HomeMy WebLinkAbout11-20-17 City Commission Packet Materials - C4. Solid Waste Fund CIP FY2019-2023
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Kristin Donald, Finance Director
SUBJECT: Adopt the Solid Waste Fund (Collection & Recycling) Capital
Improvement Plan (CIP) for Fiscal Years 2019-2023.
AGENDA ITEM TYPE: Consent
MEETING DATE: November 20, 2017
RECOMMENDATION: Adopt the Solid Waste Fund (Collection & Recycling) Capital
Improvement Plan (CIP) for Fiscal Years 2019-2023.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing the various parts of the plan forward as items on the Consent agenda. We
will be prepared to address questions, if they arise, at the public meeting.
The Public Works, City Manager, and other city staff met in October and November to develop
the attached Capital Plan for the equipment and capital needs of the Solid Waste Fund. The
attached capital replacement schedule is needed to continue operations for garbage collection and
the recycling program. This plan works in concert with the existing Solid Waste Rate study that
was completed in FY13, funding annual capital replacement at an amount similar to annual
depreciation expense noted in the rate study.
Items of Note:
23
SW52 Side Load Truck Replacement – Solid Waste is requesting this side load truck
replacement for FY21, which is critical to complete residential garbage collection
service. As per the approved 6-year replacement schedule, garbage truck, asset #3746,
will be placed as a backup truck for the division.
SW50-51 Side Load Truck Replacements- These side load trucks have been scheduled
on the plan as part of the 6-year replacement schedule for FY23.
Solid Waste Fund revenues have averaged growth of 4.8% per year over the past 5 years,
and averaged over 9% in the past 3 years. The capital plan estimates future revenues at
5% for the next 5 years.
FY Amount Change
2013 2,519,436.00$ ‐2.0%
2014 2,721,913.00$ 8.0%
2015 2,956,655.00$ 8.6%
2016 3,238,853.00$ 9.5%
2017 3,613,721.00$ 11.6%
Linear Trend‐2018 3,713,721.00$
Average FY13‐FY17 3,010,115.60$ 7.2%
640 ‐ Solid Waste Revenue history
24
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: November 7, 2017
Attached: Solid Waste CIP
25
Solid Waste Collection & RecyclingCapital Improvement PlanFinancial Summary Current YearFY18 FY19 FY20 FY21 FY22 FY23UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 468,495$ 135,862$ 452,848$ 435,683$ 667,660$ 1,016,135$ ‐$ Plus: Revenues Dedicated to CIP 492,367$ 516,986$ 542,835$ 569,977$ 598,476$ 628,399$ ‐$ Less: FY17 Carryover Capital (95,000)$ Less: Scheduled CIP Project Costs (730,000)$ (200,000)$ (560,000)$ (338,000)$ (250,000)$ (600,000)$ Projected Year‐End Cash Dedicated to CIP 135,862$ 452,848$ 435,683$ 667,660$ 1,016,135$ 1,044,535$ ‐$ Assumptions are made for Revenue Estimates Current YearFY18 FY19 FY20 FY21 FY22 FY23Estimated Annual Revenues 3,787,441$ 3,787,441$ 3,976,813$ 4,175,654$ 4,384,436$ 4,603,658$ Estimated Annual Increase in Revenues 0.0% 5.0% 5.0% 5.0% 5.0% 5.0%Total Estimated Revenues 3,787,441$ 3,976,813$ 4,175,654$ 4,384,436$ 4,603,658$ 4,833,841$ Current Revenues Dedicated to CIP % 13.0% 13.0% 13.0% 13.0% 13.0% 13.0% Plus: Increase Dedicated to CIP0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 13.0% 13.0% 13.0% 13.0% 13.0% 13.0%Total Estimated Revenues Dedicated to CIP492,367$ 516,986$ 542,835$ 569,977$ 598,476$ 628,399$ ProjectedProjectedCURRENT$(200,000)$(560,000)$(338,000)$(250,000)$(600,000)FY18 FY19 FY20 FY21 FY22 FY23 UNSCHEDULEDSOLID WASTE PROJECTS & EQUIPMENT 26
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Solid Waste FundSW32CollectionFRONT LOAD TRUCK REPLACEMENT$270,000SW36CollectionSIDE LOAD TRUCK - NEW (ADDITIONAL ROUTE)$290,000SW45CollectionTOTE DELIVERY TRUCK$38,000SW46CollectionGRAPPLE TRUCK$200,000$200,000$560,000$38,000Totals by DEPARTMENTSolid Waste FundSW47Solid WasteSOLID WASTE RATE STUDY$50,000SW48Solid WasteTROMMEL SCREEN$200,000SW50Solid WasteSIDE LOAD TRUCK$300,000SW51Solid WasteSIDE LOAD TRUCK - RECYCLING$300,000SW52Solid WasteSIDE LOAD TRUCK REPLACEMENT$300,000$600,000$300,000$250,000Totals by DEPARTMENTSummary for Solid Waste Fund (9 items)Totals by year:$600,000$200,000$560,000FY23FY19FY20UnscheduledFY22$250,000$338,000FY2127
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW32
DEPARTMENT
Collection
PROJECT NAME
Front Load Truck Replacement
FY19 FY20
$270,000
Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for an existing front-load truck currently collecting residential and commercial refuse. This equipment
is critical to the operation of the Solid Waste Division. Customer depend on refuse removal on their collection day. Efficiency is
improved with this equipment on the chassis side with increased fuel efficiency and emission reductions.
