approaches would operate at LOS C or better
during both peak hours, even with the addition of traffic generated by The Knolls at
ENGINEERING, INC. 35
The Knolls at Hillcrest East& Highland South TIS
Hillcrest East and Highland South. These recommended lane configurations are shown
in Figure 18 and capacity calculation results are summarized in Table 5 and Appendix J.
In lieu of a traffic signal, this intersection was also evaluated as a roundabout using
RODEL, a nationally accepted software program for the analysis of roundabouts. Results
of this analysis show that the intersection would operate at acceptable levels of service
with a single-lane roundabout. However, additional analysis will be required during the
design process to evaluate the ability of the roundabout to accommodate traffic generated
by future phases of development. Results of the capacity calculations performed for the
roundabout alternative are also included in Table 5 and Appendix J.
The determination of whether to install a traffic signal or roundabout, along with actual
lane configurations and/or signal phasing and timing, should be made during the design
process. Existing right-of-way constraints and approach grades will be important factors
to consider during the design process and may affect the decision of whether to install a
signal or roundabout. Prior to installation of a traffic signal or roundabout in this
location, a formal traffic signal warrant analysis should be conducted.
KAGY BOULEVARD & NIIXED-USE ACCESS
As previously discussed, the number and location of the accesses to the mixed-use lot had
not been determined at the time of this study. In order to be conservative, these
calculations were based on the assumption that a single access would be provided to
Kagy Boulevard. Based on the recommendations of the Sub-Area TIS, it was assumed
that the typical section of Kagy Boulevard between Highland Boulevard and Bozeman
Trail Road would be widened to provide a raised median and dedicated left-turn lanes at
major intersections. The access to the mixed-use lot would operate at acceptable levels
of service with a single-lane approach for exiting vehicles and a dedicated left-turn lane
on Kagy Boulevard.
ENGINEERING, INC. 36
The Knolls ui Hillcrest East&Highland South TIS
UL
`i
T#
s
T�
FIGURE IS: RECOMMENDED IMPROVEMENTS -
HIGHLAND BLVD & KAGY BLVD
ENGINEERING, INC. 37
The Knolls at Hillcrest East&Highland South TIS
Table 5. Capacity Calculation Results -Recommended Im rovements
AM Peak Hour PM Peak Hour
Existing+The Knolls Existing+The Knolls
at Hiticrest West+ at Hillcrest West+
Phase 1-5 Phase 1-5
Intersectio❑ Approach Delay LOS I v/c Delay LOS v/c
EB 16.2 B 0.670 7.2 A 0.520
Highland Blvd& WB 31.7 C 0.850 17.3 B 0.410
Kagy Blvd- NB 21.9 C 0.060 22.1 C 0.050
Traffic Signal SB 13.8 B 0.360 17.4 B 0.380
Intersection 22.5 C 0.680 12.2 B 0.560
EB 13.2 -- 0.370 17.4 -- 0.630
Highland Blvd& WB 15.6 -- 0.510 13.8 -- 0.360
Kagy Blvd- NB 12.0 -- 0.020 13.2 -- 0.020
Roundabout SB 16.2 -- 0.490 15.6 -- 0.520
Intersection 14.9 B -- 16.0 C --
EB 4.8 A 0.326 8.6 A 0.669
Kagy Blvd& WB 9.2 A 0.705 5.4 A 0.401
S Church Ave/
NB 30.9 C 0.540 25.0 C 0.254
Sourdough Rd-
Traffic Signal SB 25.2 C 0.305 30.4 C 0.561
Intersection 12.2 B 0.670 11.0 B 0.650
EB 13.2 -- 0.370 19.2 -- 0.680
Kagy Blvd& VWB 21.6 -- 0.730 15.0 -- 0.510
S Church Ave/ NB
Sourdough Rd- 13.2 -- 0.250 13.2 -- 0.140
Roundabout SB 14.4 -- 0.110 13.8 -- 0.210
Intersection 17.6 C -- 16.6 C --
KAGY BOULEVARD & BENNETT DRIVE
Results of the capacity calculations show that the intersection of Kagy Boulevard and
Bennett Drive would operate at acceptable levels of service with single-lane northbound
and southbound approaches and dedicated left-turn lanes on Kagy Boulevard. A stop
sign should be installed on the proposed Bennett Drive approach.
KAGY BOULEVARD & PAINTED HILLS ROAD
Consistent with the recommendations of the Sub-Area TIS, the analysis of the
intersection of Kagy Boulevard and Painted Hills Road was performed under the
assumption that dedicated left-turn lanes would be provided on the eastbound and
ENGINEERING, INC. 38
The Knolls at Hillcrest East& Highland South TIS
westbound approaches. Results show that this intersection would operate at acceptable
levels of service with single-lane northbound and southbound approaches and dedicated
left-turn lanes on Kagy Boulevard. As with the existing northbound approach, a stop sign
should be installed on the proposed southbound approach to the intersection.
KAGY BOULEVARD & STREET "G"
Results of the capacity calculations show that the intersection of Kagy Boulevard and
Street "G" would operate at acceptable levels of service with a single-lane southbound
approach and a dedicated left-turn lane on Kagy Boulevard, consistent with the
recommendations of the Sub-Area TIS. A stop sign should be installed on the Street"G"
approach.
KAGY BOULEVARD & SOUTH CHURCH AVENUE/SOURDOUGH ROAD
The northbound and southbound approaches to the intersection of Kagy Boulevard and
South Church Avenue/Sourdough Road currently operate at unacceptable levels of
service during both peak hours and would get considerably worse with the addition of
traffic generated by the proposed developments. Therefore, this intersection was also
evaluated as a signalized intersection using SIG/Cinema. Results show that the
intersection would operate at LOS C or better for the combination of existing traffic and
traffic generated by these developments with installation of a traffic signal and dedicated
left-turn lanes on all approaches. These recommended improvements are illustrated in
Figure 19 and capacity calculation results are summarized in Table 5 and Appendix J.
The intersection of Kagy Boulevard and South Church Avenue/Sourdough Road was also
evaluated as a roundabout using RODEL. Results of this analysis show that the
intersection would operate at acceptable levels of service with a single lane roundabout
for the combination of existing traffic volumes and traffic generated by these
developments. However, additional analysis will be required during the design process to
evaluate the ability of the roundabout to accommodate traffic generated by future phases
of development. Results of the capacity calculations performed for the roundabout
alternative are also included in Table 5 and Appendix J.
ENGINEERING, INC. 39
1 1 1 1 1 1 1
t _
KAGY BLVD
s ,•)
O
tit
•
The Knolls at Hillcrest East& Highland South TIS
The determination of whether to install a traffic signal or roundabout, along with actual
lane configurations and/or signal phasing and timing, should be made during the design
process. Prior to installation of a traffic signal or roundabout in this location, a formal
traffic signal warrant analysis should be conducted.
PAINTED HILLS ROAD
Painted Hills Road will act as a neighborhood collector for these proposed subdivisions.
However, because there would be houses fronting the street, it should not act as a typical
collector in the functional classification system. It should be designed as a two lane local
street with lanes wide enough to handle volumes that would be slightly higher than a
typical local street. Because a significant amount of bicycle and pedestrian traffic is
expected within the proposed development, it is recommended that curb bulb-outs and
pedestrian crossing treatments be provided at each of the intersections along the length of
Painted Hills Road from Highland Boulevard to Kagy Boulevard. Curb bulb-outs and
pedestrian crossing treatments should also be considered at the mid-block locations
where the multi-use trail intersects the roadway. This recommended design for Painted
Hills Road would provide for reduced traffic speeds and a more pedestrian-friendly
environment.
INTERSECTION ANALYSIS FOR FUTURE DEVELOPMENT
Although they would not be required to accommodate traffic generated by the
development of The Knolls at Hillcrest East and Highland South, the following
improvements to study area intersections should be considered as future phases within the
Sub-Area Plan develop:
HIGHLAND BOULEVARD & ELLIS STREET
As previously discussed, the eastbound approach to the intersection of Highland
Boulevard and Ellis Street will be reconstructed during the 2007 construction season to
prohibit the eastbound left and through movements. However, this intersection should be
further evaluated with full access on all four approaches as other areas within the Sub-
ENGINEERING, INC. 41
The Knolls at Hillcrest East&Highland South TIS
Area Plan develop. Consistent with the recommendations of the Sub-Area TIS, this
would be a desirable location for a future traffic signal or roundabout as it would provide
direct access to future developments within the Sub-Area Plan. Although it would not be
warranted by the volumes generated by these developments, this intersection should be
considered for a future traffic signal or roundabout to be constructed when warrants are
met with future phases of development.
HIGHLAND BOULEVARD & PAINTED HILLS ROAD/HILLCREST ACCESS
As recommended in the Sub-Area TIS, a future traffic signal should also be considered at
the intersection of Highland Boulevard and Painted Hills Road. Although two-way stop
control and dedicated left-turn lanes on all approaches would accommodate traffic
generated by The Knolls at Hillcrest East and Highland South, this intersection should be
considered for a future traffic signal or roundabout to be constructed when warrants are
met with future phases of development.
HAGGERTY LANE & EAST MAIN STREET
The northbound approach to the intersection of Haggerty Lane and East Main Street
currently operates at LOS E during the PM peak hour. Results of this analysis show that
the development of The Knolls at Hillcrest East and Highland South would add a small
amount of traffic to this intersection that would slightly increase the delay on the
northbound approach, but would not affect the existing LOS. Installation of a traffic
signal at this intersection, as recommended in the Sub-Area TIS, should be considered as
the areas adjacent to Bozeman Trail Road develop in the future and when traffic signal
warrants are met.
CONCLUSIONS
If the above improvements are implemented as recommended, any impacts resulting from
the development of The Knolls at Hillcrest East and Highland South should be mitigated
and traffic should continue to operate safely and efficiently. These recommended
improvements shall serve as interim improvements to accommodate traffic added by
ENGINEERING, INC. 42
The Knolls at Hillcrest East& Highland South TIS
these two developments. Improvements necessary to accommodate full build-out of the
F
y; entire Sub-Area Plan should be further evaluated with future phases of development and
during the design process. All traffic control improvements should be designed and
constructed in accordance with City of Bozeman and MDT standards and the Manual on
Uniform Traffic Control Devices (MUTCD), 2003 Edition.
ENGINEERING, INC. 43
APPENDIX A
TRAFFIC VOLUME DATA
Robert Peccia & Associates
825 Custer Avenue
Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman1
.rs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/14/2006
Page No : 1
Groups Printed-Unshifted-Bank 1
HIGHLAND MAIN HIGHLAND MAIN
Southbou nd Westbound Northbound Eastbound
Start Time Right Thru Left Peds :Eight Thru Left Peds Right Eru]:Left Peds Eight]7Thruj Left Peds Int.
Total
Factor 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091
07:00 AM 0 0 0 0 0 61 37 0 13 0 23 1 29 38 0 0 202
07:15 AM 0 0 0 0 0 73 27 0 16 0 25 0 22 41 0 0 204
07:30 AM 0 0 0 0 1 91 68 0 20 0 24 1 33 56 0 0 294
07:45 AM 0 0 0 1 0 129 83 0 23 0 50 0 57 71 0 0 414 ;
Total 0 0 0 1 1 354 215 0 72 0 122 2 141 206 0 0 1114
08:00 AM 0 0 0 0 0 148 72 0 22 1 58 1 74 88 0 0 464
08:15 AM 0 0 0 0 2 93 60 0 20 0 36 2 56 56 0 0 325
08:30 AM 0 0 0 4 2 84 47 0 15 1 45 1 53 80 1 0 333
08:45 AM 0 0 0 4 0 70 24 0 23 0 43 0 55 73 1 0 293
Total 0 0 0 8 4 395 203 0 80 2 182 4 238 297 2 0 1415`1
BREAK-
04:00 PM 1 0 0 0 0 90 26 0 38 0 75 0 56 118 1 0 405
04:15 PM 0 0 0 0 0 99 16 0 40 0 62 0 63 119 1 0 400
04:30 PM 0 0 1 0 0 101 22 0 52 0 77 0 60 122 0 0 435
04:45 PM 0 0 1 0 0 107 21 0 60 0 80 2 56 141 1 0 469
Total 1 0 2 0 0 397 85 0 190 0 294 2 235 500 3 0 170911
05:00 PM 1 0 2 0 0 119 35 0 65 0 84 1 57 167 0 0 531
05:15 PM 0 0 0 0 1 101 29 0 62 0 71 2 68 149 0 0 483
05:30 PM 0 0 0 0 0 99 19 0 56 0 76 1 51 121 0 0 423
{ 05:45 PM 0 0 0 0 0 81 22 0 45 0 68 0 39 119 1 0 375
Total 1 0 2 0 1 400 105 0 228 0 299 4 215 556 1 0 18121.5
Grand Total 2 0 4 9 i 6 1546 608 0 570 2 897 12 829 1559 6 0 I 6050
Apprch% 13.3 0.0 26.7 60.0 0.3 71.6 28.1 0.0 I 38.5 0.1 60.6 0.8 34.6 65.1 0.3 0.0
Total% 0.0 0.0 0.1 0.1 0.1 25.6 10.0 0.0 9.4 0.0 14.8 0.2 13.7 25.8 0.1 0.0
HIGHLAND MAIN HIGHLAND MAIN
Southbound Westbound Northbound Eastbound
Rig Left Thr Ped App. Rig Left Thr Ped App. Rig Thr Ped App. Rig Thr Left Ped App. Int.
Start Time ht u s Total ht u s Total ht u Left s Total ht u s Total Total
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:45 AM
n
Volume 0 0 0 5 5 4 454 262 0 720 80 2 189 4 275 240 295 1 0 536 1536
Percent 0.0 0.0 0.0 100. 0.6 63.1 36.4 0.0 29.1 0.7 68.7 1.5 44.8 55.0 0.2 0.0
08:00 0 0 0 0 0 0 148 72 0 220 22 1 58 1 82 74 88 0 0 162 464
Volume
Peak 0.828
Factor
High Int. 08:30 AM 08:00 AM 08:00 AM 08:00 AM
Volume 0 0 0 4 4 0 148 72 0 2201 22 1 58 1 82 74 88 0 0 162
Peak 0.313 0.818 0.838 0.827
Factor
�k
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozem n1
.rs & Trucks 406-447-5000 Site Code : 0000OU00
Start Date : 2/14/2006
Page No : 2
HIGHLAND
Out In Total
�7 5L 12
0 01 01 5
Right Thru Left Pads
♦J
° _ O
LO
rn 2 North
Z
r 14/2D06 7:45:D0 AM c
N - 14/20D6 8:30:00 AM r o
0 o w Unshifted
a
E Qan};t_ M �o
co
n —
F+
Left Thru RI ht Peds
1891 21 801 4
502 275 777
Out In Total
ihbx tsl 1�ESA WMNC' v t�
Peak Hour From 12: 0 PM to 05:45 PM-Peak 1 of 1 0'� •�
I ntersectio
04:30 PM
n
Volume 1 0 4 0 5 1 428 107 0 536 239 0 312 5 556 241 579 1 0 821 191
Percent 20.0 0.0 80.0 0.0 0.2 79.9 20.0 0.0 43.0 0.0 56.1 0.9 29.4 70.5 0.1 0.0
05:00 1 0 2 0 3 0 119 35 0 154 65 0 84 1 150 57 167 0 0 224 531
Volume
Peak
Factor 0'� 3
High Int. 05:00 PM 05:00 PM 05:00 PM 05:00 PM
Volume 1 0 2 0 3 0 119 35 0 154 65 0 84 1 150 57 167 0 0 224
Peak 0.417 0.870 0.927 0.916
Factor
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman1
Ars & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/14/2006
Page No : 3
HIGHLAND
Out In Total
( 2� 5 1
11 01 41 0
Right Thru Left Peds
N _ q D
o u(Di a J Z O
J I 3 N°
North E
� 2
Z F 2 Nm s
G— 1412006 4:30:00 PM w D
a t211412006 5:15:00 PM r Z
N
Unsh
ted Bank 1 H 1
O �� Bank 1
d n cn d
o CL m—
4, T r
Left Thru Rinht Peds
3121 01 2391 5
348 55fi 904
Out In Total
HIrHt AND
Robert Peccia & Associates
825 Custer Avenue
-1ozeman Deaconess Health Services Helena, MT 59601 File Name : Bozema 02
1. ,ars & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/21/20('i
Page No : 1
Groups Printed-Unshifted-Bank 1
HIGHLAND BLVD ELLIS STREET HIGHLAND BLVD ELLIS STREET
Southbound Westbound Northbound Eastbound 1
Start Time Right Thru Left Peds Right Thru Left Peds Righl Thru Left Peds Right Thru Left Peds L
Total
Factor 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1 1.091 1.091 11.091
07:00 ANt 9 25 4 0 0 0 2 0 4 31 0 0 0 0 3 0 8
07:15 AM 12 61 4 0 3 0 2 0 1 43 0 0 1 0 1 D 8
07:30 AM 20 99 9 0 3 0 4 0 3 58 0 0 0 0 1 0 107
07:45 AM 26 110 21 0 5 1 4 0 12 63 1 0 0 1 1 0 245
Total 67 295 38 01 11 1 12 0 20 195 1 0 1 1 6 01 r'8
08:00 AM 29 85 11 0 8 3 5 0 13 75 0 0 0 0 5 0' L_4
08:15 AM 29 86 17 0 3 0 1 0 11 64 0 0 0 0 4 01 215
08:30 AM 25 74 13 0 8 0 1 0 5 50 1 0 1 0 3 0 1 R1
08:45 AM 16 71 16 0 9 0 5 0 7 50 0 0 0 1 3 01 8
Tofal 99 316 57 0 28 3 12 0 36 239 1 0 1 1 15 01 8
BREAK"**
04:00 PM 15 52 13 0 12 1 1 0 8 84 1 0 3 1 22 1 4
04:15 PM 11 46 7 0 14 0 13 0 2 73 0 0 0 1 22 2 191
04:30 PM 1 55 5 0 15 1 11 0 5 86 0 0 1 0 27 0 207
04:45 PM 3 71 5 0 20 1 9 0 5 94 1 0 0 2 27 0 8
Total 30 224 30 0 61 3 34 0 20 337 2 0 4 4 98 3 .0
05:00 PM 3 89 4 0 13 0 8 0 7 130 1 0 2 0 25 0 282E
05:15 PM 9 96 2 0 11 1 11 0 3 84 0 1 0 1 15 2 . -S'
05:30 PM 0 89 5 0 11 0 9 0 1 83 0 0 3 1 20 4 ; 6
05:45 PIA 1 72 2 0 8 0 3 0 3 58 0 0 0 0 12 2 -1
Total 13 346 13 0 43 1 31 01 14 355 1 1 5 2 72 8 905
Grand Total 209 1181 138 0 143 8 89 0 90 1126 5 1 11 8 191 11 3: 1
Apprch% 13.7 77.3 9.0 0.0 59.6 3.3 37.1 0.0 7.4 92.1 0.4 0.1 5.0 3.6 86.4 5.0
Total% 6.5 36.8 4.3 0.01 4.5 0.2 2.8 0.0 , 2.8 35.1 0.2 0.0 0.3 0.2 5.9 0.3
HIGHLAND BLVD ELLIS STREET HIGHLAND BLVD ELLIS STREET
Southbound Westbound Northbound Eastbound
Start Time Rig Thr Left Ped App. Rig Thr Left Ped App. Rig Thr Left Ped App. Rig Thr Left Ped App. Int.
ht u s Total ht u s Total ht u s I Total ht I s Total Tc �I
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:30 AM
n
Volume 104 380 58 0 542 19 4 14 0 37 39 260 1 0 300 0 1 11 0 12 F-1
Percent 19.2 70.1 10.7 0.0 51.4 10.8 37.8 0.0 13.0 86.7 0.3 0.0 0.0 8.3 91.7 0.0
07:45 26 110 21 0 157 � 5 1 4 0 10 12 63 1 0 76 0 1 1 0 2 245
Volume
Peak 0 Q09
Factor
High Int. 07:45 AM 08:00 AM 08:00 AM 08:00 AM
Volume 26 110 21 0 157 8 3 5 0 16 13 75 0 0 88 0 0 5 0 5
Peak 0.863 0.578 0.852 0.600
Factor
r,.
Robert Peccia & Associates
825 Custer Avenue
^ozeman Deaconess Health Services Helena, MT 59601 File Name : BozemanO�
ars & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/21/2006
Page No : 2
HIGHLAND BLVD
Out In Total
290 542 632
1041 wol 581 0
Right Thry Left ft Peds
f'I I �►
nO
C
rth . rr
W r
z N —� f-2 r
c^
2112005 7:30,00 AM
o r2121f2006 8:15:00 AM
rr
y 0 o Unshifted
o Bank 1 °
a y wd
o O1—
C
Left Thru Riqht Peds
11 2601 391 0
394 300 F 694
Out In Total
ND r
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1
Intersectio 04:45 PM
Volume 15 345 16 0 376 ' 55 2 37 0 94 16 391 2 1 410 5 4 87 6 102 982
Percent 4.0 91.8 4.3 0.0 158.5 2.1 39.4 &0 3.9 95.4 0.5 0.2 4.9 3.9 85.3 5.9
05:00 3 89 4 0 96 13 0 8 0 21 7 130 1 0 138 2 0 25 0 27 282
Volume
Peak 0.871
Factor
High Int. 05:15 PM 04:45 PM 05:00 PM 04:45 PM
Volume 9 96 2 0 107 20 1 9 0 30 7 130 1 0 138 0 2 27 0 29
Peak 0.879 0.783 0.743 0.879
Factor
Robert Peccia & Associates
825 Custer Avenue
^ozeman Deaconess Health Services Helena, MT 59601 File Name : Bozema 0."
,ars & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/21/2009
Page No : 3
NI ' VD LV
Out In Total
5331 376 909
151 3451 161 0
Ritit Thru Left Peds
-- r _�
~ v no
T
rr
L N 2
Y C: 2
2112006 4:45:00 PM g
112006 5:30:00 PM r a
w...T' o� �s� n
Unshifted
0 Bank 1 o
a) m w iu
CL H o o—
+i T r
Left Thru Ri ht Peds
21 391 16 1
367 410 797
AN Out In Total
l
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman,
Ars & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/15/2006
Page No : 1
Groups Printed-Unshifted-Bank 1
HIGHLAND KAGY HIGHLAND KAGY
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int.
Total
Factor 1.091 1.091 1.091 1 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091
07:00 AM 22 0 0 0 4 28 0 0 0 0 0 0 0 7 25 0 86
07:15 AM 49 0 0 0 7 41 0 0 0 0 1 0 0 7 35 0 140
07:30 AM 80 0 2 1 5 69 0 0 0 0 2 0 0 12 48 0 219
07:45 AM 86 0 2 0 5 93 0 0 0 0 2 0 0 19 77 0 284
Total 237 0 4 1 21 231 0 0 0 0 5 0 0 45 185 0 729
08:00 AM 83 1 1 0 1 69 0 01 0 1 2 0 0 22 72 0 252
08:15 AM 55 0 2 0 3 57 0 0 0 0 1 0 0 22 57 0 197
08:30 AM 68 0 2 0 1 39 0 0 0 0 0 0 0 21 60 0 191
08:45 AM _ 75 0 2 0 7 37 0 0 0 0 1 0 0 15 53 0 190
Total 21 1 7 0 12 202 0 0 0 1 4 0 0 80 242 0 830
" BREAK'«'
04:00 PM 65 0 7 0 1 20 0 0 0 0 0 0 0 40 60 0 193
04:15 PM 67 0 7 0 0 14 0 0 0 0 1 0 0 36 55 0 180
04:30 PM 58 1 4 0 3 25 0 0 0 1 0 0 1 34 70 0 197
04.45 PM 81 2 4 2 4 28 0 0 0 0 0 0 0 28 69 0 218
Total 271 3 22 21 8 87 0 0 0 1 1 01 1 138 254 0 788
05:00 PM 89 0 8 1 9 22 0 0 0 1 0 0 1 43 53 1 228
05:15 PM 101 0 2 0 1 23 0 0 0 1 0 0 0 56 68 1 253
05:30 PM 81 1 5 0 5 16 0 0 0 1 0 0 0 46 58 0 213
( 05:45 PM 73 0 5 0 2 27 0 0 0 1 1 0 i, 0 37 45 0 191
- Total 344 1 20 1 17 88 0 0 0 4 1 0 1 182 224 2 885
Grand Total 1133 5 53 4 I 58 608 0 0 I 0 6 11 0 2 445 905 2 3232
Apprch% 94.8 0.4 4.4 0.3 8.7 91.3 0.0 0.0 0.0 35.3 64.7 0.0 0.1 32.9 66.8 0.1
Total% 35.1 0.2 1.6 0.1 1.8 18.8 0.0 0.0 0.0 0.2 0.3 0.0 0.1 13.8 28.0 0.1
HIGHLAND KAGY HIGHLAND KAGY
Southbound Westbound Northbound Eastbound
Rig I Thr Left Ped I App. Rig Thr Left Ped App. Rig I Thr Left Ped App. Rig Thr Ped App. Int.
Start Time ht u s Total ht u s Total ht u s Total Left ht u s Total Total
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:30 AM
n
Volume 304 1 7 1 313 14 288 0 0 302 0 1 7 0 8 0 75 254 0 329 952
Percent 97.1 0.3 2.2 0.3 4.6 95.4 0.0 0.0 0.0 12.5 87.5 0.0 0.0 22.8 77.2 0.0
07:45 86 0 2 0 88 5 93 0 0 98 0 0 2 0 2 0 19 77 0 96 284
Volume
Peak 0.838
Factor
High Int. 07:45 AM 07:45 AM 08:00 AM 07:45 AM
Volume 86 0 2 0 88 5 93 0 0 98 0 1 2 0 3 0 19 77 0 96
Peak 0.889 0.770 0.667 0.857
Factor
��l
Robert Peccia & Associates
825 Custer Avenue
Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozem n3
1rs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/15/2006
Page No : 2
HIGHLAND
Out In Total
269 313 582
3041 11 71 1
Right Thru Left Peds
� 1 4
�O
° North ro
02J1&2006 7:30:00 AM °o w
t 1512006 8:15:00 AM r o
'5 Unshifted
O v Bank-1 �0A
4� T rr
Left Thru Riots Peds
71 1 0 0
o R o
Out In Total
r r
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1 r �J ..a2 0� bu,`�'\
Intersectio 04:45 PM
n
Volume 352 3 19 3 377 19 89 0 0 108 0 3 0 0 3 1 173 248 2 424 91
Percent 93.4 0.8 5.0 0.8 17.6 82.4 0.0 0.0 0.0 100. 0.0 0.0 0.2 40.8 58.5 0.5
05,15 101 0 2 0 103 1 23 0 0 24 0 1 0 0 1 0 56 68 1 125 25:
Volume
Peak
p.c
Factor .
High Int. 05:15 PM 04:45 PM 05:00 PM 05:15 PM
Volume 101 0 2 0 103 4 28 0 0 32 0 1 0 0 1 0 56 68 1 125
Peak 0.915 0.844 0.750 0.848
Factor
Robert Peccia & Associates
825 Custer Avenue
Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman::
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/15/2006
Page No : 3
HIGHLA14D
Out In Total
270 377 647
3521 31 191 3
Right 'rhru Left Pads
4J L+
a � -
rthno
} —► —2 to
c 2
Q PJ15/20U6 4:45:O0 PM
Y L 1512006 5:30:00 PM m
E r�
T
Unshifted
O Bank 1 W o
a No o—
4, T r
Left Thni Right Peds
01 31 01 0
® 3
Out In Total
r
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozema DE
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 3/14/2009
Groups Printed-Unshifted-Bank 1 Page No : 1
HAGGERTY MAIN HAGGERTY MAIN
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left PedsEightU �� J�peds Total
i
Factor 1.047 1.047 1.047 1.047 1.047 1.047 1 1.047 1 1.047 1.0471 1.047 1.0471 1.047 1.0471 1.047 1.047 1.047
07:00 AM 0 0 0 0 0 77 6 0 3 0 10 0 8 42 0 0 1 7
07:15 AM 0 0 1 0 0 111 7 0 3 0 7 0 9 55 0 0 1 t
07:30 AM 0 0 0 0 0 140 12 0 9 0 8 0 24 69 0 0 2-1
07.45 AM 0 0 0 0 0 188 19 0 6 0 14 0 26 83 0 0 336
Total 0 0 1 0 516 44 0! 1 0 67 249 0 0
08:00 AM 0 0 0 01 0 123 15 0 5 0 21 01 15 57 0 0 1 2
08:15 AM 0 0 0 0 0 118 7 0 4 0 17 0 I 15 61 0 0 222
08:30AM 0 0 0 0 0 92 6 0 4 0 15 0 9 65 0 0 1G1
08:45 AM 0 0 0 0 0 112 8 0 4 0 2 i 0 17 67 0 0 2
Total 0 0 0 0 0 445 36 0 17 0 74 01 56 250 0 0 8
**" BREAK***
04:00 PM 0 0 0 0 0 106 5 0 13 0 18 0 20 110 0 0 2
04:15 PM 0 0 0 0 0 96 7 0 9 0 16 0 21 78 0 0 2/-(
04:30 PM 0 0 0 0 0 92 6 0 10 0 10 0 10 128 0 0 256
04:45 PM 0 0 0 0 0 92 9 0 12 0 18 0 27 129 0 0 27-
Total 0 0 0 0 0 386 27 0 44 0 62 01 78 445 0 0 10
05:00 PM 0 0 0 0 0 107 8 0 17 0 32 0 26 190 0 0 380
05:15 PM 0 0 0 0 0 95 5 0 20 0 16 0 25 144 0 0 W9
05:30 PM 0 0 0 0 0 82 7 0 9 0 17 0 19 95 0 0 2:
l 05:45 PM 0 0 0 0 0 87 7 0 5 0 17 0 28 105 0 0 2.
Total 0 0 0 0 0 371 27 0 51 0 82 0 98 534 0 0 1163
Grand Total 0 0 1 0 0 1718 134 01 133 0 257 01 299 1478 0 0 40:
Apprch% 0.0 0.0 100.0 0.0 0.0 92.8 7.2 0.0 34.1 0.0 65.9 0.0 16.8 83.2 0.0 0.0
Total% 0.0 0.0 0.0 0.0 0.0 42.7 3.3 0.0 3.3 0.0 6.4 0.0. 7.4 36.8 0.0 0.0
HAGGERTY MAIN HAGGERTY MAIN
Southbound Westbound Northbound Eastbound
Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Rig Thr Int.
Start Time ht u Left s Total ht u Left s Total ht u Left s Total ht utL��Appotal Tot.
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:30 AM
n
Volume 0 0 0 0 0 0 569 53 0 622 24 0 60 0 84 80 270 0 0 350 1051-'
Percent 0.0 0.0 0.0 0.0 0.0 91.5 8.5 0.0 28.6 0.0 71.4 0.0 22.9 77.1 0.0 0.0
07:45 0 0 0 0 0 0 188 19 0 207 6 0 14 0 20 26 83 0 0 109 33b
Volume
Peak 0.786
Factor
High Int. 6:45:00 AM 07:45 AM 08:00 AM 07:45 AM
Volume 0 0 0 0 0 0 188 19 0 207 5 0 21 0 26 26 83 0 0 109
Peak Factor 0.751 0.808 0.803
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman05
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 3/14/2006
Page No : 2
HAGGER1 Y
Out In Total
0 0 D 0
Right Thru Lett Peds
+j 1 `+
~J t � o
A.C..
02
North
— 14l2006 7:30:00 AM rn S
cor ?1412006 8:15:00 AM m N
a,
� Unshifted
O v" Bank 1
a y
4, i r
Left Thru Right Peds
601 01 241 0
133 94 217
Out In Total
rr.Epry
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1
Intersectio c (�� � :_,:_!--a;f{.. 1 ..l �' e
n
04:30 PM F6 b-')���:.C•, w KloY`I b ,��_•._,_.t,
Volume 0 0 0 0 0 0 386 28 0 414 59 0 76 0 135 88 591 0 0 679 1228
Percent 0.0 0.0 0.0 0.0 0.0 93.2 6.8 0.0 43.7 0.0 56.3 0.0 13.0 87.0 0.0 0.0
05:00 0 0 0 0 0 0 107 8 0 115 17 0 32 0 49 26 190 0 0 216 380
Volume
Peak 0.808
Factor
High Int. 05:00 PM 05:00 PM 1 05:00 PM
Volume 0 0 0 0 0 0 107 8 0 115 17 0 32 0 49 26 190 0 0 216
Peak 0.900 0.689 0.786
Factor
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozema )5
Irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 3/14/20(`5
Page No : 3
HA Ci R Y
Out In Total
0 0 0
—..Of 01 01 0
Right Thru Left Peds
wo
o� d
North
14/2006 4:30:00 PM
/14/2006 5:15:00 PM
o v o Unshifted ~"°
m Bank 1
IL as aR
4-, T F+
Left Thru Right Peds
761 0 59 0
116 135 251
Out In Total
HA'GEPTy
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman06
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/23/2006
Page No : 1
Groups Printed-Unshifted-Bank 1
BOZEMAN TRAIL HAGGERTY LANE BOZEMAN TRAIL HAGGERTY LANE
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int.
