HomeMy WebLinkAbout12-04-17 City Commission Packet Materials - A1. Wastewater Impact Fee CIP FY2019-2023
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Kristin Donald, Finance Director
SUBJECT: Adoption of the Wastewater Impact Fee Fund Capital Improvement
Plan (CIP) for FY19-23.
AGENDA ITEM TYPE: Action
MEETING DATE: December 4, 2017
RECOMMENDATION: Adopt the Wastewater Impact Fee Fund Capital Improvement
Plan (CIP) for FY19-23.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. The City’s Impact Fee
Advisory Committee (IFAC) met on October 30th to review and make recommendations for the
planned expenditures of wastewater Impact Fees. The Committee had a quorum on October 30th
to make a vote; they recommended adoption of this plan.
Items of Note:
1. WWIF24 Davis Lane Lift Station– This project will help expand capacity that is
needed for the area and for the new high school. This will include oversizing the wet well
capacity and sanitary sewer freeway crossing to accommodate peak hour flows up to 6.2
MGD.
2. WWIF11 Front Street Interceptor - The downstream portion of the existing sewer is
already at capacity. Additional capacity is needed to serve future development near
Bozeman Deaconess Hospital and lands to the south. This project will conform to the
290
City's Wastewater Master Plan. It is estimated that 70% of this project costs will be due
to capacity expansion and will be eligible for Wastewater Impact Fees. The remaining
30% of the project costs will need to be provided by a "local share" contribution or other
source.
3. WWIF38 Norton East Ranch Outfall Diversion – The existing system does not have
enough capacity to collect all of the flows from the full development of the Aajker Creek
and Baxter Creek Drainage Basins. Most of the flow is proposed to be collected by a new
extension in the Aajker Creek drainage basin and enter the system at the Norton East
Ranch Outfall Interceptor. The Norton East Ranch Outfall Interceptor will be constructed
from the intersection of Baxter Lane and Flanders Mill Road to the proposed Davis Lane
Lift Station north of Interstate 90 and will be a 27-inch sanitary sewer pipe. This project
will only be constructed if the Davis Lane Lift Station is constructed. If the Davis Lane
Lift Station is not constructed, we will need to divert funds from the Norton East Ranch
Outfall to upgrade the existing Baxter Meadows Lift station and sewer interceptor to the
lift station.
4. Debt Service WWIF33, WWIF40 and WWIF41- The three projects described above
will need loans to help fund the projects. ) The borrowing will need to be backed by the
Wastewater Utility – and may have implications for rate charged to customers.
Borrowing for these projects begins in FY19. SRF loans have been explored and appear
to be the best option for funding. Our estimates show that rates with a 3% rate increase a
year in the Wastewater fund will provide enough coverage to satisfy SRF State
requirements.
5. Revenues have been updated to reflect the 5-year average for Wastewater Impact Fee
collections. Revenues have been updated to reflect the 5-year average for Water Impact
Fee collections which has an average change over that time of a 16% increase, see below
for the trends in detail:
291
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission is does
not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY19.
