HomeMy WebLinkAbout17- Amendment 1 to Task Order 9 - DOWL - Street and Utilities Land Agent Services at Fowler Lane AMENDMENT #1
TO
TASK ORDER NUMBER 09
Issued under the authority of Professional Services Master Task Order Agreement between the City of
Bozeman and DOWL for: Professional and technical services for the acquisition of right of wad
easements and real property to allow for the construction of various street and utilities
improvements within the City of Bozeman
Task Order Title: Street and Utilities Land Agent Services—Fowler Lane
This Amendment to Task Order 9 is dated October 26,2017 between City of Bozeman (City) and DOWL
(Contractor).
The following representatives have been designated for the work performed under this Task Order:
City: Rick Hixson,P.E.
Contractor: Tony Gaddo,P.E.
SCOPE OF WORK:
I
The scope of work for Task Order No. 9-Amendment#1 is detailed in the attached Exhibit A-9.1 Project
Scope of Services.
COMPENSATION:
Contractor shall be reimbursed on a time and materials basis for the additional services with the original
budget increased by $2,495.00, to a revised total cost not to exceed $43,899.00. The total cost for Task
Order No. 9-Amendment#1 is detailed in the attached Project Scope of Services. Contractor shall invoice
no more often than monthly for services provided in the prior month.
The provisions of the Professional Services Master Task Order Agreement and any Special Terms and
Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work.
IN WITNESS WHEREOF,the parties authorized to commit resources of the companies have executed this
Task Order:
i
Citv of Bozeman Contractor
By: By:
I
Title: ` Title: /I✓o;�,4 � ✓
Date: 1�` Date: I Ob r6/l 7
Fed.ID.No. 92-0166301
Itk
BOWL
Exhibit A-9.1 —Scope of Services
October 26, 2017
Professional Services Agreement for Streets and Utilities Land Agent Services
Project Scope of Services
Task Order No. 9—Amendment#1
The scope of services for this City of Bozeman Right-of-Way Acquisition Project is to Appraise,
Acquire and successfully conduct and prepare the necessary meetings, agreements, and legal
documents to transfer property titles from private land owners to the City of Bozeman (City).
The City will be constructing new roadway improvements in the near future and intends to
acquire the necessary right-of-way (R/W) prior to construction. This project will serve as the
R/W acquisition process for the roadway improvements project for extending Fowler Lane from
Durston Road to Oak Street in Bozeman, Montana and for associated intersection improvements
at the intersection of Fowler Lane and Oak Street(see Figure 1).
An acquisition package was previously executed to acquire easements for Parcel 5. However,
the existing legal description for Parcel 5 changed prior to recording the easements, requiring the
easements to be updated. The existing package for Parcel 5 will be updated to reflect the change
to the property legal description, executed, and recorded.
The intent of this scope of services and corresponding cost estimate is to provide acquisition
services on a time and materials, not to exceed basis. Additional costs related to the actual land
purchase price, relocation costs paid to property owners, and any costs associated with eminent
domain proceedings are not included in this scope of services or cost estimate.
The following activities will be conducted as outlined below.
1.0 PROJECT RESEARCH
• Obtain current deeds and ownership information.
F'
2.0 INITIAL PROPERTY OWNER CONTACT
• Additional work is not included in this scope.
3.0 SURVEY
• Additional work is not included in this scope.
4.0 R/W MAPPING & EXHIBITS
• The easement exhibits for Parcel 5 will be updated to reflect the existing property legal
description.
Page 1 of 3
BOWL
Exhibit A-9.1 —Scope of Services
October 26, 2017
5_0 TITLE COMMITMENTS
• Additional work is not included in this scope.
6_0 APPRAISALS AND REVIEW APPRAISALS
• Additional work is not included in this scope.
7_0 PREPARE CONTRACTS
• Modify acquisition documents.
• QA/QC of deliverables.
8.0 ACQUISITIONS
• Conduct meetings with property owners.
• Prepare final acquisition documents.
• Prepare final acquisition costs.
• QA/QC of deliverables.
Deliverables:
• Final acquisition documents including costs.
9.0 R/W AND DESIGN PLAN UPDATES
• Additional work is not included in this scope..
10.0 RELOCATION SERVICES
• Additional work is not included in this scope.
11.0 CLOSING
• Prepare final title transfer documents, and schedule closing date.
• Attend closing meeting.
12.0 FINAL SUBMITTAL AND CLOSEOUT
• Deliver completed title transfer documents.
• Project closeout.
• QA/QC of deliverables.
Deliverables:
• Final signed title transfer documents.
13.0 CONTINGENCY
• Additional work is not included in this scope.
40,60 Page 2 of 3
OWL
Exhibit A-9.1 -Scope of Services
October 26, 2017
COST
The cost to complete the scope of services herein described on a time and materials basis with a
total cost not to exceed is $2,495.00. The total cost for this task order is detailed below:
DIRECT LABOR
1.0 PROJECT RESEARCH $125.00
2.0 INITIAL PROPERTY OWNER CONTACT $0.00
3.0 SURVEY $0.00
4.0 R/W MAPPING&EXHIBITS $500.00
5.0 TITLE COMMITMENTS $0.00
6.0 APPRAISALS AND REVIEW APPRAISALS $0.00
7.0 PREPARE CONTRACTS $495.00
8.0 ACQUISITIONS $785.00
9.0 R/W AND DESIGN PLAN UPDATES $0.00
10.0 RELOCATION SERVICES $0.00
11.0 CLOSING $250.00
12.0 FINAL SUBMITTAL AND CLOSEOUT $250.00
13.0 CONTINGENCY $0.00
DIRECT NONLABOR
Title Commitments $0.00
Vehicle Mileage $15.00
Postage/Recording Fees $75.00
SUBCONSULTANTS
R/W Appraisals $0.00
R/W Review Appraisals $0.00
Property And Topo Survey $0.00
Total Estimated Amendment#1 Cost NTE $2,495.00
Total Current Contract Cost(NTE) $41,404.00
Total Estimated Cost(NTE) $43,899.00
Page 3 of 3
BOWL
m
0
Am
ra
_ I' �• I TT 11 I
! i _ AK ;XEAGHER AVE.
-
ly
I
PROPERTY
Y'
,
OWNERSHIP
PROPERTY
- - ----- --- - -
-' BOUNDARY ----- --- --2-=-'
(TYP) PARCEL -_--
BOUNDARY
(TYP) P 'r
Y
41
.N
PROPOSED R/W
(APPROX.)
- - - --- --- --- - - - - -
;.y-- - - -- - --- - -- -- 6 i 'o
a - -
FOWLER -x\ 407
Az
AV-
ilk IL)A:v
..--_ --- -- ------ LN.
I -_ ,; ti---_ - ---- -- - - ---
Z Z
ED
> z
_ _• Q
_ 1 - - - --- --- I I J Z d
l I f ►l _,- Q
LU
IL
+HOLLAIVD DR. yr O �
� � w
LU
N _
� Z J
LU O �
� v a
OW
LLU)
Q Z r �--
PROJECT 4535.11402.09
DATE 6/24/2016
TIME 8:00 AM
USER TG
LEGEND: NOTE: ODDW L nl6
PARCEL FOR RAN ACQUISITION PRELIMINARY PLAN SUBJECT TO CHANGE. EXISTING RAN
® BOUNDARIES REFERENCED FROM MONTANA CADASTRAL
AREA TO BE ACQUIRED AND MAY NOT BE EXACT
.
FIGURE 1