HomeMy WebLinkAbout11-13-17 City Commission Packet Materials - C5. Building Inspection CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Kristin Donald, Finance Director
SUBJECT: Adopt the Building Inspection Capital Improvement Plan (CIP) for
Fiscal Years 2019-2023.
AGENDA ITEM TYPE: Consent
MEETING DATE: November 13, 2017
RECOMMENDATION: Adopt the Building Inspection Capital Improvement Plan (CIP)
for Fiscal Years 2019-2023.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. The Building
Inspection, City Manager, and other city staff met in October & November to develop the
attached Capital Plan for the equipment and capital needs of the Building Inspection Division.
Items of Note:
GF199 – Professional Building Reconfiguration – PH 2 moved the previous year to
FY19 and was adjusted for construction cost increases. Other Departments and funds are
a part of this project and funding.
Estimates of Growth in Revenues – Our estimates of growth in revenues in this fund
are based on a 5 year average with FY18 estimated from the budget. For the purposes of
the plan, we are showing 5% annual estimated growth. Revenues have been trending
upward but at an irregular pace.
115
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: October 31, 2017
Attached: Draft - Building Inspection CIP
FY Year Revenue Change
2011 1,019,717.00$
2012 978,403.00$ ‐4.1%
2013 1,333,047.00$ 36.2%
2014 1,483,742.00$ 11.3%
2015 1,539,622.00$ 3.8%
2016 1,843,206.44$ 19.7%
2017 1,784,665.00$ ‐3.2%
Average FY13‐FY17 1,596,856.49$ 13.4%
116
Building Inspection FundCapital Improvement PlanFinancial SummaryCurrent YearFY18 FY19 FY20 FY21 FY22 FY23 UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 192,100$ 224,600$ 19,065$ 30,768$ 43,056$ 55,958$ Plus: Building Inspection Revenues Dedicated to CIP32,500$ 11,146$ 11,703$ 12,288$ 12,902$ 13,548$ ‐$ Less: Scheduled CIP Project Costs ‐$ (216,681)$ ‐$ ‐$ ‐$ ‐$ (325,000)$ Projected Year‐End Cash Dedicated to CIP 224,600$ 19,065$ 30,768$ 43,056$ 55,958$ 69,506$ Assumptions Made for Revenue Estimates: Current YearFY18 FY19 FY20 FY21 FY22 FY23Estimated Annual Building Inspection Revenues 1,769,150$ 1,769,150$ 1,857,608$ 1,950,488$ 2,048,012$ 2,150,413$ Estimated Growth in Revenues 0% 5% 5% 5% 5% 5%Total Estimated Revenues 1,769,150$ 1,857,608$ 1,950,488$ 2,048,012$ 2,150,413$ 2,257,934$ Current Revenues Dedicated to CIP % 0.6% 0.6% 0.6% 0.6% 0.6% 0.6% Plus: Increase Dedicated to Capital Improvements % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 0.6% 0.6% 0.6% 0.6% 0.6% 0.6%Total Estimated Revenues Dedicated to CIP 32,500$ 11,146$ 11,703$ 12,288$ 12,902$ 13,548$ ProjectedProjectedCURRENT$(216,681)$‐$‐$‐$‐$(325,000)FY18 FY19 FY20 FY21 FY22 FY23 UNSCHEDULEDBUILDING INSPECTION PROJECTS & EQUIPMENTB ildi I ti R117
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY19UnscheduledFY23FY20FY21FY22Building InspectionBI01BUILDING INSPESTAFF VEHICLE - REPLACEMENTS$325,000GF199BUILDING INSPECTIONPROFESSIONAL BUILDING RECONFIGURATION - PHASE 2$216,681$216,681$325,000Totals by DEPARTMENTSummary for Building Inspection (2 items)Totals by year:$216,681$325,000FY23FY19FY20UnscheduledFY22FY21118
CIP Project Fund
Building Inspection
PROJECT NUMBER
BI01
DEPARTMENT
BUILDING INSPECTION
PROJECT NAME
STAFF VEHICLE - REPLACEMENTS
FY19 FY20 Unscheduled
$325,000
DESCRIPTION OF PROJECT
This item is for the scheduled replacement of Building Inspection vehicles based on age and use of the vehicle. Vehicles will be
replaced according to the City's Vehicle Replacement policy; generally, 150,000 miles/20 years before replacement of non-
emergency vehicles. This program will address the long term vehicle needs of the Building Division by allowing careful
replacement of vehicles as vehicle conditions and department needs warrant. Right now, all vehicles are in use by Department
staff, averaging approximately 5,000 miles per year. Vehicle Mileage updated October 2015. There are no maintenance issues or
significant problems to report. We do regular maintenance and service all of our vehicles and always fix small stuff before it
becomes a big problem.
