Loading...
HomeMy WebLinkAbout11-06-17 City Commission Packet Materials - C11. Amendment 2 with Morrison-Maierle for Design Services for Water Conservation Projects Commission Memorandum Report To: Honorable Mayor and City Commission From: Jessica Ahlstrom, Water Conservation Technician Craig Woolard, Director of Public Works Subject: Sunset Hills Cemetery and Lindley Park Water Conservation Project Meeting Date: November 6, 2017 Agenda Item Type: Consent Item Recommendation: Authorize the City Manager to sign Amendment No. 2 to Professional Services Agreement dated November 16, 2015 with Morrison-Maierle Inc. for additional architectural and landscape design services for the Sunset Hills Cemetery and Lindley Park Water Conservation Project. Background: The Sunset Hills Cemetery and Lindley Park Water Conservation Project will conserve water, increase availability of domestic water supplies during periods of drought, reduce safety risks to city staff associated with the Bozeman Creek diversion structure, and increase instream flows for fish habitat. It also allows for the protection and efficient use of one of the City’s most senior water rights. The scope of this project includes the design and construction of a pump house to be located near the Church St. parking lot for Burke Park. The purpose of the pump house is to pump water from Mill (Story) Ditch to the Sunset Hills Cemetery irrigation system where it will be used to irrigate the cemetery, resulting in the conservation of potable water that is currently being used to irrigate this area. The pump house will need to be accessed by City staff, conform to Planning Department requirements for landscaping, and be of such a design that it fits the character of the area. In order to achieve this, full building plans, specifications for an access road, gate, and temporary irrigation, and additional construction phase support services are needed. Alternatives: As suggested by the Commission. Fiscal Effects: Total project costs to the Cemetery Irrigation Project CIP General Fund (GF 231) are not to exceed $6,950.00. There is a total of $6,997.00 in unused grant support budgeted for this project which will not be used for grant support. This money will instead go to fund the additional $6,950.00 needed for this amendment. This results is a total project cost savings of $47.00. 107 Attachments: Amendment No. 1 to Professional Services Agreement dated November 7, 2016 with the engineering firm of Morrison-Maierle Inc. for the Sunset Hills Cemetery and Lindley Park Irrigation Project. Professional Services Agreement dated November 16, 2015 with the engineering firm of Morrison-Maierle Inc. for the Sunset Hills Cemetery and Lindley Park Irrigation Project. 108 109 110 111 112 113 2 Sections 4.2, 4.3, 4.4, 4.5, 4.6 and 4.7 are added to the Original Agreement as follows: 4.2 PRELIMINARY DESIGN PHASE After acceptance of the pre-design report and receipt of written authorization to proceed with the Preliminary Design Phase, ENGINEER shall: 4.2.1. In consultation with OWNER determine general scope, extent and character of the Project. 4.2.2. ENGINEER shall then prepare a Preliminary Design Report, preliminary plans and specifications and a written description for the Project. 4.2.3. Preliminary Design Report: Specific items to be addressed in the design report will include, but not be limited to: 4.2.3.1. Summary of construction requirements with appropriate drawings for each task included in the project. 4.2.3.2. Plans for providing water and sewer services for affected properties during construction. 4.2.3.3. Summary geotechnical report for specific tasks, if needed. 4.2.3.4. Special design considerations for Project tasks with conditions not covered in standard construction methods or specifications. 4.2.3.5. A traffic control plan for each project task, if necessary. 4.2.4. Design and Construction Survey: The ENGINEER shall conduct a design field survey of the project areas, as necessary, for locating existing utilities (such as gas, power, telephone, TV cables, water and sewer lines, irrigation facilities, fences, and approach driveways), existing right-of-way and easements, and making measured drawings of or investigating conditions of existing facilities. The ENGINEER shall provide suitable horizontal and vertical reference control points for the construction phase. 4.2.5. Permits and Rights-of-Way: The ENGINEER shall obtain approved permits, licenses, and/or easement agreements from private landowners and any other agencies or entities requiring similar approvals prior to bidding. These approvals will be coordinated with the OWNER and will be made on easement and permit documents approved by the OWNER. Information and easement descriptions provided in the Basic Engineering Services will be based on data available from design surveys and courthouse records. 112114 3 4.2.6. Geotechnical Explorations and Analysis: The ENGINEER shall conduct such geotechnical explorations and analysis as necessary for project design and bidding. A geotechnical report will be prepared with recommendations relating to conditions pertinent to the design and construction of the Project. Subsurface information will be obtained by reviewing any existing geotechnical data available and using additional backhoe test pits and soil borings as necessary. The ENGINEER shall furnish copies of a geotechnical report as requested to OWNER for use by OWNER and Contractors, and review the results of the report with Contractors in a pre-bid meeting. The report is to be prepared for design purposes; ENGINEER will not be responsible if it is used by others for other purposes. 