Report compiled on: November 27, 2017
Attached: Draft Wastewater Impact Fee Fund CIP
292
Wastewater Impact Fee Capital Improvement PlanFinancial Summary Current YearFY18 FY19 FY20 FY21 FY22 FY23UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 1,767,460$ (315,136)$ 327,072$ 568,592$ 1,260,469$ 2,023,028$ ‐$ Plus: Impact Fee Revenues Dedicated to CIP 1,221,150$ 1,282,208$ 1,346,318$ 1,413,634$ 1,484,315$ 1,558,531$ ‐$ Plus: Financing WWIF11 2,185,000$ Plus: Financing WWIF24 5,800,000$ Plus: Financing WWIF383,320,000$ Plus: Financing WWIF20 ($5,290,000)3,000,000$ Less: Carryover FY17 Capital Projects (1,863,746)$ Less: Scheduled CIP Project Costs (1,440,000)$ (8,625,000)$ (4,424,797)$ (721,757)$ (721,757)$ (6,011,757)$ (7,005,792)$ Projected Year‐End Cash Dedicated to CIP (315,136)$ 327,072$ 568,592$ 1,260,469$ 2,023,028$ 569,802$ Beginning Balance of Payback Improvements: ‐$ ‐$ 397,500$ 1,053,156$ 2,640,156$ 2,640,156$ Payback District ‐ WWIF11655,656$ Payback District ‐ WWIF201,587,000$ Payback District ‐ WWIF27397,500$ Payback District ‐ WWIF23Ending Balance of Payback Improvements: ‐$ 397,500$ 1,053,156$ 2,640,156$ 2,640,156$ 2,640,156$ Assumptions Made for Revenue EstimatesCurrent YearFY18 FY19 FY20 FY21 FY22 FY23Estimated Annual Wastewater Impact Fee Revenues1,221,150$ 1,221,150$ 1,282,208$ 1,346,318$ 1,413,634$ 1,484,315$ Estimated Annual Increase0.0% 5% 5% 5% 5% 5%Total Estimated Revenues1,221,150$ 1,282,208$ 1,346,318$ 1,413,634$ 1,484,315$ 1,558,531$ Current Revenues Dedicated to CIP %100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to Wastewater Capacity Expansion CIP0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP100.0% 100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP1,221,150$ 1,282,208$ 1,346,318$ 1,413,634$ 1,484,315$ 1,558,531$ ProjectedProjectedCURRENT$(8,625,000)$(4,424,797)$(721,757)$(721,757)$(6,011,757)$(7,005,792)FY18 FY19 FY20 FY21 FY22 FY23 UNSCHEDULEDWASTEWATER IMPACT FEE PROJECTS 293
#
^
^
^
WWIF32
WWIF24 WIF25
WWIF20
WWIF11
WIF30
WIF40
WIF42
WIF42
WIF42
WIF42
WIF27 & WIF28WIF05
WIF05
WIF21
WIF47
WWIF37
WWIF35WWIF36
WWIF38
WIF32 & WIF33
WWIF34
WWIF39
WWIF22
WIF48
WIF46
HUFFINE 19THDURSTON
STUCKYCOTTONWOOD FRONTAGE RD
MAIN
3RD7THOAKDAVIS
COLLEGE
BABCOCK
11THSPRINGHILLPEACH
GOLDENSTEIN
GRAF
3RDI
NTERSTAT
E
90BAXTER
FRONTAGEROUSE
SOURDOUGHHIGHLANDKAGY
BRIDGER
HARPERPUCKETT
VALLEY CENTER
19THGRIFFIN
BOZEMAN TRAILBLACKWOODGOOCH HILLMAIN
This map was created by the City of Bozeman GIS Department on 10/27/17 and is intended for planning purposes only.
0 10.5 Mile
¯
Water & WastewaterImpact Fees FY19-23
Water
^FY19
^FY21
^Unscheduled
Water
FY19
FY20
Unscheduled
Wastewater
#FY19
Wastewater
FY19
FY20
FY21
FY22
FY23
Active Development
City Limits
294
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Impact Fees WastewaterWWIF11Wastewater ImFRONT STREET INTERCEPTOR$2,185,000WWIF20Wastewater ImN FRONTAGE RD INTERCEPTOR$5,290,000WWIF22Wastewater Impact FeesDAVIS-FOWLER INTERCEPTOR (DURSTON RD TO W OAK ST)$778,035WWIF24Wastewater ImDAVIS LANE (LIFT STATION)$5,800,000WWIF32Wastewater Impact FeesHIDDEN VALLEY (LIFT STATIONAND FORCE MAIN)$5,190,000WWIF33Wastewater Impact FeesDAVIS LN LIFT STATION DEBT SERVICE (WWIF24)$370,300$370,300$370,300$370,300$370,300WWIF34Wastewater ImANNIE STREET SANITARY SEWER UPGRADE$300,000WWIF35Wastewater ImBABCOCK SANITARY SEWER UPGRADE$245,000WWIF36Wastewater Impact FeesBAXTER CREEK BASIN - COTTONWOOD ROAD 18" SANITARY SEWER EXTENSION$640,000WWIF37Wastewater Impact FeesHUNTERS WAY SEWER CAPACITY UPGRADE$350,000WWIF38Wastewater Impact FeesNORTON EAST RANCH OUTFALL DIVERSION$3,320,000WWIF39Wastewater Impact FeesRENOVA STREET SANITARY SEWER MAIN UPGRADE$16,000WWIF40Wastewater Impact FeesFRONT STREET INTERCEPTOR DEBT SERVICE (WWIF11)$139,497$139,497$139,497$139,497$139,497WWIF41Wastewater Impact FeesNORTON EAST RANCH OUTFALL DIVERSION DEBT SERVICE (WWIF38)$211,960$211,960$211,960$211,960$6,011,757$8,625,000$4,424,797$721,757$721,757$7,005,792Totals by DEPARTMENTSummary for Impact Fees Wastewater (14 items)Totals by year:$6,011,757$8,625,000$4,424,797$7,005,792FY23FY19FY20UnscheduledFY22$721,757$721,757FY21295
