HomeMy WebLinkAbout12-04-17 City Commission Packet Materials - C6. Wastewater CIP FY2019-2023 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Kristin Donald, Finance Director SUBJECT: Adopt the Wastewater Fund Capital Improvement Plan (CIP) for Fiscal Years 2019-2023. AGENDA ITEM TYPE: Consent MEETING DATE: December 4, 2017 RECOMMENDATION: Adopt the Wastewater Fund Capital Improvement Plan (CIP) for Fiscal Years 2019-2023. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. Similar to recent years past, we are bringing the various parts of the plan forward as items on the Consent agenda. We will be prepared to address questions, if they arise, at the public meeting. The Public Works, City Manager, and other city staff met in October and November to develop the attached Capital Plan for the equipment and capital needs of the Wastewater Fund. The Wastewater Fund CIP tracks the capital equipment replacements and construction projects for Wastewater Operations (collection system) and the Water Reclamation Facility (WRF). Item of Note:  WW49 ROLL-OFF STORAGE BUILDING CONSTRUCTION & POSSIBLE 2ND SCREW PRESS ENCLOSURE – This project would be a covered addition of the roll- 101 off loading area and would capture and redirect exhaust to keep the roll-offs from freezing in the winter and would act as storage for roll-offs and totes.  Several other recurring items, such as WW08-19 through WW08-23 WASTEWATER PIPE REPLACEMENT, have been scheduled, adjusted or added based on current needs for approximately $1 million a year.  WW89 HVAC heat loop optimization - Modify heating system to provide for facility needs for $250,000 scheduled for FY19. The current HVAC system is not adequately heating the digester and buildings. This poses some operational problems that range from inadequate sludge digestion to not being able to provide enough heat to buildings and keep utilities from freezing.  WW85 WRF Process Upgrades to Improve Nutrient Recovery & Capacity- This item has been added but is currently unscheduled for $12 million. This project will increase WRF capacity to meet facility plan recommendations and future discharge permit requirements. UNRESOLVED ISSUES: None. ALTERNATIVES: As suggested by the City Commission. If the Commission does not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY19. Report compiled on: November 27, 2017 Attached: Wastewater Fund CIP 102 Wastewater Fund Capital Improvement PlanFinancial Summary Current YearFY18 FY19 FY20 FY21 FY22 FY23UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 1,548,414$       1,730,755$           572,718$          872,315$          1,531,576$       2,342,589$      ‐$                     Plus:  Wastewater Revenues Dedicated to CIP 2,188,800$       2,254,463$           2,322,097$       2,391,760$       2,463,513$       2,537,419$      ‐$                     Less:  FY17 Carryover Capital (193,959)$          Less:  Scheduled CIP Project Costs (1,812,500)$      (3,412,500)$         (2,022,500)$     (1,732,500)$     (1,652,500)$      (1,232,500)$    (12,484,333)$   Projected Year‐End Cash Dedicated to CIP 1,730,755$       572,718$              872,315$          1,531,576$       2,342,589$       3,647,507$      Assumptions Made for Revenue Estimates Current YearFY18 FY19 FY20 FY21 FY22 FY23Estimated Annual Wastewater Revenues8,755,198$        8,755,198$            9,017,854$        9,288,390$        9,567,041$        9,854,052$         Estimated Annual Increase 0.0% 3% 3% 3% 3% 3%Total Estimated Revenues 8,755,198$        9,017,854$            9,288,390$        9,567,041$        9,854,052$        10,149,674$     Current Revenues Dedicated to CIP % 25.0% 25.0% 25.0% 25.0% 25.0% 25.0%  Plus:  Increase Dedicated to CIP0.0% 0.0% 0.0% 0.0% 0.0% 0.0%  Total % Dedicated to CIP 25.0% 25.0% 25.0% 25.0% 25.0% 25.0%Total Estimated Revenues Dedicated to CIP2,188,800$        2,254,463$            2,322,097$        2,391,760$        2,463,513$        2,537,419$       ProjectedProjectedCURRENT$(3,412,500)$(2,022,500)$(1,732,500)$(1,652,500)$(1,232,500)$(12,484,333)FY18 FY19 FY20 FY21 FY22 FY23 UNSCHEDULEDWASTEWATER FUND PROJECTS & EQUIPMENT 103 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Wastewater FundWW07EngineeringANNUAL WASTEWATER PIPE REPLACEMENT PROGRAM - DESIGN$22,500$22,500$22,500$22,500$22,500WW08-19EngineeringWASTEWATER PIPE REPLACEMENT PROGRAM - CONSTRUCTION IN 2019$1,000,000WW08-20EngineeringWASTEWATER PIPE REPLACEMENT PROGRAM - CONSTRUCTION IN 2020$1,000,000WW08-21EngineeringWASTEWATER