4.2.7. Preliminary Plans and Specifications. Prepare preliminary construction plans and specifications with information which addresses the special features of each project task. 4.2.8. Based on the information contained in the preliminary design documents, ENGINEER will submit a revised opinion of probable Total Project Costs to the OWNER. 4.2.9. ENGINEER shall prepare and furnish complete paper and electronic copies of preliminary bidding documents and design report as requested to OWNER and at the same time furnish copies as directed by OWNER to agencies and/or parties having regulatory responsibilities or direct financial participation in any part of the Project; provide any technical criteria, written descriptions and design data necessary for securing permits or approval from authorities having jurisdiction to review and approve the design, and assist owner in securing such approvals; and review documents in person with OWNER and review authorities, and, if necessary, conduct a plan-in-hand site review. All changes agreed to between ENGINEER and OWNER will be noted in a memorandum from the ENGINEER to the OWNER and incorporated into the final plans and specifications. The Preliminary Design Phase will be completed and submitted within 90 calendar days following written authorization from OWNER to ENGINEER to proceed with that phase of services. 4.3 FINAL DESIGN PHASE After written authorization to proceed with the Final Design Phase, ENGINEER shall: 4.3.1. On the basis of the accepted Preliminary Design documents and the revised opinion of probable Total Project Costs, prepare for incorporation in the Contract Documents final drawings and Technical Specifications of sufficient detail to show the general scope, extent and detailed character of the work to be furnished and performed by the Contractor(s) suitable for use in the project bidding and construction. 4.3.2. Advise OWNER of any adjustments to the latest opinion of probable Total Project Costs caused by changes in general scope, extent or character or design requirements of 113115 4 the Project or Construction Costs. Furnish to OWNER a revised opinion of probable Total Project Costs based on the Drawings and Specifications. 4.3.3. Prepare for review and approval by OWNER, its legal counsel and other advisors, contract agreement forms, general conditions and supplementary conditions, and (where appropriate) bid forms, invitations to bid and instructions to bidders, special provisions, technical specifications, and standard drawings, and other related contract documents in conformance with the latest edition of the Montana Public Works Standard Specifications (MPWSS) and City of Bozeman Modifications to MPWSS adopted by the City of Bozeman. 4.3.4. Furnish OWNER six copies and an electronic copy of the Contract Documents (including design drawings, specifications and contracts). The Final Phase will be complete and submitted within 45 calendar days following written authorization from OWNER to ENGINEER to proceed with that phase of services. 4.4 BIDDING OR NEGOTIATING PHASE After written authorization to proceed with the Bidding or Negotiating Phase, ENGINEER shall: 4.4.1. Assist OWNER in advertising for and obtaining bids or negotiating proposals for construction contract(s) and record prospective bidders to whom Bidding Documents have been issued, receive and process deposits for Bidding Documents and conduct pre-bid conferences. 4.4.2. Provide interpretation or clarification to prospective bidders regarding the Bidding Documents, and issue addenda as appropriate. 4.4.3. Consult with and advise OWNER as to the acceptability of the prime contractor, subcontractors, suppliers and other persons and organizations proposed by the prime contractor(s) (herein call "Contractor(s)") for those portions of the work as to which such acceptability is required by the Bidding Documents. 4.4.4. Consult with OWNER and determine the acceptability of substitute materials and equipment proposed by Contractor(s) when substitution prior to the award of contracts is allowed by the Bidding Documents. 4.4.5. Attend the Bid opening, prepare bid tabulation, evaluate bids, assess bidders' responsiveness and responsibility and make award recommendation to OWNER. 4.4.6 Facilitate contract award, and the execution and distribution of the contract documents for construction, materials, equipment and services. Furnish Owner two original signature sets of executed contract documents (including design drawings, 114116 5 specifications and contracts). Furnish contractor with one set of original signature executed contract documents and up to three sets of construction documents. 