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF11
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Front Street Interceptor
FY19
$2,185,000
FY20 Unscheduled
DESCRIPTION OF PROJECT
This project consists of construction of ~8,500 LF 18", 21", 24" sewer pipe from manhole E0304 to C0524. Without this
wastewater interceptor development in the vicinity of Bozeman Deaconess Health Services, Blackmore Bend Development (new
Heebs store), development on E. Main Street, and development along Haggery Lane will not be able to occur. The downstream
portion of the existing sewer is already at capacity. Additional capacity is needed to serve future development in the vicinity of
Bozeman Deaconess Hospital and lands to the south. This project will conform to the City's Wastewater Master Plan. It is
estimated that 70% of this project costs will be due to capacity expansion and will be eligible for Wastewater Impact Fees. The
remaining 30% of the project costs will need to be provided by a "local share" contribution or other source.
ALTERNATIVES CONSIDERED
No action.
ADVANTAGES OF APPROVAL
This project will significantly increase the capacity of the trunk sewer, allow for infill and new development along East Main Street, Haggerty
Lane, and Bozeman Deaconess Health.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Impact fees can not fund operating and maintenance costs. The city’s wastewater utility will pay for
these costs, which are estimated to be a small increment of the city’s system as a whole.
FUNDING SOURCES
70% Wastewater Impact Fees = $1,529,864 30% Wastewater Impact Fees for Local Share = $655,656, recovered via payback district(s).
New
Replacement
Equipment
Project
FY21 FY22 FY23
296
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF20
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
N Frontage Rd Interceptor
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
This project will replace or parallel 11,500' of the North Frontage Road interceptor between Springhill Rd and Bridger Dr.
Portions of the interceptor are at or very near capacity and unless improvements are made it will be at or over capacity when the
tributary obligated areas are developed. This project will directly increase collection capacity in the southeast and east parts of
the city. Development in the southeast part of town within the Community Plan Boundary as well as the east part of town will
be tributary to this North Frontage Road Interceptor. There are potentially a great number of private development projects
which will not be able to proceed due to the lack of wastewater collection capacity. This project will conform to the City's
Wastewater Master Plan. It is estimated that 70% of this project costs will be du e to capacity expansion and will be eligible for
Wastewater Impact Fees. The remaining 30 % of the project costs will need to be provided by a "local share" contribution or
other source.
ALTERNATIVES CONSIDERED
Limit future development in the area.
ADVANTAGES OF APPROVAL
If constructed to the line sizes master planned in the City’s Wastewater Facilities plan, capacity will be provided for future growth tributary to
this main.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Impact fees can not fund operating and maintenance costs. The city’s wastewater utility will pay for
these costs, which are estimated to be a small increment of the city’s system as a whole.