ALTERNATIVES CONSIDERED
Leasing a front-load truck.
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Average maintenance costs: $10,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY21 FY22 FY23
28
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW36
DEPARTMENT
Collection
PROJECT NAME
Side Load Truck - New (Additional Route)
FY19 FY20
$290,000
Unscheduled
DESCRIPTION OF PROJECT
This is a new side load truck to be used for additional routes. This equipment is critical to the operation of the Solid Waste
Division. Customers depend on refuse removal on their collection day. Efficiency is improved with this equipment on the chassis
side with increased fuel efficiency and emission reductions. The packer mounted on the chassis also see improvements thru
better operator agronomics with joystick controls and better packer function options.
ALTERNATIVES CONSIDERED
Leasing a side-load truck
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs = $30,000
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY21 FY22 FY23
29
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW45
DEPARTMENT
Collection
PROJECT NAME
Tote Delivery Truck
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
This truck is a replacement for an existing tote delivery truck. This truck is critical in the execution of container management.
Totes need to be delivered to new customers, exchange of totes for customers and removal of totes.
ALTERNATIVES CONSIDERED
Leasing a truck
ADVANTAGES OF APPROVAL
The Solid Waste Divison can continue to deliver,exchange and remove customer tote requests.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance costs $1,000/year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY21
$38,000
FY22 FY23
30
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW46
DEPARTMENT
Collection
PROJECT NAME
Grapple Truck
FY19
$200,000
FY20 Unscheduled
DESCRIPTION OF PROJECT
Truck with articulating arm with clam shells that will pick up large, bulky items (including brush removal) and place into dump
box. While work can still be done by hand, manual work increases risk of back injury. Efficiency is accomplished thru our work
comp rates.
ALTERNATIVES CONSIDERED
Leasing a grapple truck
ADVANTAGES OF APPROVAL
Equipment would be used to pick up large bulky items and brush. Currently we manually load these items by hand.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance cost: $6,000 per year
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY21 FY22 FY23
31
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW47
DEPARTMENT
Solid Waste
PROJECT NAME
Solid Waste Rate Study
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
Solid Waste Rate Study - including an analysis of revenue requirements, funding depreciation, and cost recovery by customer
class. The most recent rate study was completed in 2013 and should be updated.
ALTERNATIVES CONSIDERED
Continue with current rates.
ADVANTAGES OF APPROVAL
Full cost accounting, rates based on cost of services.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
NA
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY21 FY22
$50,000
FY23
32
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW48
DEPARTMENT
Solid Waste
PROJECT NAME
Trommel Screen
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
A screen that can separate out garbage from finished compost and separate the size of compost. This is the final stage of the
composting process that we are currently unable to accomplish using existing equipment.
ALTERNATIVES CONSIDERED
Rental of this equipment is not avaiable
ADVANTAGES OF APPROVAL
The Solid Waste Divison can market the finished compost product
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
NA
FUNDING SOURCES
100% Solid Waste Fund
New
Replacement
Equipment
Project
FY21 FY22
$200,000
FY23
33
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW50
DEPARTMENT
Solid Waste
PROJECT NAME
Side Load Truck
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
This side load truck is critical to complete residential garbage collection service. As per the approved 6 year replacement
schedule, garbage truck, asset # 3839, will be placed as backup truck for the division.
ALTERNATIVES CONSIDERED
Leasing a side load truck
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs $30,000
FUNDING SOURCES
100% Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY21 FY22 FY23
$300,000
34
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW51
DEPARTMENT
Solid Waste
PROJECT NAME
Side Load Truck - Recycling
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
This side load truck is critical to complete residential and commercial recycling collection service. As per the approved 6 year
replacement schedule, recycling truck, asset #3838, will be placed as a backup truck for the division.
ALTERNATIVES CONSIDERED
Leasing a side load truck
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of new equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs $30,000
FUNDING SOURCES
100% Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY21 FY22 FY23
$300,000
35
CIP Project Fund
Solid Waste Fund
PROJECT NUMBER
SW52
DEPARTMENT
Solid Waste
PROJECT NAME
Side Load Truck Replacement
FY19 FY20 Unscheduled
DESCRIPTION OF PROJECT
This side load truck is critical to complete residential garbage collection service. As per the approved 6 year replacement
schedule, garbage truck, asset #3746, will be placed as a backup truck for the division.
ALTERNATIVES CONSIDERED
Leasing a side load truck
ADVANTAGES OF APPROVAL
Reliable equipment to ensure routes completed in an efficient manner. Maintenance costs of newer equipment will be lower.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual operating and maintenance costs $30,000
FUNDING SOURCES
100% Solid Waste Enterprise Fund
New
Replacement
Equipment
Project
FY21
$300,000
FY22 FY23
36