Loading...
HomeMy WebLinkAbout17454 2nd high school ZMA ZC SRPage 1 of 11 17454, Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Public Hearing: Zoning Commission public hearing is on October 17, 2017 Project Description: Annexation of 36.896 acres and amendment of the City Zoning Map for the establishment of a zoning designation of PLI, Public Lands and Institutions. Project Location: The property is located east of N. Cottonwood Road and west of Flanders Mill Road between the future extensions of Oak and Annie Streets. The property is legally described as Tract 1A2 of Certificate of Survey 2554B, City of Bozeman, Gallatin County, Montana. Recommendation: Approval with contingencies. Recommended Zoning Commission Motion: Having reviewed and considered the staff report, application materials, public comment, and all information presented, I hereby adopt the findings presented in the staff report for application 17454 and move to recommend approval of the 2017 2nd High School Zone Map Amendment, with contingencies required to complete the application processing. Report: October 12, 2017: Staff Contact: Chris Saunders, Community Development Manager Agenda Item Type: Action - Legislative EXECUTIVE SUMMARY Unresolved Issues None Project Summary The Bozeman High School District finds that a second high school is necessary to meet the educational needs of the District students. They have selected a site and are now pursuing annexation and municipal zoning of the property in preparation for construction of a new high school. The requested PLI, Public Lands and Institutions District, is a good fit for the proposed use. The property is between an existing school site to the south and a large City park to the north, both zoned PLI. Alternatives As identified by the City Commission Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 2 of 11 TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 1 SECTION 1 - MAP SERIES .................................................................................................... 3 SECTION 2 - RECOMMENDED CONTINGENCIES OF ZONE MAP AMENDMENT..... 4 SECTION 3 - RECOMMENDATION AND FUTURE ACTIONS ........................................ 4 Zone Map Amendment ....................................................................................................... 4 SECTION 4 - ZONE MAP AMENDMENT STAFF ANALYSIS AND FINDINGS ............. 5 PROTEST NOTICE FOR ZONING AMENDMENTS ........................................................... 8 APPENDIX A - NOTICING AND PUBLIC COMMENT ...................................................... 8 APPENDIX B - PROJECT GROWTH POLICY AND PROPOSED ZONING ..................... 9 APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF ............................ 11 FISCAL EFFECTS ................................................................................................................. 11 ATTACHMENTS ................................................................................................................... 11 Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 3 of 11 SECTION 1 - MAP SERIES Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 4 of 11 SECTION 2 - RECOMMENDED CONTINGENCIES OF ZONE MAP AMENDMENT Please note that these contingencies are necessary for the City to complete the process of the proposed amendment. These contingencies only apply in the event that the related annexation request has previously been approved. Recommended Contingencies of Approval: 1. That all documents and exhibits necessary to establish an initial municipal zoning designation shall be identified as the "2017 Second High School Zone Map Amendment." All required documents must be returned to the City within 60 days of the date the City distributes the annexation agreement associated with this application or the preliminary approval shall be null and void. 2. That the applicant must submit a zone amendment map, titled "2017 Second High School Zone Map Amendment", on a 24" by 36" mylar, an 8 ½" by 11" or 8 ½" by 14" paper exhibit, and a digital copy of the area to be zoned, acceptable to the Director of Public Works, which will be utilized in the preparation of the Ordinance to officially amend the City of Bozeman Zoning Map. Said map shall either contain a metes and bounds legal description of the perimeter of the subject property including adjacent right-of-ways, or reference to a recorded plat or certificate of survey incorporating the entire property, and total acreage of the property. 3. That the Ordinance for the Zone Map Amendment shall not be finalized until the Annexation Agreement is signed by the applicant and formally approved by the City Commission. If the annexation agreement is not approved, the Zone Map Amendment application shall be null and void. 4. The Ordinance for the Zone Map Amendment shall not be drafted until the applicant provides an editable metes and bounds legal description prepared by a licensed Montana surveyor unless the entire area to be amended is included within the bounds of a recorded certificate of survey or plat. SECTION 3 - RECOMMENDATION AND FUTURE ACTIONS Zone Map Amendment Having considered the criteria established for a zone map amendment, the Staff recommends approval as submitted. The 2017 Second High School Zone Map Amendment (ZMA) is in conjunction with an annexation request. Staff’s recommendation and staff responses are predicated on approval of the annexation. Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 5 of 11 The Development Review Committee (DRC) considered the amendment on October 11, 2017. The DRC did not identify any infrastructure or regulatory constraints that would impede the approval of the application. The Zoning Commission will hold a public hearing on this ZMA on October 17, 2017 and will forward a recommendation to the Commission on the Zone Map amendment. The City Commission is presently scheduled to hold a public hearing on the zone map amendment on November 6, 2017. The meeting will be held at 121 N. Rouse Avenue, Bozeman. The meeting will begin at 6 p.m. SECTION 4 - ZONE MAP AMENDMENT STAFF ANALYSIS AND FINDINGS In considering applications for plan approval under this title, the advisory boards and City Commission shall consider the following criteria (letters A-K). As an amendment is a legislative action, the Commission has broad latitude to determine a policy direction. The burden of proof that the application should be approved lies with the applicant. In considering the criteria the analysis must show that the amendment accomplishes criteria A-D. Criteria E-K must be considered and may be found to be affirmative, neutral, or negative. A favorable decision on the proposed application must find that the application meets all of criteria A-D and that the positive outcomes of the amendment outweigh negative outcomes for criteria E-K. Section 76-2-304, MCA (Zoning) Criteria A. Be in accordance with a growth policy. Yes. As shown in Appendix B of this report, the PLI district is an implementing zoning district for the Residential future land use. The property is planned as Residential. A review of the growth policy found no conflicts with the goals and objectives of the growth policy. Section C-7, Appendix B, and Appendix H of the growth policy discuss current educational characteristics of Bozeman and the need for additional school sites. Goal PS-2: The City shall work with other service and utility providers to ensure the adequate and safe provision of services. Rationale: Public and private utilities often are located within the same rights-of-way and easements. Coordination between providers is essential to prevent conflicts, damage, and injury. Services are necessary to support urban development. Objective PS-2.1: Education - Ensure that the area around educational institutions has adequate residential parking, facilities, bike paths, safe cross walks, and zoning to ensure a high quality of life for school users and city residents. Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 6 of 11 The City is working with District 7 to address this goal and objective as the annexation and zoning review occur and as site development for the new high school is designed, reviewed, and implemented. B. Secure safety from fire and other dangers. Yes. The site is within the service area of the Bozeman Fire Department and Police Department. The PLI district is to be at the intersection of two arterial roads, Oak and Cottonwood. The site has public right of way either existing or to be created with annexation on all sides. This will provide good emergency access. The site is within the service area for the Bozeman water and sewer utilities. This will provide adequate fire suppression capability upon installation of properly placed fire hydrants. Hydrant locations will be established during the review of the school development. C. Promote public health, public safety, and general welfare. Yes. The PLI district will support development of the 2nd high school. The PLI district intent is: “The intent of the PLI public lands and institutions district is to provide for major public and quasi-public uses…” The placement of the PLI district on this site will match the zoning district and the use. A high school is an intensive use of land with significant traffic, water, sewer, and other service demands during school and for other special events. Section 38.13.020 reads in part “… all PLI development shall be subject to review and approval as provided for by this chapter, based upon recommendations received from the applicable review bodies established by article 33 of this chapter as may be applicable, and shall be required to comply with all applicable underlying zoning requirements…” The City has adopted the standards of Chapter 38 of the Bozeman Municipal Code to address a wide range of public health, safety, and general welfare issues. These standards have been in place for many years and have been tested by many different uses and users and found to be adequate to their purposes. As the construction follows these standards this criterion will be met. D. Facilitate the provision of transportation, water, sewerage, schools, parks and other public requirements. Yes. As noted in Criteria A and C, the PLI district is a good fit for a school. As noted in Criterion C, compliance with adopted standards is expected which ensures that adequate facilities are available. No new parks are required with non-residential development. The City is working with the School District to coordinate investments to meet the needs of the new facility. E. Reasonable provision of adequate light and air. Neutral. There