HomeMy WebLinkAbout16- Change Order 2 - CK May Excavating - Story Mill Landfill LFG-SVE System CHANGE ORDER No. 2
PROJECT TITLE: City of Bozeman Landfill LFGISVE System
CONTRACT DATE:January 18,2016_
OWNER:City of Bozeman
CONTRACTOR: CK May Excavatinca
Change Orders must include an itemized cost breakdown. You shall comply with the following changes
from the Contract Documents.(Show separate costs for materials, labor,equipment,and miscellaneous.
Show percent where applicable.)
Cost Of Changes
Contract Item No. Description
Change Materials Labor Equipment Cost
Well
development
VVD-7 and 2,413,66
additional J-
trap
Total Cost
Cost Of Changes
Contract Item No. Description
Change Materials Labor Equipment Cost
Changes
related to
CO-2 pitless 46,279.43
adaptors for
LFG wells
'rotat Cost for Chan e Order No.1 46.279.43
Total Cost for CO No. I
$488
including WD 7 ,6910
Original Contract Price: $1,025,233,00
Current Contract Price Adjusted by Pre-vimus Changes: 1J20,62M-4
Cost this Change Order or $48,693.08
Rev. 6/04
New Contract Price including this Change Order: $1,169,216.92
The completion date as set forth in the Contract Documents shall be increased by 14 calendar days.
The date for completion of all work will be August 22,2016
Description and Justification for Change:
This Change Order No. 2 incorporates Work Directive Change No. 7 which adds 2 days to the contract
completion date.
Change Order No. 2 also incorporates the addition of below ground pitless adapters and associated
changes for condensate lines coming out of approximately 20 LFG wells and adds 12 calendar days to
the contract completion date.
RE:Bond No.MTC42557
SURETY CONSENT
The Surety hereby consents to the aforementioned Contract Change Order and agrees that its bond or
bonds shall apply and extend to the Contract as thereby modified or amended per this Change Order.The
Principal and the Surety further agree that on or after execution of this consent, the penalty of the
applicable Performance Bonds or Bonds is hereby increased by$ $48,693.08(100 percent of the Change
Order amount)and the penalty of the applicable Labor and Material Bond or Bonds is hereby increased
by$ $48,693.08(100 percent of the Change Order amount).
COUNTERSIGNED BY MONTANA SURETY
RESIDENT AGENT
Merchants Bonding Company(Mutual)
r .
1A ON
By: Y Attome -in-Fact
rsc � N ) �k ,, Seal r
Recommended by: '�!
Engi Date
r."
Accepted by: -
on actor Date
� k I
Accepted by:
Owner Date
Rev.6/04
MERCHAN
BONDING COMPANY,,
POWER OF ATTORNEY
Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,
INC.,both being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint.
individually,
Carly Schneidenbach; Kelly L Tenold; Ryan Elliott; Spencer Fred Thomas; Tyler McIntyre
their true and lawful Attorney(s)-i n-Fact,to make,execute,seal and deliver on behalf of the Companies,as Surety,bonds,undertakings
and other written obligations in the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of:
FIVE HUNDRED THOUSAND($500,000.00)DOLLARS
This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the
Board of Directors of Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants
National Bonding,Inc.,on October 24,2011.
"The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company
thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof,'
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of
Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship
obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given
to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation.It is fully understood that consenting to the State of Florida
Department of Transportation making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company
of any of its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only.it is agreed that the power and authority hereby given
to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner-
Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 4th day of September 2015
10....1 ......
4 . \Nk G C MERCHANTS BONDING COMPANY(MUTUAL)
_A 1 1 4.41"", — . MERCHANTS NATIONAL BONDING,INC.
1*1 1,�P.
Ty 04 iik P 6,9,
T_
1933
0
ra By
STATE OF IOWA
COUNTY OF Dallas ss. President
On this 4th day of September 2015 before me appeared Larry Taylor,to me personally known,who being by me sworn did say that
he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC. and that the seats affixed
to the foregoing instrument are the Corporate seals of the Companies:and that the said instrument was signed and sealed in behalf of the
Companies by authority of their respective Boards of Directors.