Total
Factor 1.091 1 1.091 1 1.091 \1.091 1.091 1.091 1 1.091 1 1.091 1.091 1 1.091 1 1.091 1 1.091 1.091 1.091 1.091 1.091
07:00 AM 0 3 2 0 3 0 0 0 0 4 0 0 0 0 1 0 13
07:15 AM 0 2 0 0 8 0 2 0 0 4 0 0 0 0 0 0 16
07:30 AM 0 6 1 0 10 0 8 0 1 14 0 0 0 0 0 0 40
07:45 AM 0 11 0 0 11 0 1 0 0 15 0 0 0 0 0 0 38
Total 0 22 3 0 32 0 i1 0 1 37 0 0 0 0 1 01 107
08:00 AM 0 4 2 0 l 10 0 3 0 0 15 0 0 0 0 0 0 34
08:15 AM 0 8 2 0 8 0 0 0 0 11 0 0 0 0 0 0 29
08:30 AM 0 10 4 0 1 0 2 0 1 5 0 0 0 0 0 0 23
08:45 AM 0 4 4 0 10 0 0 0 _ 0 10 0 0 0 0 0 0 28
Total 0 26 12 0 29 0 5 01 1 41 0 0 0 0 0 0 114
***BREAK***
04:00 PM 1 10 10 0 2 0 1 0 2 8 0 0 0 0 0 0 34
04:15 PM 0 9 9 0 2 0 1 0 0 5 0 0 0 0 0 0 26
04:30 PM 0 7 11 0 3 0 0 0 2 12 0 0 0 0 0 0 35
04:45 PM 0 9 12 0 4 0 1 0 1 3 0 0 0 0 0 0 35
Total 1 35 412 O 11 0 _ 0 5 33 0 01 0 0 0 0 130
05:00 PM 0 21 3 0 8 0 1 0 2 8 0 0 0 0 0 0 43
05:15 PM 0 21 10 0 1 0 0 0 1 7 0 0 0 0 0 0 40
05:30 PM 0 4 16 0 13 0 0 0 3 5 0 0 0 0 0 0 41
05:45 PM 0 10 9 0 5 0 1 0 0 5 0 0 0 0 0 0 30
Total 0 56 38 0 j 27 0 2 0 6 25 0 0 0 0 0 0, 154
Grand Total 1 139 95 0 99 0 21 0 1 13 136 0 0 0 0 1 0 505
Apprch% 0.4 59.1 40.4 00 82.5 0.0 17.5 0.01 8.7 91.3 0.0 0.0 0.0 0.0 100.0 0 0
Total% 0.2 27.5 18.8 00 19.6 0.0 4.2 0.0 2.6 26.9 0.0 0.0 0.0 0.0 0.2 0.0
BOZEMAN TRAIL HAGGERTY LANE BOZEMAN TRAIL HAGGERTY LANE
Southbound Westbound Northbound Eastbound
Rig Thr Left Ped App. Rig Thr Left Left s Left Ped App. Rig Thr Ped App. Rig Thr Ped App. Int.
Start Time ht u s Total ht u s Total ht u Total ht u s I Total Total
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:30 AM
n
Volume 0 29 5 0 34 39 0 12 0 51 1 55 0 0 56 0 0 0 0 0 141
Percent 0.0 85.3 14.7 0.0 76.5 0.0 23.5 0.0 1.8 98.2 0.0 0.0 0.0 0.0 0.0 0.0
07:30 0 6 1 0 7 10 0 8 0 18 1 14 0 0 15 0 0 0 0 0 40
Volume
Peak 0.881
Factor
High Int. 07:45 AM 07:30 AM 07:30 AM 6:45:00 AM
Volume 0 11 0 0 11 10 0 8 0 18 1 14 0 0 15
Peak 0.773 0.708 0.933
Factor
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozema )6
irs & Trucks 406-447-5000 Site Code : 0000000u
Start Date : 2/23/200P,
Page No : 2
BOZEMAN I RAIL
Out In Total
94 34 L 128
0 291 51 D
Right Thru Left Peds
mo o. t
m
:u T
o North
o c—► —�
o L 23/2006 7:30:00 AM
Uj
3/2006 8:15:00 AM r
= :5 o H Unshifted rr
o Bank 1 m o
a H
of
o �
Left Thru Rig Peds
0 55 1 0
41 IJ 97
Out In Total
vC l W 2&-bca-+ -cl VA')0•-jz1 :,'s.e C
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1
Intersectio 04:45 PM
n
Volume 0 55 41 0 96 26 0 2 0 28 7 28 0 0 35 0 0 0 0 0 15,
Percent 0.0 57.3 42.7 0.0 92.9 0.0 7.1 0.0 20.0 80.0 0.0 0.0 0.0 0.0 0.0 0.0
05:00 0 21 3 0 24 8 0 1 0 9 2 8 0 0 10 0 0 0 0 0 43
Volume
Peak p c I
Factor
High Int. 05:15 PM 05:30 PM 05:00 PM
Volume 0 21 10 0 31 13 0 0 0 13 2 8 0 0 10
Peak 0.774 0.538 0.875
Factor
l
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozemanOE
trs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/23/2006
Page No : 3
B Z IvtAtq TRAJL
Out In Total
® 96 15D
01 551 411 0
Right Thru Left Peds
��� T
o � —� no
0 '"! .�.. ks
LU
g o North
4—Z rr
~— 23/2006 4:45:00 PM
w C>r 23/2006 5:30:00 PM r
o� Unshifted �
2
Bank 1
o
rr
a. a m
d N �
i+
Left Thru Ri ht Peds
01 281 7 0
57 35 92
Out In Total
Robert Peccia & Associates
825 Custer Avenue
^,)zeman Deaconess Health Services Helena, MT 59601 File Name : bozemal )7
I rs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 3/2/200E
Page No : 1
Groups Printed-Unshifted-Bank 1
BOZEMAN KAGY BOZEMAN KAGY
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right I Thru Left Peds
Total
Factor 1.0471 1.047 1.047 1.047 .0471 1.047 1.047 1.0471 1 0471 047 1.0471 1.0471 1.047 1.047
07:00 AM 5 0 1 0 3 22 0 0 0 0 3 0 1 2 0 0
07:15 AM 9 0 0 0 3 29 0 0 0 2 0 0 0 9 4 0
07:30 AM 4 0 0 0 2 29 0 0 1 3 3 0 0 4 2 0 era
07:45 AM 10 0 3 0 3 39 0 0 0 1 6 0 1 16 2 01 81
Total 28 0 4 0 11 119 0 0 1 u 12 0 2 31 8 01 2--
08:00 AM 8 0 3 0 5 36 0 0 0 2 3 0 0 14 2 0
08:15 AM 4 0 1 0 1 34 0 0 0 0 0 0 0 10 4 0 54
08:30 AM 4 0 3 0 2 21 1 0 0 0 1 0 0 16 2 0 rn
U&45 AM 4 0 0 0 1 20 0 0 1 1 1 0 0 5 2 0 _
Total 20 0 7 0 9 111 1 0 1 3 5 0 0 45 10 0 2
***BREAK***
04:00 PM 2 3 5 0 2 20 0 0 1 1 0 0 1 20 6 0
04:15 PM 3 0 3 0 1 9 0 0 0 1 0 0 6 14 6 0 43
04:30 PM 5 0 3 0 3 24 0 0 0 0 0 0 1 25 6 0 67
04:45 PM 7 0 5 0 3 10 0 0 1 2 0 0 0 20 _ 7 0 _
Total 17 3 16 01 9 63 0 0 2 4 0 0 8 79 25 0 2.
05:00 PM 3 2 5 0 3 16 0 0 0 0 1 0 3 26 5 0 64
05:15 PM 3 3 12 0 1 14 0 0 0 1 0 0 1 37 9 0
05:30 PM 5 3 4 0 3 16 0 0 0 1 0 0 1 27 2 0
05:45 PM 5 1 4 0 2 16 0 0 0 2 0 0 2 27 4 0
Total 16 9 25 0 j 9 62 0 0 0 4 1 0 7 117 20 0 270
Grand Total 81 12 52 01 38 355 1 01 4 17 18 0 17 272 63 0 ' 9
Apprch% 55.9 8.3 35.9 0.0 9.6 90.1 0.3 0.0 10.3 43.6 46.2 0.0 4.8 77.3 17.9 0.0
Total% 8.7 1.3 5.6 0.01 4.1 38.2 0.1 0.0 0.4 1.8 1.9 0.0 1.8 29.2 6.8 0.0
BOZEMAN KAGY BOZEMAN KAGY
Southbound Westbound Northbound Eastbound
Rig Thr Left Ped I App. Rig I Thr Ped App. Rig I Thr Ped App. Rig Thr Ped App. Int.
Start Time ht I u s Total ht u Left s Total ht u I Left s Total ht u Left s Total Tot
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:15 AM
n
Volume 31 0 6 0 37 13 133 0 0 146 1 8 12 0 21 1 43 10 0 54 2f'-
Percent 83.8 0.0 16.2 0.0 8.9 91.1 0.0 0.0 4.8 38.1 57.1 0.0 1.9 79.6 18.5 0.0
07:45 10 0 3 0 13 3 39 0 0 42 0 1 6 0 7 1 16 2 0 191 81
Volume
Peak UM6
Factor
High Int. 07:45 AM 07:45 AM 07:30 AM 07:45 AM
Volume 10 0 3 0 13 3 39 0 0 421 1 3 3 0 7 1 16 2 0 191
Peak
Factor 0.712 0.869 0.750 0.711
Robert Peccia & Associates
825 Custer Avenue
^-)zeman Deaconess Health Services Helena, MT 59601 File Name : bozeman07
,rs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 3/2/2006
Page No : 2
BOZEMAN
out In Total
37 681
31 01 61 0
Right Thru Left Peds
fJ! 1 `-►
N o v� t ---D�
0UO
North
v vL—► 4—::r�
} r 2 w
/212006 7:15:00 AM a
/212006 8:00:00 AM �r o
rtO- Unshifted -i
O{ oD Bank
w CL
a � o
F+
Left Thru Right Peds
121 81 1 0
21 22
Out In Total
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1
Intersectio
n 1� <�C:.t a,r.C,=:! : r:._ •. ;'.::!
05:00 PM ��Y)6.��_,,�.
Volume 16 9 25 0 50 9 62 0 0 71 0 4 1 0 5 7 117 20 0 144 270
Percent 32.0 18.0 50.0 0.0 12.7 87.3 0.0 0.0 0.0 80.0 20.0 0.0 4.9 81.3 13.9 0.0
05:15 3 3 12 0 18 1 14 0 0 15 0 1 0 0 1 1 37 9 0 47 81
Volume
Peak 0.833
Factor
High Int. 05:15 PM 05:00 PM 05:45 PM 05:15 PM
Volume 3 3 12 0 18 3 16 0 0 19 0 2 0 0 2 1 37 9 0 47
Peak Factor I 0.694 0.9341 0.625 0.766
Robert Peccia &Associates
825 Custer Avenue
",)zeman Deaconess Health Services Helena, MT 59601 File Name : bozemar 17
ors & Trucks 406-447-5000 Site Code : 00000000
Start Date : 3/2/2006
Page No : 3
OZEMAN
Out In Total
33 501 L 63
16 91 251 0
Right Thru Left Peds
� 1 L►
O
O
n p North N
v
c'Lj— r`L 1212006 5:00:00 PM c f g
_ !2/2006 5:45:00 PM �—
S
5 r` o N Unshifted
0 o Bank 1
d
a
T r
Left Thru Ri ht Peds
1 4 0 0
16 5 21
Out In Total
l
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Heath Services Helena, MT 59601 File Name : bozeman8
irs & Trucks 406-447-5000 Site Code : 00000000
( Start Date : 2/16/2006
Page No : 1
Groups Printed-Unshifted-Bank 1
NORTH CHURCH KAGY NORTH CHURCH KAGY
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int.
Total
Factor 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091
07:00 AM 2 1 4 0 2 45 3 0 11 7 8 1 1 22 1 0 108
07:15 AM 3 1 0 1 4 69 0 0 11 8 12 0 1 32 2 0 144
07:30 AM 2 2 0 0 2 89 3 0 8 4 15 0 4 44 4 0 177
07:45 AM _ 4 2 4 1 3 162 8 0 17 20 21 0 8 77 4 0 331
Total 11 6 8 2 11 365 14 0 47 39 56 1 14 175 11 0 760
08:00 AM 11 4 2 0 5 143 4 0 19 12 32 0 7 65 5 0 309
08:15 AM 5 9 2 0 6 118 4 0 13 22 25 0 7 71 4 0 286
08:30 AM 10 15 1 0 4 83 8 0 5 9 23 0 7 75 8 0 248
08:45 AM 8 3 0 0 2 93 8 0 9 11 16 0 8 72 5 0 235
Total 34 31 5 0 17 437 24 0 46 54 96 0 29 283 22 0 1078
**"BREAK***
04:00 PM 12 13 7 1 1 2 73 11 0 5 8 12 0 14 79 4 0 241
04:15 PM 4 16 2 0 5 55 11 0 10 5 13 0 20 67 8 1 217
04:30 PM 11 14 8 2 1 4 74 11 0 4 9 16 0 7 80 5 1 246
04:45 PM 14 19 2 1 4 81 11 0 5 10 10 0 19 84 7 0 267
Total 41 62 19 41 15 283 44 0 24 32 51 0 60 310 24 2 971
05:00 PM 20 19 5 0 4 88 20 0 10 12 5 0 19 125 10 0 337
05:15 PM 21 19 10 0 8 91 8 1 2 5 16 1 20 92 1 0 295
05:30 PM 13 9 8 1 3 80 21 0 8 3 16 1 31 83 7 0 284
05:45 Phl 11 19 2 0 0 69 12 0 4 4 11 0 22 81 3 0 238
Total 65 66 25 1 15 328 61 1 24 24 48 2 92 381 21 0 1154
Grand Total 151 165 57 7 58 1413 143 1 I 141 149 251 3 195 1149 78 2 3963
Apprch% 39.7 43.4 15.0 1.8 3.6 87.5 8.9 0.1 25.9 27.4 46.1 0.6 13.7 80.7 5.5 0.1
Total% 3.8 4.2 1.4 0.2 1.5 35.7 3.6 0.0 3.6 3.8 6.3 0.1 4.9 29.0 2.0 0.1
NORTH CHURCH KAGY NORTH CHURCH KAGY
Southbound Westbound Northbound Eastbound
Rig I Thr Left Ped App. Rig Left Left Left Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Int.
Start Time ht u s Total ht u s Total ht u s Total ht u s Total Total
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:45 AM
n
Volume 30 30 9 1 70 18 506 24 0 548 54 63 101 0 218 29 288 21 0 338 1174
Percent 42.9 42.9 12.9 1.4 3.3 92.3 4.4 0.0 24.8 28.9 46.3 0.0 8.6 85.2 6.2 0.0
07:45 4 2 4 1 11 3 162 8 0 173 17 20 21 0 58 8 77 4 0 89 331
Volume
Peak 0.887
Factor
High Int. 08:30 AM 07:45 AM 08:00 AM 08:30 AM
Volume 10 15 1 0 26 3 162 8 0 173 19 12 32 0 63 7 75 8 0 90
Peak Factor 0.673 0.792 0.865 0.939
l
Robert Peccia & Associates
825 Custer Avenue
Bozeman Deaconess Heath Services Helena, MT 59601 File Name : bozem 18
Irs & Trucks 406-447-5000 Site Code : 000000uo
Start Date : 2/16/20%
Page No : 2
NORTH CHURCH
Out In Total
102 70 172
301 301 91 1
Righl Tlluu Left Peds
�O
w North
co
F c
10 M 0, 1612006 7:45:00 AM ° g
N L 16/2006 8:30:00 AM r m
C)
Orl Unshifted a Bank 1 v �µ
O O
T r
Left Thru P.iaht Peds
1011 631 541 0
63 218 301
Out In Total
t 1 I
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1 N�r+h)L t I�C� ��r S F}�'�«r �
Intersectio 04:45 PM
Volume 68 66 25 2 161 19 340 60 1 420 25 30 47 2 104 89 384 25 0 498 118:
Percent 42.2 41.0 15.5 1.2 4.5 81.0 14.3 0.2 24.0 28.8 45.2 1.9 17.9 77.1 5.0 0.0
05:00 20 19 5 0 44 4 88 20 0 112 10 12 5 0 27 19 125 10 0 154 337
Volume
Peak
Factor 0.8
High Int. 05:15 PM 05:00 PM 05:30 PM 05:00 PM
Volume 21 19 10 0 50 4 88 20 0 112 8 3 16 1 28 19 125 10 0 154
Peak 0.805 0.938 0.929 0.808
Factor
1, _,
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Heath Services Helena, MT 59601 File Name : bozemanE
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/16/2006
Page No : 3
NUnTH CHURCH
Out In Total
74 F 161 235
68 601 25 1 2
Right Thlru Left Peds
f-'r
r0 lU) N
J
0� J T
North a
CO r L—/ 1 w
a— 16/2006 4:45:00 PM
Y ago L 16/2006 5:30:00 PM rCD
n
C.
o a Unshifted
Bank 1 m
EL ��
A—
l
T r+
Left Thru Right Peds
471 301 251 2
215 104 319
Out In Total
NORTH NURCH
Robert Peccia & Associates V
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozema 1 E
i.rs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/16/200
Page No : 1
Groups Printed-Unshifted-Bank 1
PAINTED HILLS RD KAGY BLVD PAINTED HILLS RD KAGY BLVD
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Total
Factor 1.091 1.D91 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091
07:00 AM 0 0 1 0 0 29 0 0 1 0 12 0 1 1 0 0 i
07:15 AM 0 0 0 0 0 31 0 0 0 0 10 0 3 9 0 0 3
07:30 AM 0 0 0 0 0 38 1 0 0 0 13 0 2 10 0 0 �4
07:45 AM 0 0 0 0 1 70 1 0 0 0 21 0 2 14 0 0 109
Total 0 0 1 0 1 168 2 0 1 0 56 0 8 34 0 0 2"
08:00 AM 0 0 0 0 0 50 0 0 3 0 17 0 3 13 0 0
08:15 AM 0 0 0 0 0 33 0 0 1 0 23 0 10 16 0 0 83
08:30 AM 0 0 0 0 0 24 1 0 2 0 10 0 10 16 0 0 F3
08:45 AM 0 0 0 0 0 31 0 0 2 0 8 0 3 13 0 0 _
Total 0 0 0 0 0 138 1 0 8 0 58 0 26 58 0 0 2
"BREAK-
04:00 PM 0 0 0 0 0 23 0 0 2 0 3 0 12 32 0 0
04:15 PM 0 0 0 0 0 10 0 0 0 0 4 0 11 21 0 0 46
04:30 PM 0 0 0 0 0 14 1 0 0 0 4 0 7 28 0 0 54
04:45 PM 0 0 0 0 0 22 _ 0 0 0 0 10 0 9 34 0 0
Total 0 0 0 0 0 69 i 0 j 2 0 21 0 39 115 0 0 2
05:00 PM 0 0 0 0 0 13 1 0 0 0 3 0 15 39 0 0 71
05:15 PM 0 0 0 0 0 26 1 0 0 0 5 0 15 35 0 0
05:30 PM 0 0 0 0 0 24 1 0 1 0 3 0 14 34 0 0
<� 05:45 PM 0 0 0 0 0 21 1 0 1 0 8 0 15 24 0 0
Total 0 0 0 0 0 84 4 D 2 0 19 0 59 132 0 0 300
Grand Total 0 0 1 0 1 459 8 0 I 13 0 154 0 132 339 0 0 ill
Apprch% 0.0 0.0 100.0 0.0 0.2 98.1 1.7 0.0 7.8 0.0 92.2 0.0 I 28.0 72.0 0.0 0.0
Total% 0.0 0.0 0.1 0.0 0.1 41.5 0.7 0.0 1.2 0.0 13.9 0.0 11.9 30.6 0.0 0.0
PAINTED HILLS RD KAGY BLVD PAINTED HILLS RD KAGY BLVD
Southbound Westbound Northbound Eastbound
Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Int.
Start Time ht u Left s Total ht u Left s Total ht u Left s Total ht u Left s I Total Tot
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:30 AM
n
Volume 0 0 0 0 0 1 191 2 0 194 4 0 74 0 78 17 53 0 0 70 34^
Percent 0.0 0.0 0.0 00 0.5 98.5 1.0 0.0 5.1 0.0 94.9 0.0 24.3 75.7 0.0 0.0
07:45 0 0 0 0 0 1 70 1 0 72 0 0 21 0 21 2 14 0 0 16 10a
Volume
Peak
0.784
Factor
High Int. 6:45:00 AM 07:45 AM 08:15 AM 08:15 AM
Volume 0 0 0 0 0 1 70 1 0 72 1 0 23 0 24 10 16 0 0 26
Peak 0.674 0.813 0.673
Factor
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman18
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/16/2006
Page No : 2
PAINTED HILLS RD
Out in Total
a o
0 01 01 0
Right Thru Left Peds
t°- ° o�� ? mA c0
-4�
M North
J ro F—► -2
c 1612006 7:30:00 AM
0 L 1612005 8:15:00 AM
N o Unshifted
O
Bank 1 C i
Q. No —
*-1 T r
Left Thru R_iy_ht Peds
741 01 41 0
19 78 97
Out In Total
T S RD
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1
Intersectio v SOc�.� I n d��,47 ou h_Gi (�G�1,.'11�;t, l,r_-i
n 04:45 PM nG' W C �JpU.f
Volume 0 0 0 0 0 0 85 3 0 88 1 0 21 0 22 53 142 0 0 195I 305
Percent 0.0 0.0 0.0 0.0 0.0 96.6 3.4 0.0 4.5 0.0 95.5 0.0 27.2 72.8 0.0 0.0
05:15 0 0 0 0 0 0 26 1 0 27 0 0 5 0 5 15 35 0 0 50 82
Volume
Peak 0.930
Factor
High Int. 05:15 PM 04:45 PM 05:00 PM
Volume 0 0 0 0 0 0 26 1 0 27 0 0 10 0 10 15 39 0 0 54
Peak 0.815 0.550 0.903
Factor
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozem� 1 F
irs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/16/2006
Page No : 3
A NTED HILLS R
Out in Total
1 01 01 01 01
fight Thru Leh Peds
o �
mm m
T �0
o A.C.
N North
a � s
2Ln
r 16/2006 4 45:00 PM
16/2006 5:30:00 PM M Iw �r
o w o
511 o N Unshifted
w Bank 1 m
n
N Q
l
T rr
Left Thru Ri ht Peds
21 0 1 0
56 22 76
Out in Total
Robert Peccia & Associates
825 Custer Avenue
Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman2z'
trs & Trucks 406-447-5000 Site Code : 00000000
( Start Date : 2/14/2006
Page No : 1
Groups Printed-Unshifted-Bank 1
HIGHLAND BLVD OLD HIGHLAND BLVD HIGHLAND BLVD OLD HIGHLAND BLVD
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds Right =ruLeft Peds Right Thru Left Peds Right Thru Left Peds Int.
Total
Factor 1.091 1 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.091
07:00 AM 3 9 1 0 0 0 0 0 0 40 10 0 1 0 1 4 69
07:15 AM 8 29 0 0 0 0 0 0 0 49 4 0 0 0 3 0 93
07:30 AM 9 46 0 0 0 0 0 0 0 54 14 0 1 0 0 0 124
07:45 AM 7 56 0 0 0 0 0 0 0 89 20 0 1 0 0 2 175
Total 27 140 1 0 0 0 0 0 0 232 48 0 3 0 4 6 461
08:00 AM 2 32 0 0' 0 0 0 0 0 82 23 01 1 0 3 0 143
08:15 AM 1 39 0 0 0 0 0 0 0 76 22 01 3 0 1 0 142
08:30 AM 1 39 0 0 0 0 0 0 0 49 4 0 1 0 4 0 98
08:45 AM 2 38 0 0 0 0 0 0 0 53 11 0 1 0 2 1 108
Total 6 148 0 0 0 0 0 0 0 2160 60 01 3 0 10 1 491
***BREAK***
04:00 PM 4 68 0 0 0 0 0 0 0 52 7 0 13 0 4 4 152
04:15 PM 4 68 0 0 0 0 0 0 0 38 9 0 8 0 7 1 135
04:30 PM 5 73 0 0 0 0 0 0 1 57 8 0 17 0 14 3 178
04:45 PM 3 82 0 0 0 0 0 0 0 53 2 0 12 0 6 3 161
Total 16 291 0 0 0 0 0 0 1 200 26 0 50 0 31 11 626
05:00 PM 3 102 0 0 0 0 0 0 0 45 3 0 15 0 5 4 177
05:15 PM 2 91 0 0 0 0 0 0 0 54 3 0 22 0 2 2 176
05:30 PM 1 74 0 0 0 0 0 0 0 55 0 0 27 0 4 3 164
05:45 PM 0 62 0 0 0 0 0 0 0 48 1 0 7 0 2 3 123
Total 6 329 0 0 0 0 0 0 0 202 7 0 71 0 13 12 640
Grand Total 55 908 1 0 I 0 0 0 0 ' 1 894 141 58 30 I 2218
Apprch% 5.7 94.2 0.1 0.0 0.0 0.0 0.0 0.0 0.1 86.3 13.6 0.0 59.6 0.0 26.6 13.8
Total% 2.5 40.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.3 6.4 0.0 5.9 0.0 2.6 1.4
HIGHLAND BLVD OLD HIGHLAND BLVD HIGHLAND BLVD OLD HIGHLAND BLVD
Southbound Westbound Northbound Eastbound
Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Int.
Start Time ht u Left s Total ht u Left s Total ht u Left s Total ht u Left s Total Total
Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1
Intersectio 07:30 AM
n
Volume 19 173 0 0 192 0 0 0 0 0 0 301 79 0 380 6 0 4 2 12 584
Percent 9.9 90.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 79.2 20.8 0.0 50.0 0.0 33.3 16.7
07:45 7 56 0 0 63 0 0 0 0 0 0 89 20 0 109 1 0 0 2 3 175
Volume
Peak 0.834
Factor
High Int. 07:45 AM 6:45:00 AM 07:45 AM 08:00 AM
Volume 7 56 0 0 63 0 0 0 0 01 0 89 20 0 109 1 0 3 0 4
Peak 0.762 0.872 0.750
Factor
Robert Peccia & Associates
825 Custer Avenue
Rozeman Deaconess Health Services Helena, MT 59601 File Name : bozeme Z
irs & Trucks 406-447-5000 Site Code : 000000U0
Start Date : 2/14/2005
Page No : 2
HIGHLAND BLV
Out In Total
305 192 497
19 173 01 0
Right Thru Left Peds
y
m
>� T
J o North o UOC
r
N L_�
C
J1412006 7:30:00 AM - o
1412006 8:15:00 AM o
2 !X w rCD
"5 a Unshifted o r
o a Bank 1 n �o
N O N
'1 T F►
Left Thru Ri hl Peds
791 301 0 0
I
779 380 559
Out to Total c
`j J4F',ta7'f Wes"�J.�n�
Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1
Intersectio 04:30 PM
Volume 13 348 0 0 361 0 0 0 0 0 1 209 16 0 226 66 0 27 12 105 69
Percent 3.6 96.4 0.0 0.0 0.0 0.0 0.0 0.0 0.4 92.5 7.1 0.0 62.9 0.0 25.7 11.4
04:30 5 73 0 0 78 0 0 0 0 0 1 57 8 0 66 17 0 14 3 34 178
Volume
Peak
Factor 0.c
High Int. 05:00 PM 04:30 PM 04:30 PM
Volume 3 102 0 0 105 0 0 0 0 0 1 57 8 0 66 17 0 14 3 34
Peak 0.860
Factor 0.856 0.772
Robert Peccia & Associates
825 Custer Avenue
Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman22
:rs & Trucks 406-447-5000 Site Code : 00000000
Start Date : 2/14/2006
Page No : 3
HIGHLAND BLv
Out In Total
236 E3EF 597
131 3481 0 10
Right Thru Left Peds
4J L4
Nn�2 N.�� A
J a North
o
r- c
14/2006 4:30:00 PM oS.
,j rn 14/2006 5:15:00 PM ��o 0
Unshifted r
v Bank 1 �U
a
0
T r
Left Thru Riaht Peds
161 2091 11 0
414 226 F 640
Out In Total
f�
T p Robert P cia &Associates
Helena, Montana Prom.•_•. gp�eri�' ��-�'��d' 717
l Proiect Number: 0"S I
C : Civil TtGF ice
/it
Transportation Date:
`' Environmental
gsSOct n s Scale: Nt7N�
t,v, TV "tfi'��'- °�T W41 OWP4
° 6 5M
44
ind
Alf
jePr
• 3 - ,. d�p}t?-S Ai_1'i�1r•�f<vc Adtt, , � 1�• ,�,.r,.