4.5 CONSTRUCTION PHASE The responsibilities of the ENGINEER during the Construction Phase are summarized as follows: 4.5.1. General Administration of Construction Contract. ENGINEER shall consult with and advise OWNER and act as OWNER'S representative as provided in EXHIBIT A - ENGINEER'S STATUS DURING CONSTRUCTION, attached to and made part of this Agreement and may be further provided under the General Conditions of the contract documents. The extent and limitations of the authority, duties, and responsibilities of the ENGINEER on the construction job site as assigned here-in shall not be modified except as the ENGINEER may otherwise agree in writing. All of OWNER's instruction to Contractor(s) will be issued through ENGINEER who will have authority to act on behalf of OWNER to the extent provided in the General Conditions except as otherwise provided in writing. In addition to the services provided under Article 10 (Exhibit A) the ENGINEER shall provide the following services during construction: 4.5.1.1 Schedule and conduct a pre-construction conference. 4.5.1.2 Provide personnel, equipment and supplies for construction layout and control, including establishment of line, grade, and blue top control staking. 4.5.1.3 Review Contractors' construction schedules and operations, and the Contractors' traffic control plans and its implementation prior to the start of construction. 4.5.1.4 Ascertain that the Contractor has secured required permits needed to accomplish his work. 4.5.1.5 Prepare and provide weekly activity and progress reports to the City's Task Director. 4.5.1.6 ENGINEER shall provide OWNER copies of all correspondence between the ENGINEER and Contractor. 4.5.1.7 Issue stop and resume work orders, in whole or in part, when work is not or cannot be performed in accordance with the Contract Documents. 4.5.1.8 Review and approve, for conformance with the project technical specifications all shop drawings, and other Contractor submittals required by the Contract Documents. 115117 6 4.5.1.9 During construction review Contractors' construction schedules and evaluate conformance and progress under the Contract time provisions. 4.5.1.10 Prepare for OWNER'S approval any plan and specification changes which due to any initial design or engineering deficiencies are required to complete the project original design concept. 4.5.1.11 Inspect the project and when appropriate, and after conferring with OWNER, issue a Certificate of Substantial Completion to the Contractor. 4.5.1.12 Prior to recommending final payment, schedule and conduct with the OWNER a final project inspection and submit a report to the OWNER documenting any outstanding items or deficiencies requiring correction prior to final payment. Upon satisfactory project completion ENGINEER shall certify in writing to the OWNER, and any required regulatory agencies, that the construction was completed in accordance with the approved plans and specifications and is performing in accordance with the design concept. 4.5.1.13 Twenty-three months after project substantial completion schedule and conduct with the Owner a Two Year Warranty Inspection of the project and advise the owner in writing whether project deficiencies exist and if the project is performing in accordance with the design concept. 4.5.2. Resident Project Representative. ENGINEER shall provide a qualified Resident Project Representative at the job site to provide observation of the work as provided in EXHIBIT B - A LISTING OF THE DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE, attached to and made part of this Agreement. The ENGINEER shall submit to the OWNER, for review and acceptance, the resume of each Resident Project Representative who may be assigned to the job site during the course of the Project not less than 10 calendar days prior to the pre-construction meeting. Any subsequent change in the resident representative shall also be subject to the OWNER'S approval. 4.5.3 Limitations of Responsibilities. ENGINEER will not be responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, and ENGINEER will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents; however, nothing contained in this agreement shall be construed to release ENGINEER from liability for failure to properly perform duties and responsibilities assumed by ENGINEER in the Contract Documents. 116118 7 4.6. PROJECT DOCUMENTATION ENGINEER shall furnish OWNER with (a) one mylar copy, two paper copies, and an electronic copy of the Project Record Drawings ("As-Builts"), (b) written monthly progress reports, and (c) a project notebook containing such correspondence and documentation as requested by OWNER. 4.7. CONSTRUCTION TESTING The inspection services shall include material testing and verification of contract compliance with job site requirements, plans and specifications. The ENGINEER shall provide and maintain detailed documentation of the following material testing: 1) Concrete strength, air content and slump 2) Embankment, trench backfill, and gravel and pavement densities 3) Aggregate gradations 4) Plant mix strength, flow and asphalt content Article 6 - Compensation For Engineering Service Sections 6.2, 6.3, and 6.4 are added to the Original Agreement as follows: 6.2 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.2.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.2 through 4.3 of this agreement pay a total sum in the amount of $87,918 for such services. 6.2.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.2 through 4.3) shall not exceed the following ceilings: $ 43,959 (50% of design fee) until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $ 83,522 (95% of design fee) until the Final Plans and Specifications have been submitted to the OWNER and review authorities. 