PIPE REPLACEMENT PROGRAM - CONSTRUCTION IN 2021$1,000,000WW08-22EngineeringWASTEWATER PIPE REPLACEMENT PROGRAM - CONSTRUCTION IN 2022$1,000,000WW08-23EngineeringWASTEWATER PIPE REPLACEMENT PROGRAM - CONSTRUCTION IN 2023$1,000,000WW27EngineeringANNUAL WATERSHED STUDY & STREAM MODELING$60,000$60,000$60,000$60,000$60,000$1,082,500$1,082,500$1,082,500$1,082,500$1,082,500Totals by DEPARTMENTWastewater FundGF227FinanceERP REPLACEMENT "SUNGARD REPLACEMENT/UPGRADE"$333,333$333,333Totals by DEPARTMENTWastewater FundPW05Public WorksPUBLIC WORKS SHOPS MASTER PLAN$20,000PW06Public WorksPUBLIC WORKS SHOPS FACILITY CONSTRUCTION$670,000$20,000$670,000Totals by DEPARTMENTWastewater FundWW54Wastewater OpREPLACE #1783 - 1995 FORD DUMP TRUCK$95,000WW86Wastewater OpWHEELED EXCAVATOR$151,000WW86Wastewater OpSTEERABLE SEWER TV TRACTOR$25,000104 CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22WW87Wastewater OpSEWER FLOW METERS$35,000$60,000$95,000$151,000Totals by DEPARTMENTWastewater FundWW39WRFRESURFACE AND REPAINT CLARIFIERS$320,000WW49WRFROLL-OFF STORAGE BUILDING CONSTRUCTION & POSSIBLE 2ND SCREW PRESS ENCLOSURE$1,500,000WW58WRFCHIP SEAL AND TOPCOAT WRF ASPHALT$55,000WW69WRFWRF FACILITY R&R$100,000$75,000$100,000$100,000$100,000WW70WRFWRF FACILITY ENGINEERING & OPTIMIZATION$50,000$50,000$50,000$50,000$50,000WW76WRFTHIRD PRETREATMENT SCREEN$500,000WW78WRFSERVER REPLACEMENT AT WRF (WRFCTRLBAK)$10,000WW83WRFUFAT GRAVITY THICKENER DRIVE AND ARMS REPLACEMENT$400,000WW84WRFSERVER REPLACEMENT AT WRF (WRFCTRLPRI)$10,000WW85WRFWRF PROCESS UPGRADES TO IMPROVE NUTRIENT RECOVERY & CAPACITY$12,000,000WW88WRFRE-TUBE BOILER$25,000WW89WRFHVAC HEAT LOOP OPTIMIZATION $250,000$150,000$2,250,000$175,000$650,000$570,000$12,000,000Totals by DEPARTMENTSummary for Wastewater Fund (26 items)Totals by year:$1,232,500$3,412,500$2,022,500$12,484,333FY23FY19FY20UnscheduledFY22$1,652,500$1,732,500FY21105 CIP Project Fund Wastewater Fund PROJECT NUMBER GF227 DEPARTMENT Finance PROJECT NAME ERP Replacement "Sungard Replacement/Upgrade" FY19 FY20 Unscheduled $333,333 DESCRIPTION OF PROJECT Replacing/upgrading the current system installed in 1999. This is the system that runs all the financial, community development, land records, utility and business license applications. Although it is unscheduled we are currently looking into this with a possibility of FY20. ALTERNATIVES CONSIDERED Continue running current SunGard package. Use SunGard.net (NaviLine EDGE) as an improvement to the current system, but not a full replacement. ADVANTAGES OF APPROVAL Simplified package. Easier to integrate the various applications/programs. Easier to pull out information for end users. Easier compiliation of Commission reports and packets for Community Development. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Unknown. Dependent on the option chosen. FUNDING SOURCES General Fund 33%; Water Fund 33%; Wastewater Fund 33% New Replacement Equipment Project FY21 FY22 FY23 106 CIP Project Fund Wastewater Fund PROJECT NUMBER PW05 DEPARTMENT Public Works PROJECT NAME Public Works Shops Master Plan FY19 $20,000 FY20 Unscheduled DESCRIPTION OF PROJECT Develop a long term master plan for Public Works shop facilities, equipment, and personnel. This includes conducting a needs assessment of space for existing and future employees, equipment, machinery, and rolling stock. There is a severe shortage of enclosed storage for equipment, vehicles, and machinery, resulting in extra wear and tear, additional maintenance costs, and time preparing the equipment on cold mornings. Additionally, there is a lack of space available for existing as well as future staff. This will be split three ways between water ($20,000), wastewater ($20,000), and streets ($20,000). ALTERNATIVES CONSIDERED Continue using existing infrastructure. ADVANTAGES OF APPROVAL Provide an accurate analysis of the City of Bozeman Public Works space needs for both equipment as well as people. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Depending on the results of the plan, the likely result will be the construction of additional storage and office space. FUNDING SOURCES This project will be split 3 ways between Water Fund ($20,000), Wastewater Fund ($20,000), and Street Maintenance Fund ($20,000) New Replacement Equipment Project FY21 FY22 FY23 107 CIP Project Fund Wastewater Fund PROJECT NUMBER PW06 DEPARTMENT Public Works PROJECT NAME Public Works Shops Facility Construction FY19 FY20 $670,000 Unscheduled DESCRIPTION OF PROJECT Construct additional facilities recommended in the result of the Public Works Shops Master Plan. This will be split three ways between water ($670,000), wastewater ($670,000), and streets ($670,000). ALTERNATIVES CONSIDERED Continue using existing infrastructure. ADVANTAGES OF APPROVAL The construction of a new Public Works facility will provide indoor storage for millions of dollars of equipment, machinery, vehicles, etc. This will both reduce wear and tear and maintenance costs, as well as reduce time spent on preparing equipment on cold mornings. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Normal building maintenance and utility costs. FUNDING SOURCES This project will be split 3 ways between Water Fund ($670,000), Wastewater Fund ($670,000), and Street Maintenance Fund ($670,000) New Replacement Equipment Project FY21 FY22 FY23 108 CIP Project Fund Wastewater Fund PROJECT NUMBER WW07 DEPARTMENT Engineering PROJECT NAME Annual Wastewater Pipe Replacement Program - Design FY19 $22,500 FY20 $22,500 Unscheduled DESCRIPTION OF PROJECT This item provides for design work to be completed every-other year, in anticipation of the Annual System Upgrades. Annual wastewater pipe replacement projects minimize service interruptions or main breaks attributable to aging infrastructure. Annual Wastewater Pipe Replacement Program project would be delayed if not done. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Provides survey work needed for design of necessary sewer system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED NA FUNDING SOURCES 100% Wastewater Utility Fund New Replacement Equipment Project FY21 $22,500 FY22 $22,500 FY23 $22,500 109 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-19 DEPARTMENT Engineering PROJECT NAME Wastewater Pipe Replacement Program - Construction in 2019 FY19 $1,000,000 FY20 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2019. Priority will will be places on the sewer segment on S Tracy from College to Babcock to coincide with the S Tracy street reconstructions scheduled for FY19. The remaining balance will be used to continue sewer replacements on segments identified as needing repairs. The condition of the sewer system is analyzed nightly to account for daily updates from the Wastewater Operations Department. ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary wastewater system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 FY22 FY23 110 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-20 DEPARTMENT Engineering PROJECT NAME Wastewater Pipe Replacement Program - Construction in 2020 FY19 FY20 $1,000,000 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2020. Priority will will be places on the sewer segment on S Black from College to the Cul-De-Sac to coincide with the S Black street reconstructions scheduled for FY20. The remaining balance will be used to continue sewer replacements on segments identified as needing repairs. The condition of the sewer system is analyzed nightly to account for daily updates from the Wastewater Operations Department. ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary wastewater system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 FY22 FY23 111 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-21 DEPARTMENT Engineering PROJECT NAME Wastewater Pipe Replacement Program - Construction in 2021 FY19 FY20 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2021. Priority will will be places on the sewer segment on N Tracy from Villard to Peach to coincide with the N Tracy street reconstructions scheduled for FY21. The remaining balance will be used to continue sewer replacements on segments identified as needing repairs. The condition of the sewer system is analyzed nightly to account for daily updates from the Wastewater Operations Department. ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary wastewater system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 $1,000,000 FY22 FY23 112 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-22 DEPARTMENT Engineering PROJECT NAME Wastewater Pipe Replacement Program - Construction in 2022 FY19 FY20 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2022. Priority will will be places on the sewer segment on N 17th from Durston to the end to coincide with the N 17th street reconstructions scheduled for FY22. The remaining balance will be used to continue sewer replacements on segments identified as needing repairs. The condition of the sewer system is analyzed nightly to account for daily updates from the Wastewater Operations Department. ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary wastewater system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 FY22 $1,000,000 FY23 113 CIP Project Fund Wastewater Fund PROJECT NUMBER WW08-23 DEPARTMENT Engineering PROJECT NAME Wastewater Pipe Replacement Program - Construction in 2023 FY19 FY20 Unscheduled DESCRIPTION OF PROJECT This project would complete design, bid and begin construction in the Spring/Summer of 2023. Priority will will be places on the sewer segment on West Koch Street from 8th to Tracy to coincide with the West Koch Street reconstructions scheduled for FY23. The remaining balance will be used to continue sewer replacements on segments identified as needing repairs. The condition of the sewer system is analyzed nightly to account for daily updates from the Wastewater Operations Department. ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Provides for the construction of necessary wastewater system maintenance work. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This project results in a net decrease in overall maintenance costs over the lifecycle of all pipes. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 FY22 FY23 $1,000,000 114 CIP Project Fund Wastewater Fund PROJECT NUMBER WW27 DEPARTMENT Engineering PROJECT NAME Annual Watershed Study & Stream Modeling FY19 $60,000 FY20 $60,000 Unscheduled DESCRIPTION OF PROJECT Develop a comprehensive, multi-year watershed study and computer model for the East Gallatin River, which would enable the City and DEQ to better determine stream load allocations and develop a more scientifically valid TMDL for the river segment we discharge to. This will require annual field sample collection, laboratory analytic al work, and detailed computer modeling using calibrated and validated datasets. It is a crucial tool to inform MPDES discharge permit negotiations and compliance with MT numeric nutrient regulations. This project leverages cooperative relationship with Gallatin Local Water Quality District in the performance of field sampling activities, and it has significant potential to affect scope of future upgrades to WRF to meet numeric nutrient limitations imposed by DEQ Circular 12A and implemented through future MPDES discharge permits. Stream modeling may reduce or eliminate the need for future upgrades dependent upon the results of ongoing data collection and model calibrations. Modeling could identify that assimilative capacity is available in the East Gallatin River or that the EGR is nutrient limited. Model also essential to identify nutrient trade opportunities which could be a significant MPDES compliance tool. ALTERNATIVES CONSIDERED Not undertake this work and risk having to accept the TMDL and waste load allocations the DEQ has proposed in their original draft documents. This decision could greatly limit our ability to appeal future nutrient limitations and could result in non-compliance. ADVANTAGES OF APPROVAL This watershed study will greatly enhance the City’s understand of our impact on the East Gallatin River and enable us to more successfully negotiate future permit limits with the DEQ. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None, unless additional stream sampling is desired in subsequent years. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 $60,000 FY22 $60,000 FY23 $60,000 115 CIP Project Fund Wastewater Fund PROJECT NUMBER WW39 DEPARTMENT WRF PROJECT NAME Resurface and Repaint Clarifiers FY19 $320,000 FY20 Unscheduled DESCRIPTION OF PROJECT Sandblast and paint clarifier drives on primary 1 and secondary 3. Beaches and weirs also need replaced on Primary 1 and 2, and on Secondary 1, 2, and 3. The old final clarifiers were installed in the late 1980's and need to be painted and resurfaced to extend their useful life. Painting and resurfacing the clarifier drives and replacing beaches and weirs will preserve the infrastructure and delay the cost of replacement. ALTERNATIVES CONSIDERED Do nothing ADVANTAGES OF APPROVAL Replace lost & chipping paint on old clarifiers to prevent further deterioration of existing infrastructure. These clarifiers have not been painted since they were installed in 1985. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No new operating costs. FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 FY22 FY23 116 CIP Project Fund Wastewater Fund PROJECT NUMBER WW49 DEPARTMENT WRF PROJECT NAME Roll-Off Storage Building Construction & Possible 2nd Screw Press Enclosure FY19 $1,500,000 FY20 Unscheduled DESCRIPTION OF PROJECT Engineering and construction of a roll-off building and 2nd screw press enclosure. Currently, an enclosed area consisting of concrete blankets is suspended by cables and heated with portable propane heaters which keeps the roll-offs from freezing in the truck storage building. The trucks are stored overnight during the winter so the solids inside them do not freeze. The addition would return the needed space in the truck storage building and would reduce heating costs by using the exhaust air from the solids handling building. Less energy would be used if an extension to the roll-off loading area was built. It could use exhaust air from the solids dewatering building to heat it. Also, not using the portable propane heaters would be a cost savings. Installing this screw press will allow not only redundancy but allows for the additional solids handling that the growing community will need. This project will allow for additional storage of roll-offs, polymer totes and the housing of a new screw press. ALTERNATIVES CONSIDERED Construction of an addition not to include the purchase of a new screw press. ADVANTAGES OF APPROVAL Installing this screw press will allow not only redundancy but allows for the additional solids handling that the growing community will need. This project will allow for additional storage of roll-offs, polymer totes and the housing of a new screw press. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED This addition could be heated with exhaust air from the Solids Handling Building, reducing costs. If a screw press was also housed in this addition, electrical costs for pumping and press operation would be additional. FUNDING SOURCES Digester 3 settlement money, amount TBD but estimated at $1,500,000. New Replacement Equipment Project FY21 FY22 FY23 117 CIP Project Fund Wastewater Fund PROJECT NUMBER WW54 DEPARTMENT Wastewater Operations PROJECT NAME Replace #1783 - 1995 Ford Dump Truck FY19 FY20 $95,000 Unscheduled DESCRIPTION OF PROJECT Vehicle maintenance is requesting that the vehicle be replaced due to age. It has a leaking brake booster that needs replaced, and they can’t get parts to get it repaired because the parts aren’t available for this vehicle anymore. The parts will continue to get harder to purchase in the future to keep this vehicle in service. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. ADVANTAGES OF APPROVAL Will be a more fuel efficient and lower emissions vehicle. The new vehicle will improve safety of the crews, there would be lower repair costs and it would help maintain current operations levels. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Using an older piece of equipment that becomes more unreliable. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 FY22 FY23 118 CIP Project Fund Wastewater Fund PROJECT NUMBER WW58 DEPARTMENT WRF PROJECT NAME Chip Seal and Topcoat WRF Asphalt FY19 $55,000 FY20 Unscheduled DESCRIPTION OF PROJECT Chip Seal and topcoat WRF Asphalt to keep it from deteriorating. The 4.894 acres of asphalt at the WRF facility needs to be protected to extend its useful life. Chip seal 0.402 acres and topcoat 4.492 acres. ALTERNATIVES CONSIDERED Do nothing. ADVANTAGES OF APPROVAL Chip seal and topcoat will extend the useful life of the existing City infrastructure. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 FY22 FY23 119 CIP Project Fund Wastewater Fund PROJECT NUMBER WW69 DEPARTMENT WRF PROJECT NAME WRF Facility R&R FY19 $75,000 FY20 $100,000 Unscheduled DESCRIPTION OF PROJECT Repair and replacement of equipment is an ongoing job at the Bozeman WRF. These funds would be used to repair or replace equipment that fails unexpectedly in an emergency situation. An unforeseen mechanical failure needs to be remedied quickly to protect the quality of facility effluent discharged into the East Gallatin. ALTERNATIVES CONSIDERED Not having this fund would defer other needed maintenance. ADVANTAGES OF APPROVAL Most processes run 24/7 and have backup systems but when the first system fails there is no backup system and repairs need to be made immediately. Not all repairs or equipment failures can be predicted and budgeted as a capital improvement project. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 $100,000 FY22 $100,000 FY23 $100,000 120 CIP Project Fund Wastewater Fund PROJECT NUMBER WW70 DEPARTMENT WRF PROJECT NAME WRF Facility Engineering & Optimization FY19 $50,000 FY20 $50,000 Unscheduled DESCRIPTION OF PROJECT This will allow engineering to be completed on needed projects and to study plant optimization options before spending money on equipment that might not be needed or the proper type. Additionally, this will allow studies to be conducted to make sure the proposed plant optimizations will actually improve the effluent quality at a reasonable expense. ALTERNATIVES CONSIDERED Order replacement or upgrades to equipment that may not be sized correctly or made of the proper materials. Proceed with optimization projects without knowing if the project will actually improve plant performance. ADVANTAGES OF APPROVAL The advantage of having funds available to do engineering studies before any project is started will make sure that the right equipment is purchased and that it will perform properly. Optimization studies will predict actual cost/benefit over time to make sure the city is spending its money efficiently. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Currently unknown FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 $50,000 FY22 $50,000 FY23 $50,000 121 CIP Project Fund Wastewater Fund PROJECT NUMBER WW76 DEPARTMENT WRF PROJECT NAME Third Pretreatment Screen FY19 FY20 Unscheduled DESCRIPTION OF PROJECT Purchase a third pretreatment screen and the engineering to properly install it. The two installed pretreatment screens are running 24/7 so there is no redundancy to the system. Adding a third screen will increase the capacity of pretreatment to handle increased flows from growth without bypassing the screens. This screen will prevent the clogging of pipes and pumps will preserve the effluent quality of the facility, and all equipment downstream of the screens will be better protected. Pipes and pumps that are not plugged run more efficiently and require less energy to run. ALTERNATIVES CONSIDERED Do nothing and run the risk of having to bypass the existing screens because they cannot handle the load coming into the plant. ADVANTAGES OF APPROVAL Protecting downstream infrastructure by not having to bypass the screens. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Additional cost of electricity for the motors on the screen. FUNDING SOURCES Wastewater Funds and possibly Impact Funds New Replacement Equipment Project FY21 $500,000 FY22 FY23 122 CIP Project Fund Wastewater Fund PROJECT NUMBER WW78 DEPARTMENT WRF PROJECT NAME Server Replacement at WRF (WRFCTRLBAK) FY19 FY20 Unscheduled DESCRIPTION OF PROJECT Replace the WRF server WRFCTRLBAK ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 FY22 $10,000 FY23 123 CIP Project Fund Wastewater Fund PROJECT NUMBER WW83 DEPARTMENT WRF PROJECT NAME UFAT Gravity Thickener Drive and Arms Replacement FY19 FY20 Unscheduled DESCRIPTION OF PROJECT Replacement of the gravity thickener deteriorating mechanism. The UFAT gravity Thickener thickens elutriated fermented sludge before it is sent to the digester thus increasing detention time in the digesters. It is the second stage of the UFAT system that generates Volatile Fatty Acids that are an energy source for the Phosphorus Accumulating Organisms. These POA's are what remove the phosphorus from the wastewater. The gravity Thickener thickens elutriated fermented sludge before it is sent to the digester thus increasing detention time in the digesters. ALTERNATIVES CONSIDERED None ADVANTAGES OF APPROVAL Installation planning and purchase of the drive and arms will allow a scheduled shutdown rather than a quick fix when the drive fails. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional costs. FUNDING SOURCES Not known at this time. New Replacement Equipment Project FY21 FY22 $400,000 FY23 124 CIP Project Fund Wastewater Fund PROJECT NUMBER WW84 DEPARTMENT WRF PROJECT NAME Server Replacement at WRF (WRFCTRLPRI) FY19 FY20 Unscheduled DESCRIPTION OF PROJECT Replace the WRF server WRFCTRLPRI ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 FY22 $10,000 FY23 125 CIP Project Fund Wastewater Fund PROJECT NUMBER WW85 DEPARTMENT WRF PROJECT NAME WRF Process Upgrades to Improve Nutrient Recovery & Capacity FY19 FY20 Unscheduled $12,000,000 DESCRIPTION OF PROJECT This project will increase WRF capacity to meet facility plan recommendations and future discharge permit requirements. ALTERNATIVES CONSIDERED Do nothing and loose a commodity that is a bi-product of anaerobic digestion ADVANTAGES OF APPROVAL The production of magnesium ammonium phosphate to be sold as a slow release fertilizer will recycle limited nutrients back into the ecosystem. This process will reduce the nitrogen and phosphorus in our sidestream returning to the head of the plant which will in turn reduce the loading on the process. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Maintenance and operating costs that will be offset by income from the sale of the slow release fertilizer. FUNDING SOURCES 100% Wastewater Funds New Replacement Equipment Project FY21 FY22 FY23 126 CIP Project Fund Wastewater Fund PROJECT NUMBER WW86 DEPARTMENT Wastewater Operations PROJECT NAME Steerable sewer TV tractor FY19 $25,000 FY20 Unscheduled DESCRIPTION OF PROJECT This tractor carries our TV camera in our sanitary and storm sewers. This tractor is the only tractor that can carry our new larger digital cameras. Currently, we only have one steerable tractor, so using both sewer trucks at the same time is not possible. ALTERNATIVES CONSIDERED Use one truck at a time with the larger camera. ADVANTAGES OF APPROVAL Using both digital cameras at the same time which televise the sewer mains much faster than our older cameras. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED NA FUNDING SOURCES NA New Replacement Equipment Project FY21 FY22 FY23 127 CIP Project Fund Wastewater Fund PROJECT NUMBER WW86 DEPARTMENT Wastewater Operations PROJECT NAME Wheeled Excavator FY19 FY20 Unscheduled $151,000 DESCRIPTION OF PROJECT This would be a trackhoe excavator with wheels instead of tracks. It is a critical piece of machinery in our departments, and it is used to maintain water, sewer, and stormwater infrastructure. The excavator will be split 50/50 with the water fund (W68). ALTERNATIVES CONSIDERED Continue to use smaller equipment. ADVANTAGES OF APPROVAL Increased productivity with larger excavator. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED N/A FUNDING SOURCES $151,000 Water Fund, $151,000 Wastewater Fund New Replacement Equipment Project FY21 FY22 FY23 128 CIP Project Fund Wastewater Fund PROJECT NUMBER WW87 DEPARTMENT Wastewater Operations PROJECT NAME Sewer Flow Meters FY19 $35,000 FY20 Unscheduled DESCRIPTION OF PROJECT Two flow meters can record sewer flows in the sewer mains, which is critical for planning for new mains. These meters will be used along with the one we purchased in FY 17. We need multiple flow meters to monitor wet weather events to calibrate our sewer model. With growth, there is also a need to monitor available sewer capacity for new subdivisions. ALTERNATIVES CONSIDERED Renting additional meters. ADVANTAGES OF APPROVAL The ability to do in house monitoring of sewer flows. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED $600 / year for software. $80 / month for cellular data. (For both meters) FUNDING SOURCES NA New Replacement Equipment Project FY21 FY22 FY23 129 CIP Project Fund Wastewater Fund PROJECT NUMBER WW88 DEPARTMENT WRF PROJECT NAME Re-Tube Boiler FY19 FY20 $25,000 Unscheduled DESCRIPTION OF PROJECT Current boiler in de-watering building continually has wear on internal components that causes deterioration. Rebuilding will ensure operation, as well as, extend life of boiler and is more economical than replacing the entire boiler. ALTERNATIVES CONSIDERED Replace and repair tubes individually as they fail. ADVANTAGES OF APPROVAL The cost of replacing 4 tubes is about the same as what replacing all 20+ would cost. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES None New Replacement Equipment Project FY21 FY22 FY23 130 CIP Project Fund Wastewater Fund PROJECT NUMBER WW89 DEPARTMENT WRF PROJECT NAME HVAC heat loop optimization FY19 $250,000 FY20 Unscheduled DESCRIPTION OF PROJECT Modify heating system to provide for facility needs. The current HVAC system is not adequately heating the digester and buildings. This poses some operational problems that range from inadequate sludge digestion to not being able to provide enough heat to buildings and keep utilities from freezing. ALTERNATIVES CONSIDERED Some alterations have already been made to the system to maximize the current setup. There is not an easy or cost effective alternative solution that would solve this problem. ADVANTAGES OF APPROVAL This project would improve the digester operation as well as keep buildings properly heated. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED There will be some increase the energy usage, but this has not been calculated yet. FUNDING SOURCES 100% Wastewater Fund New Replacement Equipment Project FY21 FY22 FY23 131