Loading...
HomeMy WebLinkAboutC & I PUD Concept plan Section 1 11-20-17COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 3 SECTION 1 - PROJECT INFORMATION PROJECT VISION COTTONWOOD + IDA WILL CREATE A VIBRANT AND DIVERSE COMMUNITY ON A 2-ACRE UNDERUTILIZED INDUSTRIAL SITE, PROVIDING THE MOST DIVERSE RANGE OF HOUSING TYPES AVAILABLE IN BOZEMAN. THE 93 DWELLING UNITS ARE DESIGNED TO BE ATTAINABLE BY MIDDLE-INCOME RESIDENTS. IN ORDER TO RESPOND TO THE VARIETY OF BUILDING USES AND SIZES IN THE SURROUNDING NEIGHBORHOOD THE DEVELOPMENT IS ORGANIZED INTO A FOUR RESIDENTIAL BUILDINGS; PROVIDING A BROAD SET OF HOUSING TYPES: AFFORDABLE AND MARKET-RATE APARTMENTS, CO-LIVING UNITS, TOWNHOUSES, LIVE-WORK UNITS, AND URBAN LOFTS. WHILE 20% OF THE UNITS (19 OF THE 93 UNITS) WILL BE SET ASIDE FOR THOSE EARNING 30% LESS THAN THE MEDIAN INCOME TO HELP ACHIEVE THE GOALS ESTABLISHED IN THE CITY’S AFFORDABLE HOUSING ORDINANCE, ONE OF THE GUIDING PRINCIPALS OF THE DEVELOPMENT IS A FOCUS ON CREATING UNITS THAT ARE AFFORDABLE-BY-DESIGN; WITH MODEST UNIT SIZES, REDUCED PARKING DEMAND, CO-LIVING OPPORTUNITIES, SHARED OPEN SPACE, AND ATTRACTIVE COMMON AMENITIES; ALL IN A WALKABLE AND BIKE-FRIENDLY NEIGHBORHOOD. THE 27,000 SF OFFICE BUILDING WILL ATTRACT MID-SIZE COMMERCIAL TENANTS LOOKING FOR NEW OR EXPANDED SPACE NEAR THE DOWNTOWN DISTRICT. THE PROJECT SUPPORTS THE COMMUNITY’S DESIRE FOR A LOCAL ARTS CULTURE, AND ACKNOWLEDGES THE NEIGHBORHOOD’S INDUSTRIAL PAST BY INCLUDING 5,000 SF OF ARTISAN MANUFACTURING WORKSHOPS. LOCATED PRIMARILY ALONG THE GROUND FLOOR ON COTTONWOOD STREET, THE WORKSHOPS WILL ACTIVATE THE PROJECT’S OPEN SPACES, AND ENCOURAGE PEDESTRIAN ACTIVITY ALONG THE STREET EDGE. A PUBLIC PLAZA WILL OCCUPY THE CENTER OF THE SITE, FRAMED BY THE DISTINCTIVE FACADE OF THE ADJACENT MISCO MILL, AND LINED WITH COMMERCIAL AND RESIDENTIAL USES TO PROVIDE DAY AND EVENING, WEEKDAY AND WEEKEND ACTIVATION. WE WILL BE RENOVATING AN EXISTING BUILDING SO THAT IT IS ABLE TO HOST SUPPORT SPACES FOR THE PLAZA, AS WELL A NEW COMMUNITY ROOM. WE ARE PURSUING SITE-WIDE CERTIFICATION UNDER THE LEED NEIGHBORHOOD DEVELOPMENT PROGRAM, WHILE THE SPECIFIC SUSTAINABILITY AND CERTIFICATION GOALS FOR INDIVIDUAL BUILDINGS ARE STILL BE RESEARCHED AND COORDINATED. PROJECT TIME FRAME PLANNING & DESIGN NOVEMBER 2017 - MARCH 2018 ENGINEERING & PERMITTING APRIL 2018 - AUGUST 2018 CONSTRUCTION START SEPTEMBER 2018 PROPOSED USES A APARTMENT BUILDING B TOWNHOUSE-STYLE APARTMENTS C GROUND FLOOR ARTISAN MANUFACTURING SPACES D RENOVATED EXISTING BUILDING E PUBLIC OPEN SPACE F OFFICE BUILDING AERIAL MASSING DIAGRAM F A A A D C E B COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 4 BUILDINGS AND OTHER ON-SITE IMPROVEMENTS THE DEVELOPMENT CONSISTS OF 6 DISTINCT BUILDINGS, PROVIDING 93 RESIDENTIAL UNITS, 27,000 SF OF OFFICE SPACE, 5,000 SF OF ARTISAN MANUFACTURING WORKSHOP SPACES, A 155+ SPACE BELOW-GRADE PARKING GARAGE, AND OVER 2,000 SF OF COMMUNITY SPACE: 1 APARTMENT BUILDING THREE AND FOUR STORIES OVER BASEMENT PARKING GARAGE 25 STUDIO APARTMENTS 20 1-BEDROOM FLATS 45 UNITS TOTAL 2 APARTMENT BUILDING THREE STORIES OVER BASEMENT PARKING GARAGE 18 STUDIOS WITH