6.2.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services 117119 8 actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.2.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.3 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.2 through 4.3) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.2 are not separately reimbursable. 6.3 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Construction Testing, shall be compensated in accordance with the following: 6.3.1 The OWNER shall pay for Construction Phase and Project Documentation Services an amount not to exceed $57,978 except as provided under 6.3.1.2 and 6.3.4. 6.3.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.3.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.3.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.3.1.1. The amount and terms of any additional compensation under 6.3.1.1 or 6.3.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.3.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct 118120 9 Labor Cost times a factor of 2.87 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.3.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $ 7,184 which includes $ 2,780 for consultants employed by the Engineer and $ 4,404 for all other reimbursable expenses. The estimated reimbursable expenses are identified in Exhibit " D ". 6.3.3. Failed Test Expenses. The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.3.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15 , or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 6.4 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Grant administration support services, as identified on Exhibit “C”, shall be compensated in accordance with the following: 6.4.1 The OWNER shall pay for Construction Phase and Project Documentation Services an amount not to exceed $15,963 except as provided under 6.4.1.2 and 6.4.4. 6.4.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.4.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project 119121 122 123 12 EXHIBIT A TO AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES ENGINEER'S STATUS DURING CONSTRUCTION This Exhibit is attached to, made a part of and incorporated by reference with the Agreement made on November 16, 2015, between CITY OF BOZEMAN (OWNER) and MORRISON MAIERLE, INC. (ENGINEER) providing for professional engineering services. ARTICLE 10 - ENGINEER'S STATUS DURING CONSTRUCTION 10.1. OWNER’S REPRESENTATIVE ENGINEER will be OWNER's representative during the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER's representative during construction are set forth in the Contract Documents and shall not be extended without written consent of OWNER and ENGINEER. 10.2. VISITS TO THE SITE ENGINEER will make visits to the site at intervals appropriate to the various stages of construction to observe the progress and quality of the executed Work and to determine, in general, if the Work is proceeding in accordance with the Contract Documents. ENGINEER will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. ENGINEER's efforts will be directed toward providing for OWNER's greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations as an experienced and qualified design professional, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defects and deficiencies in the Work. 10.3. PROJECT REPRESENTATION If OWNER and ENGINEER agree, ENGINEER will furnish a Resident Project Representative to assist ENGINEER in observing the performance of the Work. The duties, responsibilities and limitations of authority of any such Resident Project Representative and assistants will be as provided in EXHIBIT B, A LISTING OF THE DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE. 10.4. CLARIFICATIONS AND INTERPRETATIONS ENGINEER will issue with reasonable promptness such written clarifications or interpretations of the requirements of the Contract Documents (in the form of Drawings or otherwise) as ENGINEER may determine necessary, which shall be consistent with or reasonably inferable from 122124 13 the overall intent of the Contract Documents. If CONTRACTOR believes that a written clarification or interpretation justifies an increase in the Contract Price or an extension of the Contract Time and the parties are unable to agree to the amount or extent thereof, CONTRACTOR may make a claim therefor as provided in the General Provisions of the construction Contract Document. 10.5. AUTHORIZED VARIATIONS IN WORK ENGINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are consistent with the overall intent of the Contract Documents. These may be accomplished by a Field Order and will be binding on OWNER, and also on CONTRACTOR who shall perform the Work involved promptly. If CONTRACTOR believes that a Field Order justifies an increase in the Contract Price or an extension of the Contract Time and the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a claim therefor as provided in the General Conditions of the Construction Contract. 10.6. REJECTING DEFECTIVE WORK ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective, and will also have authority to require special inspection or testing of the Work as provided in the General Provisions of the construction Contract Document whether or not the work is fabricated, installed, or completed. 