ALTERNATIVES CONSIDERED
Utilize vehicles beyond the recommendations of the vehicle use policy; consider replacements of different model of vehicle.
ADVANTAGES OF APPROVAL
Based on the age and use of the vehicle a new vehicle will be purchased as replacement. In the past, vehicles were replaced after 5 years. We are
stretching the useful life within the division to match the newly-revised vehicle purchase/replacement policy.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Generally, annual operating and maintenance costs are expected to decrease when older vehicles are replaced with newer ones. More fuel
efficiency and lower repair costs are financial benefits.
FUNDING SOURCES
100% Building Inspection Fund
New
Replacement
Equipment
Project
FY21 FY22 FY23
119
CIP Project Fund
Building Inspection
PROJECT NUMBER
GF199
DEPARTMENT
BUILDING INSPECTION
PROJECT NAME
PROFESSIONAL BUILDING RECONFIGURATION - Phase 2
FY19
$216,681
FY20 Unscheduled
DESCRIPTION OF PROJECT
The City is responding to growth by adding staff to meet the increased demand for services in our community. We have also
reorganized divisions (Community Development) and created other divisions (Stormwater) to improve efficiency and better serve
our community. In order to accommodate this grow, we need to remodel the Stiff Building. In FY16 the City Commission
approved a Phase 1 of the remodel that will provide a better use of existing space by relocating certain functions to the basement
and reclaiming unused square footage. Approval of Phase II would allow the consolidation of Community Development (Planning
and Building) together on one floor and the consolidation of Public Works Services (Engineering, GIS and Stormwater) together
on another floor. This will allow better coordination of staff and better service to our public. Phase 1 is anticipated to be
completed late spring of 2016.
ALTERNATIVES CONSIDERED
Continue to operate as we are today
ADVANTAGES OF APPROVAL
Community Development would be able to consolidate its operations and services to allow for an integrated customer-focused service delivery
model. It will also provide Public Works with the ability to collocate its services in the Stiff Building. Finally it will help the City to take a planned
and efficient approach to building utilization and service optimization.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
No additional operating costs anticipated for building reconfiguration.
FUNDING SOURCES
Building Inspection, Community Development, General Fund, and Parking.
New
Replacement
Equipment
Project
FY21 FY22 FY23
120
Building Inspection Vehicles - Details
Project Number Asset #Make Model Yr Current Mileage FY19 FY20 Unscheduled NotesFY21FY22FY23
BI01 3144 Jeep Liberty 2003 70,487 $32,500 Beyond FY20
3218 Grand Cherokee 2004 55,257 $32,500 Beyond FY20
3353 Jeep Liberty 2006 49,287 $32,500 Beyond FY20
3328 Dodge Durango 2006 72,608 $32,500 Beyond FY20
3354 Jeep Liberty 2006 62,990 $32,500 Beyond FY20
3404 Dodge Durango 2008 44,945 $32,500 Beyond FY20
3329 Dodge Durango 2008 67,382 $32,500 Beyond FY20
3723 Jeep Patriot 2014 11,321 $32,500 New in 2013
3674 Jeep Patriot 2014 14,405 $32,500 New in 2013
3968 Prius 2017 385 $32,500 New in 2017
3967 Prius 2017 3,961 $32,500 New in 2017
$357,500Total By Year for Vehicle Replacements
121