HomeMy WebLinkAbout12-11-17 City Commission Packet Materials - A2. Fire Equipment and Capital Replacement CIP FY2019-2023
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Assistant City Manager
Kristin Donald, Finance Director
SUBJECT: Adoption of the Fire Equipment and Capital Replacement Fund
Capital Improvement Plan (CIP) for Fiscal Years 2019-2023.
AGENDA ITEM TYPE: Action
MEETING DATE: December 11, 2017
RECOMMENDATION: Adopt the Fire Equipment and Capital Replacement Fund
Capital Improvement Plan (CIP) for Fiscal Years 2019-2023.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Fire Department, City Manager, and other city staff met in October and November to
develop the attached Capital Plan for the equipment and capital needs of the Department that
could be funded through the 4-mill levy for Fire Capital and Equipment Replacement.
Fire Stations 1 and 2 relocation have been incorporated in the General Fund CIP since this fund
and levy was intended to be for Equipment and Capital replacements, but didn’t initially
contemplate full station replacements.
Items of Note:
207
• FE06 – Radio Replacement Program- This is the lease payments for the radio
replacement. The radio project was undertaken by Gallatin County’s 911 Services
with payments from the City for our individual radio units.
• Revenue projection in this fund is based on the value of a mill for property tax
purposes. The 5-year average change is 4%; the highest rate during that period
was for the 2017 appraisal year. We are using a conservative 3% estimate in this
CIP. This is somewhat lower than the 5-year average (see below).
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
Fiscal Year Mill Value Change
2013 83,226$
2014 85,637$ 2.9%
2015 87,894$ 2.6%
2016 86,564$ -1.5%
2017 89,325$ 3.2%
2018 101,195$ 13.3%
Average Change FY14-FY18 90,123.00$ 4.1%
Fund 187 - Fire Capital & Equipment Replacement
208
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY19.
Report compiled on: December 4, 2017
Attached: Fire Equipment and Capital Replacement CIP
209
Fire Equipment & Capital ReplacementCapital Improvement PlanFinancial Summary Current YearFY18 FY19 FY20 FY21 FY22 FY23UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 675,700$ 549,980$ 360,903$ 367,335$ 770,149$ 1,055,232$ Plus: Dedicated Tax Revenues 4 Mills 404,780$ 416,923$ 429,431$ 442,314$ 455,583$ 469,251$ ‐$ Plus: Anticipated Grant Revenue Less: Scheduled CIP Project Costs (530,500)$ (606,000)$ (423,000)$ (39,500)$ (170,500)$ (176,750)$ ‐$ Projected Year‐End Cash Dedicated to CIP 549,980$ 360,903$ 367,335$ 770,149$ 1,055,232$ 1,347,733$ Assumptions Made for Revenue Estimates: Current YearFY18 FY19 FY20 FY21 FY22 FY23Estimated Annual Tax Revenues404,780$ 404,780$ 416,923$ 429,431$ 442,314$ 455,583$ Estimated Annual Increase 0% 3% 3% 3% 3% 3%Total Estimated Revenues404,780$ 416,923$ 429,431$ 442,314$ 455,583$ 469,251$ Current Revenues Dedicated to CIP %100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to CIP0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP100.0% 100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP404,780$ 416,923$ 429,431$ 442,314$ 455,583$ 469,251$ ProjectedProjected$(606,000)$(423,000)$(39,500)$(170,500)$(176,750)$‐FY19 FY20 FY21 FY22 FY23 UNSCHEDULEDFIRE EQUIPMENT & CAPITAL REPLACEMENTS210
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Fire Equip & Capital ReplacementFE06FIRERADIO REPLACEMENT PROGRAM$250,000$250,000FE12FIREPERSONAL PROTECTIVE EQUIPMENT$41,750$36,000$38,000$39,500$40,500FE13FIRESTATION ALERTING SYSTEM$250,000FE14FIRESTRUCTURAL COLLAPSE EQUIPMENT$70,000FE15FIRECARDIAC MONITOR REPLACEMENT$135,000FE16FIREEXTRICATION TOOLS$130,000FE17FIREWILDLAND APPARATUS$135,000$176,750$606,000$423,000$39,500$170,500Totals by DEPARTMENTSummary for Fire Equip & Capital Replacement (7 items)Totals by year:$176,750$606,000$423,000FY23FY19FY20UnscheduledFY22$170,500$39,500FY21211
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE06
DEPARTMENT
FIRE
PROJECT NAME
Radio Replacement Program
FY19
$250,000
FY20
$250,000
Unscheduled
DESCRIPTION OF PROJECT
This plan allows for aging fire portable radios to be replaced, including all of the software, programming and peripheral accessories.