10.7. SHOP DRAWINGS, CHANGE ORDERS AND PAYMENT 10.7.1. The ENGINEER's responsibility for Shop Drawings and samples shall comply with the shop drawing provisions of the General Provisions of the construction Contract Document 10.7.2. The ENGINEER's responsibilities for Change Orders shall comply with the change order provisions of the General Provisions of the construction Contract Document. 10.7.3. The ENGINEER's responsibilities for contractor's Application for Payment shall comply with the payment provisions of the General Provisions of the construction Contract Document. 10.8. DETERMINATIONS FOR UNIT PRICES ENGINEER will determine the actual quantities and classifications of Unit Price Work performed by CONTRACTOR. ENGINEER will review with CONTRACTOR the ENGINEER's preliminary determinations on such matters before rendering a written recommendation thereon (by recommendation of an Application for Payment or otherwise) to OWNER. 10.9. DECISION ON DISPUTES 123125 14 10.9.1. ENGINEER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work or the interpretation of the requirements of the Contract Documents pertaining to the performance and furnishing of the Work and claims under The General Conditions of the Construction Contract in respect of changes in the Contract Price or Contract Time will be referred initially to ENGINEER in writing with a request for a formal decision in accordance with this paragraph, which ENGINEER will render in writing within a reasonable time. Written notice of each such claim, dispute and other matter shall be promptly reported and copied to the OWNER. 10.9.2. When functioning as interpreter under paragraphs 10.8 and 10.9.1, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to paragraphs 10.8 and 10.9.1 with respect to any such claim, dispute or other matter will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such claim, dispute or other matter. 124126 15 10.10. LIMITATIONS ON ENGINEER'S RESPONSIBILITIES 10.10.1. Neither ENGINEER's authority to act under this Article or elsewhere in the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility of ENGINEER to CONTRACTOR, any Sub-contractor, any Supplier, or any other person or organization performing any of the Work, or to any surety for any of them. 10.10.2. Whenever in the Contract Documents the terms "as ordered", "as directed", "as required", "as allowed", "as approved" or terms of like effect or import are used, or the adjectives "reasonable", "suitable", "acceptable", "proper" or "satisfactory" or adjectives of like effect or import are used to describe a requirement, direction, review or judgment of ENGINEER as to the Work, it is intended that such requirement, direction, review or judgment will be solely to evaluate the Work for compliance with the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to ENGINEER any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 4.5.3. 125127 1 EXHIBIT B TO AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES A LISTING OF THE DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE. This Exhibit is attached to, made a part of and incorporated by reference with the Agreement made on November 16, 2015, between CITY OF BOZEMAN (OWNER) and MORRISON MAIERLE, INC. (ENGINEER) providing for professional engineering services. ARTICLE 11 - DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE ENGINEER shall furnish a Resident Project Representative (RPR), assistants and other field staff to assist ENGINEER in observing performance of the work of Contractor. Through more extensive on-site observations of the work in progress and field checks of materials and equipment by the RPR and assistants, ENGINEER shall endeavor to provide further protection for OWNER against defects and deficiencies in the work of CONTRACTOR; but, the furnishing of such services will not make ENGINEER responsible for or give ENGINEER control over construction means, methods, techniques, sequences or procedures or for safety precautions or programs, or responsibility for CONTRACTOR's failure to perform the Work in accordance with the Contract Documents and in particular the specific limitations set forth in section 4.5 of the Agreement are applicable. The duties and responsibilities of the RPR are limited to those of ENGINEER in this agreement and in the construction Contract Documents, and are further limited and described as follows: 11.1. GENERAL RPR is ENGINEER's agent at the site, will act as directed by and under the supervision of ENGINEER, and will confer with ENGINEER regarding RPR's actions. RPR's dealings in matters pertaining to the on-site work shall in general be with ENGINEER and CONTRACTOR keeping OWNER advised as necessary. RPR's dealings with subcontractors shall only be through or with the full knowledge and approval of CONTRACTOR. RPR shall generally communicate with OWNER with the knowledge of and under the direction of ENGINEER. 11.2. DUTIES AND RESPONSIBILITIES OF RPR 126128 2 11.2.1. Schedules: Review the progress schedule, schedule of Shop Drawing submittals and schedule of values prepared by CONTRACTOR and consult with ENGINEER concerning acceptability. 11.2.2. Conferences and Meetings: Attend meetings with CONTRACTOR, such as preconstruction conferences, progress meetings, job conferences and the project-related meetings, and prepare and circulate copies of minutes thereof. 