5 , Fes: ;, �:►�
825 Custer Avenue• .O. 615653•He a, MT 59604•(406)447-5000•FAX(406)447-5036•www.rpa-hln.com
T PE�r Rok Peccia & Associates
Helena, Montana �
9
Project Number:
C = civil By: n' 4 %L?q ,Q•e
/ Transportation Date:
�gsS0C1p�E`' Environmental Scale:
Engineers
1T VD1-UM ' L TVA 1? M V\t�`
IL
,
0+JT - yy
+Lt- ►
3
Qe��, s cs S5'i,,' �M N�� 5►
1 .44 {
825 Custer Avenue•P.O.Box5653•He a, MT 59604•(406)447-5000•FAX(406)447-5036•www.rpa-hin.com
APPENDIX B
CAPACITY CALCULATIONS
EXISTING
HCM Analysis Summary
Existing Main St/Highland Blvd Area Type:Non CBD
DMR 01/01/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB LEFT
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume Nph) 1 295 240 262 454 4 189 2 80 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h) 72 0 8 0
Peds/Hour 5 1 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) --- --- --- -- --- ---Signal Settings:Actuated Operational Anal sis Cycle Length: 71.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 16.0 24.0 18.0 0
Yellow All Red 3.0 0.0 3.5 1.5 3.5 1.5
Ca a ity Analysis Results A roach:
Lane Cap v/s g/C Lane v/c Delay Delay
-AF u QS
EB
L 275 0.001 0.338 L 0.004 15.6 B 20.3 C
* TR 1117 0.169 0.338 TR 0.499 20.3 C
WB L er 229 0.000 0.408 7.9 A
* L ro 395 0.183 0.225 L 0.513 9.8 A
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.124 0.254 L 0.489 22.9 C 22.4
TR 411 0.054 0.254 TR 0.214 21.0 C
SB
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0FJA
Intersection:Delay= 14.5 sec/veh Int.LOS=B Xc-0.58 *Critical Lane Group T(v/s)Crit=0.48
SIG/Cinema v3.08 Page 1
I
HCM Summary Results
Existing Main St/Highland Blvd
DMR 01/01/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB LEFT
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS I
O O
EB
L
* 0.00 0.00 15.6 B 20.3 C
TR 0.17 0.50 20.3 C 4
45 4
262
----------------------
.L
WB qRO
.00 7.9 A '
* .18 0.51 9.8 A -------------
-•
.16 0.26 6.9 A --------------------- --- -
1
295
NB * L 0.12 0.49 22.9 C 22.4 C 240 —z
TR 0.05 0.21 21.0 C
189 80
2
SB LTR 0.00 0.00 0.0 A 0.0 A 1 2 3 ,
I
16 3 0 23 4 2 17 III 4 2
Int. 0.48 0.58 14.5 1 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Existing Main St/Highland Blvd Area Type:Non CBD
DMR O1/01/2007 Analysis Duration: 15 rains. i
PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB LEFT
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L-F T R L T R
Movement Volume v h 1 579 241 107 428 1 312 0 239 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
%Heavy Vehicles 3 3 3 3 3 3 1 -1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 72 0 2 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) --- - --- --- -- -- ---
Signal Settings:Actuated Operational Analysis Cycle Length: 67.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 24.0 20.0 0
Yellow I All Red 3.0 0.0 3.5 1.5 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
Pp-----Gmup lvoh Ratio Ratio Group -Rat' 9S
EB
L 311 0.001 0.358 L 0.003 13.8 B 21.1 C
* TR 1211 0.240 0.358 TR 0.671 21.1 C
WB L er 148 0.000 0.433 1 8.5 A
* L ro 261 0.070 0.149 L 0.301 9.8 A
TR 1935 0.141 0.552 TR 0.255 8.1 A
NB
* L 427 0.234 0.299 L 0.785 30.0 C 25.8 C
TR 482 0.158 0.299 TR 0.529 20.1 C
SB
LTR 436 0.008 0.299 LTR 0.028 16.6 B 16.6 B
Intersection:Delay= 18.6 sec/veh Int.LOS=B Xc 0.68 * Critical Lane Group 7i�(v/s)Crit=0.54
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing Main St/Highland Blvd
DMR 01/01/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB LEFT
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS
1 14
EB
L 0.00 0.00 13.8 B 21.1 C
* TR 0.24 0.67 21.1 C L 1 f
-428
107
.L
WB L er 0.00 8.5 A '
*L ro 0.07 0.30 9.8 A ----------
TR 0.14 0.25 8.1 A --------------------- ------------- -- -------
�� I
579
NB * L 0.23 0.78 30.0 C 25.8 C 241 —y
TR 0.16 0.53 20.1 C I
312�239
O
SB LTR 0.01 0.03 16.6 B 16.6 B 1 2 3
10 3 0 23 4 2 19 4 2
I
Int. 0.54 0.68 18.6 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection rE
hland&Ellis
Agency/Co. En ineering, lnc, Jurisdiction eman
Date Performed 211312007JAnalysis Year stin 2006
Analysis Time Period M Peak Hour
Pro ect Description BOZ-06052.02- The Knolls East&Highland South T!S
EastNVest Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South 1Studv Period Mrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 1 260 39 58 380 104
Peak-Hour Factor,PHF 0.85 0.85 0.85 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 1 305 45 67 441 120
Percent Heavy Vehicles 0 0
Pviedian Type Undivided
RT Channelized 0 0
I-anes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Allovement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 0 14 4 19
Peak-Hour Factor, PHF 0.60 0,60 0.60 0.58 0.58 0.58
+(Hourly Flow Rate, HFR(veh/h) 0 0 0 24 6 32
(Percent Heavy Vehicles 0 0 0 0 1 0 0
(Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 1 0 1 0
Configuration R LTR
Deta ,Queue Length.and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
!-ane Configuration L L LTR R
v(veh/h) 1 67 62 0
(m)(veh/h) 1020 1220 349 574
do 0.00 0.05 0.18 0.00
95%queue length 0.00 0.17 0.64 0.00
Control Delay(s/veh) 8.5 8.1 17.5 11.3
IILOS A A C B
Approach Delay(s/veh) 17.5
Approach LOS -- C
yrig`t1 02005 University of Florida,All Rights Reserved HCS+a., Version 5.21 Generated: 3/7/2007 9:06 AM
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k535.tmp 3/7/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Hi bland&Ellis
Agency/Co, En meerin , Inc. Jurisdiction IBozernan
Date Performed IL1312007 Analysis Year Existin 2006
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Hi hland South TIS
EastANest Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South Study Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R _ L T R
Volume(veh/h) 2 391 16 16 345 15
Peak-Hour Factor,PHF 0.74 0.74 0.74 0.88 0.88 0.88
Hourly Flow Rate,HFR(veh/h) 2 528 21 18 392 17
(Percent Heavy Vehicles 0 0 —
(Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 5 37 2 55
Peak-Hour Factor. PHF 0.88 0.88 0.88 0.78 0.78 0,78
Hourly Flow Rate,HFR(veh/h) 0 0 5 47 2 70
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 0 1 0 1 0
Configuration R LTR
Delay,Queue Length, and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
7(veh/h) 2 18 119 5
(m)(veh/h) 1149 1031 344 644
r/c 0.00 0.02 0.35 0.01
95%queue length 0.01 0.05 1.51 0.02
Control Delay(s/veh) 8.1 8.6 20.9 10.6
LOS A A C B
Approach Delay(s/veh) — — 20.9 10.6
Approach LOS — C B
Copyright©2005 University of Florida,All Rights Reserved HCS+w Version 5 21 Generated: Y712007 9:08,,
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k55B.tmp 3/7/200.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
3eneral Information Site Information
Analyst IDMR Intersection lHighland&Hillcrest Access
Agency/Co. jEngineerin , Inc. Jurisdiction lBozeman
Date Performed 2J1312007 Analysis Yea lExisting(2006)
nal sis Time Period M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
�__ast/West Street: Hillcrest Retirement Center North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
'Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
[Volume(veh/h) 79 301 173 19
Peak-Hour Factor,PHF 0.87 0.87 1.00 1.00 0.76 0.76
-lourly Flow Rate, HFR(veh/h) 5 0 8 0 0 0
[Percent Heavy Vehicles 0 -- — 0 —
Median Type Undivided
RT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Jolume(veh/h) 4 6
Peak-Hour Factor,PHF 0.75 1.00 0.75 1.00 1.00 1.00
Hourly Flow Rate,HFR(vehlh) 0 227 25 90 345 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
`.=tared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
configuration LR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Pane Configuration LT LR
v(veh/h) 90 13
C(m)(veh/h) 1321 533
v/c 0.07 0.02
95%queue length 0.22 0.07
Control Delay(s/veh) 7.9 11.9
LOS A B
,Approach Delay(s/veh) -- 11.9
pproach LOS — -- B
:opyright©2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/13/2007 4:11 PM
hle://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5254.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
[Analyst JDMR Intersection Highland&Hillcrest Access
JAgency/Co. lEngineerin , Inc. Jurisdiction lBozeman
Date Performed 1211312007 Analysis Year lExisting(2005
[Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Hillcrest Retirement Center North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 16 209 348 13
Peak-Hour Factor,PHF 0.86 0.86 1.00 1.00 0.86 0.86
Dourly Flow Rate,HFR(veh/h) 35 0 85 0 0 0
Percent Heavy Vehicles 0 -- 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
(Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
'Volume(veh/h) 27 66
Peak-Hour Factor, PHF 0.77 1.00 0.77 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 0 404 15 18 243 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 0 0 0 0 0
onfiquration LR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration LT LR
✓(veh/h) 18 120
(m)(veh/h) 1147 548
✓/c 0.02 0.22
95%queue length 0.05 0.83
Control Delay(s/veh) 8.2 13.4
I_OS A B
Approach Delay(s/veh) -- — 13.4
Approach LOS — -- B
Copyright O 2005 University of Florida,All Rights Reserved HCS+- Version 5 2 Generated: 2/13/2007 4:14 F
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5254.tmp 2/13/20G
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
(General Information 'Site Information
nal st DMR Intersection Hi bland&Ka
genc /Co. En ineerin , Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Existing 2006)
nal sis Time Period AM Peak Hour
Pro ect Description BOZ-06052.02- The Knolls East&Highland South TIS
EastANest Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period(hr3): 0.25
Vehicle Volumes and Adjustments
!Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
111 L T R L T R
Volume(veh/h) 254 75 0 0 288 14
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.77 0.77 0.77
;Hourly Flow Rate,HFR(veh/h) 295 87 0 0 374 18
Percent Heavy Vehicles 0 -- 0 —
fOedian Type Undivided
IIIRT Channelized 0 0
I-anes 1 1 0 0 1 0
Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 7 1 0 7 1 304
Peak-Hour Factor, PHF 0.67 0.67 0.67 0.89 0.89 0.89
(Hourly Flow Rate,HFR(veh/h) 10 1 0 7 1 341
Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
IDelay,Queue Length,and Level of Service
,Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L LTR LTR LTR
v(veh/h) 295 0 11 349
C(m)(veh/h) 1176 1522 65 623
/c 0.25 0.00 0.17 0.56
�35%queue length 1.00 0.00 0.56 3.47
Lontrol Delay(s/veh) 9.1 7.4 71.3 17.9
ILOS A A F C
Approach Delay(s/veh) — 71.3 17.9
Approach LOS — F C
.Opynght©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 2 Generated: 2/13/2007 4:23 PM
hle://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5266.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst JDMR Intersection Hi bland&Kaq
Agency/Co. Engineering, Inc. Jurisdiction lBozeman
Date Performed 211312007 Analysis Year lExisting(2006)
nal sis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T!S
EastANest Street: Ka Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 248 173 1 0 89 19
Peak-Hour Factor,PHF 0.85 0.85 0.85 0.84 0.84 0.64
Hourly Flow Rate,HFR(veh/h) 291 203 1 0 105 22
Percent Heavy Vehicles 0 -- 0 — --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 0 3 0 19 3 352
Peak-Hour Factor.PHF 0.75 0.75 0.75 0.92 0.92
Hourly Flow Rate,HFR(veh/h) 0 4 0 20 3 395
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
IDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12 L
Lane Configuration L LTR LTR LTR
NJ(veh/h) 291 0 4 418
(m)(veh/h) 1464 1380 219 789
Vic 0.20 0.00 0.02 0.53
95%queue length 0.74 0.00 0.06 3.16
Control Delay(s/veh) 8.1 7.6 21.7 14.6
LOS A A C B
Approach Delay(s/veh) — 21.7 14.6
Approach LOS -- C B
Copyright©2005 University of Florida,All Rights Reserved HCS+w Version 5.2 Generated: 2/13/2007 4:29 F
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5266.tmp 2/13/20G
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Main&Haggerty
encv/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 nal sis Year Existing 2006)
nal sis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastA/Vest Street: E Main St North/South Street: Haggett Haggetly Ln
Intersection Orientation: East-West IStudy Period(hrs 0.25
Vehicle Volumes and Adjustments
'Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 270 80 53 569
(Peak-Hour Factor,PHF 1.00 0.80 0.80 0.75 0.75 1.00
(Hourly Flow Rate,HFR(veh/h) 0 337 99 70 758 0
[Percent Heavy Vehicles 0 -- -- 0 -- --
(Median Type Undivided
RT Channelized 0 0
'Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 60 24
IliPeak-Hour Factor, PHF 0.81 1.00 0.81 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 74 0 29 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
l-ane Configuration L LR
v(veh/h) 70 103
CC(m)(veh/h) 1134 324
1/c 0.06 0.32
�5%queue length 0.20 1.33
Control Delay(s/veh) 8.4 21.2
dLOS A C
Approach Delay(s/veh) — 21.2
Approach LOS - C
;opynght 02005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/13/2007 4:57 PM
kile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5277.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Main&Haggerty
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analvsis Year Existing 2006
Analysis Time Period PM Peak Hour El
(Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastANest Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R _ _I
Volume(veh/h) 591 88 28 386
Peak-Hour Factor,PHF 1.00 0.79 0.79 0.90 0.90 1.00
Hourly Flow Rate,HFR(veh/h) 0 748 111 31 428 0
Percent Heavy Vehicles 0 -- — 0
Median Type Undivido d
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 76 59
Peak-Hour Factor.PHF 0.69 1.00 0.69 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 110 0 85 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LR
✓(veh/h) 31 195
(m)(veh/h) 791 289
✓lc 0.04 0.67
35%queue length 0.12 4.50
Control Delay(s/veh) 9.7 39.9
LOS A E
4pproach Delay(s/veh) — 39.9
4pproach LOS E
Copyright®2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/132007 4:591
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5277.tmp 2/13/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Haggerty Haggerly&Bozeman Trail
Agency/Co. JEngineering, Inc. Jurisdiction JBozeman
Date Performed 1211312007 Analysis Year lExisting(2006)
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South T1S
East/West Street: Ha ert Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStudy Period (hrs'l: 0.25
Vehicle Volumes and Adjustments
IVIa'or Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 55 1 5 29
Peak-Hour Factor, PHF 1.00 0.93 0.93 0.77 0.77 1.00
Hourly Flow Rate,HFR(veh/h) 0 0 0 16 0 54
Percent Heavy Vehicles 0 -- 0 -
(Median Type Undivided
14T Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration TR LT
(Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/hl 12 39
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.71 1.00 0.71
Hourly Flow Rate,HFR(veh/h) 6 37 0 0 59 1
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
I-anes 0 0 0 0 0 0
Configuration LR
Delay.Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
✓(veh/h) 6 70
t
(m)(veh/h) 1556 981
lc 0.00 0.07
95%queue length 0.01 0.23
Control Delay(s/veh) 7.3 9.0
LOS A A
Approach Delay(s/veh) - 9.0
Approach LOS -- A
;opyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5 2 Generated: 2/13r2007 5:18 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5292.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Haggerty&Bozeman Trail
Agency/Co. En ineerin , Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Existin 2006)
Analysis Time Period PM Peak Hour
Project Description SOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Haggerty ert Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T _ R
Volume(veh/h) 28 7 41 55
Peak-Hour Factor,PHF 1.00 0.88 0.88 0.77 0.77 1.00
Hourly Flow Rate,HFR(veh/h) 0 0 0 3 0 48
Percent Heavy Vehicles 0 — 0 _
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 1 0 0
IMinor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 2 26
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.54 1.00 0.54
Hourly Flow Rate,HFR(veh/h) 53 71 0 0 31 7
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration LT LR
✓(veh/h) 53 51
C(m)(veh/h) 1585 1022
✓/C 0.03 0.05
35%queue length 0.10 0.16
Control Delay(s/veh) 7.3 8.7
LOS A A
Approach Delay(s/veh) — 8.7
Approach LOS — A
Copyright m 2005 University of Florida,All Rights Reserved HCS+w Version 5.2 Generated: 2/13/2007 5:27
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5292.tmp 2/13/20o"
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection agy&Bozeman Trail
Agency/Co. JEngineering. Inc. Jurisdiction Bozeman
Date Performed 2/13/2007 Analysis Year Existing 2006)
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
IMa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 10 43 1 0 133 13
Peak-Hour Factor,PHF 0.71 0.71 0.71 0.87 0.87 0.87
Hourly Flow Rate,HFR(veh/h) 14 60 1 0 152 14
Percent Heavy Vehicles 0 -- — 0 —
Median Type Undivided
iRT Channelized 0 0
.anes 0 1 0 0 1 0
Configuration LTR LTR
II'Llpstrearn Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h) 12 8 1 6 0 31
Peak-Hour Factor, PHF 0.75 0.75 0.75 0.71 0.71 0.71
Hourly Flow Rate,HFR(veh/h) 16 10 1 8 1 0 1 43
Percent Heavy Vehicles 0 0 0 0 0 0
I3ercent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
IDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I'-ane Configuration LTR LTR LTR LTR
v(veh/h) 14 0 27 51
10(m)(veh/h) 1424 1555 658 853
✓lc 0.01 0.00 0.04 0.06
195%queue length 0.03 0.00 0.13 0.19
Control Delay(s/veh) T6 7.3 10.7 9.5
LOS A A B A
approach Delay(s/veh) — -- 10.7 9.5
4pproach LOS -- B A
:epyr,ght©2005 University of Florida,All Rights Reserved HCS+ne Version 5.2 Generated: 2/13/2007 5:34 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k52AB.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
I
General Information Site Information
Analyst 1bMR Intersection lKagy&Bozeman Trail
Agency/Co. lEngineering, Inc. Jurisdiction 18ozeman
Date Performed 1312007 Analysis Year lExisting 2006
Analysis Time Period JPM Peak Hour
.Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 20 117 7 0 62 9
IDeak-Hour Factor,PHF 0.77 0.77 0.77 0.93 0.93 0.93
Hourly Flow Rate,HFR(veh/h) 25 151 9 0 66 9
Percent Heavy Vehicles 0 — — 0
Median Type Undivided
IPT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
IMinor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 1 4 0 25 9 16
Peak-Hour Factor.PHF 0.63 0.63 0.63 0.69 0.69 0.69
Hourly Flow Rate,HFR(veh/h) 1 6 0 36 13 23
Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
IFlared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
r(veh/h) 25 0 7 72
(m)(veh/h) 1537 1432 621 733
lIc 0.02 0.00 0.01 0.10
'95%queue length 0.05 0.00 0.03 0.33
Control Delay(s/veh) 7.4 7.5 10.9 10.4
LOS A A B B
4pproach Delay(s/veh) — 10.9 10.4
4pproach LOS — — B B
Copyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 2 Generated: 2/13/2007 5:39 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k52Al3.tmp 2/13/200,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
:3eneral Information :Site Information
Analyst DMR Intersection Kaqy&Bennett Dr
encv/Co. Engineering, Inc. Jurisdiction Bozeman
v Date Performed 211312007 Analysis Year Existing 2006)
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Hi hland South T/S
North/South Street: Bennett Drive
astNVest Street Kaq Boulevard
Intersection Orientation: East-West [Study Period hrs): 0.25
dehicle Volumes and Adjustments
'Major Street Eastbound Westbound
Vlovement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 54 3 0 185
'eak-Hour Factor,PHF 1.00 0.67 0.67 0.67 0.67 1.00
sourly Flow Rate,HFR(veh/h) 0 80 4 0 276 0
Percent Heavy Vehicles 0 -- -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
::onfiguration TR LT
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 8 0
Peak-Hoar Factor, PHF 0.81 1.00 0.81 1.00 1.00 1.00
;sourly Flow Rate,HFR(veh/h) 9 0 1 0 0 1 0 1 0
Percent Heavy Vehicles 0 0 0 0 0 0
I3ercent Grade(%) 0 0
`=tared Approach N N
Storage 0 0
RT Channelized 0 0
-anes 0 0 0 0 0 0
configuration LR
Dela ,Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration LT LR
v(veh/h) 0 9
(m)(veh/h) 1526 644
vlc 0.00 0.01
95%queue length 0.00 0.04
Control Delay(s/veh) 7.4 10.7
!OS A B
Approach Delay(s/veh) - — 10.7
approach LOS B
:opyngtl©2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/14/2007 9:12 AM
Iile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5303.tmp 2/14/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
(General Information Site Information
Analyst IbmR I Intersection - _1Kagy&Bennett Dr
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 2/1,3/2007 Analysis Year lExisting(2005)
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Ka v Boulevard North/South Street: Bennett Drive
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 134 9 0 82
Peak-Hour Factor,PHF 1.00 0.90 0.90 0.82 0.82 1.00
Hourly Flow Rate,HFR(veh/h) 0 146 10 0 100 0
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 1 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 6 0
Peak-Hour Factor,PHF 0.55 1.00 0.55 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 10 0 0 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration LT LR
d(veh/h) 0 10
C(m)(veh/h) 1434 740
✓lC 0.00 0.01
35%queue length 0.00 0.04
Control Delay(s/veh) 7.5 9.9
ILOS A A
Approach Delay(s/veh) -- 9.9
Approach LOS — — A
Copyright©2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/14/2007 9:14
file:HC:\Docurnents and Settings\DReagor\Local Settings\Temp\u2k5315.tmp 2/14/200,'
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
`General Information Site Information
WPerformed
DMR Intersection Kaav&Painted Hills Dr
Engineerin , tnc. Jurisdiction Bozeman
j 211312007 nalvsis Year Existin 2006
eriod AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Hi hland South TIS
,EastNVest Street: Ka Boulevard North/South Street: Painted Hills Drive
Intersection Orientation: East-Wes( IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
.Movement 1 2 3 4 5 6
11 L T R L T R
[Volume(veh/h) 53 17 2 191
Peak-Hour Factor,PHF 1.00 0.67 0.67 0.67 0.67 1.00
.Hourly Flow Rate,HFR(veh/h) 0 79 25 2 285 0
[Percent Heavy Vehicles 0 -- 0
Median Type Undivided
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
[Minor Street Northbound Southbound
[Movement 7 8 9 10 11 12
L T R L T R
Jolume(veh/h) 74 4
Peak-Hour Factor, PHF 0.81 1.00 0.81 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 91 0 1 4 0 1 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
jFlared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
[Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
hr(veh/h) 2 95
C(m)(veh/h) 1500 634
v/c 0.00 0.15
95%queue length 0.00 0.52
:ontrol Delay(s/veh) 7.4 11.7
LOS A B
approach Delay(s/veh) — -- 11.7
4pproach LOS -- B
;opyrighl m 2005 University of Florida,All Rights Reserved HCS+*M Version 5.2 Generated: 2/13/2007 5:46 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k52BA.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Ka &Painted Hills Dr
Agency/Co. JEngineering, inc. Jurisdiction IBozeman
Date Performed 2/13/2007 Analysis Year JExistinq(2006)
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastiWest Street: Kagy Boulevard North/South Street: Painted Hills Drive
Intersection Orientation: East-West IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
IMovement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 142 53 3 85
(Peak-Hour Factor,PHF 1.00 0.90 0.90 1 0.82 0.82 1.00
(Hourly Flow Rate,HFR(veh/h) 0 157 58 3 103 0
(Percent Heavy Vehicles 0 -- 0 —
IVledian Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 21 1
Peak-Hour Factor,PHF 0.55 1.00 0.55 1.00 1.00 1.00
(Hourly Flow Rate,HFR(veh/h) 38 0 1 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
✓(veh/h) 3 39
C(m)(veh/h) 1367 701
✓lc 0.00 0.06
95%queue length 0.01 0.18
Control Delay(s/veh) 7.6 10.4
LOS A B
Approach Delay(s/veh) 10.4
Approach LOS -- B
Copyright©2005 University of Florida,All Rights Reserved HCS+ne Version 5.2 Generated: 2/13/2007 5:48 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k52BA.tmp 2/13/20Q
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Church7Sourdou h
Agency/Co.,- Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Existing 2006
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
I_ast=est Street: Ka_qy Boulevard North/South Street: S Church Ave/Sourdou h Rd
Intersection Orientation: East-West [StUdy Period(hrs): 0.25
Vehicle Volumes and Adjustments
IMa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 21 288 29 24 506 18
.Peak-Hour Factor,PHF 0.94 0.94 0.94 1 0.19 0.79 0.79
Hourly Flow Rate, HFR(veh/h) 22 306 30 30 640 22
[Percent Heavy Vehicles 0 — 0 — —
IMedian Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0 7771
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 101 63 54 9 30 30
Peak-I-lour Factor, PHF 0.87 0.87 0.87 0.67 0.67 0.67
Hourly Flow Rate, HFR(veh/h) 116 1 72 1 62 13 1 44 1 44
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
V(veh/h) 22 30 250 101
(m)(veh/h) 934 1235 194 240
l/C 0.02 0.02 1.29 0.42
95%queue length 0.07 0.07 13.60 1.96
control Delay(s/veh) 8.9 8.0 210.9 30.5
LOS A A F D
4pproach Delay(s/veh) — — 210.9 30.5
4pproach LOS — — F D
.opyright©2005 University of Florida,All Rights Reserved HCS+na Version 5 2 Generated: 213/2007 5:56 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k52C6.tmp 2/13/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst OMR Intersection IKaqy&Church/Sourdough
Agency/Co. Engineering, Inc_ Jurisdiction ozeman
Date Performed 211312007 Analysis Year 4Exisfina(2006
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard IVorth/South Street, S Church Ave/Sourdough Rd
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 25 384 89 60 340 19
Peak-Hour Factor,PHF 0.81 0.81 0.81 0.94 0.94 0.94
Hourly Flow Rate,HFR(veh/h) 30 474 109 63 361 20
Percent Heavy Vehicles 0 -- 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 47 30 25 25 66 68
Peak-Hour Factor.PHF 0.93 0.93 0.93 0.81 0.81 0.61
Hourly Flow Rate,HFR(veh/h) 50 32 26 30 81 83
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 1 0 0 1 0
onfiguration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
ILane Configuration L L LTR LTR
✓(veh/h) 30 63 108 194
(m)(veh/h) 1185 998 144 252
✓/c 0.03 0.06 0.75 0.77
95%queue length 0.08 0.20 4.50 5.64
Control Delay(s/veh) 8.1 8.9 81.5 54.9
ILOS A A F F
Approach Delay(s/veh) 81.5 54.9
Approach LOS F F
Copyright m 2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/13/2007 6:001
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k52C6.tmp 2/13/20C
APPENDIX C
CAPACITY CALCULATIONS -
EXISTING + TIME KNOLLS AT
NILLCREST WEST
HCM Analysis Summary
Existing+The Knolls at Hillerest Main St/Highland Blvd Area Type:Non CBD
DMR 01/01/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM-NB LEFT
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 295 244 262 454 4 218 2 80 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
HeavyVehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR I L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 73 0 8 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(Left Ri ht) --- --- --- --- --- --- --- '--
Signal Settings:Actuated Operational Analysis Cycle Length: 71.0 Sec Lost Time Per Cycle: 13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 16.0 24.0 18.0 0
Yellow All Red 3.0 0.0 1 3.5 1.5 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
p Group_ _-(Y Gmup Ratio- secLehl- QS
EB
L 275 0.001 , 0.338 L 0.004 15.6 B 20.3 C
* TR 1117 0.170 0.338 TR 0.502 20.4 C
WB L er 227 0.000 0.408 8.0 A
* L ro 395 0.183 0.225 L 0.514 9.8 A
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.143 0.254 L 0.565 24.1 C 23.3 C
TR 411 0.054 0.254 TR 0.214 21.0 C
SB
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0 A
Intersection:Delay= 14.8 sec/veh Int.LOS=B Xc 0.61 * Critical Lane Group 2:(v/s)Crit= 0.50
SIG/Cinema v3.08 Page 1
HCM Summary Results
y
Existing+The Knolls at Hillcrest Main St/Highland Blvd
DMR 01/01/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM-NB LEF"
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ p
E Grp v/s v/c veh) LOS veh) LOS
B
1°
L 0.00 0.00 15.6 B 20.3 C
* TR 0.17 0.50 20.4 C L 4
—454
,V--262
- --- - ---------------- ----------------- - -- -
WB Lper 0.00 8.0 A '
*L pro 0.18 0.51 9.8 A ' ' - ---
TR 0.16 0.26 6.9 A --------------------- --------- - - - - - - - --- - -
295 1
NB * L 0.14 0.57 24.1 C 23.3 C 244
TR 0.05 0.21 21.0 C
2187 80
2
SB LTR 0.00 0.00 0.0 A 0.0 A 1 2 3 ,
16 3 0 23 4 2 17 4 2
I
Int. 1 0.501 0.61 1 14.8 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Existing+The Knolls at Hillcrest Main St/Highland Blvd Area Type:Non CBD
DMR 01/01/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-PM-NB LEFT
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach joutbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 579 276 107 428 1 325 0 239 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 1 1 3
RTOR Vol(vph) 83 0 2 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 1 0 0 0 0
Parkers/Hour(LeftIRight) I --- --- --- --- --- -- "'Signal Settings:Actuated Operational Analysis Cycle Length: 70.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 26.0 21.0 0
Yellow All Red 3.0 0.0 3.5 1.5 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
Ap IQU �_ --(w&LcW-
-EB
L 322 0.001 0.371 L 0.003 13.9 B 21.3 C
* TR 1251 0.249 0.371 TR 0.671 21.3 C
WB L er 148 0.000 0.443 8.7 A
* L ro 250 0.070 0.143 L 0.309 10.3 B
TR 1952 0.141 0.557 TR 0.253 8.3 A
NB
* L 430 0.244 0.300 L 0.812 33.2 C 28.0 C
TR 485 0.158 0.300 TR 0.526 20.9 C
SB
LTR 440 0.008 0.300 LTR 0.027 17.3 B 17.3 B
Intersection:Delay= 19.5 sec/veh Int.LOS=B Xc 0.69 *Critical Lane Group :E(v/s)Crit=0.56
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+The Knolls at Hillerest Main St/Highland Blvd
DMR 01/01/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-PM-NB LEF7
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
Ap Grp v/s v/c veh) LOS veh) LOS
1 4
EB J +
L 0.00 0.00 13.9 B 21.3 C +
* TR 0.25 0.67 21.3 C 1
428
.,--107
.�--
WB L er 0.00 8.7 A
----------
L pro 0.07 0.314 10.3 B -------------
TR 0.14 0.25 8.3 A ---------------------- ----------------------
579 1 � I
--
NB * L 0.24 0.81 33.2 C 28.0 C 276
TR 0.16 0.53 20.9 C
3251239
IC
O
SB LTR 0.01 0.03 17.3 B 17.3 B 2 3
10 3 0 25 4 2 20 4 2
Int. 1 0.56 0.69 19.5 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DN1R Intersection Highland&Ellis
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Ex +The Knolls at Hillcrest
IlAnal sis Time Period AM Peak Hour
Pro ect Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 1 289 39 58 384 104
Peak-Hour Factor,PHF 0.85 0.85 0.85 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 1 339 45 67 446 120
Percent Heavy Vehicles 0 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Jpstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
plume veh/h) 0 14 4 19
Peak-Hour Factor,PHF 0.60 0.60 0.60 0.58 0.58 0.58
Hourly Flow Rate,HFR(veh/h) 0 0 0 24 1 6 1 32
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 1 0 1 0
Configuration R LTR
Dela ,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L L LTR R
v(veh/h) 1 67 62 0
C(m)(veh/h) 1016 1186 330 570
v/c 0.00 0.06 0.19 0.00
95%queue length 0.00 0.18 0.68 0.00
Control Delay(s/veh) 6.5 8.2 18.4 11.3
LLOS A A C B
,Approach Delay(s/veh) 18.4
4pproach LOS C
lgpyright©2005 University of Florida,All Rights Reserved HCS+- Version 5 21 Generated: 31712007 9:09 AM
ile:HCADocuments and Settings\DReagor\Local Settings\Temp\u2k560.tmp 3/7/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection IHiqhland&Ellis
Agency/Co- lEngineering, Inc. Jurisdiction Bozeman
Date Performed 13/2007 Analysis Year Ex +The Knolls at Hillcrest
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 1 2 3 4 5 6
L T R L T R ,
Volume(veh/h) 2 404 16 16 380 15
(Peak-Hour Factor,PHF 0.74 0.74 0.74 0.88 0.88 0.88
(Hourly Flow Rate, HFR(veh/h) 2 545 21 18 431 17
Percent Heavy Vehicles 0 — 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 5 37 2 55
Peak-Hour Factor, PHF 0.88 0.88 0.88 0.78 0.78 0.78
Hourly Flow Rate,HFR(veh/h) 0 0 5 47 2 70
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
IRT Channelized 0 0
ILanes 0 0 1 0 1 0
Configuration R LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
i(veh/h) 2 18 119 5
(m)(veh/h) 1111 1016 322 613
i/c 0.00 0.02 0.37 0.01
.35%queue length 0.01 0.05 1.65 0.02
Control Delay(s/veh) 8.2 8.6 22.6 10.9
LOS A A C B
approach Delay(s/veh) - 22.6 10.9
Approach LOS — C B
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5 21 Generated: 3r7/2007 9:10 1
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k564.tmp 3/7/200,.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st DMR Intersection Highland&Hillcrest Access
enc /Co. JEngineerioq, Inc. JUrisdiction Bozeman
Date Performed 1211312007 Analysis Year Ex+The Knolls at Hillcrest
nal sis Time Period PM Peak Hour
Pro ect Description BOZ-06052.02-The Knolls East&Highland South T/S
EastNVest Street: Hillcrest Retirement Center North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Jolume(veh/h) 88 315 175 21
Peak-Hour Factor,PHF 0.87 0.87 1.00 1.00 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 101 362 0 0 230 27
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Jolume(veh/h 19 28
Peak-Hour Factor,PHF 0.75 1.00 0.75 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 25 0 37 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 1 0 1 0 0 0
Configuration L R
Dela ,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L R
v(veh/h) 101 25 37
C(m)(veh/h) 1315 324 797
v/c 0.08 0.08 0.05
95%queue length 0.25 0.25 0.15
Control Delay(s/veh) 8.0 17.0 9.7
LOS A C A
approach Delay(s/veh) -- 12.7
4pproach LOS -- B
;o.nyriah:©2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/24/2007 12:40 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5EOD.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Hi bland&Hillcrest Access
enc /Co. [Engineering, Inc. Jurisdiction Bozeman
Date Performed 1211312007 Analysis Year Ex+The Knolls at Hillcrest
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Hillcrest Retirement Center North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L _ T R Yi
'Volume(veh/h) 38 215 366 30
(Peak-Hour Factor,PHF 0.86 0.86 1.00 1.00 0.86 0.86
(Hourly Flow Rate,HFR(veh/h) 44 249 0 0 425 34
Percent Heavy Vehicles I 0 -- - 0
(Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
(Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 34 81
Peak-Hour Factor, PHF 0.77 1.00 0.77 1.00 1.00 100
Hourly Flow Rate, HFR(veh/h) 44 0 105 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 1 0 0
IRT Channelized 0 0
Lanes 1 0 1 0 0 0
Configuration L R
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L R
r(veh/h) 44 44 105
(m)(veh/h) 1113 352 620
i/c 0.04 0.13 0.17
95%queue length 0.12 0.42 0.61
Control Delay(s/veh) 8.4 16.7 12.0
I-OS A C B
Approach Delay(s/veh) — 134
Approach LOS -- B
Copyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5.21 Generated: 2/242007 12:43 r
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E1B.tmp 2/24/200.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
3eneral Information Site Information
MPerformed
DMR Intersection Highland&KnolIS Lr1
En ineerin , Inc. Jurisdiction Bozeman
2/13/2007 Analysis Year Ex+The Knolls at Hillcrest
riod IAM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
lEastANest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
VVlovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 10 389 201 2
(Peak-Hour Factor,PHF 0.87 0.87 1.00 1.00 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 11 447 0 0 264 2
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
(Minor Street Eastbound Westbound
14ovement 7 8 9 10 11 12
L T R L T R
Volume(venin) 14 22
Peak-Hour Factor,PHF 0.75 1.00 0.75 1.00 1.00 1.00
,Hourly Flow Rate,HFR(veh/h) 16 0 1 29 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Dela ,Queue Length,and Level of Service
,Approach Northbound Southbound Westbound Eastbound
foovement 1 4 7 8 9 10 11 12
Lane Configuration L LR
v(veh/h) 11 47
(m)(veh/h) 1305 559
v/c 0.01 0.08
'35%queue length 0.03 0.27
control Delay(s/veh) 7.8 12.0
ILOS A B
4pproach Delay(s/veh) 12.0
4pproach LOS — B
,apyricpht©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 2/24/2007 1:00 PM
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E3 Ltmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst DMR Intersection Hichland&Knolls Ln
Agency/Co. Engineerin , Inc. Jurisdiction Bozeman 11
Date Performed 211312007 Analvsis Year Ex+The Knolls at Hillcrest
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 22 247 429 18
(Peak-Hour Factor,PHF 0.86 0.66 1.00 1.00 0.86 0.86
Hourly Flow Rate, HFR(veh/h) 25 287 0 0 498 20
Percent Heavy Vehicles 0 -- — 0
Median Type Undivided
IRT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
'Volume(veh/h) 6 16
Peak-Hour Factor,PHF 0.77 1.00 0.77 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 7 0 20 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
lDelay,Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LR
(veh/h) 25 27
C(m)(veh/h) 1058 478
v/c 0.02 0.06
135%queue length 0.07 0.18
Control Delay(s/veh) 8.5 13.0
LOS A B
4pproach Delay(s/veh) — — 13.0
4pproach LOS — B
Copyright©2005 University of Florida,All Rights Reserved HCS+m+ Version 5 21 Generated: 2/24/2007 12:43 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E21.tmp 2/24/200t.
,Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection lHighland&Ka
cgenc /Co. JEnqjneerinq, Inc. Jurisdiction JBozernan
Date Performed 1211312007 Analysis Yea JEx+The Knolls at Hillcrest
Analysis Time Period 14M Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastANest Street: Ka Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
IMajor Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 273 75 0 0 288 14
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.77 0.77 0.77
Hourly Flow Rate,HFR(veh/h) 317 87 0 0 374 18
Percent Heavy Vehicles 0 -- 0
(Median Type Undivided
IPT Channelized 0 0
(Lanes 1 1 0 0 1 0
Configuration L TR LTR
(upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 7 1 0 7 1 348
Peak-Hour Factor,PHF 0.67 0.67 0.67 0.89 0.89 0.89
Hourly Flow Rate,HFR(veh/h) 10 1 0 7 1 1 1 391
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
(veh/h) 317 0 11 399
C(m)(veh/h) 1176 1522 49 624
+/c 0.27 0.00 0.22 0.64
95%queue length 1.10 0.00 0.75 4.58
Control Delay(s/veh) 9.2 7.4 98.6 20.4
LOS A A F C
Approach Delay(s/veh) -- — 98.6 20.4
Approach LOS — F C
:opyfight©2005 University of Florida,All Rights Reserved HCS+TM+ Version 5 2 Generated: 2/14/2007 2:03 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k53CA.ttnp 2/14/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information 'Site Information
Analyst DMR Intersection Hi hland&Kagy
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year IjEx+The Knolls at Hillcrest
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 292 173 1 0 89 19
Peak-Hour Factor,PHF 0.85 0.65 0.85 0.84 0.84 0.84
(Hourly Flow Rate,HFR(veh/h) 343 203 1 0 105 22
(Percent Heavy Vehicles 0 -- p _
(Median Type Undivided
RT Channelized 0 0
Lanes 1 i 0 0 1 0
Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 0 3 0 19 3 383
Peak-Hour Factor.PHF 0.75 0.75 0.75 0.92 0.92 1.00
Hourly Flow Rate,HFR(veh/h) 0 4 0 20 3 383
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
(veh/h) 343 0 4 406
C(m)(veh/h) 1464 1380 183 752
do 0.23 0.00 0.02 0.54
95%queue length 0.91 0.00 0.07 3.27
Control Delay(s/veh) 8.2 7.6 25.1 15.3
LOS A A D C
Approach Delay(s/veh) - 25.1 15.3
Approach LOS -- - D C
Copyright©2005 University of Florida,All Rights Reserved HCS+- Version 5 2 Generated: 2/1412007 2:06 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k53CF.tmp 2/14/200,:
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kaq &Church/Sourdough
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Ex +The Knolls at Hillcrest
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastANest Street: Kagy Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West IStudy Period(hrs': 0.25
Vehicle Volumes and Adjustments
IMa'or Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 21 307 29 24 550 18
Peak-Hour Factor,PHF 0.94 0.94 0.94 0.79 0.79 0.79
Hourly Flow Rate,HFR(veh/h) 22 326 30 30 696 22
(Percent Heavy Vehicles 0 — -- 0
Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume vehih) 101 63 54 9 30 30
Peak-Hour Factor. PHF 0.87 0.87 0.87 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 116 72 62 13 1 44 44
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
f=tared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
t',onfiguration LTR LTR
Dela .Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
1.
lNovement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
(veh/h) 22 30 250 101
C(m)(veh/h) 891 1214 170 214
vlc 0.02 0.02 1.47 0.47
95%queue length 0.08 0.08 15.90 2.31
Control Delay(s/veh) 9.1 8.0 290.9 36.0
LOS A A F E
Approach Delay(s/veh) -- 290.9 36.0
Approach LOS — F E
,opyright©2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2114/2007 12:31 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k538B.tmp 2/14/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst DMR I finteisection IKayy&Church/Sourdough
Agency/Co. Engineering, Inc. urisdiction lBozeman
Date Performed 211312007 nal sis Yea I&+The Knolls at Hillcrest
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Kar V Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West [Study Period Mrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 25 428 89 60 371 19
Peak-Hour Factor,PHF 0.81 0.81 0.81 0.94 0.94 0.94
(Hourly Flow Rate,HFR(veh/h) 30 528 109 63 394 20
Percent Heavy Vehicles 0 _ 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 47 30 25 25 66 68
Peak-Hour Factor,PHF 0,93 0.93 0.93 0.81 0.81 0.81
(Hourly Flow Rate,HFR(veh/h) 50 32 26 30 1 81 1 83
(Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
v(veh/h) 30 63 108 194
C(m)(veh/h) 1152 953 118 222
v/c 0.03 0.07 0.92 0.87
95%queue length 0.08 0.21 5.77 6.96
Control Delay(s/veh) 8.2 9.0 130.1 77.6
LOS A A F F
4pproach Delay(s/veh) -- — 130.1 77.6
Approach LOS -- — F F
Copyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5.2 Generated: 2/14/2007 12:33 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5391.tmp 2/14/2001
APPENDIX D
INTERNAL CAPTURE
CALCULATIONS
ti
c
E m "
w
kt E v a
_ w E o
E "
e w e w 4
►r,a �' v � m � Y U
tz
W CL
17— W
0 0
d
O aCC
a b b 1P 5
z-
z '' � al' co c � � � c� cal o
c _
w ui
MIS
A ` __.
0 tO4
co
UCOO
_ 0
:a ° co
LU
LU
~ W LU ~ Q o
t-- > g
Z � = m
CUJ 0_An _ m , c:
AGA Z v/ 4z
il. _
ON ° ° ro r c
O ` n v O � O a G - O ? LU
w
co
LU M
m b b
LLJ
LU CLe c m Z
oza = -- = 3
o C. c� b �
LU�J
U)a.
Q ro
4 " E F-
LU
Lu 0 0 o b Q � o C j
u cmi � a V
d. co
�`� L� � 0
Q N c LU
�o
.2 M- z
Q
to
El)
� �� mMM � �
_ _ LL' _
M
ti
ID
G w Y y
Q m O O v 0 co O
U W Fo W
� W =
W x
F— W W �° b u W �— Q
•. _ e W � � e C I-
m 5
�."
c— E E d
N W Uj UJ w �
ico LO
w p� W
110 EYE Trip ene6tiort Handbook, 2nd Edition Chapter 7
APPENDIX E
CAPACITY CALCULATIONS -
EXISTING + THE KNOLLS AT
NILLCREST WEST + PHASE 1
HCM Analysis Summary
Existing +The Knolls West+Ph 1 Main St/Highland Blvd Area Type:Non CBD
DMR 01/01/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
A roach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h) 1 295 248 263 454 4 228 2 85 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 1 3
RTOR Vol v h 74 0 16 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) --- I --- --- I --- --- w ---
---
Signal Settings:Actuated Operational Analysis Cycle Length: 71.0 Sec Lost Time Per Cycle:13.0 See
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 16.0 24.0 18.0 L
Yellowl All Red 3.0 0.0 3.5 1.5 3.5 1.5
I i
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
p ati (sg� OS-
EB
L 275 0.001 0.338 L 0.004 15.6 B 20.4 C
* TR 1115 0.171 0.338 TR 0.507 20.4 C
WB L er 225 0.000 0.408 8.0 A
* L ro 395 0.183 0.225 L 0.518 9.9 A
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.149 0.254 L 0.589 24.6 C 23.7 C
TR 411 0.052 0.254 TR 0.204 21.0 C
SB
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0 A
Intersection:Delay= 15.0sec/veh Int.LOS=B Xc 0.62 *Critical Lane Group :5:(v/s)Crit=0.50
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+The Knolls West+Ph 1 Main St/Highland Blvd
DMR 01/01/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-AM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS
O 0
EB
L 0.00 0.00 15.6 B 20.4 C
* TR 0.17 0.51 20.4 C 4
= 454
263
.L
WB L er 0.00 8.0 A '
-----------
--
*L ro 0.18 0.52 9.9 A ---------�-
TR 0.16 0.26 6.9 A --------------------- ---------------------
1 — 7 � �► I
295 1
NB * L 0.15 0.59 24.6 C 23.7 C 248 —�
TR 0.05 0.20 21.0 C .
228 85
2
SB LTR 0.00 0.00 0.0 A 0.0 A
16 3 0 23 4 2 17 4 2
Int. 0.50 0.62 15.0 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Existing+The Knolls West+Ph 1 Main St/Highland Blvd Area Type: Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
A roach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 579 288 112 428 1 332 0 242 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 1 3
RTOR Vol v h 86 0 24 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour LeftjRight) --- --- --- -- --- ---
Signal Settings:Actuated Operational Analysis Cycle Length: 70.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 26.0 21.0 0
Yellowl All Red 3.0 0.0 3.5 1.5 3.5 1.5 F+
Cap ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
Group Ratl
EB
L 322 0.001 0.371 L 0.003 13.9 B 21.5 C
* TR 1249 0.252 0.371 TR 0.680 21.5 C
WB L er 144 0.000 0.443 8.8 A
* L ro 250 0.074 0.143 L 0.327 10.6 B
TR 1952 0.141 0.557 TR 0.253 8.3 A
NB
* L 430 0.249 0.300 L 0.830 35.0 C 29.2 C
TR 485 0.145 0.300 TR 0.482 20.3 C
SB
LTR 443 0.008 0.300 LTR 0.027 17.3 B 17.3 B
Intersection:Delay= 19.8 sec/veh Int.LOS=B XC=0.71 *Critical Lane Group >�(v/s)Crit= 0.58
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+The Knolls West+Ph I Main St/Highland Blvd
DMR 2/22/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-PM
Lane Group Approach I
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS
1 4
EB J
L 0.00 0.00 13.9 B 21.5 C
* TR 0.25 0.68 21.5 C L 1
428
�112
•--------------------- ---------------------
WB L er 0.00 8.8 A
*L ro 0.07 0.33 10.6 B ---------- ---
TR 0.14 0.25 8.3 A ------------ -- ---- --- ----------------- -- ---
1
579
NB * L 0.25 0.83 35.0 C 29.2 C 288
TR 0.14 0.48 20.3 C I
3321242
0 I
SB LTR 0.01 1 0.03 17.3 B 17.3 B 1 2 3 ,
10 3 0 25 4 2 20 4 2
I
Int. 0.58 0.71 19.8 1 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nalvst DMR Intersection Highland&Ellis
Agency/Co Engineering, Inc. Airisdiction Buzeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
.=astNVest Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South 13tudy Period(111 0.25
Vehicle Volumes and Adjustments
(Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 1 304 39 58 389 104
3eak-Hour Factor, PHF 0.85 0.85 0.85 0,86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 1 357 45 67 452 120
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
11IRT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 0 14 4 19
Peak-Hour Factor, PHF 0.60 0.60 0.60 0.58 0.58 0.58
Hourly Flow Rate,HFR(veh/h) 0 0 0 24 6 32
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
=lared Approach N N
Storage 0 0
RT Channelized 0 0
-anes 0 0 1 0 1 0
:onfiguration R LTR
Dela ,Queue Length.and Level of Service
Approach Northbound Southbound Westbound Eastbound
fovement 1 4 7 8 9 10 11 12
f_ane Configuration L L LTR R
(veh/h) 1 67 62 0
C(m)(veh/h) 1011 1168 319 566
1lc 0.00 0.06 0.19 0.00
35%queue length 0.00 0.18 0.71 0.00
Control Delay(s/veh) 8.6 8.3 19.0 11.4
_OS A A C B
approach Delay(s/veh) -- 19.0
Approach LOS C
noyrcrhr©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 3/7/2007 9:13 AM
tile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k56A.tmp 3/7/2007
Two Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JbmR Intersection Hi hland&Ellis
Agency/Co. En ineeriny, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year JEx+The Knolls West+Ph 1
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(vehih) 2 414 16 16 397 15
Peak-Hour Factor,PHF 0.74 0.74 0.74 0.88 0.88 0.88
Hourly Flow Rate,HFR(veh/h) 2 559 21 18 451 17
Percent Heavy Vehicles 0 0 --
(Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
(Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 5 37 2 55
Peak-Hour Factor.PHF 0.68 0.88 0.88 0.78 0.78 0.78
Hourly Flow Rate,HFR(veh/h) 0 0 5 47 2 70
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
I-anes 0 0 1 0 1 0
onfiguration R LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
/(veh/h) 2 18 119 5
(m)(veh/h) 1094 1004 309 597
Vic 0.00 0.02 0.39 0.01
95%queue length 0.01 0.05 1.75 0.03
Control Delay(s/veh) 8.3 8.7 23.8 11.1
LOS A A C B
Approach Delay(s/veh) -- 23.8 11.1
Approach LOS C B
Copyright©2005 University of Florida,All Rights Reserved HCS+*M Version 5,21 Generated: 3/7/2007 9:14
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k570.tmp 3/7/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
13eneral Information Site Information
Analyst DMR Intersection Ni hland Blvd&Painted Hills
enc /Co. Engineering,Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Ex +The Knolls West+Ph 1
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Hillcrest/Painted Hills Rd North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
volume(veh/h) 88 325 0 2 178 21
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0,76
Hourly Flow Rate,HFR(veh/h) 101 373 0 2 234 27
Percent Heavy Vehicles 0 0 --
IMedian Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
,Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 19 0 28 0 0 5
Peak-Hour Factor,PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 25 0 37 0 1 0 5
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
I-anes i 1 0 1 1 0
Configuration L TR L TR
Dela ,Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
it(veh/h) 101 2 0 5 25 37
C(m)(veh/h) 1311 1197 255 678 271 793
r/c 0.06 0.00 0.00 0.01 0.09 0.05
'95%queue length 0.25 0.01 0.00 0.02 0.30 0.15
Control Delay(s/veh) 8.0 8.0 19.1 10.3 19.6 9.8
[_OS A A C B C A
4pproach Delay(s/veh) -- 10.3 13.7
4pproach LOS B B
:opyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 21 Generated: 2/24/2007 1:04 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E36.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Highland&Painted Hills Rd
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastiWest Street: Hillcrest/Painted Hills Rd North/South Street: Highland Boulevard
Intersection Orientation: North-South IStUdy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
olurne(veh/h) 38 222 0 5 378 30
Peak-1 iuur Factor, FI il- 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 44 258 0 5 439 34
Percent Heavy Vehicles 0 0 -- --
Mcdian Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 1 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 1 t 12
L T R L T R
Volume veh/h 34 0 81 0 0 3
Peak-Hour Factor, PI-1F 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate, HFR(veh/h) 44 0 105 0 0 3
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 1 0 1 1 0
onfiguration L TR L TR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
(veh/h) 44 5 0 3 44 105
(m)(veh/h) 1099 1318 222 786 288 609
lc 0.04 0.00 0.00 0.00 0.15 0.17
95%queue length 0.12 0.01 0.00 0.01 0.53 0.62
Control Delay(s/veh) 8.4 7.7 21.2 9.6 19.7 12.1
LOS A A C A C B
pproach Delay(s/veh) - 9.6 14.4
pproach LOS -- - A B
Copyright©2005 University of Florida,All Rights Reserved HCS+w Version 5 21 Generated: 2/24/2007 1:06.
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E3B.tmp 2/24/20(
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
13eneral Information Site Information
MPerformed
DMR Intersection Hi hland&Knolls Ln
En ineerng, Inc. Jurisdiction Bozeman
Analysis Year Ex+The Knolls West+Ph 1
eriod AM Peak Hour
Project Description BOZ-05052.02-The Knolls East&Highland South TIS
EastNVest Street Knolls Ln Worth/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 10 399 0 0 204 2
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 11 458 0 0 268 2
Percent Heavy Vehicles 0 -- -- 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
(Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h) 14 0 22 0 0 0
Peak-Hour Factor, PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 18 0 29 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
lFlared Approach N N
Storage 0 0
IRT Channelized 0 0
-anes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
6Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
v(veh/h) 11 0 0 47
C(m)(veh/h) 1301 1114 506
v/c 0.01 0.00 0.09
95%queue length 0.03 0.00 0.30
Control Delay(s/veh) 7.8 8.2 12.8
LOS A A B
Approach Delay(s/veh) -- -- 12.8
Approach LOS -- B
-�opyf,gh!©2005 University of Florida,All Rights Reserved HCS+w Version 5.21 Generated: 2/24/2007 1:07 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E3F.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Highland&Knolls Ln
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 22 254 0 0 441 18
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 25 295 0 0 512 20
Percent Heavy Vehicles 0 — -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0 -777
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 6 0 16 0 0 0
Peak-Hour Factor, PHF 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 7 0 20 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
onfiguration LTR LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
(veh/h) 25 0 0 27
(m)(veh/h) 1046 1278 438
/c 0.02 0.00 0.06
5%queue length 0.07 0.00 0.20
Control Delay(s/veh) 8.5 7.8 13.8
LOS A A B
pproach Delay(s/veh) -- — 13.8
pproach LOS — B
Copyright©2005 University of Florida,All Rights Reserved HCS+TM Version 5 21 Generated: 2/24/2007 1:08
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E45.tmp 2/24/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
lueneral Information Site Information
Analyst IDMR Intersection Highland&Kaq
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 1211312007 Analysis Year Ex+The Knolls West+Ph 1
nal sis Time Period M Peak Hour
Pro ect Description BOZ-06052.02- The Knolls East 8 Highland South TIS
iEastNVest Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 273 85 0 0 320 24
Peak-Hour Factor,PHF 0.86 0,86 0.86 0.77 0.77 0.77
Hourly Flow Rate,HFR(veh/h) 317 98 0 0 415 31
Percent Heavy Vehicles 0 -- 0 -- -
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 0 1 0
!configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Allovement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 7 1 0 10 1 348
Peak-Hour Factor,PHF 0.67 0.67 0,67 0.89 0.89 0.89
Hourly Flow Rate,HFR(veh/h) 10 1 0 11 1 391
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
p-anes 0 1 0 0 1 0
Configuration LTR LTR
IDelay,Queue Length,and Level of Service
tApproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
F(veh/h) 317 0 11 403
C(m)(veh/h) 1123 1508 40 565
e/c 0.28 0.00 0.28 0.71
95%queue length 1.17 0.00 0.91 5.80
Control Delay(s/veh) 9.5 7.4 126.2 25.6
1ILOS A A F D
Approach Delay(s/veh) — -- 126.2 25.6
Approach LOS F D
,opynght 0 2005 University of Florida,All Rights Reserved HCS+TM Version 5 2 Generated: 2/2212007 10:23 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k595D.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR I Intersection l-i hland&Kagy
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 1212212007 Analysis Year lEx+The Knolls West+Ph 1
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Hi hland Boulevard
Intersection Orientation: East-West IStUdy Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/l,) 292 209 1 0 109 26
Peak-Hour Factor, PHF 0.85 0.85 0.85 1 0.84 0.84 0.84
Hourly Flow Rate,HFR(veh/h) 343 245 1 0 129 30
Percent Heavy Vehicles 0 - 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 1 12
L T R L T R
Volume veh/h) 0 3 0 31 3 383
Peak-Hour Factor,PFIF 0.75 0.75 0.75 0.92 0,92 0.92
Hourly Flow Rate,HFR(veh/h) 0 4 0 33 3 416
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
(veh/h) 343 0 4 452
C(m)(veh/h) 1425 1332 164 654
/c 0.24 0.00 0.02 0.69
95%queue length 0.94 0.00 0.07 5.51
Control Delay(s/veh) 8.3 7.7 27.5 21.9
LOS A A D C
Approach Delay(s/veh) 27.5 21.9
Approach LOS - — D C
Copyright©2005 University of Florida,All Rights Reserved HCS+- Version 5 2 Generated: 2/22/2007 11:44,
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k59CD.tmp 2/22/200
Two-Way Stop Control Page 1 of
I
TWO-WAY STOP CONTROL SUMMARY
general Information ite Information
nal st IDMR I Intersection Main&Haggerty
,Agency/Co. JEngineering, Inc. Jurisdiction lBo2eman
iDate Performed 212212007 Analysis Year JEx+The Knolls West+Ph 1
nal sis Time Period M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
astMest Street: E Main St North/South Street: Haggerty Ln
ntersection Orientation: East-West IStudy Period(hrs) 0.25
ehicle Volumes and Adjustments
'Aa'or Street Eastbound Westbound
,Aovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 275 80 54 570
'eak-Hour Factor,PHF 1.00 0.80 0.80 0.75 0.75 1.00
,sourly Flow Rate,HFR(veh/h) 0 343 99 72 760 0
Percent Heavy Vehicles 0 0 --
Aedian Type Undivided
RT Channelized 0 0
I-anes 0 2 0 1 2 0
.onfiguration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
Aovement 7 8 9 10 11 12
L T R L T R
olume(veh/h 60 26
='eak-Hour .Factor.PHF 0.81 1.00 0.81 1.00 1.00 1.00
sourly Flow Rate, HFR(veh/h) 74 0 32 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 1 0
Percent Grade(%) 0 0
=fared Approach N N
Storage 0 0
RT Channelized 0 0
..anes 0 0 0 0 0 0
1�.onfiguration LR
Oela ,Queue Length,and Level of Service
'approach Eastbound Westbound Northbound Southbound
61Aovement 1 4 7 8 9 10 11 12
bane Configuration L LR
r(veh/h) 72 106
C(m)(veh/h) 1129 323
r/c 0.06 0.33
35%queue length 0.20 1.39
:ontrol Delay(s/veh) 8.4 21.5
.OS A C
kpproach Delay(s/veh) -- 21.5
approach LOS C
cpyrhnt©2005 University of Florida,All Rights Reserved HCS+lm Version 5.2 Generated: 2122=07 10:55 Al
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k597D.tmp 2/22/20011
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Main&Haggerty
Agency/Co. Engineering. Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex +The Knolls West+Ph 1
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: E Main St North/South Street: Haggerty Haggerly Ln
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
fovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 594 88 30 391
Peak-Hour Factor,PHF 1.00 0.79 0.79 0.90 0.90 1.00
Hourly Flow Rate,HFR(veh/h) 0 751 111 33 434 0
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 76 60
Peak-Hour Factor, PHF 0.69 1.00 0.69 1.00 1.00 1,00
Hourly Flow Rate,HFR(veh/h) 110 0 86 0 0 0
(Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Delay.Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(veh/h) 33 196
C(m)(veh/h) 789 285
✓lc 0.04 0.69
95%queue length 0.13 4.66
Control Delay(s/veh) 9.8 41.4
LOS A E
Approach Delay(s/veh) 41.4
Approach LOS — E
Copyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5.2 Generated: 2/22/2007 11:56/
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k59E5.tmp 2/22/200,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
veneral Information ite Information
M
DMR Intersection Haooert &Bozeman Trail
En ineenn , Inc. urisdiction Bozeman
med 212212007 nalysis Year Ex+The Knolls West+Ph 1
e Period M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Haqgerly Lane North/South Street: Bozeman Trail Road
intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
iMa'or Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 57 1 5 30
(Peak-Hour Factor, PHF 1.00 0.93 0.93 0.77 0.77 1.00
Hourly Flow Rate, HFR(veh/h) 0 0 0 16 0 54
[Percent Heavy Vehicles 0 -- — 0
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
(Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
✓olume veh/h) 12 39
Peak-Hour .Factor,PHF 1.00 1.00 1.00 0.71 1.00 0.71
Hourly Flow Rate,HFR(veh/h) 6 38 0 0 61 1
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
!Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
[Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v(veh/h) 6 70
(m)(veh/h) 1554 978
�dc 0.00 0.07
95%queue length 0.01 0.23
control Delay(s/veh) 7.3 9.0
LLOS A A
4pproach Delay(s/veh) -- 9.0
,Approach LOS -- A
:oaynyrn::2005 University of Florida,All Rights Reserved HCS+TM Version 5 2 Generated: 2/22/2007 10:57 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5982.tmp 2/22/2007
Two-Way Stop Conirol Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst 10MR Intersection Haggerty&Bozeman Trail
Agency/Co. lEngineering, Inc. Jurisdiction Bozernan
Date Performed 1212212007 Analysis Year Ex+The Knolls West+Ph 1
nal sis Time Period IPM Peak Hour
Proiect Description SOZ-06052.02- The Knolls East&Highland South TIS
EastAA/est Street: Haggerty Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 29 7 41 57
Peak-Hour Factor,PHF 1.00 0.88 0.88 0.77 0.77 1.00
Hourly Flow Rate,HFR(veh/h) 0 0 0 3 0 48
Percent Heavy Vehicles 0 - 0
(Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
(Upstream Signal 0 0
(Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 2 26
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.54 1.00 0.54
Hourly Flow Rate,HFR(veh/h) 53 1 74 0 0 32 7
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 0 0 0 0 0
{Configuration LR
IDelay.Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration LT LR
(veh/h) 53 51
C(m)(veh/h) 1584 1019
✓/c 0.03 0.05
95%queue length 0.10 0.16
Control Delay(s/veh) 7.4 8.7
ILOS A A
Approach Delay(s/veh) — 8.7
Approach LOS — A
Copyright m 2005 University of Florida,All Rights Reserved HCS+- Version 5 2 Generated: 2/22/2007 11:58/
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k59EB.tmp 2/22/200,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst 10MR Intersection JKaov&Bozeman Trail
Agency/Co. JEngineering, Inc. urisdiction Bozeman
Date Performed 2/22/2007 nal sis Year I&+The Knolls West+Ph 1
Analysis Time Period 4M Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period hrs): 0.25
✓ehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 12 44 1 0 133 13
Peak-Hour Factor,PHF 0.71 0.71 0.71 0.87 0.87 0.87
Hourly Flow Rate,HFR(veh/h) 16 61 1 0 152 14
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
RT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
(Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Vol-me(veh/h) 12 8 1
6 0 32
ak-Hour Factor, PHF 0.75 0.75 0.75 0.71 0.71 0.71
Hourly Flow Rate, HFR(veh/h) 16 10 1 8 1 0 45
Percent Heavy Vehicles 0 0 0 0 1 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
,Lanes 0 1 0 0 1 0
onfiguration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
'v(veh/h) 16 0 27 53
f
(m)(veh/h) 1424 1554 649 853
v/c 0.01 0.00 0.04 0.06
95%queue length 0.03 0.00 0.13 0.20
Control Delay(s/veh) 7.6 7.3 10.8 9.5
iLOS A A B A
approach Delay(s/veh) 10.8 9.5
%pproach LOS -- -- B A
'.opyn�ht©2005 University of Florida,All Rights Reserved HCS+n+ Version 5 2 Generated: 2/22/2007 11:03 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k598E.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Kagy&Bozeman Trail I
Agency/Co. lEngineeting, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 21 118 7 0 63 9
Peak-Hour Factor,PHF 0.77 0.77 0.77 0.93 0.93 0.93
Hourly Flow Rate,HFR(veh/h) 27 153 9 0 67 9
Percent Heavy Vehicles 0 -- 0 -
--=I
Mcdian Type Undwidcd
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 1 4 0 25 9 18
Peak-Hour Factor,PHI= 0.63 0.63 0.63 0.69 0.69 0.69
Hourly Flow Rate,HFR(veh/h) 1 6 0 36 13 26
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
(veh/h) 27 0 7 75
(m)(veh/h) 1536 1429 613 733
Ic 0.02 0.00 0.01 0.10
95%queue length 0.05 0.00 0.03 0.34
Control Delay(s/veh) 7.4 7.5 10.9 10.5
LOS A A B B
Approach Delay(s/veh) - 10.9 10.5
Approach LOS - — B B
Copyright©2005 University of Florida,All Rights Reserved HCS+- Version 5 2 Generated: 2/22/2007 12:05 f
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k59FA.tmp 2/22/200,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
p3eneral Information Site Information
E
DMR Intersection Ka &Bennett Dr
o. En ineering, Inc. urisdiction Bozeman
ormed 212212007 nal sis Year Ex +The Knolls West+Ph1
ime Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T1S
East/West Street: Kagy Boulevard North/South Street: Bennett Drive
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
(Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 0 57 3 0 186 0
(Peak-Hour Factor,PHF 0.67 0.67 0.67 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 0 85 4 0 277 0
[Percent Heavy Vehicles 0 — 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 8 0 0 0 0 0
Peak-Hour Factor,PHF 0.81 0.81 0.81 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 9 0 0 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
configuration LTR LTR
Dela ,Queue Length,and Level of Service
�kpproach Eastbound Westbound Northbound Southbound
M1Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v(veh/h) 0 0 9 0
C(m)(veh/h) 1298 1519 596
Vic 0.00 0.00 0.02
95%queue length 0.00 0.00 0.05
Control Delay(s/veh) 7.8 7.4 11.1
ILOS A A B
4pproach Delay(s/veh) 11.1
approach LOS - B
:o;yrn�ht©2005 University of Florida,All Rights Reserved HCS+rM Version 5 2 Generated: 2/22/2007 11:00 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5988.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
nal st DMR Intersection IKa &Bennett Dr
enc /Co. En inoerinq, Inc. Jurisdiction Bozeman
Date Performed 1212212007 Analysis Year lEx+The Knolls West+Ph 1
nalvsis Time Period JPM Peak Hour
Proiect Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard North/South Street: Bennett Drive
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 0 136 9 0 85 0
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.82 0.82 0.62
Hourly Flow Rate,HFR(veh/h) 0 151 10 0 103 0
Percent Heavy Vehicles 0 - 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 6 0 0 0 0 0
Peak-Hour Factor,PHF 0.55 0.55 0.55 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 10 0 0 0 9 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
Iovement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
/(veh/h) 0 0 10 0
(m)(veh/h) 1502 1430 698
llc 0.00 0.00 0.01
95%queue length 0.00 0.00 0.04
Control Delay(s/veh) 7.4 7.5 10.2
LOS A A B
Approach Delay(s/veh) 10.2
Approach LOS B
Copyright©2005 University of Florida,All Rights Reserved HCS+nn Version 5 2 Generated: 2/22/2007 12:021
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k59F5.tmp 2/22/20G
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Painted Hills Dr
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1
nal sis Time Period M Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastWest Street: Kagy Boulevard North/South Street: Painted Hills Drive
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 5 54 17 2 191 1
Peak-Hour Factor, PHF 0.67 0.67 0.67 0.67 0.67 0.67
11 Hourly Flow Rate,HFR(veh/h) 7 80 25 2 265 1
Percent Heavy Vehicles 0 -- - 0
lMedian Type Undivided
RT Channelized 0 0
lanes 1 1 0 1 1 0
!,Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 74 0 4 2 0 17
Peak-Hour Factor,PHF 0.81 0.81 0.81 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 91 0 4 2 0 18
Percent Heavy Vehicles D 0 0 0 0 0
Percent Grade(%) 0 0
1I=1ared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
v(veh/h) 7 2 95 20
C(m)(veh/h) 1288 1499 555 732
v/c 0.01 0.00 0.17 0.03
95%queue length 0.02 0.00 0.61 0.08
Control Delay(s/veh) 7.8 7.4 12.8 10.1
LOS A A B B
Approach Delay(s/veh) -- — 12.8 10.1
4pproach LOS — B B
,opyrighl©2005 University of Florida,All Rights Reserved HCS+- Version 5.27 Generated: 315/2007 2AB PM
f1le://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k 1 94.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection IKagy&Painted Hills Dr
Agency/Co. En ineerinc, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastAAlest Street: Kagy Boulevard North/South Street: Painted Hills Drive
Intersection Orientation: East-West IStUdy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 19 143 53 3 86 2
Peak-Hour Factor,PHF 0.90 0.90 0.90 0.82 0.82 0.82
Dourly Flow Rate,HFR(veh/h) 21 158 58 3 104 2
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 a 9 10 11 12
L T R L T R
Volume(veh/h) 21 0 1 1 0 11
Peak-Hour Factor,PFIF 0.55 0.55 a55 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 38 0 1 1 0 12
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0 t
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
/(veh/h) 21 3 39 13
(m)(veh/h) 1498 1366 602 915
r/c 0.01 0.00 0.06 0.01
95%queue length 0.04 0.01 0.21 0.04
Control Delay(s/veh) 7.4 7.6 11.4 9.0
LOS A A B A
4pproach Delay(s/veh) -- — 11.4 9.0
4pproach LOS -- — B A
Copyright©2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 3/5/2007 2:51
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k199.tmp 3/5/20G
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection JKagy&Street G
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/2007 Analysis Year JEx+The Knolls West+Ph 1
Analysis Time Period AM Peak Hour
Project Description BOZ-06052 02- The Knolls East&Highland South TIS
East/West Street. Kagy Boulevard North/South Street: Street G
'Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 8 75 282 0
(Peak-Hour Factor, PHF 0.67 0.67 1.00 1.00 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 11 111 0 0 420 0
Percent Heavy Vehicles 0 -- 0 -- --
Median Type Undivided
IRT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
lJpstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume vehlh) 1 25
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.90 1.00 0.90
Hourly Flow Rate,HFR(veh/h) 0 0 0 1 0 27
Percent Heavy Vehicles 0 0 0 0 0 0
I3ercent Grade(%) 0 0
iFlared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
',onfiguration LR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
M(veh/h) 11 28
(m)(veh/h) 1150 631
plc 0.01 0.04
35%queue length 0.03 0.14
Control Delay(s/veh) 8.2 11.0
ILOS A B
Approach Delay(s/veh) — -- 11.0
Approach LOS — B
,opynght 0 2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 3/5/2007 2:53 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k19F.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection IKagy&Street G
4 enc /C Engineering, Inc. Jurisdiction IBozeman
Date Performed 2/22/2007 Analysis Year IEx+The Knolls West+Ph 1
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard North/South Street: Street G
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
IMovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 29 214 117 1
(Peak-Hour Factor,PHF 0.90 0.90 1.00 1.00 0.82 0.82
(Hourly Flow Rate,HFR(veh/h) 32 237 0 0 142 1
(Percent Heavy Vehicles 0 -- -- 0 --
(Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 0 1 0
Configuration L T TR
(Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume vehih 1 16
IPeak-Hour Factor.PHF 1.00 1.00 1.00 0.90 1.00 0.90
(Hourly Flow Rate,HFR(veh/h) 0 0 0 1 0 17
(Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
IDela .Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LR
✓(veh/h) 32 18
C(m)(veh/h) 1452 881
✓lc 0.02 0.02
95%queue length 0.07 0.06
Control Delay(s/veh) 7.5 9.2
LOS A A
Approach Delay(s/veh) — - 9.2
Approach LOS A
Copyright 0 2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 3/5/2007 2:54
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k1A3.tmp 3/5/20(
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st QMR Intersection Kagy&Church/Sourdough
enc /Co JEngineerin , Inc. Jurisdiction Bozeman
Date Performed 1212212007 Analysis Year Ex+The Knolls West+Ph 1
nal sis Time Period JAM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Kagy Boulevard North/South Street: S Church AvelSourdou h Rd
Intersection Orientation: East-West IStudy Period Mrs): 0.25 777771
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 21 317 29 24 581 19
Peak-Hour Factor,PHF 0.94 0.94 0.94 0.79 0.79 0.79
Hourly Flow Rate,HFR(veh/h) 22 337 30 30 735 24
