HomeMy WebLinkAbout12-04-17 City Commission Packet Materials - C4. Street and Curb Reconstruction CIP FY2019-2023
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Kristin Donald, Finance Director
SUBJECT: Adopt the Street and Curb Reconstruction Fund Capital
Improvement Plan (CIP) for Fiscal Years 2019-2023 .
AGENDA ITEM TYPE: Consent
MEETING DATE: December 4, 2017
RECOMMENDATION: Adopt the Street and Curb Reconstruction Fund Capital
Improvement Plan (CIP) for Fiscal Years 2019-2023.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Public Works, City Manager, and other city staff met in October and November to develop
the attached Capital Plan for the equipment and capital needs of the Street and Curb
Reconstruction Fund. This plan outlines the use of Street Maintenance District dollars that are
dedicated to the reconstruction of streets and curbs. The policy for required matches with
Special Improvement Districts (SID’s) is outlined in Commission Resolution No. 4507.
Item of Note:
Each project is dependent upon the creation of a Special Improvement District to pay for
a share of the project costs.
31
If preliminary information indicates that property owners along the street are likely to
have sufficient protests to prevent creation of the SID, we recommend moving to the next
project on the list.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY19.
Report compiled on: November 22, 2017
Attached: Street and Curb Reconstruction CIP
32
Street and Curb Reconstructions Capital Improvement PlanFinancial Summary Current YearFY18 FY19 FY20 FY21 FY22 FY23UnscheduledProjected Beginning Reserve Balance Dedicated to CIP469,863$ (206,137)$ 375,541$ 856,103$ 1,230,542$ 1,704,915$ Plus: Street Maintenance Assessments Dedicated 684,000$ 697,680$ 711,634$ 725,866$ 740,384$ 755,191$ Plus: SID for West Lincoln ‐ SCR20 ‐ 75%168,008$ Plus: SID for South Tracy ‐ SCR09 ‐ 50%240,000$ Plus: SID for South Black ‐ SCR08 ‐ 75%513,213$ Plus: SID for North Tracy ‐ SCR10 ‐ 50%291,428$ Plus: SID for North 17th ‐ SCR16 ‐ 75%618,032$ Plus: SID for W Kochh ‐ SCR12 ‐ 50%867,070$ Plus: SID for S 5th ‐ SCR14 ‐ 50%1,277,873$ Less: Scheduled CIP Project Costs(1,600,000)$ (284,011)$ (744,284)$ (642,856)$ (884,042)$ (4,349,886)$ (12,610,559)$ Projected Year‐End Cash Dedicated to CIP (206,137)$ 375,541$ 856,103$ 1,230,542$ 1,704,915$ 255,164$ Assumptions Made for Revenue Estimates Current YearFY18 FY19 FY20 FY21 FY22 FY23Total Estimated Annual Street Assessment Revenue 684,000$ 684,000$ 697,680$ 711,634$ 725,866$ 740,384$ Estimated Annual Increase ‐ Attributed to Annexations 0.0% 2% 2%2% 2% 2%Total Estimated Revenues 684,000$ 697,680$ 711,634$ 725,866$ 740,384$ 755,191$ Current Revenues Dedicated to Street & Curb CIP % 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to Reconstruction & Curbs 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP 684,000$ 697,680$ 711,634$ 725,866$ 740,384$ 755,191$ ProjectedProjectedCURRENT$(284,011)$(744,284)$(642,856)$(884,042)$(4,349,886)$(12,610,559)FY18 FY19 FY20 FY21 FY22 FY23 UNSCHEDULEDSTREET RECONSTRUCTION PROJECTS 33
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Street & Curb Reconstruction FundSCR01EngineeringANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM$60,000$60,000$60,000$60,000$60,000SCR03EngineeringW OLIVE (8TH TO TRACY) - DESIGN AND CONSTRUCTION$1,736,555SCR04EngineeringS GRAND (OLIVE TO HAYES) – DESIGN AND CONSTRUCTION$2,118,375SCR05EngineeringN GRAND (MENDENHAL TO PEACH) - DESIGN AND CONSTRUCTION$1,191,119SCR07EngineeringS 3RD (OLIVE TO CLEVELAND) - DESIGN AND CONSTRUCTION$1,866,113SCR08EngineeringS BLACK (COLLEGE TO S CUL-DE-SAC) - DESIGN AND CONSTRUCTION$684,284SCR10EngineeringN TRACY (VILLARD TO PEACH) - DESIGN AND CONSTRUCTION$582,856SCR11EngineeringS 4TH AVE (COLLEGE TO BABCOCK) - DESIGN AND CONSTRUCTION$1,637,967SCR12EngineeringW KOCH (8TH TO TRACY) - DESIGN AND CONSTRUCTION$1,734,140SCR13EngineeringS 6TH (BABCOCK TO CLEVELAND) - DESIGN AND CONSTRUCTION$2,117,189SCR14EngineeringS 5TH (OLIVE TO HAYES) - DESIGN AND CONSTRUCTION$2,555,746SCR15EngineeringW HARRISON (TRACY TO 6TH) - DESIGN AND CONSTRUCTION$1,305,886SCR16EngineeringN 17TH (DURSTON TO END) - DESIGN AND CONSTRUCTION$824,042SCR19EngineeringDAVIS (CHURCH TO PLUM) - DESIGN AND CONSTRUCTION$637,355SCR20EngineeringW LINCOLN (GRAND TO WILSON) - DESIGN AND CONSTRUCTION$224,011$4,349,886$284,011$744,284$642,856$884,042$12,610,559Totals by DEPARTMENT34
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Summary for Street & Curb Reconstruction Fund (15 items)Totals by year:$4,349,886$284,011$744,284$12,610,559FY23FY19FY20UnscheduledFY22$884,042$642,856FY2135
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR01
DEPARTMENT
Engineering
PROJECT NAME
Annual Curb Replacement & Concrete Repair Program
FY19
$60,000
FY20
$60,000
Unscheduled
DESCRIPTION OF PROJECT
When a pedestrian ramp is installed, many times the adjacent curbs need to be replaced in order to get drainage to not stop at
the new ramp. Smaller curb repairs can be necessary rather than replacing a whole block. These repairs result in improved
stormwater control, and facilitates better street sweeping. Additionally, broken curbs can be hazardous to vehicle tires. These