WENDY Woo�y Coali-ission Nwrbci r84651
My cow n"Iscion Expres
June;20.2017 County,Naar,Publi to va
(Expiration of notary's commission
does not invalidate this instrument)
1,VVilliam Warner.Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC
do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies..
v,,hich is still in full force and effect and has not been amended or revoked.
In Witness Whereof. I have hereunto set my hand and affixed the seal of the Companies on this 21st day of July 2016
(314
�k P
-vt
Secretary
A rc
POA 00-14 (6/15)
WORK DIRECTIVES
Bozeman hndfill LFG/SVE System
Subcontractor Materials Employee Equipment Total
bun. Labor an
contractor Total Material Cost plus Total Equipment Total Equipment
Item Description Date Sub Units Sub Rate Mark up Equipment Description Cost Mark up 15% Name Position Rate Hours Employee Description Rate Hours Equipment&Material
Disconnect existing Gas Handling Matt Smith&
CO 2 System at 7 well locations 7/5/2016 Cody May Operator $75,00 28 $2,100.00 52100.00
Excavate and expose 17 Well
JD 210 Excavator
Casings Matt Smith Operator $75.00 51 53,825.00 with Cody May 5204.90 34 $6,966.60 S10,791.60
Install Pilless Adaptors for?
existing Well Casings with Cody May and
additional Reducer Fittings Man Smith 0 orator $80.00 28 52,240.00 52.240.00
Install Pilless Adaptors for 10 New
Well Casings.Includes chipping Matt Smith&
Grout at casing Cody May Operator 575.00 30 $2,250.00 $2,250.00
mono own oe...Pc or
Work to Install Designed Above
Ground Leachate onto Pitless
Adaptors Service Truck with 2
Subcontractor Persons 30.001 150.00 1.051 4.725.00 $4725W
Demolition of existing Concrete
and 4 Bollards at OW 19.Does JD 210 Excavator
Not include Concrete Re lacement Cody May Foreman $80.00 4 5320.00 with Cotl Ma: $204.90 2 5409.80 5729.80
Replace Bollards 4.00 120.00 1.15 552.00 Matt Smith Operator $75.00 4 $300.00 $852.00
Concrete Disposal 4,50 25.00 1,15 129.38 Dum Tmck. 1 $100.00 1 $100.00 $229.38
Malerizl for Existing Wells- 1.00 1,295.00 1.15 1,489.25 S L809.25
Pipe Material for New Design-
Includes someImport 1.00 8,395.00 1.15 9,654.25 59.654.25
1D 210 Excavator
with Cody May
Backfdl
Sonmubes and
Benlonite Amended Grout 7.00 300.00 1.15 2,415.00 excavation $204.90 10 $2.049.00 54,464.00
Cody May and Haul Track with
Matt Smith Matt Smith
Installing Foreman& shuttling Crasher
14"Sonotubes Installed 102.00 433 1.15 507.91 Sonotube aad Operator 575.00 8 5600.00 Fines $211.30 10 $2113.00 $3,220.91
CravcI Freight
Crasher Fines 50.00 6.50 1.15 373.75 with Transfer $110.00 4 $440.00 5813.75
Reve etation 6.800.00 0.20 1.00 1.360.00 $1,360.05
Consideration of Base Contract
26A and 26B will be incorporated '..
per Contract unit pricing if '..
Increased Builders Risk L00 550.00 1.15 632.50
S40 7.50
Gross Receipts Tax CO2 1.005407
00 407.00 1.00 407.00 .00
Increased Bond CO 02 1.00 407.00 1.15 469.27
Some Components are Non
Compliant to American Iran and
Steel Act
E49,535.00
50.00 $0.00
Additional Contract time re ucstW @ 15 days $ $0.00 50.00
Total Change Request#2 a �.. c ,"� .- 19A 8.65 'e $0.00 $0.00. - „`:$12:07Bf90 546.279.43