Percent Heavy Vehicles 0 -- -- 0
(Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
,'onfiguration L TR L TR
Upstream Signal 0 1 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 101 63 54 9 30 30
Peak-Hour Factor.PHF 0.87 0.87 0.87 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 116 72 62 13 44 44
Percent Heavy Vehicles 0 0 0 0 0 0
I3ercent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 1 0 0 1 0
configuration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L L LTR LTR
by(veh/h) 22 30 250 101
(�(m)(veh/h) 860 1203 156 198
d/c 0.03 0.02 1.60 0.51
35%queue length 0.08 0.08 17.20 2.58
Control Delay(s/veh) 9.3 8.1 350.8 40.7
LOS A A F E
Approach Delay(s/veh) 350.8 40.7
Approach LOS — F E
lonyrnghl©2005 University of Florida,All Rights Reserved HCS+TM Version 5.2 Generated: 2/22/2007 10:29 AM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k596B.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection Kaq &Church/Sourdough
Agency/Co. JEngineering, lnc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year JEx +The Knolls West+Ph 1
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/VVest Street: Kagy Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
IVlovement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 25 463 89 60 390 20
(Peak-Hour Factor,PHF 0.81 0.81 0.81 0.94 0.94 0.94
IHourly Flow Rate,HFR(veh/h) 30 571 109 63 414 21
Percent Heavy Vehicles 0 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 47 30 25 26 66 68
Peak-Hour Factor,PHF 0.93 0.93 0,93 0.81 0.81 0,81
Hourly Flow Rate,HFR(veh/h) 50 32 26 32 81 83
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
r(veh/h) 30 63 108 196
(m)(veh/h) 1132 918 102 202
do 0.03 0.07 1.06 0.97
35%queue length 0.08 0.22 6.75 8.21
Control Delay(s/veh) 8.3 9.2 183.9 104.6
LOS A A F F
4pproach Delay(s/veh) — 183.9 104.6
4pproach LOS F F
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5 2 Generated: 2/222007 11:40
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k59DD.tmp 2/22/20C
APPENDIX F
CAPACITY CALCULATIONS -
EXISTING + 1'FIE KNOLLS AT
NILLCREST WEST + PHASE 1 -Z
HCM Analysis Summary
_ Existing+The Knolls West+Ph 1-2 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-2-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 295 255 265 454 4 247 2 94 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups _ L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 76 0 18 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) I --- --- --- --- --- --- -- ---
Signal Settings:Actuated Operational Analysis Cycle Length: 71.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 1 16.0 24.0 18.0 1 1 0
Yellow All Red 1 3.0 0.0 3.5 I 1.5 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
--App- Group ph) Grou D3-
EB
L 275 0.001 0.338 L 0.004 15.6 B 20.5 C
* TR 1114 0.173 0.338 TR 0.513 20.5 C
WB L er 222 0.000 0.408 8.0 A
* L ro 395 0.184 0.225 L 0.524 10.0 B
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.162 0.254 L 0.639 25.9 C 24.8 C
TR 411 0.057 0.254 TR 0.224 21.1 C
SB _
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0 A
Intersection:Delay= 15.4sec/veh Int.LOS=B Xc=0.64 * Critical Lane Group :�K(v/s)Crit=0.52
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+The Knolls West+Ph 1-2 Main St/Highland Blvd —�
DMR 2/22/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-2-AM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS
0 0
EB
L 0.00 0.00 15.6 B 20.5 C `►
* TR 0.17 0.51 20.5 C 4
= 454
265
WB L er 0.00 8.0 A ------------ -
*L ro 0.18 0.52 10.0 B ----------- --
TR 0.16 0.26 6.9 A --------------------- ---------------------
1
295 —►
NB * L 0.16 0.64 25.9 C 24.8 C 255 —�
TR 0.06 0.22 21.1 C
247 94
2
SB LTR 0.00 0.00 0.0 A 0.0 A 2 3
16 3 0 23 4 2 17 �� 4 2
Int. 0.52 0.64 1 15.4 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Existing+The Knolls West+Ph 1-2 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-2-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 579 310 120 428 1 344 0 247 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 93 0 25 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) - --- --- __ ___ .._ ___ _-
Signal Settings:Actuated Operational Analysis Cycle Length: 72.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 26.0 23.0 0
Yellow All Red 3.0 0.0 3.5 1.5 1 3.5 1.5
Ca a ity Analysis Results Ap
proach:
Lane Cap v/s g/C Lane v/c Delay
-Ap a
EB _
L 313 0.001 0.361 L 0.003 14.7 B C
* TR 1212 0.258 0.361 TR 0.714 23.4 C
WB L er 130 0.000 0.431 9.8 A
* L ro 243 0.079 0.139 L 0.370 12.2 B
TR 1898 0.141 0.542 TR 0.260 9.1 A
NB
* L 457 0.258 0.319 L 0.810 32.3 C 27.4 C
TR 516 0.148 0.319 TR 0.463 19.8 B
SB
LTR 475 0.008 0.319 LTR 0.025 16.8 B 16.8 B
Intersection:Delay=20.5 sec/veh Int.LOS=C Xc 0.73 *Critical Lane Group :T(v/s)Crit=0.59
SIG/Cinema v3.08 Page 1
HCM Summary Results - M
Existing+The Knolls West+Ph 1-2 Main St/Highland Blvd
DMR 2/22/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-2-PM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s We veh) LOS veh) LOS
1 4
EB +
L 0.00 0.00 14.7 B 23.4 C
* TR 0.26 0.71 23.4 C 1
- 428
V F —120
--------------
WB Liver 0.00 9.8 A ~------- -
*L ro
TR 0.08 0.37 12.2 B --- ----------
0.14 0.26 9.1 A ---------------------- --------------------
579
NB * L 0.26 0.81 32.3 C 27.4 C 310
TR 0.15 0.46 19.8 B
344j247
O
SB LTR 0.01 0.03 16.8 B 16.8 B 1 2 3
10 3 0 25 4 2 22 4 2
LUM Int. 0.59 0.73 20.5 C
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
t3eneral Information Site Information
Analyst JDMR Intersection Highland&Ellis
Agency/Go. lEngineering, Inc Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period JAM Peak Hour
Pro ect Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation North-South IStudy Period(hrs) 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
9Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 1 332 39 58 398 104
Peak-Hour Factor, PHF 0.85 0.85 0.85 0.86 0.86 0.86
Hourly Flow Rate, HFR(veh/h) 1 390 45 67 462 120
Percent Heavy Vehicles 0 0 --
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 0 14 4 19
Peak-Hour Factor, PFIF 0.60 0.60 0.60 0.58 0.58 0.58
(Hourly Flow Rate,HFR(veh/h) 0 0 0 24 6 32
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
ki=lared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 1 0 1 0
4Sonfiguration R LTR
Qela ,Queue Length,and Level of Service
(Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
^J(veh/h) 1 67 62 0
C(m)(veh/h) 1002 1135 301 559
dlc 0.00 0.06 0.21 0.00
95%queue length 0.00 0.19 0.76 0.00
Control Delay(s/veh) 8.6 8.4 20.0 11.4
LOS A A C B
Approach Delay(s/veh) — -- 20.0
Approach LOS -- C
-opyright©2005 University of Florida,All Rights Reserved HCS+*m Version 5 21 Generated: 3r7/2007 9:16 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k575.tmp 3/7/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMf? Intersection Hi bland&Ellis
enc /Co. lEngineering, Inc. Jurisdiction Bozeman
Dale Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastANest Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
IVlovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 2 431 16 16 427 15
Peak-Hour Factor, PHF 0.74 0.74 0.74 0.88 0.68 0.88
Hourly Flow Rate,HFR(veh/h) 2 582 21 18 485 17
Percent Heavy Vehicles 0 — 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 5 37 2 55
Peak-Hour Factor, PHF 0.88 0.86 0.88 0.78 0.78 0.78
Hourly Flow Rate,HFR(veh/h) 0 0 5 47 2 70
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
ILanes 0 0 1 0 1 0
Configuration R LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
(veh/h) 2 18 119 5
C(m)(veh/h) 1062 984 289 572
e 0.00 0.02 0.41 0.01
95%queue length 0.01 0.06 1.93 0.03
Control Delay(s/veh) 8.4 8.7 25.9 11.3
LOS A A D B
Approach Delay(s/veh) — -- 25.9 11.3
Approach LOS D B
Copyright©2005 University of Florida,All Rights Reserved HCS+*M Version 5 21 Generated: 3/7/2007 9:171
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k57A.tmp 3/7/200.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR I lintersection lHighland Blvd&Painted Hills
Agency/Co. JEngineerin , Inc. I Purisdiction Bozeman
Date Performed 2,22/2007 nal sis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Hillcrest/Painted Hills Rd North/SOuth Street: Highland Boulevard
Intersection Orientation North-South IStudy Period firs): 0.25
Vehicle Volumes and Adjustments
Ma'or Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 88 340 0 7 182 21
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 101 390 0 9 239 27
Percent Heavy Vehicles 0 - - 0
(Median Type Undivided
IPT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume vehlh) 19 0 28 0 0 18
(Peak-Hour Factor,PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 25 0 37 0 0 20
(Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
(veh/h) 101 9 0 20 25 37
C(m)(veh/h) 1305 1180 240 663 246 789
I/c 0.08 0.01 0.00 0.03 0.10 0.05
95%queue length 0.25 0.02 0.00 0.09 0.34 0.15
Control Delay(s/veh) 8.0 8.1 20.0 10.6 21.3 9.8
LOS A A C B C A
approach Delay(s/veh) -- 10.6 14.4
4pproach LOS - B B
C.apyri:^.l O 2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/24/2007 1:15 PM
- ile://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E4B.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Isite Information
nal st MR Intersection Hi bland&Painted Hills Rd
en /Co. En ineerin , Inc. urisdiction Bozeman
ate Performed 2/22/2007 nal sis Year +The Knolls West+Ph 1-2
nal sis Time Period M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South T/S
EastWest Street: Hillcrest/Painted Hills Rd North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs: 0.25
ehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 38 231 0 20 393 30
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate, HFR(veh/h) 44 1 268 0 23 456 34
Percent Heavy Vehicles 0 1 0 -- -
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
[Hourly
vement 7 8 9 10 11 12
L T R L T R
lume veh/h 34 0 81 0 0 11
ak-Hour Factor,PHF 0.77 0.77 0.77 0.90 0.90 0.90
Flow Rate,HFR(veh/h) 44 0 105 0 0 12
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
I/C
ane Configuration L L L TR L TR
(veh/h) 44 23 0 12 44 105
(m)(veh/h) 1084 1307 197 776 253 595
0.04 0.02 0.00 0.02 0.17 0.18
5%queue length 0.13 0.05 0.00 0.05 0.62 0.64
Control Delay(s/veh) 8.5 7.8 23.3 9.7 22.2 12.3
LLOS A A C A C B
pproach Delay(s/veh) - 9.7 15.3
pproach LOS - -- A C
Copyright©2005 University of Florida,All Rights Reserved HCS+na Version 5.21 Generated: 2/242007 1:16 _
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E4F.tmp 2/24/20C.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection lHighland&Knolls Ln
Agent/Co, JEngineering, Inc. Jurisdiction JBozernan
Date Performed 2/22/07 Analysis Year lEx +The Knolls West+Ph 1-2
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052 02- The Knolls East&Highland South TIS
East/West Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 10 414 0 0 208 2
Peak-Hour Factor, PHF 0.87 0.87 0.87 0.76 0.76 0.76
Hourly Flow Rate, HFR(veh/h) 11 475 0 0 273 2
Percent Heavy Vehicles 0 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 14 0 22 0 0 0
Peak-Hour Factor, PFIF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate, HFR(veh/h) 18 0 29 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay.Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
r(veh/h) 11 0 0 47
C(m)(veh/h) 1296 1098 496
v/c 0.01 0.00 0.09
135%queue length 0.03 0.00 0.31
Control Delay(s/veh) 7.8 8.3 13.0
LOS A A B
Approach Delay(s/veh) -- -- 13.0
Approach LOS -- B
Copyright O 2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/242007 1:17 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E53.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection Hi h1and&Knolls Ln
Agency/Co. JEngineenng, Inc. Jurisdiction Bozeman
Date Performed 121122/2007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastAlVest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(firs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 22 263 0 0 456 18
(Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 25 305 0 0 530 20
Percent Heavy Vehicles 0 -- -- 0
(Median.Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 6 0 16 0 0 0
Peak-Hour Factor, PHF 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 7 0 20 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
(veh/h) 25 0 0 27
C(m)(veh/h) 1030 1267 424
J/c 0.02 0.00 0.06
95%queue length 0.07 0.00 0.20
Control Delay(s/veh) 8.6 7.8 14.1
ILOS A A B
Approach Delay(s/veh) 14.1
Approach LOS B
Copyright 0 2005 University of Florida,All Rights Reserved HCS+na Version 5 21 Generated: 2/24/2007 1:18 t
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E57.tmp 2/24/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
i3eneral Information Site Information
Analyst JDAIR Intersection Hichland&Kao
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 2/13/2007 Analvsis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period M Peak Hour
Project Description BOZ-06052.02- The Knolls East&Hi hland South TIS
East/West Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
dMa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 273 110 0 7 382 71
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.77 0.77 0.77
lHourly Flow Rate,HFR(veh/h) 317 127 0 9 496 92
Percent Heavy Vehicles 0 - 0
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 0 1 0
;Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 7 1 7 48 1 348
Peak-Hour Factor,PHF 0.67 0.67 0.67 0.89 0.89 0.89
pHourly Flow Rate,HFR(veh/h) 10 1 10 53 1 391
(Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Len th,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L LTR LTR LTR
✓(veh/h) 317 9 21 445
(m)(veh/h) 995 1472 42 351
✓/c 0.32 0.01 0.50 1.27
35%queue length 1.38 0.02 1.79 20.07
Control Delay(s/veh) 10.3 7.5 156.9 172.9
LOS B A F F
Approach Delay(s/veh) — 156.9 172.9
Approach LOS — F F
�;opyngh!©2005 University of Florida.All Rights Reserved HCS+Tm Version 5 2 Generated: 2/22✓2007 1:17 PM
'file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5A33.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nalvst DMR Intersection JHqhland&Kagy
Agency/Co. Engineering, Inc. Jurisdiction JBozeman
Date Performed 212212007 Analysis Year JEx +The Knolls West+Ph 1-2
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South T/S
EastANest Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 292 282 1 9 152 81
Peak-Hour Factor,PHF 0.85 0.85 0.85 0.84 0.84 0.84
Hourly Flow Rate,HFR(veh/h) 343 331 1 10 180 96
Percent Heavy Vehicles 0 -- 0
IVlediar.Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuratlon L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(vehlh) 0 3 11 97 3 383
Peak-Hour Factor,PHF 0.75 0.75 0.75 0.92 0.92 0.92
Hourly Flow Rate,HFR(veh/h) 0 4 14 105 3 416
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
FIT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
v(veh/h) 343 10 18 524
(m)(veh/h) 1292 1239 331 349
v/c 0.27 0.01 0.05 1.50
95%queue length 1.07 0.02 0.17 28.72
Control Delay(s/veh) 8.8 7.9 16.5 268.5
LOS A A C F
Approach Delay(s/veh) -- -- 16.5 268.5
Approach LOS C F
Copyright©2005 University of Florida,All Rights Reserved HCS+na Version 5.21 Generated: 2122/2007 2:47
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5AA8.tmp 2/22/20C.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Main&Haggerty
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 284 80 55 572
Peak-Hour Factor,PHF 1.00 0.80 0.80 1 0.75 0.75 1.00
Hourly Flow Rate,HFR(veh/h) 0 354 99 73 762 0
Percent Heavy Vehicles 0 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 60 30
Peak-Hour Factor, PHF 0.81 1.00 0.81 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 74 0 37 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
VLanes 0 0 0 0 0 0
Configuration LR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
iovement 1 4 7 8 9 10 11 12
I-ane Configuration L LR
0i(veh/h) 73 111
(m)(veh/h) 1118 324
i/c 0.07 0.34
35%queue length 0.21 1.48
Control Delay(s/veh) 8.4 21.8
I-OS A C
Approach Delay(s/veh) -- 21.8
Approach LOS - -- C
:oryngh:©2005 University of Florida,All Rights Reserved HCS+TM Version 5.2 Generated: 2/22/2007 1:32 PM
I ile:XADocuments and Settings\DReagor\Local Settings\Temp\u2k5A5B.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection IMain&HaggetlyI
Agency/Co. lEngineering, Inc. Jurisdiction lBozeman
Date Performed 212007 Analysis Year JEx +The Knolls West+Ph72
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 599 88 34 399
Peak-Hour Factor, PHF 1.00 0.79 0.79 0.90 0.90 1.00
Hourly Flow Rate,HFR(veh/h) 0 758 111 37 443 0
Percent Heavy Vehicles 0 -- -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 76 63
Peak-Hour Factor,PHF 0.69 1.00 0.69 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 110 0 91 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(veh/h) 37 201
(m)(veh/h) 784 281
/c 0.05 0.72
95%queue length 0.15 5.02
Control Delay(s/veh) 9.8 44.5
LOS A E
Approach Delay(s/veh) — — 44.5
Approach LOS -- E
Copyright©2005 University of Florida,All Rights Reserved HCS+rmi Version 5.21 Generated: 2/22/2007 3:04 I
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5AD5.tmp 2/22/200
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Ha pert &Bozeman Trail
Agency/Co. jEngineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-2
nal sis Time Period 14M Peak Hour
Pro ect Description BOZ-06052.02- The Knolls East&Highland South TIS
EastAVest Street: Haggerty Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStudy Period (hrs): 0.25
✓ehicle Volumes and Adjustments
[Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
dolume(veh/h) 61 1 5 31
'Peak-Hour Factor, PHF 1.00 0.93 0.93 0.77 0.77 1.00
Hourly Flow Rate, HFR(veh/h) 0 0 0 16 0 54
Percent Heavy Vehicles 0 0
110edian Type Undivided
RT Channelized 0 0
I-anes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Wlinor Street Eastbound Westbound
!Movement 7 8 9 10 11 12
L T R L T R
olume veh/h) 12 519
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.71 1.00 0.71
(Hourly Flow Rate, HFR(veh/h) 6 1 40 1 0 0 65 1
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
_anes 0 0 0 0 0 0
3onfiguration LR
Delay,Queue Len th,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
(veh/h) 6 70
(m)(veh/h) 1549 972
v/c 0.00 0.07
135%queue length 0.01 0.23
Control Delay(s/veh) 7.3 9.0
LOS A A
4pproach Delay(s/veh) 9.0
Approach LOS -- -- A
,cpynghl©2005 University of Florida,All Rights Reserved HCS+- Version 5.2 Generated: 2/22/2007 1:13 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5A23.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection lHaggerly&Bozeman Trail
Agency/Co. Engineering, Irrc. Jurisdiction Bozeman
Date Performed 2/22J2007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T/S
EastANest Street: Haggerty Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStUdy Period hrs': 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
ulume(vehih) 32 7 41 61
Peak-Hour Factor,PHF 1.00 0.88 0.88 0.77 0.77 1.00
Hourly Flow Rate,HFR(veh/h) 0 0 0 3 0 48
Percent Heavy Vehicles 0 0 —
Median Type Undivided
IRT Channelized 0 0
Lanes 0 1 0 0 i 0
Configuration TR LT
Upstream Sional 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 2 26
Peak-Hour Factor.PHF 1.00 1.00 1.00 0.54 1.00 0.54
Hourly Flow Rate,HFR(veh/h) 53 79 0 0 36 7
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
ITT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay.Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v(veh/h) 53 51
C(m)(veh/h) 1579 1013
v/C 0.03 0.05
'95%queue length 0.10 0.16
Control Delay(s/veh) 7.4 8.7
LOS A A
Approach Delay(s/veh) 8.7
Approach LOS A
Copyright©2005 University of Florida,All Rights Reserved HCS+T Version 5.2 Generated: 2/22/2007 2:11
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5A80.tmp 2/22/20(
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Kagy&Bozeman Trail
enc /Co. IEngineerin , lnc. Jurisdiction Bozeman
Date Performed 2/22/2007 final sis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period M Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastWest Street: Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
IMa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 24 58 3 0 148 13
Peak-Hour Factor,PHF 0.71 0.71 0.71 0.87 0.87 0.87
Hourly Flow Rate,HFR(veh/h) 33 81 4 0 170 14
(Percent Heavy Vehicles 0 - 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 14 8 1 6 0 41
Peak-Hour Factor, PHF 0.75 0.75 0.75 0.71 0.71 0.71
Hourly Flow Rate,HFR(veh/h) 18 10 1 8 0 57
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
configuration LTR LTR
Delay,Queue Length,and Level of Service
'4pproach Eastbound Westbound Northbound Southbound
1Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
(veh/h) 33 0 29 65
(m)(veh/h) 1403 1524 570 826
SIC 0.02 0.00 0.05 0.08
35%queue length 0.07 0.00 0.16 0.26
Control Delay(s/veh) 7.6 7.4 11.7 9.7
ILOS A A B A
4pproach Delay(s/veh) — 11.7 9.7
Approach LOS -- -- B A
:3pyrigh'02005 University of Florida,All Rights Reserved HCS+na Version 5.2 Generated: 2/22/2007 1:26 PM
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5A47.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
F
DMR Intersection KaG &Bozeman Trail
En ineerin , lnc. Jurisdiction Bozeman
rmed 2/22/2007 nal sis Year Ex +The Knolls West+Ph 1-2
me Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 35 138 10 0 87 9
Peak-Flour Factor, PHF 0.77 0.77 0.77 0.93 0.93 0.93
Hourly Flow Rate,HFR(veh/h) 45 179 12 0 93 9
Percent Heavy Vehicles 0 -- -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olurne vehlh) 5 4 0 25 9 34
Peak-Hour Factor,PHF 0.63 0.63 0.63 0.69 0.69 0.69
Hourly Flow Rate,HFR(veh/h) 7 6 0 36 13 49
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
(veh/h) 45 0 13 98
(m)(veh/h) 1503 1395 523 706
!c 0.03 0.00 0.02 0.14
5%queue length 0.09 0.00 0.08 0.48
Control Delay(s/veh) 7.5 7.6 12.1 10.9
LOS A A B B
Approach Delay(s/veh) -- 12.1 10.9
Approach LOS -- B B
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 2t2212007 2:55 F
file:M\Documents and Settings\DReagor\Local Settings\Temp\u2k5AB8.tmp 2/22/200,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kaqy&Mixed-Use Access 1
Agency/Co. lEngineering, Inc. Jurisdiction Dozeman
Date Performed 12122.12007 Analysis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period M Peak Flour
Project Description BOZ-06052.02- The Knolls East&Highland South T1S
East/West Street: Kagy Boulevard North/South Street: Single Mixed-Use Access
Intersection Orientation: East-West IStudy Period (hrs): 0.25
Vehicle Volumes and Adjustments
]Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Jolume(veh/h) 86 55 164 48
Peak-Hour Factor,PHF 0.67 0.67 1.00 1.00 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 128 82 0 0 244 71
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
4Jpstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 a 9 10 11 12
L T R L T R
olume veh/h) 30 110
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.90 1.00 0.90
Hourly Flow Rate,HFR(veh/h) 0 0 0 33 0 122
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
IIS onfiguration LR
IlDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
w(veh/h) 126 155
0(m)(veh/h) 1257 645
�dc 0.10 0.24
95%queue length 0.34 0.93
Control Delay(s/veh) 8.2 12.3
11-OS A B
4pproach Delay(s/veh) — 12.3
%pproach LOS -- -- B
'spynght©2005 University of Florida,All Rights Reserved HCS+w Version 5.21 Generated: 3/5/2007 1:46 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2kl6F.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst DMR Intersection IKagy&Mixed-Use Access 1
enc /Co. En it eerie , Inc. Jurisdiction IBozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard Worth/South Street: Single Mixed-Use Access
Intersection Orientation: East-West IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(vvh1h) 153 114 74 55
Peak-Hour Factor,PHF 0.90 0.90 1.00 1.00 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 170 126 0 0 90 67
percent Heavy Vehicles 0 0
Median Type Undivided
FIT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 59 126
Peak-Hour Factor. PHF 1.00 1.00 1.00 0.90 1.00 0,90
Hourly Flow Rate,HFR(veh/h) 0 0 0 65 0 140
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
IDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LR
u(veh/h) 170 205
(m)(veh/h) 1435 671
r/c 0.12 0.31
35%queue length 0.40 1.29
Control Delay(s/veh) 7.8 12.7
LOS A B
Approach Delay(s/veh) — — 12.7
Approach LOS — -- B
Copyright©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 3/5/2007 1:58 i
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k174.tmp 3/5/200.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Kagy&Bennett Dr
Agency/Co. IEn ineerin , Inc. Jurisdiction Bozeman
Date Performed 1212212007 Analysis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastANest Street: Kagy Boulevard North/South Street: Bennett Drive
Intersection Orientation: East-West [Study Period Mrs): 0.25
Vehicle Volumes and Adjustments
(Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 6 133 3 2 268 4
(Peak-Hour Factor, PHF 0.67 0.67 0.67 0.67 0.67 0.67
(Hourly Flow Rate,HFR(veh/h) 8 198 4 2 399 5
(Percent Heavy Vehicles 0 -- 0 --
(Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 8 0 2 6 0 17
Peak-Hour Factor, PHF 0.81 0.81 0.81 0.90 0.90 0.90
Hourly Flow Rate, HFR(veh/h) 9 0 2 6 1 0 1 18
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
✓(veh/h) 8 2 11 24
C(m)(veh/h) 1166 1382 426 563
✓lc 0.01 0.00 0.03 0.04
95%queue length 0.02 0.00 0.08 0.13
Control Delay(s/veh) 8.1 7.6 13.7 11.7
LOS A A B B
Approach Delay(s/veh) — 13.7 11.7
Approach LOS -- B B
Copyright©2005 University of Florida,All Rights Reserved HCS+m Version 5.21 Generated: 315/2007 3:00 PM
ifile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2klA9.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Bennett Dr
Agency/Co. Engineering Inc. Airisdiction Bozeman
Date Performed 212212007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Hir hland South TIS
EastANest Street: Kagy Boulevard IVorth/South Street: Bennett Drive
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 19 257 9 2 190 8
Peak-Hour Factor,PHF 0.90 0.90 0.90 0.82 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 21 285 10 2 231 9
(Percent Heavy Vehicles 0 - 0 --
(Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 6 0 3 7 0 11
Peak-Hour Factor. PHF 0.55 0.55 0.55 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 10 1 0 5 7 0 12
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IPT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
iDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
✓(veh/h) 21 2 15 19
(m)(veh/h) 1339 1278 491 606
✓lc 0.02 0.00 0.03 0.03
95%queue length 0.05 0.00 0.09 0.10
Control Delay(s/veh) 7.7 7.8 12.6 11.1
ILOS A A B B
4pproach Delay(s/veh) — 12.6 11.1
4pproach LOS — B B
Copyright©2005 University of Florida,All Rights Reserved HCS+nm Version 5 21 Generated: 3/5/2007 3:01 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k1AE.tmp 3/5/204.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st DMR Intersection Kaqy&Painted Hills Dr
Agency/Co. Engineering, lnC. Jurisdiction Bozeman
Date Performed 2/2007 Analysis Year Ex +The Knolls West+Ph 1-2
Analysis Time Period AM Peak Hour
Proiect Description BOZ-06052.02-The Knolls East&Highland South TIS
East/ West Street: Ka Boulevard North/South Street: Painted Hills Drive
Ilntersection Orientation: East-West [Study Period hrs): 0.25
&hicle Volumes and Adjustments
IVIa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 18 115 17 8 272 13
Peak-Hour Factor,PHF 0.67 0.67 0.67 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 26 171 25 11 405 19
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
lMllnor Street Northbound Southbound
lovement 7 8 9 10 11 12
L T R L T R
✓olume(veh/h) 74 0 11 16 0 56
Peak-Hour Factor,PHF 0.81 0.81 0.81 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 91 0 13 17 0 62
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
iDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I'-ane Configuration L L LTR LTR
v(veh/h) 26 11 104 79
C(m)(veh/h) 1146 1389 339 547
vlc 0.02 0.01 0.31 0.14
95%queue length 0.07 0.02 1.27 0.50
Control Delay(s/veh) 8.2 7.6 20.3 12.7
ILOS A A C B
,Approach Delay(s/veh) — 20.3 12.7
4pproach LOS — -- C B
JopyriUW®2005 University of Florida,All Rights Reserved HCS+TM Version 5 21 Generated: 3/5/2007 3:02 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k1B3.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kaqy&Painted Hills Dr
Agency/Co. En ineerin , Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/ West Street: Kagy Boulevard North/South Street: Painted Hills Drive
Intersection Orientation: East-West IStudy Period(hrs): 0.25
ehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 64 254 53 13 172 22
Leak-Hour Factor,PHF 0.90 0.90 0.90 0.82 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 71 282 58 15 209 26
Percent Heavy Vehicles 0 -- -- 0 --
IVledian Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Si nal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 21 0 11 20 0 37
(Peak-Hour Factor.PHF 0.55 0.55 0.55 0.90 0.90 0.90
(Hourly Flow Rate,HFR(veh/h) 38 0 19 22 0 41
(Percent Heavy Vehicles 0 0 0 0 0 0
13ercent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
/(veh/h) 71 15 57 63
(m)(veh/h) 1344 1230 384 534
//c 0.05 0.01 0.15 0.12
95%queue length 0.17 0.04 0.52 0.40
Control Delay(s/veh) 7.8 8.0 16.0 12.6
ILOS A A C B
Approach Delay(s/veh) — 16.0 12.6
Approach LOS C B
Copyright©2005 University of Florida,All Rights Reserved HCS+w Version 5 21 Generated: 3/5/2007 3:03
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k1B7.tmp 3/5/204
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Street G
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Street G
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 8 145 398 4
Peak-Hour Factor, PHF 0.67 0.67 1.00 1.00 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 11 216 0 0 594 5
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
11111nor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
IV—olume(veh/h) 5 25
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.90 1.00 0.90
Hourly Flow Rate, HFR(veh/h) 0 0 0 5 1 D 1 27
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
configuration LR
IDela .Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
v(veh/h) 11 32
C(m)(veh/h) 988 470
V/c 0.01 0.07
95%queue length 0.03 0.22
Kontrol Delay(s/veh) 8.7 13.2
LOS A B
4pproach Delay(s/veh) — 13.2
4pproach LOS -- — B
:opynghl©2005 University of Florida,All Rights Reserved HCS+Tm Version 5.21 Generated: 3/5/2007 3:04 PM
Ale://CADocuments and Settings\DReagor\Local Settings\Temp\u2k1BB.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection IKaqy&Street G
Agency/Co. n ineerin , Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West Ph 1-2
Analysis Time Period JPM Peak Hour
.Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Ka Boulevard North/South Street: Street G
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 29 364 224 6
Peak-Hour Factor,PHF 0.90 0.90 1.00 1.00 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 32 404 0 0 273 7
Percent Heavy Vehicles 0 — — 0
Median Type Undivided
IRT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Illl!nor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 7 16
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.90 1.00 0.90
Hourly Flow Rate,HFR(veh/h) 0 0 0 7 0 17
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LR
(veh/h) 32 24
(m)(veh/h) 1294 588
sic 0.02 0.04
95%queue length 0.06 0.13
Control Delay(s/veh) 7.9 11.4
LOS A B
4pproach Delay(s/veh) -- -- 11.4
4pproach LOS -- -- B
Copyright m 2005 University of Florida,All Rights Reserved HCS+va Version 5.21 Generated: 3/5/2007 3:04 1
file:HCADocuments and Settings\DReagor\Local Settings\Temp\u2k1BF.tmp 3/5/20Q
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection JKagy&Church/Sourdough
Agency/Co. JEngineering. Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-2
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Hi hland South TIS
EastM/est Street: Kagy Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West IStudy Period hrs1: 0.25
Vehicle Volumes and Adjustments
lVa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 21 335 29 28 637 21
Peak-Flour Factor,PHF 0.94 0.94 0.94 0.79 0.79 0.79
Hourly Flow Rate,HFR(veh/h) 22 356 30 35 806 26
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
tlllinor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
✓olume(veh/h) 101 63 58 12 30 30
Peak-Hour Factor, PHF 0.87 0.87 0.87 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 116 72 66 17 44 44
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
IDelay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
IVlovement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
u(veh/h) 22 35 254 105
C(m)(veh/h) 808 1184 130 158
vlc 0.03 0.03 1.95 0.66
35%queue length 0.08 0.09 20.21 3.78
Control Delay(s/veh) 9.6 8.1 512.7 64.2
LOS A A F F
Approach Delay(s/veh) -- 512.7 64.2
Approach LOS -- F F
:c,yrnq?rt m 2005 University of Florida,All Rights Reserved HCS+•M Version 5 2 Generated: 2/22/2007 1:28 PM
isle://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5A4B.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection lKagy&Church/Sourdough
enc /Co. Engineering, Inc. Jurisdiction lBozeman
Date Performed 2/22/2007 Analysis Year lEx +The Knolls West+Ph 1-2
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T1S
EastNVest Street: Ka Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West IStudy Period firs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 25 526 89 66 424 23
Peak-Hour Factor, PHF 0.81 0.81 0.81 0.94 0.94 0.94
Hourly Flow Rate,HFR(veh/h) 30 649 109 70 451 24
Percent Heavy Vehicles 0 -- — 0
(Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
IMinor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume vehlh 47 30 31 30 66 66
Peak-Hour Factor,PHF 0.93 0.93 0.93 0.81 0.81 0.81
Hourly Flow Rate,HFR(veh/h) 50 32 33 37 81 83
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
1-anes 0 1 0 0 1 0
Configuration I I LTR LTR
Delay,Queue Length,and Level of Service
approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
r(veh/h) 30 70 115 201
C(m)(veh/h) 1094 860 75 160
o/c 0.03 0.08 1.53 1.26
'95%queue length 0.08 0.27 9.53 11.61
Control Delay(s/veh) 8.4 9.6 391.0 211.8
ILOS A A F F
Approach Delay(s/veh) — 391.0 211.8
4pproach LOS — — F F
Copyright®2005 University of Florida.All Rights Reserved HCS+rM Version 5.21 Generated: 2/22/2007 2:57
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5ABD.tmp 2/22/200.