This is a planned replacement of radios at the end of their predicted usable life, estimated between eight and ten years. This will
provide for seamless communication and response capabilities as the radios become less reliable and repair is no longer a
financially prudent option. Radios are an essential item in the operation of the Bozeman Fire Department. Fire radios must be
available for fire use 24 hours a day, 365 days a year. These radios are assigned to the three stations, all apparatus, and
management staff and are used daily. The decision was made during FY-17 CIP discussions to postpone scheduled replacements
of Fire Department radios due to uncertain plans of the Gallatin County 911 Center. Since this decision one year ago, a test was
conducted with Bozeman Fire and Bozeman Police Department. The test utilized an 800 MHz radio system to evaluate its use as a
potential upgrade from the current radio system. The results of the test were extremely positive, with noted improvements
related to in-building coverage and city wide coverage. Since the test, the 911 advisory board has voted to move forward with a 4
phase plan to upgrade the radio system in Gallatin County. Phase 1 would call for the City of Bozeman to move to an 800 MHz
digital trunked radio system.
ALTERNATIVES CONSIDERED
We still have the option of backing out of the 800 MHz system, however in doing so we would need to re-visit with 911 and the 911 Advisory
Board about other potential solutions for Bozeman Fire. If Bozeman Fire were to back out and Bozeman Police still move forward, we would
lose the ability to communicate effectively with each other, something that creates a major safety concern for both parties. In order to maintain
consistency in public safety operations, both departments should remain on the same radio system.
ADVANTAGES OF APPROVAL
Clear and dependable communication allows for quick and efficient emergency deployment and the required level of firefighter safety. The
portable radio project addresses a planned replacement program that existed in the CIP prior to the decision to move to 800 MHz radios. The
purchase improves our ability to communicate within the city, particularly inside of larger buildings such as the high school, hospital, and big box
retailers. We potentially may see some trade in value or resale value for some of the replaced units depending on their condition.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
As these are replacement radios we anticipate very little increases operating costs.
FUNDING SOURCES
100% Fire Equipment & Capital Replacement Fund - with possible reimbursement by Gallatin County 911 System.
New
Replacement
Equipment
Project
FY21 FY22 FY23
212
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE12
DEPARTMENT
Fire
PROJECT NAME
Personal Protective Equipment
FY19
$36,000
FY20
$38,000
Unscheduled
DESCRIPTION OF PROJECT
Today each member of the Bozeman Fire Department is issued two sets of personal protective equipment (PPE), a primary and a
backup set. By having two sets available members are ensured that if their primary set becomes contaminated or damaged on a
call that they have a backup set of gear to move over into to complete their shift while their primary set is cleaned or repaired.
The NFPA and manufacturer guidelines recommend that PPE used by firefighters, often referred to as turnout gear, be replaced
every 10 years due to the breakdown of the protective fibers that are used to make the gear. Presently the fire department
purchases gear on a rotating cycle so that a firefighter’s primary gear is 0-5 years old and their back-up gear is 6-10 years old. This
rotation is consistent with national best practice and is something the fire department plans to continue. To this point these
purchases have been made annually out of the general fund even though its meets the criteria for the Capital Equipment and
Replacement Fund. Starting in FY-19 the fire department will move this purchase form the general fund to the capital fund. This
will become an annual expense in the capital plan.
ALTERNATIVES CONSIDERED
Continue to purchase out of the general fund budget
ADVANTAGES OF APPROVAL
Moves purchase from general fund budget to capital budget
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Will be replaced in 10 years
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21
$39,500
FY22
$40,500
FY23
$41,750
213
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE13
DEPARTMENT
Fire
PROJECT NAME
Station Alerting System
FY19
$250,000
FY20 Unscheduled
DESCRIPTION OF PROJECT
Presently the fire department receives primary notification of emergency calls via an alpha numeric pager. The use of alpha
numeric paging is an outdated method of notifying emergency responders of response request and is difficult to find technological
support for. The new 800 MHz radio system coupled with the installation of a new Computer Aided Dispatch (CAD) system
now gives the Fire Department the ability to utilize a station alerting system. The implementation of a station alerting system
allows for faster notification of responders as it eliminates the need for alpha numeric pagers which are slower, as they require
the use of multiple interfaces. Station alerting allows for both audible and visual notification of responders while not increasing the
workload on dispatchers. The moment that dispatchers have the basic information of an emergency call, a station alerting system
automatically notifies the appropriate response unit while the dispatcher continues to gather information. This improves the first
phase of a response which is commonly referred to as the call processing time, which by national standard is to be completed
within 60 – 80 seconds. Today the average call processing time is approximately 90 seconds. By improving call processing times
the overall response time to an emergency response is also reduced. This project also has a direct effect on the second phase of a
response which is referred to as turnout time. Turnout time is the time from when responders are notified until they begin their
actual driving response. Today with the alpha paging system the fire department routinely sees a 30-40 second delay in pager
activation which causes extended turnout times. The national standard for turnout times is 60-80 seconds depending on the type
of call, however today BFD times are closer to 90-105 seconds, primarily related to the alpha pager delay. Station alerting has the
potential to reduce overall response times by nearly a minute and solves the problem of using alpha numeric paging. This project
would require the installation of specific equipment in all of the fire stations, thus if a plan is implemented to address the current
station 1 and station 2 as suggested in the Fire Master Plan, this project may need to be postponed until that occurs.