11.2.3. Liaison: 11.2.3.1. Serve as ENGINEER's liaison with CONTRACTOR, working principally through CONTRACTOR's superintendent and assist in understanding the intent of the Contract Documents; and assist ENGINEER in serving as OWNER's liaison with CONTRACTOR. 11.2.3.2. Assist in obtaining from OWNER additional details or information, when required for proper execution of the Work. 11.2.4. Shop Drawings and Samples: 11.2.4.1. Record date of receipt of Shop Drawings and samples. 11.2.4.2. Receive samples which are furnished at the site by CONTRACTOR, and notify ENGINEER of availability of samples for examination. 11.2.4.3. Advise ENGINEER and CONTRACTOR of the commencement of any Work requiring Shop Drawing or sample if the submittal has not been approved by ENGINEER. 11.2.5. Review of Work, Rejection of Defective Work, Inspections and Tests: 11.2.5.1. Conduct on-site observations of the Work in progress to assist ENGINEER in determining if the Work is in general proceeding in accordance with the Contract Documents. 11.2.5.2. Report to ENGINEER whenever RPR believes that any Work is unsatisfactory, faulty or defective or does not conform to the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise ENGINEER of Work that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. 11.2.5.3. Verify that tests, equipment and systems startup and operating and maintenance training are conducted in the presence of appropriate personnel, and 127129 3 the CONTRACTOR maintains adequate records thereof; and observe, record and report to ENGINEER appropriate details relative to the test procedures and startup. 11.2.5.4. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these inspections and report to ENGINEER. 11.2.6. Interpretation of Contract Documents: Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as issued by ENGINEER. 11.2.7. Modifications: Consider and evaluate CONTRACTOR's suggestions for modifications in Drawings or Specifications and report with RPR's recommendations to ENGINEER. Transmit to CONTRACTOR decisions as issued by ENGINEER. 11.2.8. Records: 11.2.8.1. Maintain at the job site orderly files for correspondence, reports of job conferences, Shop Drawings and samples, reproductions of original Contract Documents including all Work Directive Changes, Addenda, Change Orders, Field Orders, additional Drawings issued subsequent to the execution of the Contract, ENGINEER's clarifications and interpretations of the Contract Documents, progress reports, and other Project related documents. 128130 4 11.2.8.2. Keep a detailed and accurate diary or log book, recording CONTRACTOR hours on the job site, weather conditions, prime and subcontractor daily work force, daily log of equipment onsite or on standby, data relative to questions of Work Directive Changes, Change Orders or changed conditions, list of job site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to ENGINEER. 11.2.8.3. Record names, addresses and telephone numbers of all CONTRACTORS, subcontractors and major suppliers of materials and equipment. 11.2.9. Reports: 11.2.9.1. Furnish ENGINEER periodic reports as required of progress of the Work and of CONTRACTOR's compliance with the progress schedule and schedule of Shop Drawing and sample submittals. 11.2.9.2. Consult with ENGINEER in advance of scheduled major tests, inspections or start of important phases of the Work. 11.2.9.3. Draft proposed Change Orders and Work Directive Changes, obtaining backup material from CONTRACTOR and recommend to ENGINEER Change Orders, Work Directive Changes, and Field Orders. 11.2.9.4. Report immediately to ENGINEER and OWNER upon the occurrence of any accident. 11.2.10. Payment Requests: Review applications for payment with CONTRACTOR for compliance with the established procedure for their submission and forward with recommendations to ENGINEER, noting particularly the relationship of the payment requested to the schedule of values, Work completed and materials and equipment delivered at the site but not incorporated in the Work. 11.2.11. Certificates, Maintenance and Operation Manuals: During the course of the Work, verify that certificates, maintenance and operation manuals and other data required to be assembled and furnished by CONTRACTOR are applicable to the items actually installed and in accordance with the Contract Documents, and have this material delivered to ENGINEER for review and forwarding to OWNER prior to final payment for the Work. 11.2.12. Completion: 11.2.12.1. Submit to CONTRACTOR, and ENGINEER a list of observed items requiring completion or correction before ENGINEER may issue a Certificate of Substantial Completion. 129131 5 11.2.12.2 Assess completion or correction of items noted under 11.2.12.1, advise ENGINEER on their status, and make recommendation to Engineer regarding issuance of a Certificate of Substantial completion. 11.2.12.3. Conduct final inspection in the company of ENGINEER, OWNER, and CONTRACTOR and prepare a final list of items to be completed or corrected. 11.2.12.4. Observe that all items on final list have been completed or corrected and make recommendations to ENGINEER concerning final acceptance. 11.3. LIMITATIONS OF AUTHORITY Resident Project Representative: 11.3.1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipments, unless authorized by ENGINEER. 11.3.2. Shall not exceed limitations of ENGINEER's authority as set forth in the Agreement or the Contract Documents. 