APPENDIX G
CAPACITY CALCULATIONS -
EXISTING + THE KNOLLS AT
FIILLCREST WEST + PHASE 1 -3
HCM Analysis Summary
Existing+ The Knolls West+Ph 1-3 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-3-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 295 257 266 454 4 254 2 97 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 _ 1 3
RTOR Vol v h 77 0 19 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) - --- --- -» »- I --
Signal Settings:Actuated Operational Analysis Cycle Length: 71.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 16.0 24.0 18.0 0
Yellow All Red 3.01 0.01 3.5 1 1.5 1 3.5 1.5
Capacitv Anal sis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
EB
L 275 0.001 0.338 L 0.004 15.6 B 20.5 C
* TR 1114 0.174 0.338 TR 0.513 20.5 C
WB L er 222 0.000 0.408 8.0 A
* L ro 395 0.185 0.225 L 0.525 10.1 B
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.166 0.254 L 0.657 26.4 C 25.2 C
TR 411 0.059 0.254 TR 0.231 21.1 C
SB
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0 A
Intersection:Delay= 15.6 sec/veh Int.LOS=B Xc 0.64 * Critical Lane Group 2(v/s)Crit=0.52
SIG/Cinema v3.08 Page 1
HCM- Summary Results
Existing+The Knolls West+Ph 1-3 Main St/Highland Blvd
DMR 2/22/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-3-AM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ U
App Grp v/s v/c veh) LOS veh) LOS
U U
EB
L 0.00 0.00 15.6 B 20.5 C
* TR 0.17 0.51 20.5 C 4
454
v-266
.L
WB L er 0.00 8.0 A ' --
*L ro 0.18 0.53 10.1 B -------------
TR 0.16 0.26 6.9 A --- ------- - - - -------- - --- - -
I —?
295
NB * L 0.17 0.66 26.4 C 25.2 C 257
TR 0.06 0.23 21.1 C
2541 97
2 I
SB LTR 0.00 0.00 0.0 A 0.0 A 2 3 ,
16 3 0 23 4 2 17 4 2
I
Int. 0.52 0.64 15.6 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Existing+The Knolls West+Ph 1-3 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-3-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 579 318 123 428 1 348 0 249 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 95 0 25 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftjRight) --- I --- --- I -- --- --- ---
Signal Settings:Actuated Operational Analysis Cycle Length: 72.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 26.0 23.0 0
Yellow All Red 3.0 0.0 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
p --Group-
EB
L 313 0.001 0.361 L 0.003 14.7 B 23.6 C
* TR 1210 0.260 0.361 TR 0.720 23.6 C
WB L er 127 0.000 0.431 9.9 A
* L ro 243 0.080 0.139 L 0.381 12.5 B
TR 1898 0.141 0.542 TR 0.260 9.1 A
I
NB
* L 457 0.261 0.319 L 0.818 33.0 C 27.9 C
TR 516 0.149 0.319 TR 0.467 19.8 B
SB
LTR 474 0.008 0.319 LTR 0.025 16.8 B 16.8 B
Intersection:Delay= 20.7 sec/veh Int.LOS=C Xc 0.73 *Critical Lane Group :K(v/s)Crit=0.60
SIG/Cinema v3.08 Page 1
HCM Summary Results
_
Existing+The Knolls West+Ph 1-3 Main St/Highland Blvd
DMR 2/22/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-3-PM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS
1 4
EB
L 0.00 0.00 14.7 B 23.6 C
* TR 0.26 0.72 23.6 C I
-4-428
123
WB L er 0.00 9.9 A
*L ro 0.08 0.384 12.5 B -------------
TR 0.14 0.26 9.1 A •------------------- -- ..
579
NB * L 0.26 0.82 33.0 C 27.9 C 318
TR 0.15 0.47 19.8 B `l r
3481249
0
SB LTR 0.01 0.03 16.8 B 16.8 B 1 2 3
10 3 0 25 4 2 22 4 2
Int. 0.60 0.73 F20.7 C
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st DIVIR Intersection Highland&Ellis
Agency/Co. En ineerin , Inc. Jurisdiction JBozenian
Date Performed 1212212007 Analysis Year JEx+The Knolls West+Ph 1-3
Analysis Time Period 14M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Hi bland South T1S
EasLANest Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South JStudy Period(hrs): 0.25 777771
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 1 342 39 58 401 104
Peak-Hour Factor,PHF 0.85 0.85 0.85 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 1 402 45 67 466 120
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 0 14 4 19
Peak-Hour Factor, PHF 0.60 0.60 0.60 0.58 0.58 0.58
Hourly Flow Rate,HFR(veh/h) 0 0 0 24 6 32
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 1 0 1 0
Configuration R LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
✓(veh/h) 1 67 62 0
(m)(veh/h) 999 1124 294 556
✓lc 0.00 0.06 0.21 0.00
95%queue length 0.00 0.19 0.78 0.00
Control Delay(s/veh) 8.6 6.4 20.5 11.5
LOS A A C B
Approach Delay(s/veh) 20.5
Approach LOS -- C
,,�pyrlght 02005 University of Florida,All Rights Reserved HCS+rm Version 5 21 Generated: 3I7I2007 9:19 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k57E.tmp 3/7/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Sitc Information
Analyst DMR Intersection lHighland&Ellis
Agency/Go. Engineering, Inc. Jurisdiction lBozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-3
nalvsis Time Period PM Peak I lour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 2 437 16 16 438 15
(Peak-Hour Factor.PHF 0.74 0.74 0.74 0.88 0.88 0.88
(Hourly Flow Rate,HFR(veh/h) 2 590 21 18 497 17
(Percent Heavy Vehicles 0 -- -- 0 -- --
(Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 5 37 2 55
Peak-Hour Factor,PHF 0.88 0.8B 0.88 0,78 0.78 0.78
Hourly Flow Rate,HFR(veh/h) 0 0 5 47 2 70
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 0 1 0 1 0
Configuration R LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L L LTR R
i(veh/h) 2 18 119 5
C(m)(veh/h) 1051 978 282 563
!/c 0.00 0.02 0.42 0.01
95%queue length 0.01 0.06 1.99 0.03
Control Delay(s/veh) 8.4 8.7 26.8 11.5
I-OS A A D B
Approach Delay(s/veh) — — 26.8 11.5
Approach LOS D B
Copyright©2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 3/7/2007 9:19!
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k583.tmp 3/7/200
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
3eneral Information Site Information
Analyst JDMR Intersection Hi hland Blvd&Painted Hills
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex+The Knolls West+Ph 1-3
naI sis Time Period 14M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South T1S
IEast/West Street: HillcrestlPainted Hills Rd North/South Street: Highland Boulevard
(Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 88 343 0 9 183 21
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
IHourly Flow Rate, HFR(veh/h) 101 394 0 11 240 27
Percent Heavy Vehicles 0 - 0 --
(Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 19 0 28 0 0 25
Peak-Flour Factor, PHF 0.75 0.75 0.75 0.90 0.90 0.90
IHourly Flow Rate,HFR(veh/h) 25 0 37 0 0 27
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay,Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
✓(veh/h) 101 11 0 27 25 37
C(m)(veh/h) 1304 1176 237 659 236 787
✓lc 0.08 0.01 0.00 0.04 0.11 0.05
95%queue length 0.25 0.03 0.00 0.13 0.35 0.15
Control Delay(s/veh) 8.0 8.1 20.2 10.7 21.9 9.8
LOS A A C B C A
Approach Delay(s/veh) -- -- 10.7 14.7
4pproach LOS B 8
:opyr ght 02005 University of Florida,All Rights Reserved HCS+Tm Version 5.21 Generated: 2/24/2007 1:25 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E5D.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Hi hland&Painted Hills Rd
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex +The Knolls West+Ph 1-3
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastMest Street: Hillcrest/Painted Hills Rd North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs)- 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 38 233 0 28 396 30
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 44 270 0 32 460 34
Percent Heavy Vehicles 0 -- 0 -- --
Median Type Undivided
RT Channelized 0 0
'Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(vehlh) 34 0 81 0 0 15
Peak-Hour Factor.PHF 0.77 0.77 0.77 0.90 0.90 0.90
(Hourly Flow Rate, HFR(veh/h) 44 0 105 0 0 16
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Dela ,Queue Length.and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
v(veh/h) 44 32 0 16 44 105
C(m)(veh/h) 1080 1305 189 774 241 g592
vlc 0.04 0.02 0.00 0.02 0.18,95%queue length 0.13 0.08 0.00 0.06 0.65 Control Delay(s/veh) 8.5 7.8 24.0 9.7 23.2
LOS A A C A C B
4pproach Delay(s/veh) - 9.7 15.6
Approach LOS A C
Copyright©2005 University of Florida,All Rights Reserved HCS+*M Version 5 21 Generated: 2/24/2007 1:26 1
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E63.tmp 2/24/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
E
DMR Intersection Hi bland&Knolls Ln
o En ineering Inc. urisdiction Bozeman
ormed 2/22/07 nal sis Year Ex+The Knolls West+Ph 1-3
ime Period AM Peak Hour
Pro ect Description SOZ-06052.02- The Knolls East&Highland South TIS
astNVest Street: Knolls Ln North/South Street: Highland Boulevard
;ntersection Orientation: North-South IStudy Period(hrs 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 10 417 0 0 209 2
,beak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0,76 0.76
Hourly Flow Rate,HFR(veh/h) 11 479 0 0 275 2
Percent Heavy Vehicles 0 — 0 --
Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 14 0 '12 0 0 0
eak-Hour Factor.PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 18 0 29 0 0 1 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
belay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
v(veh/h) 11 0 0 47
C(m)(veh/h) 1293 1094 493
v/c 0.01 0.00 0.10
95%queue length 0.03 0.00 0.31
control Delay(s/veh) 7.8 8.3 13.1
LOS A A B
4pproach Delay(s/veh) 13.1
approach LOS — B
^.pyrng0l©2005 University of Florida,All Rights Reserved HCS+T Version 5.21 Generated: 2/24/2007 1:26 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E67.tmp 2/24/2007
"h\%o-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst JDMR Intersection i hland&Knolls Ln
Agency/Co._ JEngineering, Inc. JUriscliction Bozeman
Date Performed 1212212007 Analysis Year lEx+The Knolls West+Ph 1-3
Analysis Time Period JPM Peak Hour
Project Description B07--06052.02-The Knolls East&Highland South TIS
IEastANest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(firs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 22 265 0 0 459 18
(Peak-Hour Factor,PHF 0.86 0.86 0.86 1 0.66 0.86 0.86
(Hourly Flow Rate,HFR(veh/h) 25 308 0 0 533 20
Percent Heavy Vehicles 0 0 —
Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 1 0 0
Minor Street Eastbound Westbound
IMovement 7 8 9 10 11 12
L T R L T R
'Volume(veh/h) 6 0 16 0 0 0
Peak-Hour Factor, PHF 0.77 0.77 0.77 0.90 0.90 0.90
(Hourly Flow Rate,HFR(veh/h) 7 0 20 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
IDelay.Queue Lenath,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
ILane Configuration L L LTR LTR
d(veh/h) 25 0 0 27
C(m)(veh/h) 1027 1264 421
C 0.02 0.00 0.06
35%queue length 0.07 0.00 0.20
Control Delay(s/veh) 8.6 7.8 14.1
ILOS A A B
Approach Delay(s/veh) — -- 14.1
Approach LOS — B
Copyright m 2005 University of Florida,All Rights Reserved HCS+rm Version 5.21 Generated: 2/24/2007 1:27
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E6B.tmp 2/24/20C .
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR I Intersection Highland&Kagy
enc /Co. jEngineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Ex+The Knolls West+Ph 1-3
nal sis Time Period JAM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Ka v Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 273 117 0 7 403 74
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.77 0.77 0.77
Hourly Flow Rate,HFR(veh/h) 317 136 0 9 523 96
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
IRT Channelized 0 0
Lanes 1 1 0 0 1 0
,Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
;Movement 7 8 9 10 11 12
L T R L T R
'Volume(veh/h) 7 1 7 49 1 348
Peak-Hour Factor, PHF 0.67 0.67 0.67 0.89 0.89 0.89
Hourly Flow Rate,HFR(veh/h) 10 1 10 55 1 391
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IPT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
v(veh/h) 317 9 21 447
C(m)(vehlh) 969 1461 34 330
V/c 0.33 0.01 0.62 1.35
95%queue length 1.43 0.02 2.11 22.18
Control Delay(s/veh) 10.5 7.5 216.8 209.8
LOS B A F F
Approach Delay(s/veh) 216.8 209.8
Approach LOS - F F
Copynght©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 2/22/2007 4:14 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5B23.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection lHighland&Kagy
Agency/Co. En ineerinq, Inc. Jurisdiction IBozernan
Date Performed 2/22/2007 Analysis Year IEx+The Knolls West+Ph 1.3
Analysis Time Period M Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period hrs: 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 292 305 1 9 165 83
Peak-!-tour Factor, PHF 0.85 0.85 0.85 0.84 0.84 0.84
Hourly Flow Rate,HFR(veh/h) 343 358 1 10 196 98
Percent Heavy Vehicles 0 -- — 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 0 3 11 100 3 383
Peak-Hour Factor,PHF 0.75 0.75 0.75 0.92 0.92 0.92
Hourly Flow Rate,HFR(veh/h) 0 4 14 108 3 416
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Len th,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
(veh/h) 343 10 18 527
(m)(veh/h) 1273 1211 314 325
IC 0.27 0.01 0.06 1.62
95%queue length 1.10 0.02 0.18 31.52
Control Delay(s/veh) 8.9 8.0 17.2 322.2
LOS A A C F
Approach Delay(s/veh) 17.2 322.2
Approach LOS - C F
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 2/22/2007 5:161
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5B55.tmp 2/22/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Main&Haggeily
Agency/Co, —Engineering, Inc, Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period AM Peak Hour
Project Description 80Z-06052.02-The Knolls East&Highland South TIS
EastNVest Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 287 80 56 573
Peak-Hour Factor,PHF 1.00 0.80 0.80 0.75 0.75 1.00
Hourly Flow Rate,HFR(veh/h) 0 358 99 74 764 0
Percent Heavy Vehicles 0 -- -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h' 60 31
Peak-Hour Factor.PHF 0.81 1.00 0.81 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 74 0 38 0 1 0 1 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
lovement 1 4 7 8 9 10 11 12
Lane Configuration L LR
r(veh/h) 74 112
(m)(veh/h) 1114 324
do 0.07 0.35
95%queue length 0.21 1.50
Control Delay(s/veh) 8.5 21.9
L OS A C
Approach Delay(s/veh) -- — 21.9
4pproach LOS -- C
'opotgnt 02005 University of Florida,All Rights Reserved HCS+m Version 5.21 Generated: 2/2212007 4:19 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5B34.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Main&Haggerty
Agency/Co, IEngit7eering, Inc. Jurisdiction IBozeman
Date Performed 1212212007 nal sis Year IEx +The Knolls West+Ph 1-3
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&HKfhland South TIS
EastNVest Street: E Main St North/South Street: Hag2edy Ln
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 601 88 35 402
Peak-Hour Factor, PHF 1.00 0.79 0.79 0.90 0.90 1.00
Hourly Flow Rate,HFR(veh/h) 0 760 111 38 446 0
Percent Heavy Vehicles 0 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 76 64
(Peak-Hour Factor, PHF 0.69 1.00 0.69 1.00 1.00 100
(Hourly Flow Rate,HFR(veh/h) 110 0 92 0 0 0
(Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
FIT Channelized 0 0
I-anes 0 0 0 0 0 0
onfiguration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
r(veh/h) 38 202
(m)(veh/h) 783 279
flc 0.05 0.72
95%queue length 0.15 5.13
Control Delay(s/veh) 9.8 45.6
LOS A E
Approach Delay(s/veh) — — 45.6
Approach LOS — — E
Copyright®2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/22/2007 5:31 i
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5B86.tmp 2/22/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection Haggerly&Bozeman Trail
Agency/Co. n ineerinq, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-3
Analysis Time Period M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Hagqerly Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStudy Period hrs): 0.25
I/ehicle Volumes and Adjustments
1Wa'or Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Jolume(veh/h) 62 1 5 32
Leak-Hour Factor,PHF 1.00 0.93 0.93 0.77 0.77 1.00
Hourly Flow Rate, HFR(veh/h) 0 66 1 6 41 0
Percent Heavy Vehicles 0 -- 0 --
IVledian Type Undivided
RT Channelized 0 0
I-anes 0 1 0 0 1 0
Configuration TR LT
upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 12 39
Peak-Hour Factor, PFIF 1.00 1.00 1.00 0.71 1.00 0.71
Hourly Flow Rate,HFR(veh/h) 0 1 0 1 0 16 1 0 54
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 0 0 0 0 0
configuration LR
Delay,Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration LT LR
v(veh/h) 6 70
C(m)(veh/h) 1547 972
v/c 0.00 0.07
95%queue length 0.01 0.23
Control Delay(s/veh) 7.3 9.0
LOS A A
Approach Delay(s/veh) -- -- 9.0
Approach LOS A
.cppght©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 21 Generated: 212212007 3:57 PM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5AEC.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst JD&IR I Intersection lHaggerty&Bozeman Trail
Agency/Co. lEngineering, Inc. Jurisdiction Bozernan
Date Performed 2/22/2007 Analysis Year lEx+The Knolls West+Ph 1-3
nal sis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Hi bland South TIS
East/1Nest Street: Haggerty Lane North/South Street: Bozeman Trail Road
Intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 33 7 41 62
Peak-Hour Factor,PHF 1 00 0.88 0.68 0.77 0.77 1.00
Hourly Flow Rate,HFR(veh/h) 0 37 7 53 80 0
Percent Heavy Vehicles 0 - 0
Median Type undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration TR LT
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 2 26
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.54 1.00 0.54
Hourly Flow Rate, HFR(veh/h) 0 0 0 3 0 48
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Hared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
(veh/h) 53 51
(m)(veh/h) 1577 1013
!c 0.03 0.05
95%queue length 0.10 0.16
Control Delay(s/veh) 7.4 8.7
LOS A A
Approach Delay(s/veh) - 8.7
Approach LOS A
Copyright©2005 University of Florida,All Rights Reserved HCS+TM Version 5 21 Generated: 2/22/2007 5:141
file://CADocuments and SettingsMeagor\Local Settings\Temp\u2k5B49.tmp 2/22/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Bozeman Trail
Agency/Co. JEngineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Ka V Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 25 59 3 0 148 13
Peak-Hour Factor,PHF 0.71 0.71 0.71 0.87 0.87 0.87
Hourly Flow Rate,HFR(veh/h) 35 83 4 0 170 14
Percent Heavy Vehicles 0 0 --
Median Type Undivided
PT Channelized 0 0
Lanes 0 1 0 0 1 0
!configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 14 8 1 6 0 42
Peak-Hour Factor, PHF 0.75 0.75 0.75 0.71 0.71 0.71
,Hourly Flow Rate,HFR(Veit/h) 18 10 1 8 0 59
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade N 0 0
,Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length,and Level of Service
pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration LTR LTR LTR LTR
w(veh/h) 35 0 29 67
(m)(veh/h) 1403 1522 563 826
vlc 0.02 0.00 0.05 0.08
95%queue length 0.08 0.00 0.16 0.26
control Delay(s/veh) 7.6 7.4 11.7 9.7
ILOS A A B A
pproach Delay(s/veh) 11.7 9.7
pproach LOS -- B A
:opyrighl©2005 University of Florida,All Rights Reserved HCS+ Version 5 21 Generated: 21222007 4:10 PM
File://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5B0F.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection Kagy&Bozeman Trail
Agency/Co. lbjgiiieering. Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-3
nal sis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South T/S
EastNVest Street: Kagy Boulevard North/South Street: Bozeman Trail Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 36 138 10 0 88 9
(Peak-Hour Factor,PHF 0.77 0.77 0.77 0.93 0.93 0.93
(Hourly Flow Rate,HFR(veh/h) 46 179 12 0 94 9
Percent Heavy Vehicles 0 0 —
!Median Type Undivided
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
(Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
'Volume(veh/h) 5 4 0 25 9 35
Peak-Hour Factor,PHF 0.63 0.63 0.63 0.69 0.69 0.69
Hourly Flow Rate,HFR(veh/h) 7 6 0 36 13 50
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
r(veh/h) 46 0 13 99
C(m)(veh/h) 1502 1395 520 707
dC 0.03 0.00 0.03 0.14
95%queue length 0.09 0.00 0.08 0.49
Control Delay(s/veh) 7.5 7.6 12.1 10.9
LOS A A B B
approach Delay(s/veh) — 12.1 10.9
approach LOS -- -- B B
Copyright©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 2/22/2007 5:24
I
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5B6A.tmp 2/22/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
3eneral Information Site Information
nal st JDMR Intersection JKayy&Mixed-Use Access 1
enc /Co. lEngineering, Inc. Jurisdiction JBozeman
Date Performed 212212007 Analysis Year lEx +The Knolls West+Ph 1-3
nal sis Time Period M Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
_astANest Street: Ka Boulevard North/South Street: Single Mixed-Use Access
ntersection Orientation: East-West IStudy Period hrs): 0.25
ehicle Volumes and Adjust ents
Major Street Eastbound Westbound
vovement 1 2 3 4 5 6
L T R L T R
olume(vehih) 86 57 165 48
'eak-Flour Factor, PHF 0.67 0.67 1.00 1.00 0.67 0.67
-burly Flow Rate,HFR(veh/h) 128 85 0 0 246 71
Percent Heavy Vehicles 0 — 0
vledian Type Undivided
r2T Channelized 0 0
Lanes 1 1 0 0 1 0
configuration L T TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume(veh/h) 30 110
peak-Hour Factor, PHF 1.00 1.00 1.00 0.90 1.00 0.90
Hourly Flow Rate,HFR(veh/h) 0 0 0 33 0 122
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
belay.Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
v(veh/h) 128 155
(m)(veh/h) 1255 643
vlc 0.10 0.24
95%queue length 0.34 0.94
ontrol Delay(s/veh) 8.2 12.4
LOS A B
pproach Delay(s/veh) - — 12.4
pproach LOS -- -- B
opyright©2005 University of Florida,All Rights Reserved HCS+m+ Version 5 21 Generated: 3/1/2007 9:57 AM
'le://CADocuments and Settings\DReagor\Local Settings\Temp\u2k264.tmp 3/1/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR I Intersection jKagy&Mixed-Use Access 1
Agency/Co. jEngineering, Inc. Jurisdiction jBozeman
Date Performed 1212212007 Analysis Year lEx +The Knolls West+Ph 1-3
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South T1S
East/West Street: Kagy Boulevard North/South Street: Single Mixed-Use Access
Intersection Orientation East-West IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 153 115 76 55
Peak-Hour Factor,PHF 0.90 0.90 1.00 1.00 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 170 127 0 0 92 67
Percent Heavy Vehicles 0 - 0 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 59 126
Peak-Hour Factor,PHF 1.00 1.00 1,00 0.90 1.00 0.90
Hourly Flow Rate,HFR(veh/h) 0 0 0 65 0 140
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration I I I I LR 777
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
✓(veh/h) 170 205
C(m)(veh/h) 1433 668
✓lc 0.12 0.31
95%queue length 0.40 1.30
Control Delay(s/veh) 7.9 12.8
PAS A B
Approach Delay(s/veh) 12.8
Approach LOS — B
Copyright©2005 University of Florida,All Rights Reserved HCS+nn Version 5 21 Generated: 3/1/2007 10:00 1
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k26B.tmp 3/1/20(,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
(general Information ,site Information
Analyst DMR Intersection I<agy&Bennett Dr
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kapv Boulevard North/South Street: Bennett Drive
Intersection Orientation: East-West [Study Period(hrs): 0.25
Vehicle Volumes and Adjustments
INa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 6 135 3 2 269 4
Weak-Hour Factor, PHF 0.67 0.67 0.67 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 8 201 4 2 401 5
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 8 0 2 6 0 17
Peak-Hour Factor, PHF 0.81 0.81 0.81 0.90 0.90 0.90
(Hourly Flow Rate,HFR(veh/h) 9 0 2 6 0 18
[Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
L-anes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L L LTR LTR
(veh/h) 8 2 11 24
(m)(veh/h) 1164 1378 423 560
rlc 0.01 0.00 0.03 0.04
95%queue length 0.02 0.00 0.08 0.13
control Delay(s/veh) 8.1 7.6 13.7 11.7
ILOS A A B B
Approach Delay(s/veh) 13.7 11.7
Approach LOS — B B
;opyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 21 Generated: 3/5/2007 3:14 PM
nle://CADocuments and Settings\DReagor\Local Settings\Temp\u2k1C6.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst MR Intersection Kagy&Bennett Dr
Agency/Co. Engineering, Inc: Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Hir bland South TIS
EastMest Street: Ka Boulevard North/South Street: Bennett Drive
Intersection Orientation: East-West IStudy Period(hrs): 0 25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 19 258 9 2 192 8
Peak-Hour Factor,PHF 0.90 0.90 0.90 0.82 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 21 286 10 2 234 9
Percent Heavy Vehicles 0 0 -- -
Median Type Undivided
IRT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
(Minor Street Northbound SOtlthbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 6 0 3 7 0 11
Peak-Hour Factor, PHF 0.55 0.55 0.55 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 10 0 5 7 0 12
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
(veh/h) 21 2 15 19
(m)(veh/h) 1335 1277 489 604
v/c 0.02 0.00 0.03 0.03
135%queue length 0.05 0.00 0.09 0.10
Control Delay(s/veh) 7.7 7.8 12.6 11.2
LOS A A B B
Approach Delay(s/veh) — 12.6 11.2
Approach LOS B B
Copyright©2005 University of Florida,All Rights Reserved HCS+w Version 5.21 Generated: 3/5/2007 3:14
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k1CB.tmp 3/5/20(
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Painted Hills Dr
Agency/Co, Engineering, Inc, Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street. Kagy Boulevard North/South Street: Painted Hills Drive
Intersection Orientation: East-West IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
IMa'or Street Eastbound Westbound
l Avement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 26 115 17 8 272 14
Peak-Hour Factor, PHF 0.67 0.67 0.67 0.67 0.67 0.67
(Hourly Flow Rate,HFR(veh/h) 38 171 25 11 405 20
[Percent Heavy Vehicles 0 -- 0 --
IMedian Type Undivided
iRT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
IWinor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
✓olume(vehih) 74 0 11 18 0 80
Peak-Hour Factor.PHF 0.81 0.81 0.81 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 91 0 13 20 0 88
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Confguration L L LTR LTR
b(veh/h) 38 11 104 108
C(m)(veh/h) 1145 1389 306 551
v/c 0.03 0.01 0.34 0.20
95%queue length 0.10 0.02 1.46 0.72
control Delay(s/veh) 8.3 7.6 22.7 13.1
LOS A A C B
,Approach Delay(s/veh) -- 22.7 13.1
4pproach LOS -- — C B
:opyrighl©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 3/5/2007 3:15 PM
nle://CADocuments and Settings\DReagor\Local Settings\Temp\u2k1D0.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Painted Hills Dr
Agency/Co. n ineetin . Inc. urisdiction Bozernan
Date Performed 1212212007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard lNorthlSouth Street: Painted Hills Drive
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 90 254 53 13 172 24
Peak-Hour Factor,PHF 0.90 0.90 0.90 0.82 0.82 0.82
Hourly Flow Rate,HFR(veh/h) 100 282 58 15 209 29 `
Percent Heavy Vehicles 0 -- -- 0
(Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 B 9 10 11 12
L T R L T R
Volume(veh/h) 21 0 11 21 0 52
Peak-Hour Factor,PHF 0.55 0.55 0.55 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 38 0 19 23 0 57
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
4pproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
/(veh/h) 100 15 57 80
(m)(veh/h) 1341 1230 341 537
/C 0.07 0.01 0.17 0.15
195%queue length 0.24 0.04 0.59 a52
Control Delay(s/veh) 7.9 8.0 17.7 12,9
LOS A A C g
4pproach Delay(s/veh) — — 17.7 12.9
Approach LOS — -- C B
Copyright m 2005 University of Florida,All Rights Reserved HCS+ne Version 5.21 Generated: 3/5/2007 3:16
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k1D6.tmp 3/5/200
Two-Way Stop Control Page 1 of 1
i TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR Intersection agy&Street G
Agency/Co. lEngineering, Inc. Jurisdiction Bozeman
Date Performed 1212212007 Analysis Year Ex+The Knolls West+Ph 1-3
Analysis Time Period JAM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Kagy Boulevard North/South Street: Street G
Intersection Orientation: East-West Stud Period hrs): 0.25
Vehicle Volumes and Adjustments
INa'or Street Eastbound Westbound
,Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 8 153 422 4
Peak-Hour Factor,PHF 0.67 0.67 1.00 1.00 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 11 228 0 0 629 5
Percent Heavy Vehicles 0 -- — 0
(Median Type Undivided
IRT Channelized 0 0
I-anes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
(Minor Street Northbound Southbound
Allovement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 5 25
Peak-Hour Factor, PHF 1.00 1.00 1.00 0.90 1.00 0.90
(Hourly Flow Rate,HFR(veh/h) 0 0 0 5 0 27
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
IDe(ay,Queue Length,and Level of Service
.Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L LR
v(veh/h) 11 32
(m)(veh/h) 959 447
l/c 0.01 0.07
95%queue length 0.03 0.23
'ontrol Delay(s/veh) 8.8 13.7
LOS A B
,Approach Delay(s/veh) -- 13.7
Approach LOS B
;opyogN 02005 University of Florida,All Rights Reserved HCS+w Version 5 21 Generated: 3/5/2007 3:17 PM
ile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k1DC.tmp 3/5/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst 16mR Intersection JKagy&Street G
pent /Co En ineerin , Inc. Jurisdiction JBozeinan
Date Performed 2/22/2007 Analysis Year IEx+The Knolls West+Ph 1-3
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Kagy Boulevard North/South Street: Street G
Intersection Orientation: East-West IStudy Period 'hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 29 390 239 6
Peak-Hour Factor,PHF 0.90 0.90 1.00 1.00 0.82 0.82
Hourly Flow Rate, HFR(veh/h) 32 433 0 0 291 7
Percent Heavy Vehicles 0 - -- 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 7 16
Peak-Hour Factor,PHF 1.00 1.00 1.00 0.90 1.00 0.90
Hourly Flow Rate,HFR(veh/h) 0 0 0 7 0 17
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(veh/h) 32 24
(m)(veh/h) 1275 564
/c 0.03 0.04
5%queue length 0.08 0.13
Control Delay(s/veh) 7.9 11.7
LOS A B
Approach Delay(s/veh) -- 11.7
Approach LOS — B
Copyright 0 2005 University of Florida,All Rights Reserved HCS+vn Version 5.21 Generated: 3/5/2007 3:1 B F
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k1E2.tmp 3/5/200.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection agy&Church/Sourdough
Agency/Co. Engineering, Inc Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-3
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
astNVest Street: Kagy Boulevard North/South Street: S Church Ave/Sourdough Rd
ntersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
✓olume(veh/h) 21 342 29 28 657 22
r3eak-Hour Factor, PHF 0.94 0.94 0.94 0.79 0.79 0.79
dourly Flow Rate,HFR(veh/h) 22 363 30 35 831 27
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
configuration L TR L TR
lJpstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
plume veh/h 101 63 58 12 30 30
Peak-Hour Factor, PHF 0.87 0.87 0.87 0.67 067 0.67
Hourly Flow Rate,HFR(veh/h) 116 72 66 17 44 44
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
=tared Approach N N
Storage 0 0
RT Channelized 0 0
-anes 0 1 0 0 1 0
3onfiguration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
>(veh/h) 22 35 254 105
(m)(veh/h) 790 1177 123 149
//c 0.03 0.03 2.07 0.70
35%queue length 0.09 0.09 20.93 4.10
Control Delay(s/veh) 9.7 8.2 564.8 72.6
SOS A A F F
,Approach Delay(s/veh) — 564.8 72.6
4pproach LOS F F
opyriyht©2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/22/2007 4:11 PM
le://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5B16.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst DMR Intersection agy&Church/Sourdough
pent 1Co. En ineerin , Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-3
Analysis Time Period PM Peak Hour
Project Description B0Z-06052.02- The Knolls East&Highland South TIS
EastANest Street: Ka Boulevard IVorth/South Street: S Church Ave/Sourdou h Rd
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 25 548 89 66 436 24
Peak-Hour Factor,PHF 0.81 0.81 0.81 0.94 0.94 0.94
Hourly Flow Rate,HFR(veh/h) 30 676 109 70 463 25
Percent Heavy Vehicles 0 0 --
Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 47 30 31 31 66 68
Peak-Hour Factor,PHF 6.93 0.93 0.93 0.81 0.81 0.81
Hourly Flow Rate,HFR(veh/h) 50 32 33 38 81 83
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
r(veh/h) 30 70 115 202
C(m)(veh/h) 1082 840 65 149
v/c 0.03 0.08 1.77 1.36
195%queue length 0.09 0.27 10.40 12.62
Control Delay(s/veh) 8.4 9.7 505.6 254.6
LOS A A F F
Approach Delay(s/veh) — 505.6 254.6
Approach LOS — — F F
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 2122t2007 5:25 i,
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5B6F.tmp 2/22/200-
APPENDIX H
CAPACITY CALCULATIONS -
EXISTING + THE KNOLLS AT
FIILLCRE51' WEST + PHASE 1 -4
HCM Analysis Summary
Existing+The Knolls West+Ph 1-4 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-4-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
ApproachlOutbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 1 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB I 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h) 1 295 259 268 454 4 262 2 103 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 78 0 19 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) I --- --- --- --- --- --- -'- I '-'
Signal Settings:Actuated Operational Analysis Cycle Length: 71.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 16.0 24.0 18.0 0
Yellow All Red I3.0 1 0.01 3.5 1 1.5 3.51 1.5
Capacity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
APP
EB
L 275 0.001 0.338 L 0.004 15.6 B 20.5 d
* TR 1114 0.174 0.338 TR 0.514 20.5 C
WB L er 221 0.000 0.408 8.1 A
* L ro 395 0.187 0.225 L 0.531 10.2 B
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.172 0.254 L 0.678 27.2 C 25.7 C
TR 410 0.063 0.254 TR 0.249 21.2 C
SB
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0 A
Intersection:Delay= 15.8 sec/veh Int.LOS=B Xc 0.65 *Critical Lane Group 2(v/s)Crit= 0.53
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+The Knolls West+Ph 1-4 Main St/Highland Blvd
DMR 2/22/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-4-AM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s We veh) LOS veh) LOS 0 10
EB
L 0.00 0.00 15.6 B 20.5 C
* 'TR 0.17 0.51 20.5 C 4
454
[71-
268
WB L er 0.00 8.1 A
*L ro 0.19 0.53 10.2 B ------------- - -
TR 0.16 0.26 6.9 A --------------------- -----------
1 295
NB * L 0.17 0.68 27.2 C 25.7 C 259
TR 0.06 0.25 21.2 C r'
262j103
2
SB $Int. 0.53
0.00 0.0 A 0.0 A 1 2 3
16 3 0 23 4 2 17 1�1 4 2
0.65 15.8 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Y