ALTERNATIVES CONSIDERED
Continue to use existing alpha pagers / delay this project until decisions on existing fire stations are made.
ADVANTAGES OF APPROVAL
Improved response times / answers question about long term solution to emergency responder notification
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21 FY22 FY23
214
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE14
DEPARTMENT
Fire
PROJECT NAME
Structural Collapse Equipment
FY19
$70,000
FY20 Unscheduled
DESCRIPTION OF PROJECT
A structural collapse can be defined as a car driving into a building causing part of the building to fall, up to a total building
collapsing due to a seismic event that occurs. Today the Fire Department has no structural collapse equipment in its cadre of
tools. In the event of structural collapse, the nearest capable response team would be dispatched from Idaho Falls, ID. The
department has spent the past two budget years improving our confined space and trench rescue response capabilities and is now
prepared to add structural collapse to our capabilities. The requested equipment includes tools that are capable of accessing
patients through concrete and steel, some of the more common obstacles encountered in a structural collapse. Also included in
the requested is a search camera which allows rescuers to evaluate areas of collapse both visually and audibly for potential victims
without having to access the area thus speeding up the search for potential victims.
ALTERNATIVES CONSIDERED
Do not purchase equipment / accept current level of risk / rely on out of state support for response if needed
ADVANTAGES OF APPROVAL
Provides city with equipment necessary to handle a structural collapse, most likely to occur with a seismic event. Minimizes need for out of
state response.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21 FY22 FY23
215
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE15
DEPARTMENT
Fire
PROJECT NAME
Cardiac Monitor Replacement
FY19 FY20
$135,000
Unscheduled
DESCRIPTION OF PROJECT
The Fire Department maintains 4 cardiac monitors that are on in-service apparatus. It is best practice to keep all of our cardiac
monitors the same across the board so that staff do not have to attempt to remain familiar with multiple models of monitors.
The next scheduled update to the cardiac monitoring is set for 2020. The department has the ability to receive trade in credit on
its existing monitors during this transition as well. By staying with the most current version of cardiac monitors the department
maintains interoperability with both AMR and Bozeman Health. These units would be expected to last until 2030 which is the
next scheduled update. The department also maintains an annual service contract on the monitors during their life span.
ALTERNATIVES CONSIDERED
Continue to use current model cardiac monitors and make replacements out of general fund as needed
ADVANTAGES OF APPROVAL
Helps maintain interoperability with Bozeman Health and AMR. Keeps monitors consistent across the board for all BFD paramedics
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Will be replaced in 10 years
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21 FY22 FY23
216
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE16
DEPARTMENT
Fire
PROJECT NAME
Extrication Tools
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
These are the tools that are used to access and remove patients from automobile accidents when they have become pinned or
trapped in a vehicle. Having up to date extrication equipment is important as auto manufacturers continue to come out with new
metals and materials that older equipment cannot cut. By replacing all three of the units at the same time we standardized our
fleet of tools, making use, training, and maintenance consistent across the board. The anticipated life span of this equipment is 10
years.
ALTERNATIVES CONSIDERED
Continue to use existing equipment and plan replacement out of general fund budget
ADVANTAGES OF APPROVAL
Moves purchase from general fund to capital fund. Ensures that extrication equipment is consistent across the department and up to current
standards related to automobile construction.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21 FY22
$130,000
FY23
217
CIP Project Fund
Fire Equip & Capital Replacement
PROJECT NUMBER
FE17
DEPARTMENT
Fire
PROJECT NAME
Wildland Apparatus
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
The City of Bozeman continues to have several areas of undeveloped land within its corporate boundaries. Areas such as Story
Mill, the Gallatin Regional Park, MSU agricultural fields, Pete’s Hill, and others still pose a risk of wildland fire problems. Having a
wildland apparatus allows for the BFD to respond to these types of events in a vehicle that is equipped and designed for these
types of responses, which often require that we travel off road to address the fire problem. The City’s current wildland apparatus
will be approaching 30 years old during this fiscal year. While the vehicle may not have significant mileage other assessments such
as structural integrity of the vehicle will need to be done based on the use of the vehicle as well as an assessment of the fire pump
on the unit.
ALTERNATIVES CONSIDERED
Continue to use existing apparatus
ADVANTAGES OF APPROVAL
Provides department with reliable, up to date, wildland apparatus to address identified risk in the community.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21 FY22 FY23
$135,000
218