improvements can be combined with ADA ramp replacement work and inlet replacement work.
ALTERNATIVES CONSIDERED
Continue current operations
ADVANTAGES OF APPROVAL
This will allow completion of smaller projects instead of waiting for an entire block to be repaired
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Cost of Materials
FUNDING SOURCES
Street & Curb Replacement Fund
New
Replacement
Equipment
Project
FY21
$60,000
FY22
$60,000
FY23
$60,000
36
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR03
DEPARTMENT
Engineering
PROJECT NAME
W Olive (8th to Tracy) - Design and Construction
FY19 FY20 Unscheduled
$1,736,555
DESCRIPTION OF PROJECT
Reconstruction of West Olive St from 8th to Tracy, including repairs to failed curbs and gutters. The street is already in a failing
condition and continues to function; however, eventually the street will become deteriorated to a point where it is unfeasible to
maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant pedestrian
ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage improvements will
eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at completion. This project
will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For planning purposes, project
estimates West Olive to function as a Major Collector, which would require a 15% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 85%. Local SID - 15%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
37
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR04
DEPARTMENT
Engineering
PROJECT NAME
S Grand (Olive to Hayes) – Design and Construction
FY19 FY20 Unscheduled
$2,118,375
DESCRIPTION OF PROJECT
Reconstruction of S Grand, from Olive to Hayes, including repairs to failed curbs and gutters. The street is already in a failing
condition and continues to function; however, eventually the street will become deteriorated to a point where it is unfeasible to
maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant pedestrian
ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage improvements will
eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at completion. This project
will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For planning purposes, project
estimates Lincoln to function as a Local Street, which would re quire a 75% contribution from property owners via a Special
Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
38
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR05
DEPARTMENT
Engineering
PROJECT NAME
N Grand (Mendenhal to Peach) - Design and Construction
FY19 FY20 Unscheduled
$1,191,119
DESCRIPTION OF PROJECT
Reconstruction of North Grand from Mendenhal to Peach, including repairs to failed curbs and gutters. The street is already in a
failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates North Grand will function as a Local Street, which would re quire a 75% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
39
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR07
DEPARTMENT
Engineering
PROJECT NAME
S 3rd (Olive to Cleveland) - Design and Construction
FY19 FY20 Unscheduled
$1,866,113
DESCRIPTION OF PROJECT
Reconstruction of South 3rd Ave from Olive to Cleveland, including repairs to failed curbs and gutters. The street is already in a
failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates S 3rd to function as a Minor Collector, which would require a 50% contribution from
property owners via a Special District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
40
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR08
DEPARTMENT
Engineering
PROJECT NAME
S Black (College to S Cul-De-Sac) - Design and Construction
FY19 FY20
$684,284
Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Black from College to the Cul-de-Sac, including repairs to failed curb and gutters. The street is already in
a failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates South Black to function as a Local Street, which would re quire a 75% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
41
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR10
DEPARTMENT
Engineering
PROJECT NAME
N Tracy (Villard to Peach) - Design and Construction
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of North Tracy Street from Villard to Peach, including repairs to failed curbs and gutters. The street is already in
a failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates North Tracy to function as a Minor Collector, which would require a 50% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY21
$582,856
FY22 FY23
42
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR11
DEPARTMENT
Engineering
PROJECT NAME
S 4th Ave (College to Babcock) - Design and Construction
FY19 FY20 Unscheduled
$1,637,967
DESCRIPTION OF PROJECT
Reconstruction of South 4th Ave from College to Babcock, including re pairs to failed curbs and gutters. The street is already in a
failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates South 4th to function as a Local Street, which would re quire a 75% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
43
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR12
DEPARTMENT
Engineering
PROJECT NAME
W Koch (8th to Tracy) - Design and Construction