Existing+The Knolls West+Ph 1-4 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-4-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 579 327 129 428 1 353 0 253 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
y %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
(` Lane Groups L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 98 0 25 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftjRight) --- I --- --- I -- --_ _� �_
Signal Settings:Actuated Operational Analysis Cycle Length: 73.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 26.0 1 24.0 0
Yellow I All Red 1 3.01 0.01 3.5 1 1.5 1 3.5 1.5
i
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
App Grow -(secLx
EB
L 309 0.001 0.356 L 0.003 15.2 B 24.6 C
* TR 1193 0.262 0.356 TR 0.736 24.6 C
WB L er 121 0.000 0.425 10.5 B
* L ro 240 0.084 0.137 L 0.410 13.5 B
TR 1872 0.141 0.534 TR 0.263 9.6 A
NB
* L 471 0.265 0.329 L 0.807 31.7 C 26.9 C
TR 531 0.152 0.329 TR 0.461 19.6 B
SB
LTR 490 0.008 0.329 LTR 0.024 16.6 B 16.6 B
Intersection:Delay=21.0 sec/veh Int.LOS=C Xc 0.74 * Critical Lane Group :5:(v/s)Crit=0.61
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+ The Knolls West+Ph 1-4 Main St/Highland Blvd
DMR 2/22/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-4-PM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s v/c veh) LOS veh) LOS
1 14
EB
L 10.00 0.00 15.2 B 24.6 C
* TR 0.26 0.74 24.6 C t— 1
—428
;--129
.L
---------------------- ----------------
WB Lper 0.00 10.5 B
*L ro 1 0.08 0.414 13.5 B ----- -------- --
TR 0.14 0.26 9.6 A ------------ ------
579
NB * L 0.27 0.81 31.7 C 26.9 C 327
TR 0.15 0.46 19.6 B �1
353�253
0
SB LTR 10.01 0.02 16.6 B 16.6 B 1 2 3
l,
10 3 0 25 4 2 23 �1 4 2
Int. Fo.61 0.74 21.0 C
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
:3eneral Information Site Information
Analyst JDMR Intersection Highland 8;Ellis
Agency/Co. jEngineerin , Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-4
nal sis Time Period 1AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
astNVest Street Ellis Street North/South Street: Highland Boulevard
ntersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 1 356 39 58 405 104
-leak-Hour Factor, PHF 0.85 0.85 0.85 0.86 0.86 0.86
lourly Flow Rate, HFR(veh/h) 1 418 45 67 470 120
Percent Heavy Vehicles 0 -- 0
�Aedian Type Undivided
OT Channelized 0 0
I-anes 1 1 0 1 1 0
configuration L TR L TR
Upstream Signal 0 0
(Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 0 14 4 19
weak-Hour Factor, PHF 0.60 0.60 0.60 0.56 0.58 0.58
lourly Flow Rate,HFR(veh/h) 0 0 0 24 6 32
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
-'fared Approach N N
Storage 0 0
RT Channelized 0 0
..anes 0 0 1 0 1 0
3onfiguration R LTR
Dela ,Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
iMovement 1 4 7 8 9 10 11 12
I-ane Configuration L L LTR R
V(veh/h) 1 67 62 0
C(m)(veh/h) 995 1109 286 553
W/C 0.00 0.06 0.22 0.00
95%queue length 0.00 0.19 0.81 0.00
Control Delay(s/veh) 8.6 8.5 21.0 11.5
LOS A A C B
ll.%pproach Delay(s/veh) -- 21.0
4pproach LOS - C
:opyright©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 3r712007 9:21 AM
ile:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k588.tmp 3/7/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Hi hland&Ellis
Agency/Co. Eng eerinr, Inc Jurisdiction lBozeman
Date Performed 2/2212007 Analysis Year lEx +The Knolls West+Ph 1-4
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: Ellis Street North/South Street: Hic hand Boulevard
Intersection Orientation: North-South IStudy Period Mrs): 0.25
Vehicle Volumes and Ad'ustfnents
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(v(-.hlii) 2 446 16 16 453 15
(Peak-Hour Factor,PHF 0.74 0.74 0.74 0.88 0.88 0.88
Hourly Flow Rate,HFR(veh/h) 2 602 21 18 514 17
Percent Heavy Vehicles 0 -- - 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 5 37 2 55
Peak-Hour Factor,PHF 0.68 0.86 0.88 0.78 0.78 0.78
(Hourly Flow Rate,HFR(veh/h) 0 0 5 47 2 70
(Percent Heavy Vehicles 0 0 0 0 0 1 0
(Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IPT Channelized 0 0
Lanes 0 0 1 0 1 0
Configuration R LTR
Delay.Queue Length,and Level of Service
4pproach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR R
IV(veh/h) 2 18 119 5
C(m)(veh/h) 1036 968 272 550
dlC 0.00 0.02 0.44 0.01
95%queue length 0.01 0.06 2.10 0.03
Control Delay(s/veh) 8.5 8.8 28.1 11.6
LOS A A D F B
4pproach Delay(s/veh) 28.1 11.6
4pproach LOS -- D B
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 317/2007 9:25 A
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k59C.tmp 3/7/200'.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Hi bland Blvd&Painted Hills
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-4
nal sis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Hillcrest/Painted Hills Rd North/South Street: Hi bland Boulevard
Intersection Orientation: North-South IStudv Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 88 349 3 11 185 21
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 101 401 3 14 243 27
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
✓olume(veh/h) 19 0 28 10 0 33
Peak-Hour Factor, PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 25 1 0 1 37 11 1 0 36
Percent Heavy Vehicles 0 0 0 0 0 0
?ercent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Dela ,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
%/(veh/h) 101 14 11 36 25 37
C(m)(veh/h) 1301 1166 230 653 227 785
vlc 0.08 0.01 0.05 0.06 0.11 0.05
95%queue length 0.25 0.04 0.15 0.17 0.37 0.15
:ontrol Delay(s/veh) 8.0 8.1 21.4 10.8 22.8 9.8
I-OS A A C B C A
,Approach Delay(s/veh) -- 13.3 15.1
gpproach LOS B C
,opynght©2005 University of Florida,All Rights Reserved HCS+rM Version 5 21 Generated: 2/24/2007 2:01 PM
File://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E7B.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
(General Information Site Information
Analyst DMR fntersection 1-1lahland&Painted Hills
Rd-
enc /Co. Engineering,Inc. Jurisdiction Bozeman
Date Performed ?./22/2007 Analysis Year IEx+The Knolls West+Ph 1-4
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Hillcrest/Painted Hills Rd INorthlSouth Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 38 237 11 37 402 30
Peak-Hour Factor,PHF 0.86 0.86 0.86 1 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 44 275 12 43 467 34
Percent Heavy Vehicles 0 - - 0 - --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 34 0 81 6 0 20
Peak-Hour Factor,PHF 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 44 0 105 6 0 22
Percent Heavy Vehicles 0 0 0 0 0 0
(Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Allovement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
(veh/h) 44 43 6 22 44 105
(m)(veh/h) 1074 1287 176 763 222 587
v/c 0.04 0.03 0.03 0.03 0.20 0.18
95%queue length 0.13 0.10 0.11 0.09 0.72 0.65
Control Delay(s/veh) 8.5 7.9 26.2 9.9 25.2 12.5
LOS A A D A D 8
Approach Delay(s/veh) 13.4 16.2
Approach LOS - B C
Copyright©2005 University of Florida,All Rights Reserved HCS+nn Version 5.21 Generated: 2/24/2007 2:03 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E80.tmp 2/24/200
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Highland&Knolls Ln
Agency/Co. Engineering. Inc. Jurisdiction Bozeman
Date Performed 2/22/07 Analysis Year Ex +The Knolls West+Ph.1-4
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastANest Street: Knolls Ln Worth/South Street: Highland Boulevard
Intersection Orientation: North-South [Study Period (hrs),: 0.25 777771
Vehicle Volumes and Adjustments
'Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
[Volume(veh/h) 10 420 5 2 219 2
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 11 482 5 2 288 2
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
IMInor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
[Volume veh/h) 14 0 22 14 0 6
Peak-Hour Factor, PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 18 0 29 15 0 6
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
v(veh/h) 11 2 21 47
C(m)(veh/h) 1279 1086 334 474
v/c 0.01 0.00 0.06 0.10
95%queue length 0.03 0.01 0.20 0.33
"ontrol Delay(s/veh) 7.8 8.3 16.5 13.4
LOS A A C B
Approach Delay(s/veh) -- 16.5 13.4
approach LOS -- C B
:npyrrg�ll©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 2124/2007 2:04 PM
Aile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5E85.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information 'Site Information
Analyst OMR Intersection Hi hland&Knolls Ln
Agency/Co. En ineenn , Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year JEx+The Knolls West+Ph 1-4
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T/S
EastNVest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound SouthboUnd
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 22 276 16 6 465 18
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 25 320 18 6 540 20
Percent Heavy Vehicles 0 -- -- 0
(Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
(Movement 7 8 9 10 11 112
L T R L T R
Volume(veh/h) 6 0 16 10 0 4
Peak-Hour Factor,PHF 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 7 0 1 20 11 0 4
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
Lanes 0 1 0 0 1 0
onfiguration LTR LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
✓(veh/h) 25 6 15 27
C(m)(veh/h) 1021 1232 279 406
✓/c 0.02 0.00 0.05 0.07
95%queue length 0.08 0.01 0.17 0.21
Control Delay(s/veh) 8.6 7.9 18.6 14.5
LOS A A C B
Approach Delay(s/veh) -- 18.6 14.5
Approach LOS -- C B
Copyright©20D5 University of Florida,All Rights Reserved HCS+w Version 521 Generated: 2/24/2007 2:05 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E89.tmp 2/24/200,.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Highland&Kagy
Agency/Co- Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Ex +The Knolls West+Ph 1-4
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Hi hland Boulevard
Intersection Orientation: East-West [Study Period Mrs): 0.25 71
✓ehicle Volumes and Adjustments
IMa'or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 281 117 0 7 403 74
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.77 0.77 0.77
sourly Flow Rate,HFR(veh/h) 326 136 0 9 523 96
Percent Heavy Vehicles 0 -- 0
'VIedian Type Undivided
rZT Channelized 0 0
I-anes 1 1 0 0 1 0
configuration L TR LTR
upstream Signal 0 0
(Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
[Volume veh/h) 7 1 7 49 1 372
Peak-Hour Factor,PHF 0.67 0.67 0.67 0.89 0.89 0.89
-burly Flow Rate,HFR(veh/h) 10 1 10 55 1 417
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
--tared Approach N N
Storage 0 0
RT Channelized 0 0
-.anes 0 1 0 0 1 0
configuration LTR LTR
Dela .Queue Length,and Level of Service
'lproach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
p(veh/h) 326 9 21 473
IC(m)(veh/h) 969 1461 27 330
r/c 0.34 0.01 0.78 1.43
i5%queue length 1.49 0.02 2.46 24.98
Eontrol Delay(s/veh) 10.6 7.5 310.1 242.0
OS B A F F
Approach Delay(s/veh) 310.1 242.0
Approach LOS F F
lopyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 21 Generated: 2/2212007 6:13 PM
iile://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5BAD.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR I Intersection JHphland&Kagy
Agency/Co. En ineerin . Inc. Jurisdiction JBozeman
Dale Performed 2/22/2007 Analysis Year JEx+The Knolls West+Ph 1-4
naI sis Time Period JPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(vehlh) 319 305 1 9 165 83
(Peak-Hour Factor,PHF 0.85 0.65 0.85 0.84 0.84 0.84
(Hourly Flow Rate,HFR(veh/h) 375 358 1 10 196 98
Percent Heavy Vehicles 0 -- 0 — --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
'Volume(veh/h) 0 3 11 100 3 399
Peak-Hour Factor.PHF 0.75 0.75 0.75 0.92 0.92 0.92
Hourly Flow Rate,HFR(veh/h) 0 4 14 106 3 433
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LTR LTR LTR
✓(veh/h) 375 10 18 544
C(m)(veh/h) 1273 1211 289 302
✓/c 0.29 0.01 0.06 1.80
95%queue length 1.24 0.02 0.20 35.93
Control Delay(s/veh) 9.0 8.0 18.3 402.6
LOS A A C F
Approach Delay(s/veh) -- — 18.3 402.6
Approach LOS — — C F
Copyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5.21 Generated: 2/23/2007 8:241
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5C41.tmp 2/23/200
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nalvst DMR Intersection Main&Hap ert
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex +The Knolls West+Ph 1-4
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period(hrs): 0.25
chicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 293 80 56 575
Peak-Hour Factor, PHF 1.00 0.80 0.60 0.75 0.75 1.00
Hourly Flow Rate,HFR(veh/h) 0 366 99 74 766 0
Percent Heavy Vehicles 0 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume(veh/h) 60 31
Peak-Hour Factor, PHF 0.81 1.00 0.81 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 74 0 38 0 1 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
configuration LR
Dela ,Queue Len th,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
✓(veh/h) 74 112
C(m)(veh/h) 1107 319
✓lc 0.07 0.35
35%queue length 0.21 1.53
ontrol Delay(s/veh) 8.5 22.3
_OS A C
,Approach Delay(s/veh) — 22.3
pproach LOS — C
opyright©2005 University of Florida,All Rights Reserved HCS+nn Version 5.21 Generated: 2/28/2007 9:00 AM
le://C:\Documents and Settings\DReagor\Local Settings\Temp\u2kB6.tmp 2/28/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
I
Analyst ID&IR Intersection Main&Haggerly
Agency/Co. [Engineering, Inc. Jurisdiction 18ozer77an
Date Performed 2/22/2007 Analysis Year lEx+The Knolls West+Ph 1-4
Analysis Time Period JPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
EastNVest Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 605 88 35 408
(Peak-Hour Factor,PHF 1.00 0.79 0.79 0.90 0.90 1.00
(Hourly Flow Rate,HFR(veh/h) 0 765 111 38 453 0
Percent Heavy Vehicles 0 -- 0 - --
(Median Type Undivided
IRT Channelized 0 0
Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 76 64
Peak-Hour Factor.PHF 0.69 1.00 0.69 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 110 0 92 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
(Lane Configuration L LR
(veh/h) 38 202
(m)(veh/h) 779 276
plc 0.05 0.73
135%queue length 0.15 5.23
Control Delay(s/veh) 9.9 46.8
PAS A E
Approach Delay(s/veh) — 46.8
Approach LOS — E
Copyright©2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/28/2007 0:52.
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2kA0.tmp 2/28/20(_
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
3eneral Information Site Information
Analyst DMR Intersection fKagy&Church/Sourclouch
Agency/Co/Co Engineering, Inc. Jurisdiction jBozeman
Date Performed 212212007 Analysis Year IEx+The Knolls West+Ph 1-4
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
astMlest Street: Kagv Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West -Itudv Period(hrs): 0.25
Vehicle Volumes and Adjustments
Ma or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 21 350 29 28 681 22
'eak-Hour Factor,PHF 0.94 0.94 0.94 0.79 0.79 0.79
-iourly Flow Rate,HFR(veh/h) 22 372 30 35 862 27
Percent Heavy Vehicles 0 0 -- --
'Oedian Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
'3onfiguration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
✓olume veh/h) 101 63 58 12 30 30
Peak-Hour Factor, PHF 0.87 0.87 0.87 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 116 72 66 17 44 44
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
configuration LTR LTR
Dela ,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
(veh/h) 22 35 254 105
(m)(veh/h) 769 1168 113 138
I/c 0.03 0.03 2.25 0.76
35%queue length 0.09 0.09 21.96 4.54
control Delay(s/veh) 9.8 8.2 650.8 86.0
LOS A A F F
4pproach Delay(s/veh) 650.8 86.0
4pproach LOS -- F F
yr^.ht©2005 University of Florida,All Rights Reserved HCS+Tm Version 5 21 Generated: 2/22/2007 6:14 PM
Jile://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5BB4.tmp 2/22/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst 12MR JKagy&Church/Sourdough
Agency/co. Jff2 7neerin Inc. urlsdictlon lBoveman
Date Performed 2/22/2007 nal sis Year IEx+The Knolls West+Ph 1-4
Analysis Time Period ry Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West [Study Period hrs : 0.25
chicle Volumes and Adjustments
Major Street Eastbound Westbound
IMovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 25 575 89 66 452 24
Peak-Hour Factor, PHF 0.81 0.81 0.81 0.94 0.94 0.94
Hourly Flow Rate,HFR(veh/h) 30 709 109 70 480 25
Percent Heavy Vehicles 0 - 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
upstream Signal 0 0
Minor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 47 30 31 31 66 68
Peak-Hour Factor,PHF 0.93 0.93 0.93 0.81 0.81 0.81
(Hourly Flow Rate,HFR(veh/h) 50 1 32 33 38 1 81 83
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
I-anes 0 1 0 0 1 0
;onfiguration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
(veh/h) 30 70 115 202
C(m)(veh/h) 1066 817 55 138
plc 0.03 0.09 2.09 1.46
95%queue length 0.09 0.28 11.31 13.58
Control Delay(s/veh) 8.5 9.8 665.0 303.0
ILOS A A F F
Approach Delay(s/veh) - - 665.0 303.0
Approach LOS — F F
Copyright©2005 University of Florida,All Rights Reserved HCS+na Version 5 21 Generated: 2/23/2007 6:26 P
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5C46.tmp 2/23/200,
APPENDIX
CAPACITY CALCULATIONS -
EXISTING + THE KNOLLS AT
FIILLCREST WEST + PHASE 1 -5
HCM Analysis Summary
Existing +The Knolls West+Ph 1-5 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-5-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 295 261 269 454 4 267 2, 106 0 0 0
PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Groups L TR I L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 78 0 21 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftiRight) --- --- --- -^ --- --- --- ---
Signal Settings:Actuated Operational Analysis Cycic Lcngth: 71.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 16.0 24.0 18.0 0
Yellow) All Red 3.0 � 0.0 1 3.5 1 1.5 1 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
App CuQu (Yph)- Ratin RatiQ
EB
L 275 0.001 0.338 L 0.004 15.6 B 20.6 C
* TR 1113 0.175 0.338 TR 0.517 20.6 C
WB L er 221 0.000 0.408 8.1 A
* L ro 395 0.187 0.225 L 0.532 10.2 B
TR 2120 0.160 0.606 TR 0.264 6.9 A
NB
* L 460 0.175 0.254 aTR
0.691 27.7 C 26.1 C
TR 410 0.064 0.2540.251 21.2 C
SB
LTR 482 0.000 0.254 LTR 0.000 0.0 A 0.0 A
Intersection:Delay= 15.9 sec/veh Int.LOS=B XC 0.66 * Critical Lane Group 2(v/s)Crit=0.54
SIG/Cinema v3.08 Page 1
HCM Y Summar Results
�
Existing+The Knolls West+Ph 1-5 Main St/Highland Blvd
DMR 2/22/2007
AM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-5-AM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 0
App Grp v/s We veh) LOS veh) LOS
o to
EB
L 0.00 0.00 15.6 B 20.6 C
* TR 0.171 0.52 20.6 C 4
454
41 1 _--269
- ---------------------
WB L er 0.00 8.1 A r ----------
*L ro 0.19 0.534 10.2 B - -- -- -
-.
TR 0.16 0.26 6.9 A ------------- - - - --- - -- ----------------------
1 ?.- , 1,
295
NB * L 0.18 0.69 27.7 C 26.1 C 261
TR 0.06 0.25 1 21.2 C
2677106
2
SB LTR 0.00 0.00 0.0 A 0.0 A 1 2 3
1 17
16 3023 4217 111 42
Int. 0.54 0.66 15.9 B }
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
HCM Analysis Summary
Existing+The Knolls West+Ph 1-5 Main St/Highland Blvd Area Type:Non CBD
DMR 2/22/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-5-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 3 2 L 12.0 T 1 12.0 TR 12.0
WB 3 2 L 12.0 T 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 1 1 LTR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 1 579 332 132 428 1 356 0 255 4 0 1
PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42
%Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1
Lane Grows L TR L TR L TR LTR
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 100 - 0 25 0
Peds/Hour 5 5 5 0
%Grade 0 0 -3 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) I --- --- '-- """ "'- -"-Signal Settings:Actuated Operational Analysis Cycle Length: 73.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTR LTP
NB LTP
SB LTP
Green 10.0 26.0 24.0 0
Yellowl All Red 3.0 1 0.0 1 3.5 1 1.5 1 3.5 1.5
Ca a ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
lzp P
EB
L 309 0.001 0.356 L 0.003 15.2 B 24.7 C
* TR 1192 0.263 0.356 TR 0.739 24.7 C
WB L er 120 0.000 0.425 10.5 B
* L ro 240 0.087 0.137 L 0.422 13.7 B
TR 1872 0.141 0.534 TR 0.263 9.6 A
NB
* L 471 0.267 0.329 L 0.813 32.2 C 27.3 C
TR 531 0.153 0.329 TR 0.465 19.6 B
SB
LTR 489 0.008 0.329 LTR 0.025 16.6 B 16.6 B
Intersection:Delay= 21.2 sec/veh Int.LOS=C Xd=0.75 *Critical Lane Group :E(v/s)Crit=0.62
SIG/Cinema v3.08 Page 1
HCM Summary Results
Existing+The Knolls West+Ph 1-5 Main St/Highland Blvd
DMR 2/22/2007
PM Peak Hour Case: HIGHLAND-MAIN-EX+TNW+1-5-PM
Lane Grou!Tveh)
Approach
DelayDelay
Lane X (sec/ (sec/ 0
Ap Grp v/s We veh) LOS I
1 4
EB �
L 0.00 0.00 15.2 B 24.7 C 4
* TR 0.26 0.74 24.7 C I
428
f —132
----- -------------- -- ---------------------
WB L er 0.00 10.5 B '__------- .
*L ro 0.09 0.424 13.7 B -------------
TR 0.14 0.26 9.6 A --------------------- ---------------------
579
NB * L 0.27 0.81 32.2 C 27.3 C 332
TR 0.15 0.47 1 19.6 B
356�255 ,
0 I
SB LTR 0.01 0.02 16.6 B 16.6 B 2 3 ,
10 3 0 25 4 2 23 4 2
LInt. 0.62 0.75 1 21.2 C
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Hirhland&Ellis
Agency/Co. En ineerin , Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Anaiysis Year Ex+The Knolls West+Ph 1-5
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
castNVest Street Ellis Street North/South Street: Highland Boulevard
Intersection Orientation: Nash-South IStudy Period hrs . 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 1 364 39 58 408 104
Peak-Hour Factor,PHF 0.85 0.85 0.85 0.86 0.86 0,86
Hourly Flow Rate,HFR(veh/h) 1 428 45 67 474 120
Percent Heavy Vehicles 0 - -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
0onfiguration L TR L TR
Upstream Signal 0 0
I ninor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
IV—olurne veh/h 0 14 4 19
Peak-Hour Factor,PHF 0.60 0.60 0.60 0.58 0.58 0.58
Hourly Flow Rate,HFR(veh/h) 0 0 0 24 6 32
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 1 0 1 0
configuration R LTR
Dela .Queue Length,and Level of Service
�kpproach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
II'Lane Configuration L L LTR R
a(veh/h) 1 67 62 0
C(m)(veh/h) 992 1099 279 550
Y/c 0.00 0.06 0.22 0.00
35%queue length 0.00 0.19 0.63 0.00
Control Delay(s/veh) 8.6 8.5 21.6 11.5
LOS A A C B
4pproach Delay(s/veh) -- -- 21.6
4pproach_LOS_ C
:opynght©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: Y712007 9:28 AM
Ale://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5A3.tmp 3/7/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection lHighlarld&Ellis
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year 1Ex+The Knolls West+Ph 1-5
nal sis Time Period IPM Peak Hour
r
o'oct Descri tion BOZ-06052.02-The Knolls East&Highland South TIS
s'Mest Street: Ellis Street North/South Street: Hi hland Boulevard
ersection Orientation North-Snuth IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
(Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 2 451 16 16 461 15
(Peak-Hour Factor,PHF 0.74 0.74 0.74 0.88 0.88 0.88
(Hourly Flow Rate,HFR(veh/h) 2 609 21 18 523 17
Percent Heavy Vehicles 0 - 0 —
(Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 1 12
L T R L T R
Volume(veh/h) 5 37 2 55
Peak-Hour Factor, PHF 0.88 0.88 0.88 0.78 0.78 0.78
Hourly Flow Rate,HFR(veh/h) 0 0 5 47 12 70
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 1 0 1 0
Configuration R LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
VMovement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR R
d(veh/h) 2 18 119 5
C(m)(veh/h) 1028 962 266 544
plc 0,00 0.02 0.45 0.01
95%queue length 0.01 0.06 2.17 0.03
Control Delay(s/veh) 8.5 8.8 29.0 11.7
LOS A A D B
4pproach Delay(s/veh) 29.0 11.7
4pproach LOS D B
Copyright©2005 University of Florida,All Rights Reserved HCS+*m Version 5 21 Generated: 3/7/2007 9:29
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5A9.tmp 3/7/20C
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
M
DMR Intersection Hi htand Blvd&Painted Hills
En ineerin , Inc. urisdiction Bozeman
med 2/22/2007 nal sis Year Ex+The Knolls West+Ph 1-5
e Period OM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Hillcrest/Painted Hills Rd North/South Street: Highland Boulevard
Intersection Orientation: North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
IMa or Street Northbound Southbound
IMovement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 88 352 5 13 186 21
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
Hourly Flow Rate,HFR(veh/h) 101 404 5 17 244 27
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
RT Channelized 0 0
I-anes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Jolume(veh/h) 19 0 r28 15 D 38
(Peak-Hour Factor.PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 25 0 37 16 0 42
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
t✓lovement 1 4 7 8 9 10 11 12
I-ane Configuration L L L TR L TR
v(veh/h) 101 17 16 42 25 37
C(m)(veh/h) 1300 1161 225 649 219 783
v/c 0.08 0.01 0.07 0.06 0.11 0.05
95%queue length 0.25 0.04 0.23 0.21 0.38 0.15
:ontrol Delay(s/veh) 8.0 8.1 22.2 10.9 23.5 9.8
LOS A A C B C A
pproach Delay(s/veh) - - 14.0 15.4
4pproach LOS B C
:opyrlght©2005 University of Florida,All Rights Reserved HCS+TM Version 5 21 Generated: 2/24/2007 2:17 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5E9F.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Highland&Painted Hills Rd
-11
Agency/Co. Enclineering,Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-5
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: Hillcrest/Painted Hills Rd North/South Street: Highland Boulevard
Intersection Orientation: North-South Studv Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R _
Volume(veh/h) 38 239 17 42 405 30
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 44 277 19 48 470 34
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 34 0 81 9 0 23
Peak-Hour Factor,PHF 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 44 0 105 10 0 25
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
(Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L L TR L TR
r(veh/h) 44 48 10 25 44 105
(m)(veh/h) 1071 1277 170 758 214 585
dC 0.04 0.04 0.06 0.03 0.21 0.18
95%queue length 0.13 0.12 0.19 0.10 0.75 0.65
Control Delay(s/veh) 8.5 7.9 27.5 9.9 26.1 12.5
LOS A A D A D B
Approach Delay(s/veh) -- 14.9 16.5
Approach LOS - 8 C
Copyright©2005 University of Florida,All Rights Reserved HCS+rM Version 5.21 Generated: 2/24/2007 2:18 r
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5EA3.tmp 2/24/200,.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information ite Information
Analyst DMR Intersection Hi hland&Knolls Ln
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 2/22/07 Analysis Year Ex+The Knolls West+Ph 1-5
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
Fast/West Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation: North-South [Study Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Jolume(veh/h) 10 422 8 3 224 2
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.76 0.76 0.76
liourly Flow Rate,HFR(veh/h) 11 485 9 3 294 2
Percent Heavy Vehicles 0 - -- 0
Median Type Undivided
RT Channelized 0 0
(Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 14 0 22 22 0 9
Peak-Hour Factor,PHF 0.75 0.75 0.75 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 18 0 29 24 0 10
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
IRT Channelized 0 0
!-anes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length.and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
4(veh/h) 11 3 34 47
C(m)(veh/h) 1273 1080 329 465
plc 0.01 0.00 0.10 0.10
95%queue length 0.03 0.01 0.34 0.34
Control Delay(s/veh) 7.9 8.3 17.2 13.6
LOS A A C B
pproach Delay(s/veh) — 17.2 13.6
4pproach-LOS C B
.�pvfg'r.©2005 University of Florida,All Rights Reserved HCS+- Version 5.21 Generated: 2/24/2007 2:19 PM
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5EA8.tmp 2/24/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR. Intersection F li hiand&Knolls Ln
Agency/Co. JEngineen.n , Inc, JUrisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-5
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T/S
EastNVest Street: Knolls Ln North/South Street: Highland Boulevard
Intersection Orientation. North-South IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
'Volume(veh/h) 22 282 25 9 468 18
Peak-Hour Factor,PHF 0.86 0.86 0.86 0.86 0.86 0.86
Hourly Flow Rate,HFR(veh/h) 25 327 29 10 544 20
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
Lanes i 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h) 6 0 16 15 0 6
Peak-Hour Factor.PHF 0.77 0.77 0.77 0.90 0.90 0.90
Hourly Flow Rate,HFR(veh/h) 7 0 20 16 0 6
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
onfiguration LTR LTR
Delay,Queue Length,and Level of Service
Approach Northbound Southbound Westbound Eastbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
(veh/h) 25 10 22 27
C(m)(veh/h) 1018 1214 269 396
v/c 0.02 0.01 0.08 0.07
95%queue length 0.08 0.02 0.26 0.22
Control Delay(s/veh) 8.6 8.0 19.6 14.8
I_OS A A C B
4pproach Delay(s/veh) 19.6 14.8
Approach LOS C B
Copyright©2005 University of Florida,All Rights Reserved HCS+rm Version 5.21 Generated: 2/24/2007 2:19 F
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5EAC.tmp 2/24/200-,
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Hi hland&Kagy
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 211312007 Analysis Year Ex+The Knolls West+Ph 1-5
Analysis Time Period AM Peak Hour
Pro ect Description BOZ-06052.02- The Knolls East&Highland South TIS
astNdest Street: Ka Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
'Major Street Eastbound Westbound
?Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 286 117 0 7 403 74
i'eak-Hour Factor,PHF 0.86 0.86 0.86 0.77 0.77 0.77
Hourly Flow Rate,HFR(veh/h) 332 136 0 9 523 96
Percent Heavy Vehicles 0 -- 0 --
Median Type Undivided
RT Channelized 0 0
[Lanes 1 1 0 0 1 0
:configuration L TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
olume veh/h 7 1 7 49 1 385
Peak-Hour Factor, PHF 0.67 0.67 0.67 0.89 0.89 0.89
dourly Flow Rate,HFR(veh/h) 10 1 10 55 1 432
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
=tared Approach N N
Storage 0 0
IRT Channelized 0 0
..anes 0 1 0 0 1 0
configuration LTR LTR
lima .Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
[Lane Configuration L LTR LTR LTR
J(veh/h) 332 9 21 488
C(m)(veh/h) 969 1461 23 331
dc; 0.34 0.01 0.91 1.47
35%queue length 1.53 0.02 2.68 26.52
Control Delay(s/veh) 10.6 7.5 396.3 259.0
LOS B A F F
,Approach Delay(s/veh) 396.3 259.0
6proach_LOS_ F F
opyrighi 02005 University of Florida,All Rights Reserved HCS+TM Version 5 21 Generated: 2/23/2007 9:15 AM
ile://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5C7D.tmp 2/23/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection Hi hland&Kac
Agency/Co, Engineerin , Inc. Jurisdiction lBozeman
Date Performed 2/22/2007 Analysis Year I Ex+The Knolls West+Ph 1-5
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South T1S
EastNVest Street: Kagy Boulevard North/South Street: Highland Boulevard
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 334 305 1 9 165 83
Peak-Hour Factor, PHF 0.85 0.85 0.85 0.84 0.84 0.84
Hourly Flow Rate,HFR(veh/h) 392 358 1 10 196 98
Percent Heavy Vehicles 0 -- -- 0
Median Type Undivided
IRT Channelized 0 0
(Lanes 1 1 0 0 1 0
Configuration L TR LTR
Upstream Signal 1 0 0
(Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 0 3 11 100 3 407
Peak-Flour Factor, PHF 0.75 0.75 0.75 0.92 0.92 0.92
Hourly Flow Rate, HFR(veh/h) 0 4 14 108 3 442
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
(Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LTR LTR LTR
V(veh/h) 392 10 18 553
(m)(veh/h) 1273 1211 278 290
/lc 0.31 0.01 0.06 1.91
95%queue length 1.32 0.02 0.21 38.29
Control Delay(s/veh) 9.1 8.0 18.8 450.1
LOS A A C F
Approach Delay(s/veh) -- -- 18.8 450.1
Approach LOS -- -- C F
Copyright©2005 University of Florida,All Rights Reserved HCS+TM Version 5.21 Generated: 2/23/2007 9:34
file:HC:\Documents and Settings\DReagor\Local Settings\Temp\u2k5CAl.tmp 2/23/200�
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Main&Haggerty
Agency/Co. En ineennq, Inc. Jurisdiction Bozeman
Date Performed 2/22/2007 Analysis Year Ex+The Knolls West+Ph 1-5
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
castNVest Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStudy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume(veh/h) 296 80 56 576
Peak-Hour Factor,PHF 1.00 0.80 0.80 0.75 0.75 1.00
Hourly Flow Rate, HFR(veh/h) 0 369 99 74 768 0
Percent Heavy Vehicles 0 0
Median Type Undivided
RT Channelized 0 0
I-anes 0 2 0 1 2 0
Configuration T TR L T
lJpstream Signal 0 0
(Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
I—volume(veh/h) 60 31
Peak-Hour Factor, PHF 0.81 1.00 0.81 1.00 1.00 1.00
Hourly Flow Rate, HFR(veh/h) 74 0 38 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Dela ,Queue Len th,and Level of Service
Approach Eastbound Westbound Northbound, Southbound
Movement 1 4 7 8 9 10 11 12
P-ane Configuration L LR
v(veh/h) 74 112
C(m)(veh/h) 1104 318
vlc 0.07 0.35
95%queue length 0.22 1.54
Control Delay(s/veh) 8.5 22.4
LOS A C
approach Delay(s/veh) — 22.4
Npproach_LOS_ — C
;opyright©2005 University of Florida,All Rights Reserved HCS+- Version 5 21 Generated: 212B/2007 8:58 AM
File://C:\Documents and Settings\DReagor\Local Settings\Temp\u2kA4.tmp 2/28/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst JDMR Intersection Main&Ha2aetly
Agency/Co. Engineering, oc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex +The Knolls West+Ph 1-5
Analysis Time Period PM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
EastNVest Street: E Main St North/South Street: Haggerty Ln
Intersection Orientation: East-West IStUdy Period(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
(Movement 1 2 3 4 5 6
L T R L T R t
Volume(veh/h) 607 88 35 411
Peak-Hour Factor,PHF 1.00 0.79 0.79 0.90 0.90 1.00
Hourly Flow Rate,HFR(veh/h) 0 768 111 38 456 0
Percent Heavy Vehicles 0 — 0
Median Type Undivided
RT Channelized 0 0
(Lanes 0 2 0 1 2 0
Configuration T TR L T
Upstream Signal 1 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 76 64
Peak-Hour Factor,PHF 0.69 1.00 0.69 1.00 1.00 1.00
Hourly Flow Rate,HFR(veh/h) 110 0 1 92 0 0 0
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) _ 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
IV(veh/h) 38 202
(m)(veh/h) 777 274
rlc 0.05 0.74
95%queue length 0.15 5.30
Control Delay(s/veh) 9.9 47.6
ILOS A E
Approach Delay(s/veh) — 47.6
Approach LOS E
Copyright©2005 University of Florida,All Rights Reserved HCS+Tm Version 5.21 Generated: 2/282007 8:59/
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2kB0.tmp 2/28/200.