FUNDING SOURCES
Wastewater Impact Fees, with local share recovered via payback district(s)
New
Replacement
Equipment
Project
FY21 FY22 FY23
$5,290,000
297
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF22
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Davis-Fowler Interceptor (Durston Rd to W Oak St)
FY19 FY20 Unscheduled
$778,035
DESCRIPTION OF PROJECT
This project will replace or parallel 2700' of the Davis-Fowler Interceptor between Durston and Oak. The interceptor between
Durston Rd and W Oak will eventually exceed capacity as the Baxter Creek drainage basin develops. In order to convey the
ultimate build-out flow, the interceptor will need to be increased from an 18-inch diameter to a 24-inch diameter pipe.
ALTERNATIVES CONSIDERED
Limit future development in the area.
ADVANTAGES OF APPROVAL
If constructed to the line sizes master planned in the City’s Wastewater Facilities plan, capacity will be provided for anticipating the long-term
future growth in this area
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Impact fees can not fund operating and maintenance costs. The city’s wastewater utility will pay for
these costs, which are estimated to be a small increment of the city’s system as a whole.
FUNDING SOURCES
Wastewater Impact Fees, with local share recovered via payback district
New
Replacement
Equipment
Project
FY21 FY22 FY23
298
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF24
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Davis Lane (Lift Station)
FY19
$5,800,000
FY20 Unscheduled
DESCRIPTION OF PROJECT
Complete the buildout of the Davis Ln Lift Station.
ALTERNATIVES CONSIDERED
Limit future development in the area.
ADVANTAGES OF APPROVAL
If constructed to the line sizes master planned in the City’s Wastewater Facilities plan, capacity will be provided for anticipating the long-term
future growth in this area
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Impact fees can not fund operating and maintenance costs. The city’s wastewater utility will pay for
these costs, which are estimated to be a small increment of the city’s system as a whole.
FUNDING SOURCES
Wastewater Impact Fees, with local share recovered via payback district
New
Replacement
Equipment
Project
FY21 FY22 FY23
299
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF32
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Hidden Valley (Lift Stationand Force Main)
FY19 FY20 Unscheduled
$5,190,000
DESCRIPTION OF PROJECT
Design and Construct Hidden Valley Lift Station and Force Main. This project will conform to the City's Wastewater Collection
Facilities Plan. The Davis Lane Lift Station must be upgraded to accommodate flows from the Hidden Valley Lift Station when the
Hidden Valley Lift Station is constructed.
ALTERNATIVES CONSIDERED
Limit development on the northwestern edge of of the City due to no sanitary sewer availability.
ADVANTAGES OF APPROVAL
Increased service area of the City's sanitary sewer system.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating costs will be paid from the City's sewer enterprise fund.
FUNDING SOURCES
Payback district or other local share contribution from development at the time of construction.
New
Replacement
Equipment
Project
FY21 FY22 FY23
300
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF33
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Davis Ln Lift Station Debt Service (WWIF24)
FY19 FY20
$370,300
Unscheduled
$370,300
DESCRIPTION OF PROJECT
This project will provide a debt service payment for the City's portion of the Davis Ln Lift Station. If we do not fund this debit
service, the City will be in default of our loan. This lift station serves development north of the Cattail Lake Lift Station, and it will
conform to the City's Wastewater Master Plan. The Billings Clinic will finance the lift station, and the City will reimburse the
Billings Clinic for the City's portion over 5 years. The Billings Clinic will not be reimbursed for their portion of the lift station
capacity, which is estimates as 8% of the capacity of the initial lift station construction. The Norton East Ranch Diversion would
reduce early operational challenges in the Davis Lane Lift Station due to odors associated with minimal flows.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
This will pay off the City's portion of the Davis Ln Lift Station
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Impact fees can not fund operating and maintenance costs. The city’s wastewater utility will pay for
these costs, which are estimated to be a small increment of the city’s system as a whole.
FUNDING SOURCES
Billings Clinic is constructing the Lift Station and will provide a payback district for the City's portion of the financing.
