17- Task Order 17 - DOWL - Street and Utilities Land Agent Services, Norton East Ranch ROW Acquisition Services
Exhibit A to Master Task Order Agreement for Professional Services TASK ORDER NUMBER 17 Issued under the authority of Professional Services Master Task Order Agreement between the City of Bozeman and DOWL for: Professional and technical services for the acquisition of right of way, easements and real property to allow for the construction of various street and utilities improvements within the City of Bozeman Task Order Title: Street and Utilities Land Agent Services—Norton East Ranch This Task Order is dated November 20,2017 between City of Bozeman (City)and DOWL (Contractor). The following representatives have been designated for the work performed under this Task Order: City: Shawn Kohtz,P.E. Contractor: Tony Gaddo,P.E. SCOPE OF WORK: The scope of work for Task Order No. 17 is detailed in the attached Exhibit A-17 Project Scope of Services. COMPENSATION: Contractor shall be reimbursed on a lump sum basis for Phases 1-3 and time and materials basis for Phases 4-13, with a total cost not to exceed $57,165.00. The total cost for Task Order No. 17 is detailed in the attached Exhibit A-17 Project Scope of Services. Contractor shall invoice no more often than monthly for services provided in the prior month. The provisions of the Professional Services Master Task Order Agreement and any Special Terms and Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work. IN WITNESS WHEREOF, the parties authorized to commit resources of the companies have executed this Task Order: Citv of Bozeman Contractor r By:, rjt'F �'t By. Title: CA I Title: r^ II�J :r(e�S S �r✓iS�� Date: t ` Date: 1217120 l 7 Fed.ID.No. 92-0166301 'IfBOWL Exhibit A-17— Scope of Services November 20, 2017 Professional Services Agreement for Streets and Utilities Land Agent Services Project Scope of Services Task Order No. 17 The scope of services for this City of Bozeman (City) Project is to complete the conceptual design and alternative analysis activities for a new sanitary sewer main and to acquire the necessary rights-of-way (R/W). The City will be constructing new sanitary sewer main improvements to allow future development in the Aajker Creek drainage basin and surrounding area. This project will serve as the conceptual engineering and right-of-way phase for the Norton East Ranch Outfall Diversion project in Bozeman, Montana (see Figure 1). The intent of this scope of services and corresponding cost estimate is to provide limited survey and conceptual design engineering services on a lump sum basis for activities 1.0-3.0. R/W acquisition services in activities 4.0-13.0 are on a time and materials basis. Additional costs related to the actual land purchase price, relocation costs paid to property owners, and any costs associated with eminent domain proceedings are not included in this scope of services or cost estimate. The following activities will be conducted as outlined below. 1_0 PROJECT RESEARCH • Obtain and review available preliminary design plans. • Obtain and review available project documentation. • Coordination meeting with the project team members. • Obtain current deeds and ownership information. 2_0 SURVEY • Complete a limited survey to collect elevation data of the relevant manholes, sewers, storm water facilities, water courses and any other features affecting the vertical depth of the proposed routes. Additional limited survey will be conducted to locate existing property pins for Parcel 4 and 5. • The survey data will be correlated to available topographic data to generate a conceptual sewer profile for the route or routes. 