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of West Koch Street from 8th to Tracy, including repairs to failed curbs and gutters. The street is already in a
failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates West Koch to function as a Minor Collector, which would require a 50% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
$1,734,140
44
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR13
DEPARTMENT
Engineering
PROJECT NAME
S 6th (Babcock to Cleveland) - Design and Construction
FY19 FY20 Unscheduled
$2,117,189
DESCRIPTION OF PROJECT
Reconstruction of South 6th Ave from Babcock to Cleveland, including repairs to failed curbs and gutters. The street is already in
a failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates South 6th to function as a Local Street, which would re quire a 75% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
45
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR14
DEPARTMENT
Engineering
PROJECT NAME
S 5th (Olive to Hayes) - Design and Construction
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South 5th Ave from Olive to Hayes, including repairs to failed curbs and gutters. The street is already in a
failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates South 5th to function as a Minor Collector, which would require a 50% contribution from
property owners via a Special District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
$2,555,746
46
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR15
DEPARTMENT
Engineering
PROJECT NAME
W Harrison (Tracy to 6th) - Design and Construction
FY19 FY20 Unscheduled
$1,305,886
DESCRIPTION OF PROJECT
Reconstruction of West Harrison from Tracy to 6th, including repairs to failed curbs and gutters. The street is already in a failing
condition and continues to function; however, eventually the street will become deteriorated to a point where it is unfeasible to
maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant pedestrian
ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage improvements will
eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at completion. This project
will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For planning purposes, project
estimates West Harrison to function as a Local Street, which would re quire a 75% contribution from property owners via a
Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
47
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR16
DEPARTMENT
Engineering
PROJECT NAME
N 17th (Durston to End) - Design and Construction
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of North 17th Ave from Durston to Waggon Wheel Trailer Park, including repairs to failed curbs and gutters.
The street is already in a failing condition and continues to function; however, eventually the street will become deteriorated to a
point where it is unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with
ADA compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met
at completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates North 17th to function as a Local Street, which would re quire a 75% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22
$824,042
FY23
48
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR19
DEPARTMENT
Engineering
PROJECT NAME
Davis (Church to Plum) - Design and Construction
FY19 FY20 Unscheduled
$637,355
DESCRIPTION OF PROJECT
Reconstruction of Davis from Church to Plum, including repairs to failed curbs and gutters. The street is already in a failing
condition and continues to function; however, eventually the street will become deteriorated to a point where it is unfeasible to
maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant pedestrian
ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage improvements will
eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at completion. This project
will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For planning purposes, project
estimates Davis to function as a Local Street, which would require a 75% contribution from property owners via a Special
Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
49
CIP Project Fund
Street & Curb Reconstruction Fund
PROJECT NUMBER
SCR20
DEPARTMENT
Engineering
PROJECT NAME
W Lincoln (Grand to Wilson) - Design and Construction
FY19
$224,011
FY20 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of West Lincoln, from Grand to Wilson, including repairs to failed curbs and gutters. The street is already in a
failing condition and continues to function; however, eventually the street will become deteriorated to a point where it is
unfeasible to maintain and keep open to public use. This project will provide a city standard street section, with ADA compliant
pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and drainage
improvements will eliminate potholes and minimize ice buildup. ADA compliance and MS4 permit compliance will be met at
completion. This project will trigger water, sewer, and storm drain improvement projects within the reconstruction area. For
planning purposes, project estimates Lincoln to function as a Local Street, which would re quire a 75% contribution from
property owners via a Special Improvement District Assessment.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY21 FY22 FY23
50