HomeMy WebLinkAboutC & I PUD Concept plan Section 5 11-20-17COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 16 FOOTPRINT SITE AREA %FLOOR AREA PROJECT AREA %F.A.R. OVERALL SITE 90,000 SF ---- OVERALL BLDG AREA 43,600 SF 48.4%123,300 GSF 100%1.37 RESIDENTIAL UNITS 27,100 GSF 30.1%88,800 GSF 72% COMMERCIAL OFFICE 9,000 GSF 10%27,000 GSF 22% ARTISAN MANUFACTURING 5,000 SF 5.5%5,000 GSF 4% COMMUNITY BLDG.2,500 SF 2.8%2,500 GSF 2% OPEN SPACE 46,400 SF 51.6% COMMON PLAZA 10,000 SF 11.1% COMMON ROOF DECK 1,500 SF 1.7% COMMON LANDSCAPED AREA 7,500 SF 8.3% PRIVATE PATIO 1,920 SF 2.1% PRIVATE BALCONY 360 SF 0.4% RESIDUAL OPEN SPACE 25,120 SF 28% SECTION 5 - LAND USE ALLOCATION LAND USE DIAGRAM PARK AREA AND OPEN SPACE REQUIREMENTS OPEN SPACE 2-BDRM UNITS 18 X 150 SF = 2,700 SF STUDIO & 1-BDRM UNITS 75 X 100 SF = 7,500 SF TOTAL RESIDENTIAL OPEN SPACE REQUIRED 10,200 SF COMMON PLAZA 10,000 SF COMMON ROOF DECK 1,500 SF COMMON LANDSCAPED AREA 7,500 SF PRIVATE PATIOS 12 X 160 SF = 1,920 SF PRIVATE BALCONIES 6 X 60 SF = 360 SF TOTAL RESIDENTIAL OPEN SPACE PROVIDED 21,280 SF COMMON PLAZA LANDSCAPED PUBLIC RIGHT OF WAY ROOF DECK OFFICE BUILDING APARTMENT BUILDING APARTMENT BUILDINGAPARTMENT BUILDING EAST COTTONWOOD STREET NORTH EAST ASPEN STREET NORTH IDA AVENUENORTH WALLACE AVENUEEXISTING BUILDINGTOWNHOUSESPUBLIC PARK LAND DEDICATION TRACKING TABLE SUBDIVISION NAME NORTHERN PACIFIC ADDITION PROJECT NAME COTTONWOOD + IDA P.U.D. NUMBER OF RESIDENTIAL UNITS 93 UNITS NET LOT AREA 2.04 ACRES MAXIMUM DEDICATION REQUIREMENT 12 UNITS PER ACRE CALCULATED UNITS FOR DEDICATION 24.48 UNITS REQUIRED PARK LAND DEDICATION 0.73 ACRES REQUESTED METHOD TO MEET DEDICATION IN-LIEU FEE PLAN APPROVAL DATE COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 17 UTILITY STRATEGIES DOMESTIC WATER THE ONLY DOMESTIC WATER LINE CURRENTLY ADJACENT TO THE SITE IS ALONG COTTONWOOD STREET. IN ORDER TO ADEQUATELY SERVE THE NEW RESIDENTIAL AND COMMERCIAL USES, WE ANTICIPATE NEEDING TO COMPLETE THE BLOCK’S WATER LINE - EXTENDING THE SERVICE UP IDA STREET ON THE EAST, AND ACROSS ASPEN STREET TO THE NORTH, CONNECTING BACK UP WITH THE EXISITNG MAIN ON WALLACE AVENUE. IN ADDITION TO THE INDIVIDUAL BUILDING SERVICE CONNECTIONS, WE EXPECT SEVERAL SITE SERVICE CONNECTIONS FOR INCIDENTAL USES IN THE PLAZA, AS WELL AS IRRIGATION. WASTEWATER THERE ARE SANITARY SEWER LINES TO THE NORTH AND SOUTH OF THE SITE - IN ASPEN AND COTTONWOOD STREETS - AND WE DO NOT ANTICIPATE NEEDING TO CONNECT THOSE MAINS THROUGH IDA STREET. EACH PROPOSED BUILDING HAS DIRECT ACCESS TO A NEARBY WASTEWATER LINE. STORMWATER A STORMWATER LINE CURRENTLY COMES DOWN COTTONWOOD STREET TO THE MID-POINT OF THE BLOCK. WE HOPE TO DIRECT MUCH OF THE RAINWATER FROM CATCHBASINS AND ROOF DRAINS INTO INFILTRATION AREAS TO REDUCE RUN-OFF. SURFACE WATER AND OVERFLOW WILL BE SENT TO THE STORMWATER SYSTEM VIA A NEW CONNECTION IN THE COTTONWOOD STREET DRAIN. OFFICE BUILDING APARTMENT BUILDING APARTMENT BUILDINGAPARTMENT BUILDING EAST COTTONWOOD STREET NORTH EAST ASPEN STREET NORTH IDA AVENUENORTH WALLACE AVENUEEXISTING BUILDINGTOWNHOUSESEXISTING WASTEWATER EXISTING STORMWATER PROPOSED WASTEWATER PROPOSED STORMWATER EXISTING DOMESTIC WATER PROPOSED DOMESTIC WATER UTILITY DIAGRAM COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 18 STREET EDGE THE SIDEWALKS AROUND THE PROJECT WILL PROVIDE PEDESTRIAN-ORIENTED, SAFE AND ACTIVE STREET EDGES, FRONTED WITH RESIDENTIAL STOOPS AND SMALL-SCALE ARTISAN MANUFACTURING SPACES. STREET TREES AND SIDEWALK PLANTING AREAS WILL BE PROVIDED WHERE FEASIBLE. COTTONWOOD AVENUE WILL BE DESIGNED TO RESEMBLE THE RECENT STREET IMPROVEMENTS ALONG THE SOUTH SIDE OF THE STREET, WITH DIAGONAL PARKING AND A WIDER SIDEWALK TO ENCOURAGE ACTIVE USES AT THE WORKSHOP SPACES. IDA STREET WILL BE BUILT OUT AS A TRADITIONAL RESIDENTIAL STREET, WITH INDIVIDUAL STOOPS CONNECTING THE UNITS WITH THE SIDEWALK. ASPEN AVENUE IS CURRENTLY UNIMPROVED, AND CLOSED TO TRAFFIC. THE PROPOSAL IS TO CONSTRUCT A STREET ALONG THE SOUTHERN HALF OF THE RIGHT-OF-WAY, WITH SIDEWALK, STREET TREES, THE GARAGE ENTRY, PARALLEL PARKING, AND A LOADING ZONE. THE NORTHERN HALF OF ASPEN WILL BE LANDSCAPED CONSISTENT WITH THE EXISTING CONDITIONS, AND PRESERVED AS PASSIVE OUTER DOOR SPACE FOR DOG WALKING, ETC. A - COTTONWOOD AVENUE SECTION B - IDA STREET SECTION C - ASPEN AVENUE SECTION AT APARTMENT BUILDING D - ASPEN AVENUE SECTION AT OFFICE BUILDING COTTONWOOD AVE.A CD B ASPEN AVE. ASPEN AVE. LANDSCAPED RIGHT OF WAY WALLACE ST.IDA ST.STREET SECTION KEYPLAN OFFICE BLDG.APT. BLDG.APT. BLDG.SET BACK THE TOP OF THE BUILDING ABOVE 37’ APT. BLDG.EXIST’G. BLDG.TOWNHOUSES