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst DMR Intersection Kagy&Church/Sourdouc h
Agency/Co. Engineering, Inc. Jurisdiction Bozeman
Date Performed 212212007 Analysis Year Ex +The Knolls West+Ph 1-5
Analysis Time Period AM Peak Hour
Project Description BOZ-06052.02-The Knolls East&Highland South TIS
Fast/West Street: Ka Boulevard North/South Street: S Church Ave/Sourdough Rd
Intersection Orientation: East-West IStUdy Period hrs): 0.25
Vehicle Volumes and Adjustments
(Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 21 355 29 28 694 22
Peak-Hour Factor, PHF 0.94 0.94 0.94 0.79 0.79 0.79
Hourly Flow Rate,HFR(veh/h) 22 377 30 35 878 27
Percent Heavy Vehicles 0 -- -- 0 —
6Uledian Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Northbound Southbound
lovement 7 8 9 10 11 12
L T R L T R
W✓olume(veh/h) 101 63 58 12 30 30
Peak-Hour Factor,PHF 0.87 0.87 0.87 0.67 0.67 0.67
Hourly Flow Rate,HFR(veh/h) 116 72 66 17 44 44
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Dela ,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
I-ane Configuration L L LTR LTR
(veh/h) 22 35 254 105
v (m)(veh/h) 758 1163 109 133
lc 0.03 0.03 2.33 0.79
95%queue length 0.09 0.09 22.38 4.76
control Delay(s/veh) 9.9 8.2 669.8 93.6
ILOS A A F F
Approach Delay(s/veh) -- -- 689.8 93.6
Approach_LOS_ F F
,opyright©2005 University of Florida,All Rights Reserved HCS+� Version 521 Generated: 2/2312007 9:16 AM
file://C:\Documents and Settings\DReagor\Local Settings\Temp\u2k5C81.tmp 2/23/2007
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IDMR I Intersection IKac &Church/Sourdough
Agency/Co. lEngineeting, Inc, Jurisdiction ozeman
Date Performed 1212212007 Analysis Year IEx+The Knolls West+Ph 1-5 1
Analysis Time Period IPM Peak Hour
Project Description BOZ-06052.02- The Knolls East&Highland South TIS
East/West Street: Kagy Boulevard North/South Street: S Church Ave/Sourclou h Rd
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Ma or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume(veh/h) 25 590 89 66 460 24
Peak-Hour Factor, PHF 0.81 0.81 0.81 0.94 0.94 0.94
Hourly Flow Rate, HFR(veh/h) 30 728 109 70 489 25
Percent Heavy Vehicles 0 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
IlAinor Street Northbound Southbound
(Movement 7 8 9 10 11 12
L T R L T R
Volume(veh/h) 47 30 31 31 66 68
Peak-Hour Factor, PHF 0.93 0.93 0.93 0.81 0.81 0,81
Hourly Flow Rate, HFR(veh/h) 50 32 33 38 81 83
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
IDelay,Queue Length.and Level of Service
Approach Eastbound Westbound Northbound Southbound
(Movement 1 4 7 8 9 10 11 12
(Lane Configuration L L LTR LTR
v(veh/h) 30 70 115 202
C(m)(veh/h) 1058 803 48 132
ulc 0.03 0.09 2.40 1.53
135%queue length 0.09 0.29 11.98 14.12
Control Delay(s/veh) 8.5 9.9 817.7 333.3
ILOS A A F F
Approach Delay(s/veh) -- 817.7 333.3
Approach LOS F F
Copyright©2005 University of Florida,All Rights Reserved HCS+* Version 5.21 Generated: 2/23/2007 9:351
file://CADocuments and Settings\DReagor\Local Settings\Temp\u2k5CA6.tmp 2/23/200
APPENDIX J
CAPACITY CALCULATIONS -
RECOMMENDED IMPROVEMENTS
HCM Analysis Summary
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Highland Blvd Area Type: Non CBD
DMR 02/24/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: Highland-Kagy-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach lOutbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 2 1 L 12.0 TR 12.0
WB 2 1 L 12.0 TR 12.0
NB 1 1 LTR 12.0
SB 2 1 LT 12.0 R 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 286 117 0 7 403 74 7 1 7 49 1 385
PHF 0.86 0.86 0.86 0.77 0.77 0.77 0.67 0.67 0.67 0.89 0.89 0.89
%Heavy Vehicles 2 0 0 0 0 0 0 0 0 0 0 2
Lane Groups L TR L TR LTR LT R
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h 0 7 1 150
Peds/Hour 0 1 0 1
%Grade 0 0 0 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) - I --- I --- 1 --- --- --- --- I '--
Signal Settings:Actuated Operational Analysis Cycle Length: 70.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 1 2 3 4 5 6 7 8 Ped Only
EB LTP LTP
WB LTP
NB LTP
SB R LTP
Green 1 15.0 1 27.0 15.0 0
Yellow All Red 1 3.0 0.0 1 3.5 1.5 3.5 1.5
Cap ity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
-Ap u
EB L er 115 0.000 0.457 16.2 B
* Lpro 379 0.188 0.214 L 0.674 20.7 C
TR 1221 0.072 0.643 TR 0.111 5.0 A
WB
L 491 0.007 0.386 L 0.018 13.4 B 31.7 C
* TR 715 0.329 0.386 TR 0.853 32.0 C
NB
LTR 339 0.013 0.214 LTR 0.059 21.9 C 21.9 C
SB
* LT 299 0.040 0.214 LT 0.187 22.6 C 13.8 B
R 736 0.169 0.471 R 0.359 11.9 B
Intersection:Delay=22.5 sec/veh Int.LOS=C Xc 0.68 * Critical Lane Group :5:(v/s)Crit=0.56
SIG/Cinema v3.08 Page 1
HCM Summary Results
� Y
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Highland Blvd
DMR 02/24/2007
AM Peak Hour Case: Highland-Kagy-AM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 1 I
App Grp v/s v/c veh) LOS veh) LOS 385 49
EB L er 0.00 16.2 I B
*L ro 0.19 0.674 20.7 C
TR 0.07 0.11 5.0 A
-- 74
�► 403
-- , 7
WB L 0.01 0.02 13.4 B 31.7 C
* TR 0.33 0.85 32.0 C -------� t-
286 —? �j►
117
O —�
NB LTR 0.01 0.06 21.9 C 21.9 C h
- 7 ? 7
1
SB * LT 0.04 0.19 22.6 C 13.8 B 1 j 2 3
R 0.17 0 336 11.9 B
15 3 0 26 4 2 14 IF 4 2
I
Int. 0.56 0.68 1 22.5 C
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
NETSIM Summary Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Highland Blvd
DMR 02/24/2007
AM Peak Hour Case: Highland-Kagy-AM
LAvg/Max
eues Spillback in
Lane Average Worst Lane
Lane Speed (%of Peak 1
App Groupeh) (mph) Period) 385 i 4I9
EB L 4/ 6 8.5 0.0 L'
TR 2/ 2 23.8 0.0 ;
` 74
-4 403
All 14.3 0.0 7
WB L 0/ 2 3.9 0.0
TR 8/ 10 10.9 0.0
286 �j�►
117
O �
All 10.8 0.0
NB LTR 0/ 1 15.7 0.0
7 7
1
All 15.7 0.0
1 2 3 -
SB LT 1 / 4 22.0 0.0 =
15 3 0 26 4 2 14 �1 4 2
R 4/ 6 9.4 0.0
All 15.3 0.0
Intersect. 12.9
SIG/Cinema v3.08 Page 3
HCM Analysis Summary
Y
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Highland Blvd Area Type:Non CBD
DMR 02/24/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: Highland-Kagy-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 2 1 L 12.0 TR 12.0
WB 2 1 L 12.0 TR 12.0
NB 1 1 I LTR 12.0
SB 2 1 LT 12.0 R 12.0
East West North _ South '
Data L T R L T R L T R L T R
Movement Volume v h 334 305 1 9 165 83 0 3 11 100 3 407
PHF 0.85 0.85 0.85 0.84 0.84 0.84 0.75 0.75 0.75 0.92 0.92 0.92
%Heavy Vehicles 2 0 0 0 0 0 0 0 0 0 0 2
Lane Groups L TR L TR LTR LT R
Arrival Type 3 3 3 3 3 3 3
RTOR Vol v h) 0 8 1 150
Peds/Hour 0 1 0 1
%Grade 0 0 0 0 '
Buses/Hour 0 0 0 0
Parkers/Hour LeflRight) --- --- --- --- --- »- _-------
Signal Settings: ctuated Operational Analysis Cycle Length: 70.0 Sec Lost Time Per Cycle:13.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP LTP
WB LTP
NB LTP '
SB R LTP
Green 15.0 27.0 15.0 0
Yellow All Red 3.0 0.0 3.5 1.5 3.5 1.5
Capacity Analysis Results Approach:
Lane Cap v/s g/C Lane v/c Delay Delay '
v -(
EB L er 372 0.017 0.457 7.2 A
* L ro 379 0.214 0.214 L 0.523 8.2 A
TR 1221 0.190 0.643 TR 0.295 6.1 A
WB
L 400 0.011 0.386 L 0.027 13.5 B 17.3 B
* TR 694 0.159 0.386 TR 0.411 17.5 B
NB
LTR 365 0.010 0.214 LTR 0.047 22.1 C 22.1 C
SB
* LT 293 0.082 0.214 LT 0.382 27.3 C 17.4 B 1
R 736 0.179 0.471 R 0.379 13.4 B
Intersection:Delay= 12.2 sec/veh Int.LOS=B Xc 0.56 *Critical Lane Group 2(v/s)Crit=0.45
SIG/Cinema v3.08 Page 1
HCM Summary Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Highland Blvd
DMR 02/24/2007
PM Peak Hour Case: Highland-Kagy-PM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 3
App Grp v/s v/c veh) LOS veh) LOS
407
EB L er 0.02 7.2 A1100
L
*L ro 0.21 0.52 8.2 A
TR 0.19 0.29 6.1 A
L 83
I —165
9
WB L 0.01 0.03 13.5 B 17.3 B - - - - -
* TR 0.16 0.41 17.5 B ---------- _— j
--- 334 � 410 -- -
305
1 �
NB LTR 0.01 0.05 22.1 C 22.1 C
41
o � 11
3
SB * LT 0.08 0.38 27.3 C 17.4 B 1 2 3
R 0.18 0.38 13.4 B --
15 3 0 26 4 2 14 4 2
Int. 0.45 0.56 12.2 B
* Critical Lane Group #Left Movement Total
SIG/Cinema v3.08 Page 2
L
NETSIM Summa
ry Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Highland Blvd
DMR 02/24/2007
PM Peak Hour Case: Highland-Kagy-PM
Queues Spillback in
Per Lane Average Worst Lane
Lane Avg/Max Speed (%of Peak 3
App Group (veh) (mph) Period) 407 100 ,
EB L 4/ 6 12.2 0.0
TER 2/ 4 23.8 0.0
' t — 83
till► --165 I
All 18.4 0.0 �J 1L 9 I
WB L 0/ 1 4.6 0.0
TR 3 / 5 13.9 0.0
334 —� ��►
305
1
All 13.8 0.0
NB LTR 0/ 1 16.5 0.0 0 11
3 I .
All 16.5 0.0 i
1 2 3 1
SB LT 2/ 6 19.3 0.0 = '
15 3 0 26 4 2 14 ��� 4 2 _
R 2/ 4 15.2 0.0
All 17.9 0.0 I
Intersect. 17.1
SIG/Cinema v3.08 Page 3
********************************************************************************
26 :2 : 07 KAGY+HLD - am 145
*
* E (m) 4 .3 4 . 3 4 . 3 4 .3 * TIME PERIOD min 90
L' (m) 25 . 00 25 . 00 25 . 0 25 . 0 * TIME SLICE min 15
V (m) 4 . 00 4 . 0 4 . 0 4 . 0 * RESULTS PERIOD min 15 75
RAD (m) 25 . 00 25 . 0 25 . 0 25 . 0 * TIME COST $/hr 15 . 00
* PHI (d) 20 . 00 20 . 00 20 . 00 20 . 00 * FLOW PERIOD min 15 75
DIA (m) 41 . 00 41 . 00 41 . 00 41 . 00 * FLOW TYPE pcu/veh VEH
GRAD SEP 0 0 0 0 * FLOW PEAK am/op/pm PM
* * *
LEG NAME *PCU *VEH TURNS (1st exit, 2nd. .U) *FLOF*CL* FLOW RATIO *FLOW TIME*
* * * * * * * *
*NORTH *1 . 02* 385 1 49 0 *1 . 00*85*0 . 75 1 . 125 0-:75*15 45 75
WEST *1 . 02* 0 117 286 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
SOUTH *1 . 02* 7 1 7 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* EAST *1 . 02* 74 403 7 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* * * * * * * *
********************************************************************************
FLOW veh �435 403 15 484 * AVEDEL s 14 . 9 *
* CAPACITY veh 884 1094 864 956 * LOS SIG B *
AVE DELAY mins 0 . 27 0 . 22 0 . 20 0 . 26 * LOS UNSIG B *
MAX DELAY mins 0 . 32 0 . 25 0 . 22 0 . 31
* AVE QUEUE veh 1 1 0 1 * VEHIC HRS 5 . 5
MAX QUEUE veh 1 1 0 1 * COST $ 83
* *
********************************************************************************
*
* 26 : 2 : 07 KAGY+HLD - PM 144
* *
* *
* E (m) 4 . 3 4 . 3 4 . 3 4 .3 * TIME PERIOD min 90
* L' (m) 25 . 00 25 . 00 25 . 0 25 . 0 * TIME SLICE min 15
* V (m) 4 . 00 4 . 0 4 . 0 4 . 0 * RESULTS PERIOD min 15 75
* RAD (m) 25 . 00 25 . 0 25 . 0 25 . 0 * TIME COST $/hr 15 . 00
* PHI (d) 20 . 00 20 . 00 20 . 00 20 . 00 * FLOW PERIOD min 15 75
* DIA (m) 41 . 00 41 . 00 41 . 00 41 . 00 * FLOW TYPE pcu/veh VEH
* GRAD SEP 0 0 0 0 * FLOW PEAK am/op/pm PM
********************************************************************************
* LEG NAME *PCU *VEH TURNS (1st exit, 2nd. .U) *FLOF*CL* FLOW RATIO *FLOW TIME
*NORTH *1 . 02* 407 3 100 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* WEST *1 . 02* 1 305 334 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
*SOUTH *1 . 02* 11 3 0 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* EAST *1 . 02* 83 165 83 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* * * * * * *
********************************************************************************
*
* FLOW veh 510 640 14 331 * AVEDEL s 16 . 0
* CAPACITY veh 983 1019 696 931 * LOS SIG B *
* AVE DELAY mins 0 . 26 0 . 29 0 . 22 0 . 23 * LOS UNSIG C
* MAX DELAY mins 0 . 31 0 . 37 0 . 25 0 . 27
* AVE QUEUE veh 1 2 0 1 * VEHIC HRS 6 . 7 *
* MAX QUEUE veh 1 2 0 1 * COST $ 100
Not
*
HCM Analysis Summary
Y
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Sourdough Rd Area Type:Non CBD
y�
DMR 02/24/2007 Analysis Duration: 15 mins.
AM Peak Hour Case: Kagy-Church-AM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 2 1 L 12.0 TR 12.0
WB 2 1 L 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 2 1 L 12.0 TR 12.0
East West North South
Data L T R L T R L T R L T R
Movement Volume v h 21 355 29 28 694 22 101 63 58 12 30 30
PHF 0.94 0.94 0.94 0.79 0.79 0.79 0.87 0.87 0.87 0.67 0.67 0.67
%Heavy Vehicles 0 2 0 0 0 0 0 0 0 0 2 0
Lane Groups L TR L TR L TR L TR
Arrival ape 3 3 3 3 3 3 3 3
RTOR Vol v h 3 2 6 3
Peds/Hour 1 1 0 1
%Grade 0 0 0 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRi ht) I --- I --- --- --- -- --- --- ---
Signal Settings:Actuated Operational Analysis Cycle Length: 62.0 Sec Lost Time Per Cycle:10.0 Sec
Phase: 1 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTP
NB LTP
SB LTP
Green 42.0 10.0 0
Yellow All Red 3.5 1.5 3.5 1.5
Ca a ity Analysis Results Approach:
B Lane Cap v/s g/C Lane v/c Delay Delay O�
R uP
EB
L 272 0.055 0.677 L 0.081 4.0 A 4.8 A
TR 1247 0.221 0.677 TR 0.326 4.8 A
WB
L 660 0.036 0.677 L 0.053 3.5 A 9.2 A
* TR 1281 0.478 0.677 TR 0.705 9.5 A
NB
* L 215 0.087 0.161 L 0.540 33.3 C 30.9 C
TR 285 0.075 0.161 TR 0.463 28.9 C
SB
L 206 0.014 0.161 L 0.087 23.0 C 25.2 C
TR 279 0.049 0.161 TR 0.305 25.7 C
Intersection:Delay= 12.2 sec/veh Int.LOS=B X�0.67 * Critical Lane Group :5:(v/s)Crit=0.56
SIG/Cinema v3.08 Page I
HCM. Summary Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Sourdough Rd
DMR 02/24/2007
AM Peak Hour Case: Kagy-Church-AM
Lane Group Approach
Delay Delay I
Lane X (sec/ (sec/ 30
App Grp v/s v/c veh) LOS veh) LOS
EB
30 12
L 0.05 0.08 4.0 A 4.8 A '
TR 0.22 0.33 4.8 A
-- 22 I
-694
4 28
WB L 0.04 0.05 3.5 A 9.2 A
* TR 0.48 0.70 9.5 A - -- -- --- --
21 l � �
355 I 29
NB * L 0.09 0.54 33.3 C 30.9 C
TR 0.07 0.46 28.9 C r� I
101 58
63 I
SB L 0.01 0.09 23.0 C 25.2 C 1 2
TR 0.05 0.30 25.7 C
41 4 2 9 4 2
Int. LO.56 0.67 12.2 B
* Critical Lane Group
SIG/Cinema v3.08 Page 2
NETSIM Summary Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Sourdough Rd
DMR 02/24/2007
AM Peak Hour Case: KAGY-CHURCH-AM
Queues Spillback in
Per Lane Average Worst Lane
Lane Avg/Max Speed (%of Peak
App Group (veh) (mph) Period) 30
30 112
EB L 0/ 1 16.8 0.0
TR 2/ 4 22.1 0.0
22
694
All 21.9 0.0 41 ; _ 28
WB L 0/ 1 11.6 0.0 ____
TR 6 / 9 18.3 0.0 -------"""
—z'
21 �►
355
All 18.2 0.0 29 ,
NB L 1 / 4 3.2 0.0
TR 2/ 3 15.6 0.0 f
101 58
63
All 11.7 0.0
SB L 0/ 1 4.3 0.0 1 2
TR 1 / 2 14.3 0.0
41 4 2 9 ' 4 2
All 13.2 0.0
Intersect. 17.1
1
J
J
J
SIG/Cinema v3.08 Page 1
HCM Analysis Summary
�.
y y
Ex+The Knolls West+Ph 1 5 Kagy Blvd/Sourdough Rd Area Type:Non CBD
DMR 02/24/2007 Analysis Duration: 15 mins.
PM Peak Hour Case: Kagy-Church-PM
Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet)
ApproachlOutbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6
EB 2 1 L 12.0 TR 12.0
WB 2 1 L 12.0 TR 12.0
NB 2 1 L 12.0 TR 12.0
SB 2 1 L _L_IZ.O_j TR 12.0
East West North South
Data I L T R L T R L T R L T R
Movement Volume v h 25 590 89 I 66 460 24 47 30 31 31 66 68
PHF 0.81 0.81 0.81 0.94 0.94 0.94 0.93 0.93 0.93 0.81 `0.81 0.81
%Heavy Vehicles 0 2 0 0 0 0 0 0 0 0 2 0
Lane Groups L TR I L TR L TR L TR
Arrival Type 3 3 3 3 3 3 3 3
RTOR Vol v h _ 9 2 3 7
Peds/Hour 1 1 0 1
%Grade 0 0 0 0
Buses/Hour 0 0 0 0
Parkers/Hour(LeftIRight) --- --- -- ___ __ --_ --
Signal Settings:Actuated Operational Analysis Cycle Length: 62.0 Sec Lost Time Per Cycle: 10.0 Sec
Phase: 1 _ 2 3 4 5 6 7 8 Ped Only
EB LTP
WB LTP
NB LTP
SB I LTP
Green 1 42.0 10.0 0
Yellow All Red 1 3.5 1.5 3.5 1.5
Ca a ity Analysis Results _ _ Approach:
Lane Cap v/s g/C Lane v/c Delay Delay
-Ap v�
EB
L 568 0.037 0.677 L 0.055 3.5 A 8.6 A
* TR 1236 0.453 0.677 TR 0.669 8.8 A
WB
L 326 0.146 0.677 L 0.215 5.3 A 5.4 A
TR 1277 0.272 0.677 TR 0.401 5.4 A
NB
L 201 0.041 0.161 L 0.254 25.8 C 25.0 C
TR 284 0.035 0.161 TR 0.218 24.4 C
SB
L 220 0.028 0.161 L 0.173 24.1 C 30.4 C
* TR 278 0.090 0.161 TR 0.561 31.9 C
Intersection:Delay= 11.0 sec/veh Int.LOS=B Xc 0.65 * Critical Lane Group :5:(v/s)Crit=0.54
SIG/Cinema v3.08 Page 1
HCM Summary Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Sourdough Rd
DMR 02/24/2007
PM Peak Hour Case: Kagy-Church-PM
Lane Group Approach
Delay Delay
Lane X (sec/ (sec/ 66
App Grp v/s v/c veh) LOS veh) LOS
68 31
EB j
L 0.04 0.05 3.5 A 8.6 A
* TR 0.45 0.67 8.8 A
L 24
l .4-460
66
WB L 0.15 0.21 5.3 A 5.4 A
1
TR 0.27 0.40 5.4 A ----------
2 5
590
89
NB L 0.04 0.25 25.8 C 25.0 C
TR 0.04 0.22 24.4 C . r'
47 31
30
SB L 0.03 0.17 24.1 C 30.4 C 1 2
* TR 0.09 0.56 31.9 C -'
41 4 2 9 � 4 2
Int. 0.54 0.65 11.0 B
* Critical Lane Group
SIG/Cinema v3.08 Page 2
NETSIM Summary Results
Ex+The Knolls West+Ph 1-5 Kagy Blvd/Sourdough Rd A
DMR 02/24/2007
PM Peak Hour Case: KAGY-CHURCH-PM
Queues Spillback in
Per Lane Average Worst Lane
Lane Avg/Max Speed (% of Peak 66 I
App Group (veh) (mph) Period) 68 131
EB L 0/ 1 14.2 0.0
TR 51 8 18.4 0.0 I
L
� 24
All 18.3 0.0 —460 I
66
WB L 1 / 3 4.0 0.0
----- - I
TR 3 / 6 21.1 0.0 � r
25 �.
All 19.5 0.0 89 590 I
N13 L 1 / 2 3.4 0.0
TR 1 / 2 14.1 0.0 I I
47 31
30 I
All 11.4 0.0
SB L 0/ 2 4.0 0.0 1 2 -
I
TR 2/ 3 15.7 0.0 _'
41 4 2 9 �� 4 2
All 14.1 0.0
Intersect. 17.4
SIG/Cinema v3.08 Page 1
********************************************************************************
*
26 : 2 : 07 KAGY+srd - am 149
* *
* E (m) 4 . 3 4 . 3 4 . 3 4 . 3 * TIME PERIOD min 90
* L' (m) 25 . 00 25 . 00 25 . 0 25 . 0 * TIME SLICE min 15
E V (m) 4 . 00 4 . 0 4 . 0 4 . 0 * RESULTS PERIOD min 15 75
RAD (m) 25 . 00 25 . 0 25 . 0 25 . 0 * TIME COST $/hr 15 . 00
* PHI (d) 20 . 00 20 . 00 20 . 00 20 . 00 * FLOW PERIOD min 15 75
DIA (m) 41 . 00 41 . 00 41 . 00 41 . 00 * FLOW TYPE pcu/veh VEH
GRAD SEP 0 0 0 0 * FLOW PEAK am/op/pm PM
* * *
LEG NAME *PCU *VEH TURNS (1st exit, 2nd. .U) *FLOF*CL* FLOW RATIO *FLOW TIME*
* * * * * * *
*NORTH *1 . 02* 30 30 12 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75 *
WEST *1 . 02* 29 355 21 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75 *
SOUTH *1 . 02* 58 63 101 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75 *
* EAST *1 . 02* 22 694 28 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75 *
* * * * * * *
* * * * * * *
* * * * * * * *
FLOW veh 72 405 222 744 * AVEDEL s 17 . 6 *
* CAPACITY veh 647 1087 901 1020 * LOS SIG B *
AVE DELAY mins 0 . 24 0 . 22 0 . 22 0 . 36 * LOS UNSIG C *
MAX DELAY mins 0 . 27 0 . 25 0 . 25 0 . 50
* AVE QUEUE veh 0 1 0 3 * VEHIC HRS 7 . 1 *
MAX QUEUE veh 0 1 0 4 * COST $ 106 *
* *
********************************************************************************
*
* 26 : 2 : 07 KAGY+srd - PM 146
* *
********************************************************************************
* *
* E (m) 4 . 3 4 . 3 4 . 3 4 . 3 * TIME PERIOD min 90
* L' (m) 25 . 00 25 . 00 25 . 0 25 . 0 * TIME SLICE min 15
* V (m) 4 . 00 4 . 0 4 . 0 4 . 0 * RESULTS PERIOD min 15 75
* RAD (m) 25 . 00 25 . 0 25 . 0 25 . 0 * TIME COST $/hr 15 . 00
* PHI (d) 20 . 00 20 . 00 20 . 00 20 . 00 * FLOW PERIOD min 15 75
* DIA (m) 41 . 00 41 . 00 41 . 00 41 . 00 * FLOW TYPE pcu/veh VEH
* GRAD SEP 0 0 0 0 * FLOW PEAK am/op/pm PM
********************************************************************************
* LEG NAME *PCU *VEH TURNS (1st exit, 2nd. .U) *FLOF*CL* FLOW RATIO *FLOW TIME
* * * * * * *
*NORTH *1 . 02* 68 66 31 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* WEST *1 . 02* 89 590 25 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
*SOUTH *1 . 02* 31 30 47 0 *1. 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* EAST *1 . 02* 24 460 66 0 *1 . 00*85*0 . 75 1 . 125 0 . 75*15 45 75
* * * * * * *
* * * * * * *
********************************************************************************
* 3
* FLOW veh 165 704 8 5 * AVEDEL s 16 . 6
* CAPACITY veh 793 1033 750 1068 * LOS SIG B
* AVE DELAY mins 0 . 23 0 . 32 0 . 22 0 . 25 * LOS UNSIG C
* MAX DELAY mins 0 . 26 0 .42 0 . 26 0 . 29
* AVE QUEUE veh 0 2 0 1 * VEHIC HRS 7 . 1
* MAX QUEUE veh 0 3 0 1
* COST $ 106
*
*******************************************************************************
Vic -