11.3.3. Shall not undertake any of the responsibilities of CONTRACTOR, subcontractors or CONTRACTOR's superintendent. 11.3.4. Shall not advise on, issue directions relative to or assume control over any aspect of the means, methods, techniques, sequences or procedures of construction unless such advice or directions are specifically required by the Contract Documents. 11.3.5. Shall not advise on, issue directions regarding or assume control over safety precautions and programs in connection with the Work. 11.3.6. Shall not accept Shop Drawing or sample submittals from anyone other than CONTRACTOR. 11.3.7. Shall not authorize OWNER to occupy the Project in whole or in part. 11.3.8. Shall not participate in specialized field or laboratory tests or inspections conducted by others except as specifically authorized by ENGINEER. 130132 6 N:\0417\076\Contracts - Client\Contracts\Draft Design Construction\PSA Amendment 1.docx 131133 EXHIBIT C Sunset Hills Cemetery and Lindley Park Irrigation Project Scope of Work Design and Construction Engineering Services Project Description The project generally consists of new rock ramp diversion in Sourdough Creek with a headgate, irrigation ditch/pipe extension from the new diversion to the existing irrigation ditch, lining of a portion of the existing irrigation ditch, irrigation ditch turnouts associated with a new pump station, connection to the existing Sunset Hills Cemetery and Lindley Park irrigation systems, and leak repairs in the Sunset Hills Cemetery irrigation system. The project is the implementation of the recommended project of the Preliminary Engineering Report. Task 1 – Design 1A. Topographic survey of the project area suitable for design and permitting purposes. Survey is limited to Sourdough Creek, Story Ditch, pump station site, and profile of irrigation mainline. Remaining design elements will utilize available aerial photo and topographic data for design and plan development. 1B. Develop final design calculations for the project elements and summarize in a brief design report. 1C. Prepare two sets of drawings including one set at an 80% level for review and comment and permitting and one final set of drawings. For the pumps station portion of the project drawings will be limited to a schematic level as it will be a pre-engineered facility using a performance based specification, the exception to this is that the foundation and electrical service will be included on the drawings as fully designed elements. 1D. Prepare technical specifications using the City of Bozeman standard specifications and additional specifications as required. These will be prepared at the 80% review level and the final version. 1E. Prepare project cost estimates at the 80% and 100% level. 1F. Develop contract manual and bidding documents at the 80% and 100% level. 1G. Project management and coordination for design phases. Deliverables  Design Report  80% Design Package and Cost Estimate  Final Plans and Project Manual and Cost Estimate City Involvement  Review of 80% documents. 132134 Task 2 – Permitting Project permitting includes making application and gaining approval of the various agencies with jurisdiction over the project and grant agencies as appropriate. This includes those tasks associated with environmental compliance for the project. It is assumed one agency site visit will be facilitated by the consultant team. 2A. City of Bozeman Public Works Review – Submit 80% design package for review and submit 100% design package. Provide response to 80% review comments as appropriate. 2B. City of Bozeman Floodplain Permitting – Preparation of application and supporting documents for review and approval from the City of Bozeman Floodplain Administrator. Making modifications to the project plans and application materials in response to comments and resubmission of materials. Coordination with agency during design and permitting. It is assumed that a 1-D hydraulic model will be prepared to demonstrate the hydraulic effect of the diversion structure on the mapped floodplain. This scope assumes that a no-rise hydraulic condition will occur and that completion of a Letter of Map Revision or Conditional Letter of Map Revision is not needed. 2C. State of Montana 124 Permit – Preparation of application and supporting documents for review and approval from the Montana Department of Fish, Wildlife, and Parks. Coordination with agency during design and permitting. 2D. State of Montana 318 Permit - Preparation of application and supporting documents for review and approval from the Montana Department of Environmental Quality. Development of construction sequencing plan to limit turbidity. Coordination with agency during design and permitting. 2E. Funding Agencies – This task is limited to responding to technical comments from the funding agencies in review of the project design. It is anticipated that the Owner will take the lead in correspondence with the agencies. 2F. Federal Section 404 and Section 7 ESA – Based on the information gathered during the preliminary engineering report it is not anticipated that any significant effort will be required for these two items. A letter describing the project and the exemption from Section 404 permitting requirements will be drafted and sent to the US Army Corp of Engineers to notify them of the project. No effort is budgeted for interaction with the US Fish and Wildlife Service. If during the course of the grant process or final design it is determined that these two programs require more attention, additional budget will be required. 