New
Replacement
Equipment
Project
FY21
$370,300
FY22
$370,300
FY23
$370,300
301
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF34
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Annie Street Sanitary Sewer Upgrade
FY19 FY20 Unscheduled
$300,000
DESCRIPTION OF PROJECT
This project consists of upgrading approximately 1,200 feet of an existing 18-inch sanitary sewer main in the Annie Street
alignment to a 21-inch main. Given the current planned development projects, this main will be at capacity in 5-10 years upon
buildout of multiple projects.
ALTERNATIVES CONSIDERED
No action, but this will limit infill development when the capacity of the sewer main is reached.
ADVANTAGES OF APPROVAL
Allows future infill development.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
The additional operating costs will be minimal as this is an upgrade of an existing line.
FUNDING SOURCES
Payback district.
New
Replacement
Equipment
Project
FY21 FY22 FY23
302
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF35
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Babcock Sanitary Sewer Upgrade
FY19 FY20
$245,000
Unscheduled
DESCRIPTION OF PROJECT
To accommodate flows from Phase 2 of the Icon Apartments project, Ferguson Farm, and Lupine Village as well as future in-fill
development, the existing 10-inch sanitary sewer main in W. Babcock must be upgraded to a 15-inch sanitary sewer main from
Manhole L0408 at the intersection of Resort Drive and Babcock to L0412 at the intersection of Babcock and Cottonwood.
ALTERNATIVES CONSIDERED
Do nothing.
ADVANTAGES OF APPROVAL
Allows infill development to proceed as this sanitary sewer main will be at capacity after development of Phase I of Icon Apartments and various
site plan applications at Ferguson Farms.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal as this will be a capacity upgrade of an existing sanitary sewer main.
FUNDING SOURCES
Development that depends on this line upgrade will be required to upgrade this main as necessary to serve their projects. However, an upsizing
fee from the City is anticipated to support this upgrade.
New
Replacement
Equipment
Project
FY21 FY22 FY23
303
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF36
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Baxter Creek Basin - Cottonwood Road 18" Sanitary Sewer Extension
FY19
$640,000
FY20 Unscheduled
DESCRIPTION OF PROJECT
This project consists of constructing an 18-inch sanitary sewer main from the intersection of Babcock and Cottonwood to the
intersection of Cottonwood and Durston per the Wastewater Collection Facilities Plan Update (2015). This section of
Cottonwood Road is currently being designed and will be constructed in the summer of 2018, and the sewer improvement must
be constructed with the road upgrade, so the road will not need to be excavated for new sewer main construction within the
next 2-3 years. The sanitary sewer main identified in the facilities plan is also required to serve any new development upstream
of this section of sanitary sewer. The existing 12-inch main capacity is completely dedicated for approved, new development.
Any new development served by this line including current site plan applications are dependent on an upgrade of the sanitary
sewer at this location (Icon Apartments, Lupine Village, and multiple smaller site plans at Ferguson Farms will require this upgrade
in the immediate short term). Also, there will be substantial cost savings to complete the sewer improvement with the
Cottonwood Road upgrade. The cost of the project in this item reflects the cost listed in the facility plan, but the cost will be less
expensive if completed with the street upgrade.
ALTERNATIVES CONSIDERED
The line is at capacity and must be upgraded now, or infill property served by this pipe will not be allowed to proceed.
ADVANTAGES OF APPROVAL
Allows immediate use by development as multiple development applications are dependent on this upgrade (Icon Apartments, site plan
applications in Ferguson Farms, Lupine Village)
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Additional operating costs are minimal as the proposed upgrade is a replacement of an existing 12-inch main that is at capacity.
FUNDING SOURCES
N/A
New
Replacement
Equipment
Project
FY21 FY22 FY23
304
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF37
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Hunters Way Sewer Capacity Upgrade
FY19 FY20
$350,000
Unscheduled
DESCRIPTION OF PROJECT
Approximately 1,600 feet of sanitary sewer main requires an upgrade from a 12-inch main to a 15-inch main to accommodate
infill development including buildout of the MSU Innovation Campus and other infill areas immediately west of S. 19th.
