HomeMy WebLinkAboutC & I PUD Concept plan Section 6 11-20-17COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 19 SECTION 6 - PHASING OFFICE BUILDING APARTMENT BUILDING 16 2 345APARTMENT BUILDINGAPARTMENT BUILDING EAST COTTONWOOD STREET BUILDINGS 3 AND 4 POTENTIALLY PHASED FOR EARLY COMPLETION NORTH EAST ASPEN STREET NORTH IDA AVENUENORTH WALLACE AVENUEEXISTING BUILDING TOWNHOUSESCONSTRUCTION WILL BEGIN ON THE ENTIRE PROJECT ONCE PERMITTING HAS BEEN COMPLETED. SINCE ALL OF THE NEW BUILDINGS SIT ON TOP OF THE PARKING GARAGE, WITH THEIR FOUNDATIONS AND MANY OF THEIR UTILITY CONNECTIONS INTEGRATED INTO THAT BELOW-GRADE STRUCTURE, THERE IS LITTLE TO BE GAINED BY PHASING PERMITTING OR CONSTRUCTION START DATES. WE DO, HOWEVER, ANTICIPATE COMPLETING THE SMALLER BUILDINGS AHEAD OF THE LARGER ONES, AND WOULD LIKE TO CONFIGURE PERMITTING AND INSPECTIONS TO ALLOW FOR PHASED LEASING AND OCCUPANCY. BUILDINGS 3 AND 4 THESE TWO STRUCTURES HAVE SIGNIFICANTLY SMALLER FLOOR AREAS, SIMPLIFIED STRUCTURAL AND MECHANICAL SYSTEMS, AND MORE INDEPENDENT ACCESS. ONCE THE PARKING GARAGE IS COMPLETE, THE CONSTRUCTION OF THESE BUILDINGS MAY BE PRIORITIZED, WITH THE GOAL OF COMPLETING CONSTRUCTION, FINALIZING PERMITS, AND GETTING THEM LEASED AND OCCUPIED BEFORE BUILDINGS 1, 2, AND 6 HAVE FINISHED CONSTRUCTION. BUILDING 5 THE OVERALL SCHEDULE OF RENOVATING THE EXISTING STRUCTURE MAY BE CONTINGENT ON CONSTRUCTION LOGISTICS FOR THE PARKING GARAGE AND SITE WORK. IT IS LIKELY THAT THE EXISTING BUILDING WILL BE USED FOR ON- SITE CONSTRUCTION OFFICES UNTIL THE GARAGE IS COMPLETE, AND ABLE TO ACCOMMODATE SECURE CONSTRUCTION OFFICES.