3_0 SEWER MAIN ROUTE ALTERNATIVE EVALUATION • Identify preliminary route options and constraints. • Meet with City to discuss the options and determine which options warrant further consideration. • Evaluate the options with respect to the horizontal alignment impacts to property and existing infrastructure including roads, utilities, and both natural and man-made water courses. tDOWL Page 1 of 4 Exhibit A-17—Scope of Set-vices November 20, 2017 • Evaluate the options with respect to the vertical grade required to avoid existing utilities, provide acceptable separation with natural and man-altered water courses and result in acceptable depth for access and maintenance of the sewer. • Provide an alternatives summary and constraints description of the conceptual design alignments and grades along with a conceptual level cost estimate for the proposed alternatives. Deliverables: • Alternatives summary. • Conceptual design alignment plan and profile drawings. • Conceptual cost estimates. 4_0 INITIAL PROPERTY OWNER CONTACT • Compile contact information. • Initiate contact with owners. 5_0 R/W MAPPING&EXHIBITS • Review proposed R/W acquisition areas. • Road easements will be acquired from Parcel 4 for future road improvements to Cattail St. Sanitary sewer easements will be acquired from Parcels 2, 3, 4, and 5, as needed. Parcel 1 is owned by the City and will not require an easement. • Prepare preliminary permanent and/or temporary easement exhibits for five (5) parcels of land, as required. • QA/QC of exhibits. 6.0 TITLE COMMITMENTS • Title commitments will be secured for three (3) parcels requiring property acquisition, Parcels 2, 4, and 5, as required. • Team coordination. 7_0 APPRAISALS • Full appraisal reports will not be prepared for this project. • Waiver valuations will be completed for three (3)parcels by DOWL. • A compensation valuation will be prepared for Parcel 1 to address private property features impacted by the project, as required. • Valuation of acquired property or impacted private property features for Parcel 3 is not included in this scope. • Team coordination. • QA/QC of waiver valuations. Page 2 of 4 � � BOWL Exhibit A-17—Scope of Services November 20, 2017 8_0 PREPARE CONTRACTS • Permanent and temporary easements will be acquired for five (5)parcels, as required. • Prepare preliminary acquisition documents. • Prepare preliminary acquisition costs. • QA/QC of documents. 9_0 ACQUISITIONS • Conduct pre-acquisition meetings. • Conduct meetings with property owners. • Prepare final acquisition documents. • Prepare final acquisition costs. • Acquisition meetings for Parcel 3 are not included in this scope of services. • QA/QC of deliverables. Deliverables: • Final acquisition documents including costs. 10.0 R/W AND DESIGN PLAN UPDATES • Based on acquisitions and agreements, updates to the preliminary easement exhibits will be completed, if required. 11.0 CLOSING • Prepare final title transfer documents, and schedule closing dates. • Attend closing meeting. 12.0 FINAL SUBMITTAL AND CLOSEOUT • Deliver completed title transfer documents. • Project closeout. • QA/QC of deliverables. Deliverables: • Final signed title transfer documents. 13.0 CONTINGENCY Due to the nature of property acquisition work, the time required to work with individual property owners varies significantly. The scope of services as detailed in this document includes all the necessary steps to acquire property from private owners, but much of that work relies on good cooperation and timely responses from all parties. The contingency item serves to capture the possible additional costs incurred during the acquisition process due to challenging situations with property owners. Page 3 of 4 4011D�' Exhibit A-17— Scope of Services November 20, 2017 COST The cost to complete the scope of services herein described on a lump sum and time and materials basis with a total cost not to exceed is $57,165.00. The total cost for this task order is detailed below: DIRECT LABOR 1.0 Project Research $1,355.00 2.0 Survey $660.00 3.0 Sewer Main Route