Loading...
HomeMy WebLinkAbout17- Joint Funding Agreement - U.S. Department of the Interior Geological Survey (USGS) - Streamflow Gaging on the East Gallatin River Form 9-1366 U.S. DEPARTMENT OF THE INTERIOR Customer#: 6000001514 (April 2015) GEOLOGICAL SURVEY Agreement#: 18WNMT151400007 Project#: RSOOFN6 JOINT FUNDING AGREEMENT TIN#: 81-6001238 USGS DUNS#: 949286017 Fixed Cost Agreement YES[X] NO[ ] FOR Wyoming-Montana Water Science Center, Northwest Region THIS AGREEMENT is entered into as of the Is'day of October, 2017, by the U.S. GEOLOGICAL SURVEY, UNITED STATES DEPARTMENT OF THE INTERIOR, party of the first part,and the CITY OF BOZEMAN, party of the second part. 1. The parties hereto agree that subject to availability of appropriations and in accordance with their respective authorities there shall be maintained in cooperation for the continued operation of a streamflow-gaging station on East Gallatin River above Water Reclamation Facility,near Bozeman(06048660), herein called the program. The USGS legal authority is 43 USC 36C; 43 USC 50; and 43 USC 50b. 2.The following amounts shall be contributed to cover all of the cost of the necessary field and analytical work directly related to this program. 2(b) include In-Kind-Services in the amount of$0.00. (a) $6,770 by the party of the first part during the period October 1, 2017 to September 30, 2018 (b) $9,850 by the party of the second part during the period October 1,2017 to September 30, 2018 (c) Contributions are provided by the party of the first part through other USGS regional or national programs, in the amount of$0.00. Description of the USGS regional/national program: NA (d) Additional or reduced amounts by each party during the above period or succeeding periods as may be determined by mutual agreement and set forth in an exchange of letters between the parties. (e) The performance period may be changed by mutual agreement and set forth in an exchange of letters between the parties. 3. The costs of this program may be paid by either party in conformity with the laws and regulations respectively governing each party. 4. The field and analytical work pertaining to this program shall be under the direction of or subject to periodic review by an authorized representative of the party of the first part. 5. The areas to be included in the program shall be determined by mutual agreement between the parties hereto or their authorized representatives. The methods employed in the field and office shall be those adopted by the party of the first part to insure the required standards of accuracy subject to modification by mutual agreement. 6. During the course of this program, all field and analytical work of either party pertaining to this program shall be open to the inspection of the other party, and if the work is not being carried on in a mutually satisfactory manner, either party may terminate this agreement upon 60 days written notice to the other party. 7. The original records resulting from this program will be deposited in the office of origin of those records. Upon request, copies of the original records will be provided to the office of the other party. Page 1 of 2 Form 9-1366 U.S. DEPARTMENT OF THE INTERIOR Customer#: 6000001514 (April 2015) GEOLOGICAL SURVEY Agreement#: 18WNMT151400007 Project#: RSOOFN6 JOINT FUNDING AGREEMENT TIN #: 81-6001238 USGS DUNS#: 949286017 8. The maps, records or reports resulting from this program shall be made available to the public as promptly as possible. The maps, records or reports normally will be published by the party of the first part. However, the party of the second part reserves the right to publish the results of this program and, if already published by the party of the first part shall, upon request; be furnished by the party of the first part; at cost, impressions suitable for purposes of reproduction similar to that for which the original copy was prepared. The maps, records or reports published by either party shall contain a statement of the cooperative relations between the parties. 9. USGS will issue billings utilizing Department of the Interior Bill for Collection (form DI-1040). Billing documents are to be rendered annually. Payments of bills are due within 60 days after the billing date. If not paid by the due date, interest will be charged at the current Treasury rate for each 30 day period, or portion thereof, that the payment is delayed beyond the due date. (31 USC 3717; Comptroller General File B-212222, August 23, 1983). USGS Technical Point of Contact Customer Technical Point of Contact Name: Kirk Miller Name: Brian Heaston U.S. Geological Survey,WY-MT WSC City of Bozeman Address: 521 Progress Circle, Suite 6 Address: P.O. Box 1230 Cheyenne,WY 82007 Bozeman, MT 59771-1230 Telephone: (307)775-9168 Telephone: (406)582-2924 Fax: (307)778-2764 Fax: Email: kmiller@usgs.gov Email: bheaston(a)bozeman.net USGS Billing Point of Contact Customer Billing Point of Contact Name: Jennifer Walgrave Name: U.S. Geological Survey,WY-MT WSC Address: 3162 Bozeman Avenue Address: Helena, MT 59601 Telephone: (406)457-5916 Telephone: Fax: (406)457-5990 Fax: Email: jalgrave@usgs.gov Email: U.S.Geological Survey United States CITY OF BOZEMAN Department of Interior Signature Signatures) 2017,12.06 —18-- I�2 +�1 By 08:22:18-07'00'Date: Byl\�/�2 w;,'�f� J��u�lDate: p Name: John M. Kilpatrick Name: 'Prr✓tA SW r6t1t Title:WY-MT Water Science Center Director Title: Ott m-VIOq ✓ By Date: Name: Title: Page 2 of 2