CO-LIVING COMMON SPACES 18 UNITS TOTAL 3 TOWNHOUSE-STYLE APARTMENTS THREE STORIES OVER BASEMENT PARKING GARAGE 12 2-BEDROOM FLATS 4 APARTMENT BUILDING THREE STORIES OVER BASEMENT PARKING GARAGE 6 1-BEDROOM LIVE-WORK APARTMENTS 6 1-BEDROOM LOFT-STYLE APARTMENTS 6 2-BEDROOM TOWNHOUSE-STYLE APARTMENTS 18 UNITS TOTAL ARTISAN MANUFACTURING (4A) APPROXIMATELY 5,000 GSF OF GROUND FLOOR WORKSHOP SPACE TO PROVIDE AN ACTIVE, PEDESTRIAN-ORIENTED STREET EDGE ALONG COTTONWOOD AVE. 5 EXISTING BUILDING RENOVATED TO PROVIDE A COMMUNITY MEETING ROOM, AS WELL AS ACCESSORY PROGRAM FOR THE ADJACENT OPEN SPACES (RESTROOMS, STORAGE, ETC.). 6 OFFICE BUILDING APPROXIMATELY 27,000 GSF OF OPEN-PLAN OFFICE SPACE 7 BELOW-GRADE PARKING GARAGE APPROXIMATELY 155 COMMERCIAL AND RESIDENTIAL SPACES BUILDING USE DIAGRAM 6 1 2 4 5 7 4A 3 RESIDENTIAL COMMERCIAL ARTISAN MFR. COMMUNITY UNIT MIX SUMMARY STUDIO 1-BDRM 2-BDRM TOTAL UNIT COUNT 49 26 18 93 PERCENTAGE 53%28%19%- COTTONWOOD + IDA PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 page 5 PLAN DIAGRAM SITE IMPROVEMENTS 1 BELOW-GRADE PARKING GARAGE THE RESIDENTIAL BUILDINGS, THE OFFICE BUILDING, AND A PORTION OF THE PUBLIC OPEN SPACE ARE CONSTRUCTED OVER A PARKING GARAGE. +/-155 PARKING SPACES 1A - ENTRY & EXIT TO THE PARKING GARAGE IS FROM ASPEN ST. IN ORDER TO DIRECT TRAFFIC TO WALLACE AVENUE, AND REDUCE TRAFFIC IMPACTS ON COTTONWOOD STREET AND IDA AVENUE. 2 EAST ASPEN STREET THE ENTIRE RIGHT-OF-WAY ADJACENT TO THE PROPERTY IS CURRENTLY UNDEVELOPED. THE PROPOSAL IS TO CONSTRUCT A ROADWAY, WITH SIDEWALK AND OTHER STREET IMPROVEMENTS ALONG THE SOUTH SIDE OF THE RIGHT-OF-WAY. IN ADDITION TO THE PARKING GARAGE ENTRY, THE STREET WILL ACCOMMODATE SEVERAL PARALLEL PARKING SPACES, AND A LOADING ZONE. THE NORTHERN PORTION OF THE RIGHT-OF-WAY WOULD REMAIN LANDSCAPED, PASSIVE OPEN SPACE - SIMILAR TO THE EXISTING CONDITION - AND WOULD MAINTAIN THE WALKING TRAIL CONNECTION. 3 EAST COTTONWOOD STREET THE NORTHERN HALF OF THE RIGHT-OF-WAY ADJACENT TO THE PROJECT SITE WILL BE IMPROVED. THE INTENTION IS FOR THE PROPOSED IMPROVEMENTS TO MATCH THE CHARACTER OF RECENT IMPROVEMENTS DIRECTLY ACROSS THE STREET - WITH SIDEWALK, STREET TREES, AND DIAGONAL PARKING. 4 NORTH IDA AVENUE THE RIGHT-OF-WAY ADJACENT TO THE PROJECT SITE WILL BE IMPROVED WITH SIDEWALK, STREET TREES, CURB, AND PARALLEL PARKING (IF FEASIBLE). IMPROVEMENTS WILL CONTINUE EAST ACROSS THE IDA RIGHT- OR-WAY UP TO, BUT NOT INCLUDING, THE OPPOSITE CURB. 5 PEDESTRIAN ACCESS THE 20’ FIRE LANE WILL SERVE AS A THROUGH-BLOCK PEDESTRIAN CONNECTION BETWEEN THE ACTIVE COTTONWOOD-WALLACE INTERSECTION, AND THE OPEN GREEN SPACE AT ASPEN STREET. 6 PUBLIC OPEN SPACES THE MAIN OPEN SPACE ON THE SITE TAKES ADVANTAGE OF THE DISTINCTIVE MISCO MILL AND THE RENOVATED ON-SITE BUILDING TO CREATE A PLAZA SUITABLE FOR HOSTING FOOD VENDORS, FARMER’S MARKETS, AND SIMILAR COMMUNITY EVENTS; AS WELL AS DAILY INFORMAL USE BY THE OFFICE TENANTS, RESIDENTS, AND ARTISAN COMMUNITY. PUBLIC SERVICES, SUCH AS EVENT STORAGE AND RESTROOMS WILL BE LOCATED IN THE RENOVATED BUILDING AT THE SOUTHWEST CORNER OF THE SITE. 1 6 5 1A LOADING ASPEN STREET COTTONWOOD STREET IDA AVENUEFIRE ACCESS2 4 3