Loading...
HomeMy WebLinkAbout01-29-18 City Commission Packet Materials - C5. Resolution 4856, GMPA with Dick Anderson for Sports Park ParkingCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Carolyn Poissant – Manager of Trails, Open Space, and Parks Design and Development Mitch Overton – Director of Parks and Recreation SUBJECT: Resolution No. 4856 - Guaranteed Maximum Price Amendment No. 5 - Bozeman Sports Park Phase I Field and Parking Lot Construction MEETING DATE: January 29, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution No. 4856 for Guaranteed Maximum Price Amendment No. 5 with Dick Anderson Construction, Inc. for Phase I field and parking lot construction at the Bozeman Sports Park for an amount not to exceed $3,199,503.27, for a total contract amount $4,436,052.05 for Amendments 1, 2, 3, 4, and 5 (Attachment A). BACKGROUND: Resolution No. 4521 was unanimously approved by the Commission April 14, 2014 for the allocation of Trails, Open Space and Parks (TOP) bond funding in an amount not to exceed $7,500,000 for the acquisition of park land and development of the Bozeman Sports Park Project (“Park Project”), which requires the assistance of a professional design and engineering team. The resolution allocated up to (i) $2,100,000 for the acquisition of approximately 80 acres of park land; (ii) up to $1,788,000 for infrastructure improvements as stated in the Commission motion adopted April 7, 2014; and (iii) the remainder for park design and development. The land purchase was completed in 2014 for $2,022,413 leaving $3,689,587 for design and construction of park improvements, reserving the $1,788,000 for infrastructure. The Commission approved Resolution 4680 authorizing the use of an alternate delivery contract for the hiring a General Contractor/Construction Manager (“GCCM”). The Bozeman Sports Park Master Plan has was approved by Commission July 11, 2016. Dick Anderson Construction, Inc. was approved by Commission as the GCCM for the project May 23, 2016. Guaranteed Maximum Price Amendment Nos. 1 - 4 were previously approved by Commission for a total contact amount of $1,236,548.78. Bids were received on December 12, 2017 for Phase I field and parking lot construction of the Sports Park (Attachment B – Bid Tab). The contract includes soil amendments and sodding of four sodded athletic fields, a restroom / vending / entry pavilion facility, sidewalks, parking, landscaping and irrigation, stormwater control, and park signage for a total cost of $3,199,503.27 (Attachment C – GCCM Proposal). 48 UNRESOLVED ISSUES: The City is in the process of finalizing the easement for the relocated Maynard pipeline on the Sports Park property. ALTERNATIVES: Per Commission. FISCAL EFFECTS: The Agreement will allow the project to proceed as previously approved. ATTACHMENTS: Resolution 4856 Attachment A – AIA A133 – “Exhibit A - Guaranteed Maximum Price Amendment No. 5” Attachment B – Sports Park Bid Tab 12_12_17 Attachment C – GCCM Proposal Report compiled on: January 12, 2018 49 COMMISSION RESOLUTION NO. 4856 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, AND APPROVING GUARANTEED MAXIMUM PRICE AMENDMENT NO. 5 TO THE CONTRACT WITH DICK ANDERSON CONSTRUCTION, INC. FOR THE BOZEMAN SPORTS PARK WHEREAS, on May 23, 2016, the City Commission approved the “Agreement for General Contractor / Construction Manager (“GCCM”) Services with Dick Anderson Construction, Inc. for the Bozeman Sports Park” ("contract"); and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any alterations or modifications of the specifications and/or plans of a contract be made by resolution; and WHEREAS, portions of the work were previously approved under Commission Resolution Nos. 4754, 4793, 4805 and 4836 (GMP Amendment Nos. 1, 2, 3, and 4 respectively, to the GCCM contract); and WHEREAS, bids were received on December 12, 2017 for the remaining portions of the work to complete Phase I of the Sports Park site improvements; and WHEREAS, the work to be performed is to be awarded to the lowest responsible bidders in compliance with City of Bozeman Purchasing Policy and the executed GCCM contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modification to the contract between the City of Bozeman, a municipal corporation, and Dick Anderson Construction, Inc. as indicated on Attachment A (“Exhibit A: Guaranteed Maximum Price Amendment No. 5”), attached hereto, is hereby approved; and the City Manager is hereby authorized and directed to execute the contract 50 amendment for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 29th day of January, 2018. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 51 It AIA Document A133™ 2009 Exhibit A Guaranteed Maximum Price Amendment for the following PROJECT: (Name and address or location) Bozeman Sports Park 4600 Baxter Lane Bozeman, MT 59718 THE OWNER: (Name, legal status and address) The City of Bozeman Montana 121 N. Rouse Ave. PO Box 1230 Bozeman, MT 59771-1230 ("Owner") and the Construction Manager: (Name, legal status and address) Dick Anderson Construction, Inc. 4498 Jackrabbit Lane Bozeman, MT 59718 ("Construction Manager") ARTICLE A.1 § A.1.1 Guaranteed Maximum Price Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work, as that tenn is defined in Article 6 of this Agreement. § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed three million one hundred ninety-nine thousand five hundred-three dollars and 27 cents ($3,199,503.27) for Phase One site improvements (fields, parking, structures, landscaping and irrigation and signage) for a total contract of $4,436,052.05 subject to additions and deductions by Change Order as provided in the Contract . § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, allowances, contingencies, alternates, the Construction Manager's Fee, and other items that comprise the Guaranteed Maximum Price. (Attachment C - Proposal Letter from Construction Manager dated January 12, 2018.) ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A20l--2007, § A.1.1.3 The Guaranteed Maximum Price is based on the following base bid and alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.) 1.3 Site Hardscapes; 1.4 Irrigation / Landscape / Amendments; Alternate Buildout - Fields 3 and 4; Sod - all 4 Fields as per Attachment B dated January 12, 2018. § A.1.1.4 Allowances included in the Guaranteed Maximum Price, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item «NIA» Price ($0.00) § A.1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price is based: The work is a portion of Phase I site improvements, as per the approved Sports Park Master Plan. § A.1.1.6 The Guaranteed Maximum Price is based upon the Supplementary and other Conditions of the Contract included in the project specifications. § A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications: "Bozeman Sports Park Phase 1 Improvements Project Manual," dated May 12, 2017 as amended per Attachment C dated January 12, 2018. § A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings: "Bozeman Sports Park: Phase 1 Improvements," dated April 25, 2017, as amended per Attachment C dated January 12. 2018. § A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information: Attachment C -Proposal letter from Dick Anderson Construction re: Site Hardscapes; Irrigation /Landscape / Amendments plus alternates - GMP No. 5 Request for the Bozeman Sports Park, dated January 12, 2018. ARTICLE A.2 § A.2.1 The anticipated date of Substantial Completion established by this Amendment: November 1, 2018. OWNER City of Bozeman ____________________________________________________________ Andrea Surratt City Manager CONSTRUCTION MANAGER Dick Anderson Construction, Inc. ______________________________________________________ (By: Signature) ______________________________________________________ (Printed Name ) ______________________________________________________ (Title) AIA Document A133"' - 2009 Exhibit A. Copyright , 1991, 2003 and 2009 by The American Institute of Architects. Al.l rights reserved. WARNDiG: This AL:...- Dvcu..,r,ent is protected by U S Copyright La·n and Ir,ternational Treaties llnauthor.1.zed reprcduction or d1str1.but1-on of this AIA.i.. Document or any portion of it, may �esult 1.n sever,e civil and crimirial penalt.1.es, and will be prosecuted to the maximum extent possible under the la;.; This draft was produced by AIA software at 14: 45: 40 on 12/02/2015 under Order No. 7109973622 which expires on 12/01/2016, and is not for resale. User Notes: (3B9ADA1F) 2 53 ATTACHMENT A - SPORTS PARK BID TAB Bozeman Sports Park Phase 1A Improvements 2018 Contractor Bid Security Addenda 1&2 Non- discrimination Non- Collusion Base Bid Total Alternate gavel/paving Alternate Security Alternate Jack Leg Fence 1.3 Site Hardscapes CMG X X X X $ 621,880.00 $ 59,912.00 $ 11,500.00 $ 3,705.00 ASKIN X X X $ 824,029.00 $ 73,920.00 $ 5,930.00 $ 7,856.00 WILLIAMS CIVIL X X X X $ 905,813.00 $ 87,900.00 $ 6,100.00 $ 6,000.00 SIME CONSTRUCTION X X X X $ 776,400.00 $ 67,621.00 $ 15,000.00 $ 5,460.00 1.4 Irrigation/Landscape/Amendments Bid Security Addenda 1&2 Non- discrimination Non- Collusion Base Bid Total Shrubs & Perennials Alternate Sod 1 field Alternate Buildout 3rd Field RAINMAKER X X X X $ 1,252,460.00 $ 16,660.00 $ 44,000.00 $ 268,480.00 GOODEARTHWORKS X X X X $ 1,369,500.00 $ 9,815.00 $ 86,875.00 $ 253,025.00 RECOMMENDED AWARD As Read 12-14-2017 56 ATTACHMENT C 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. ELECTRONIC COPYING of any portion of this AIA' Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document. AIA Document A133'8' - 2009 E.z:hibit A. Copyright ,-. 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Dcci..LT,ent is protected by U S Copyright La· .. · c1nd International Treaties Unauthorized reprod,-1ction or d1stributicn of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the la\,{ This draft was produced by AIA software at 14: 45: 40 on 12/02/2015 under Order No. 7109973622 which expires on 12/01/2016, and is not for resale. User Notes: (389/\DAlF) 1 ATTACHMENT A 52