Alternative Evaluation $17,200.00 4.0 Initial Property Owner Contact $750.00 5.0 R/W Mapping&Exhibits $2,730.00 6.0 Title Commitments $375.00 7.0 Appraisals $2,380.00 8.0 Prepare Contracts $5,490.00 9.0 Acquisitions $15,245.00 10.0 R/W And Design Plan Updates $900.00 11.0 Closing $1,350.00 12.0 Final Submittal And Closeout $1,090.00 13.0 1 Contingency $2,320.00 DIRECT NONLABOR T&M Title Commitments $1,050.00 Vehicle Mileage $120.00 Postage $50.00 SUBCONSULTANTS (LS) Survey(Alpine) $4,100.00 SUBTOTAL PHASES 1-3 (LS) Engineering Design $19,215.00 SUBTOTAL PHASES 4-14 (T&M) R/W Acquisition Services $32,630.00 Total Estimated Cost (NTE) $57,165.00 Page 4 of 4 BOWL C(\w u ❑ o El EEU ❑ � LPN PH` V � c0 0 EnW ANOA�"US�AN AVE C� " PROJECT y' _- E yL��-r .,�..- ' PIPELINE ii __,__ ---r=--. -- — ' SchoolDistnct PROJECT D CORRIDOR <- - _:,�...r=-�—.-- 2 r i r _. , (ALTERNATE) .----=- %`' _ - --- -- ,- -- - ORR, .- C IDOR ,�' ,' '�,,' PIPELINE l7 ; School DisMcf -------- -- - ----='-- --,'---- ---- --, i?$ - -e. •7L -- r' .....------ ----A . ---_-.-- RABIAN AVE. -r ' / I 1 -- ~ ,City of Bozeman, ,' < � � � U Y''' , f' �s r W � ' f` Y Cok Z I— LIJ PROJECT ' m e. o Q PIPELINE co , ' z CORRIDOR W Y O w Q LL School District' ',f'; Z z W O 0� O IATA RD. — R w:, C� W Q � L O :�j 0D Y' ❑ Q Q O z co m O Z z U L 4r Q West%ake,''' W F— ,rr�� c� co PROJECT 4535.11402.17 Q , DATE 111151201T PROPERTY PROPERTY Z TIME 10:00 AM OWNERSHIP PARCEL USER TG BOUNDARY BOUNDARY LEGEND: NOTE: ©ooWL2017 (TYP) (TYP) LZ PARCEL FOR R/W ACQUISITION EXISTING R/W BOUNDARIES REFERENCED FROM MONTANA CADASTRAL AND MAY NOT BE EXACT. FIGURE PAGE 1 OF 4 `. �. . . . . .. . .. . . . . . . . . . . . . . . . . . . . . . 1, 1, '1, 'IN . . . . . . . . . . *; %\ %\ I IN 1\ 1, . . . . . . . . . . I I . . . . . . 1, 1, 'IN 'I, 'I, "I "I "I I, "I N, 'I, 'IN 'I, "I "I "I "I "I "I "I "I I 'I, , "IN I", 1", 1%1' 1%1, %, I", I", I", I", 1", %1, 'IN 'I, 'I, 'I, 'I, • `` 1, 'IN 'I, 'I, oN �� ` ; O � o. Westlake' ❑ Westlake' `` .` coJ = E = CATTAIL ST. ❑ ❑ Cn PROPERTY _ z f— ; 3 OWNERSHIP PROJECT ' CITY LIMITS O w BOUNDARY PIPELINE 7i (TYP) CORRIDOR O Q PROPERTY z w PARCEL - O o- Q Q BOUNDARY , r z - z z (TYP) L O o� O cnwz Q IN Lij Lu C) � N ti ❑❑ z CD LL ¢ O Q = I— ❑ Z z U l ❑ LLJ F- ❑❑ co Q N W KIMBERWICKE ST. F -I F,--] F—iF—iFiFi----11 rn PROJECT 4535.11402.17 DATE 11115I20W TIME 10:00 AM USER TG LEGEND: NOTE: BOWL 2017 PARCEL FOR RAN ACQUISITION EXISTING R!W BOUNDARIES REFERENCED FROM MONTANA CADASTRAL AND MAY NOT BE EXACT. FIGURE PAGE 2OF4 j n f f / . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PROPERTY, OWNERSHIP - $ 'BOUNDARY ' U) .(TYP) �n E Q' 'PROPERTY ,' PARCEL lk PROJECT 'BOUNDARY'' ,'' 3 ,Westlake'' ,PIPELINE 4n ' ;' ,-' ;' CORRIDOR.-' f' p ' , Westlake, ,'Schaplow Farms,LLC,''' 4 l,• ''' ''' 'gyp,' J,, �., r -- - --------- - - - ._......__. - ................ �DAVIS LN. �, PnH ❑ cl) o ❑ ❑❑ ❑ ❑ _ � ❑o z z LLJ 0 w Q Q O Z CJ � U ULL cl flu p Z Z O E TTQ Fw � W El � � m ❑ Q❑ ° � Qo ❑ ❑ ❑ ❑ a Q = � Z U U Z W F- _ cf cn W IT p PROJECT 4535.11402.17 DATE 1 1/1 51201 7 TIME 10:00AM Z USER TO LEGEND: NOTE: ODOW L 2017 PARCEL FOR R/W ACQUISITION EXISTING R/VV BOUNDARIES REFERENCED FROM MONTANA CADASTRAL AND MAY NOT BE EXACT. FIGURE PAGE 3 OF 4 PROPERTY OWNERSHIP BOUNDARY (TYP) '' w ono PROPERTY wo i;P2 PARCEL , BOUNDARY (TYP) ________ _ Schaplow Farms,LLC lk Peter Family Living Trusty m '' PROJECT ' 'Schaplow Farms,LLC' '' ,,Schaplow Farms'LLC'' PIPELINE E CORRIDOR -----------------------------------------------==-=- - - __ __o - 1 --------- - DAVIS�LN - --- - zU) O w / o Y z > z LL L� w OIxO J n rr Hwy w z Q _ >- Lu C) QO L co Q O Z U U of co / J _j w PROJECT 4535.11402.17 DATE 1 1/1 512 01 7 Z TIME 10:00 AM USER TG LEGEND: NOTE: 0DOWL 2017 PARCEL FOR R/W ACQUISITION EXISTING RAN BOUNDARIES REFERENCED FROM MONTANA CADASTRAL AND MAY NOT BE EXACT. FIGURE PAGE 4OF4