Loading...
HomeMy WebLinkAbout11-13-17 City Commission Packet Materials - C13. Resolution 4863, Change Order 2 with Montana Civil for 5.3 MG Water Tank Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Resolution 4863 authorizing Change Order No. 2 to the 5.3 Million Gallon (MG) Water Storage Tank Project. MEETING DATE: November 13, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4863 authorizing Change Order No. 2 to the 5.3 MG Water Storage Tank Project. BACKGROUND: Attached is a copy of resolution 4863 and change order number 2 for the above referenced project. This change order includes five items. Two are credits and three are additions. Pages three through ten of the change order provide a short description of each of the items involved with this change along with additional backup information. Overall this change will decrease the contract price by $36,234.06 and increase the contract time by 17 days. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order decreases the contract amount by $36,234.06 from $7,668,234.00 to $7,631,999.94. Attachments: Resolution No 4863, Change Order No 2 Report compiled on: 10/31/17 195 196 197 198 199 200 201 202 203 204 205 206 207