ALTERNATIVES CONSIDERED
No action. This option would not allow buildout of the MSU Innovation Campus and other infill development immediately west of S. 19th.
ADVANTAGES OF APPROVAL
Allows buildout of the MSU Innovation Campus and other infill projects immediately west of S. 19th including a potential student housing project.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operational costs would remain the same as the existing 12-inch main would be upgraded to a 15-inch main.
FUNDING SOURCES
In-fill development contributions through a direct contribution or a payback district.
New
Replacement
Equipment
Project
FY21 FY22 FY23
305
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF38
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Norton East Ranch Outfall Diversion
FY19 FY20
$3,320,000
Unscheduled
DESCRIPTION OF PROJECT
The existing system does not have enough capacity to collect all of the flows from the full development of the Aajker Creek and
Baxter Creek Drainage Basins. Most of the flow is proposed to be collected by a new extension in the Aajker Creek drainage
basin and enter the system at the Norton East Ranch Outfall Interceptor. The Norton East Ranch Outfall Interceptor will be
constructed from the intersection of Baxter Lane and Flanders Mill Road to the proposed Davis Lane Lift Station north of
Interstate 90 and will be a 27-inch sanitary sewer pipe. The project will take pressure off the Baxter Meadows Lift Station which
has limited capacity. This project will only be constructed if the Davis Lane Lift Station is constructed. If the Davis Lane Lift
Station is not constructed, we will need to divert funds from the Norton East Ranch Outfall to upgrade the existing Baxter
Meadows Lift station and sewer interceptor to the lift station.
ALTERNATIVES CONSIDERED
1) Upgrade the existing sanitary sewer interceptor and Baxter Meadows Lift Station that serve the Aajker Creek and Baxter Creek Drainage
Basins, or 2) do nothing.
ADVANTAGES OF APPROVAL
Frees capacity in existing infrastructure to serve infill development while simultaneously opening new areas for development that currently do
not have access to the City sanitary sewer system.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance of sanitary sewer mains including flushing and long-term maintenance.
FUNDING SOURCES
Local share contributions from development. New development that connects to the interceptor sewer would be required to pay the
assessment associated with a payback district.
New
Replacement
Equipment
Project
FY21 FY22 FY23
306
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF39
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Renova Street Sanitary Sewer Main Upgrade
FY19 FY20 Unscheduled
$16,000
DESCRIPTION OF PROJECT
A small section, 40-feet, of 21-inch sanitary sewer main in Renova Street must be upgraded to a minimum 24-inch main due to
the flat slope of this segment of pipe. Upon buildout of the currently planned development projects, this segment of sanitary
sewer main will be at capacity in approximately 5-10 years. Further evaluation of this pipe segment is required prior to an
upgrade including a survey of the actual grade of the pipe and flow monitoring to verify the need for the upgrade and the results
of the City's hydraulic model.
ALTERNATIVES CONSIDERED
Additional flow monitoring and survey data needed to verify the timing and need for this upgrade.
ADVANTAGES OF APPROVAL
Accommodate future development demands on this segment of interceptor sewer.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal due to replacement of an existing, smaller main.
FUNDING SOURCES
N/A
New
Replacement
Equipment
Project
FY21 FY22 FY23
307
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF40
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Front Street Interceptor Debt Service (WWIF11)
FY19 FY20
$139,497
Unscheduled
$139,497
DESCRIPTION OF PROJECT
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21
$139,497
FY22
$139,497
FY23
$139,497
308
CIP Project Fund
Impact Fees Wastewater
PROJECT NUMBER
WWIF41
DEPARTMENT
Wastewater Impact Fees
PROJECT NAME
Norton East Ranch Outfall Diversion Debt service (WWIF38)
FY19 FY20 Unscheduled
$211,960
DESCRIPTION OF PROJECT
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY21
$211,960
FY22
$211,960
FY23
$211,960
309