2G. City of Bozeman and State of Montana Stormwater Runoff Management – Permitting for these two programs will be the responsibility of the construction Contractor as development of the applications is highly dependent on the Contractor’s means and methods. 2H. Northwestern Energy Electrical Service – This task includes making application for the electrical service and coordination with the utility. 133135 2I. State of Montana – Montana Water Use Act – Upon project completion, Form 644 – “Notice of Replacement Point of Diversion” will be completed and submitted to the Department of Natural Resources and Conservation. Deliverables  Permit application packages for the various permits. City Involvement  Provide review and input on permit application as desired or requested. Task 3 – Bidding Period Services This task consists of assisting the Owner in the bidding phase of the project as identified in the body of the agreement. Task 4 – Construction Related Services This task consists of assisting the Owner in the Construction phase of the project as identified in the body of the agreement. The budget assumes an average of 24 hours per week of Resident Project Representative time over a 12 week construction period. Task 5 – Grant Administration Support Services 5A. This task is services completed on an as requested basis in support of the Owner in administration of the various grants obtained for the project. It is understood that the Owner is taking on the primary role of grant administration. This task provides budget to allow for the Owner’s project manager to request technical assistance or to provide additional resources when needed in support of grant administration for the project. 5B. This task includes a Class III Cultural Resource Inventory in support of the WaterSMART Grant. Scope is further outlined in the attached proposal from Ethnoscience. Deliverables  Class II Cultural Resource Inventory  Other items as requested. 134136 Sub-consultants Scope HydroSystems-KDI, Inc. Scope of work includes pump station design, irrigation mainline design, irrigation system control design, and minimal construction period assistance. A letter and detailed scope of services are included as an attachment. Architecture 118 Scope of work includes design and construction phase services for the exterior of the pre-engineered pump station building. A letter outlining the scope of services is included as an attachment. Ethnoscience Scope of work includes a Class III Cultural Resource Inventory. A letter outlining the scope of services is included as an attachment. 135137 TASK TOTAL SUPERVISING SENIOR SENIOR Environmental LAND SURVEY CADD TOTAL COSTEXPENSES HOURS ENGINEER III ENGINEER I ENGINEER II Scientist II / RPR SURVEYOR III CREW Principal DRAFTER CLERICAL FOR TASKTask 1 Design Task 1A - Topographic Survey32420 8Task 1B - Design Calculations 66 2 60 4Task 1C - Project Drawings 158 2 60 1680Task 1D - Project Specifications 78 6 40 824Task 1E - Cost Estimate 8 4 4Task 1F - Contract Manual and Bidding Documents 24 12 84Task 1G - Management, Coordination and QA Review 28 1612Tech Charge 2,364$ Hydrosystems-KDI 8,400$ Architecture 118 6,650$ Mileage 800$ Survey Equipment 480$ Miscellaneous Expense 300$ Total for Task 18,994$ 394 42 172 28 4 20 12 88 2870,014$ Task 2 PermittingTask 2A - Public Works Submittal 6 2 4Task 2B - Floodplain Hydraulics, Application and Submittal 76 2 60284Task 2C - 124 Permit Application 32 24 8Task 2D - 318 Permit Application 2 2Task 2E - Funding Agency Review Technical Assistance 10 2 8Task 2F - 404 and Section 7 ESA 2 2Task 2G - Stormwater - Not IncludedTask 2H - Northwestern Energy Service Coordination 4 4Task 2I - Form 644 4 4Tech Charge 816$ Hydrosystems-KDI -$ Miscellaneous Expense 200$ Total for Task 1,016$ 136 6 76 4 28 2 16 417,904$ Task 3 Bidding Period ServicesTask 3A - Bid Process Coordination 4 13Task 3B - Clarification and Addenda 9 1 8Task 3C - Bid Opening and Review 6 2 4Task 3D - Contract Award and Contracts 4 13Tech Charge 138$ Miscellaneous Expense 300$ Total for Task 438$ 23 5 1263,370$ Task 4 Construction Related ServicesTask 4A - Preconstruction Conference 8 4 4Task 4B - Construction Survey 22216 4Task 4C - Construction Administration 88 40 48Task 4D - Resident Project Representative 288 288Tech Charge 2,436$ Hydrosystems-KDI 1,580$ Architecture 118 1,200$ Mileage 1,000$ Survey Equipment 480$ Miscellaneous Expense 50$ Total for Task 6,746$ 406 44 48 292 2 16 454,608$ Task 5 Grant Administration Support ServicesTask 5A - Support Services 80 4 76Tech Charge 480$ Ethnoscience 4,369$ Miscellaneous Expense 50$ Total for Task 4,899$ 80 4 7615,963$ SUBTOTAL OF STAFF HOURS REQUIRED 1039 101 384 32 320 6 36 14 108 38HOURLY LABOR COST$182 $136 $149 $102 $121 $185 $194 $85 $65LABOR COST BY POSITION$18,382 $52,224 $4,768 $32,640 $726$6,660 $2,716 $9,180 $2,470TOTAL LABOR: $129,766TOTAL EXPENSES 32,093$ TOTAL COST: $161,859161,859$ STAFF HOUR ESTIMATEEXHIBIT D - Engineering Fee EstimateSunset Hills Cemetery and Lindley Park Irrigation ProjectDesign and Construction Engineering Services1 of 1136138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160