setback requirements for the PLI district are those of any adjacent non-PLI district. The site is bounded by existing or planned roads on all sides which provide Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 7 of 11 opportunity for light and air to enter the site. Large portions of the site will be used for parking and exercise facilities which will limit building coverage. F. The effect on motorized and non-motorized transportation systems. Neutral. A high school generates substantial demand for transportation. The site is bounded by existing or planned roads on all sides of the area to be zoned as PLI. Two of these, Oak Street and Cottonwood Road are major arterial streets which connect the site to the larger community. The other two streets, Annie and Flanders Mill, are not arterials but provide significant connections to adjacent residential areas. These roads will or do include both motorized and non-motorized facilities. The City has a long range transportation plan to consider necessary road links and expansions. The City will use this plan in the evaluation of the future impacts of the high school. Necessary improvements will be required and installed to offset the impacts of a new school. Therefore, the effect of the PLI district designation will be largely neutral. The City has recently or is now constructing significant expansions in traffic control and additional driving lanes in the area that will service this site. Examples are widening of Oak Street, a traffic signal at Durston and Cottonwood, widening of Cottonwood Road, and installation of Ferguson Avenue among others. G. Promotion of compatible urban growth. Yes. PLI is an urban district which supports the construction of essential public services necessary to support additional residential and non-residential development. The site is currently wholly surrounded by the City so this site is an infill location. The PLI site for the school will provide educational services to the immediately surrounding and extended service area of the district. H. Character of the district. Yes. The properties to the north and south are also zoned as PLI. To the south is an existing school operated by the School District. Properties to the east and west are separated from the site by streets and are developed for residential uses. These homes will be where some of the students for the new facility will live. Schools are included in the defined category of Community Center and are allowed in all residential districts as well as PLI. I. Peculiar suitability for particular uses. Neutral. The site is generally flat and well situated for municipal services. It has no specific geographical features that distinguish it from other particular sites in the near vicinity. The site does have excellent street access existing or planned which will enable good access for future users. Locations with similar access to utilities and streets and of an appropriate size and configuration to support a high school are few. J. Conserving the value of buildings. Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 8 of 11 Neutral. There are no existing buildings on the site. The site is separated from any non-PLI area by public streets which provide a buffer from activities on the site. K. Encourage the most appropriate use of land throughout the jurisdictional area. Yes. The PLI district will enable an intensive use to locate within the City where needed services can be effectively provided. Locations with similar access to utilities and streets and of an appropriate configuration to support a high school are few. Substantial residential development has occurred in the NW part of the community. Placing PLI at this site will facilitate delivery of important education services to the larger community and specifically within the City of Bozeman. PROTEST NOTICE FOR ZONING AMENDMENTS IN THE CASE OF WRITTEN PROTEST AGAINST SUCH CHANGES SIGNED BY THE OWNERS OF 25% OR MORE OF THE AREA OF THE LOTS WITHIN THE AMENDMENT AREA OR THOSE LOTS OR UNITS WITHIN 150 FEET FROM A LOT INCLUDED IN A PROPOSED CHANGE, THE AMENDMENT SHALL NOT BECOME EFFECTIVE EXCEPT BY THE FAVORABLE VOTE OF TWO-THIRDS OF THE PRESENT AND VOTING MEMBERS OF THE CITY COMMISSION. The City will accept written protests from property owners against the proposal described in this report until the close of the public hearing before the City Commission. Pursuant to 76-2-305, MCA, a protest may only be submitted by the owner(s) of real property within the area affected by the proposal or by owner(s) of real property that lie within 150 feet of an area affected by the proposal. The protest must be in writing and must be signed by all owners of the real property. In addition, a sufficient protest must: (i) contain a description of the action protested sufficient to identify the action against which the protest is lodged; and (ii) contain a statement of the protestor's qualifications (including listing all owners of the property and the physical address and legal description of the property), to protest the action against which the protest is lodged, including ownership of property affected by the action. Signers are encouraged to print their names after their signatures. A person may in writing withdraw a previously filed protest at any time prior to final action by the City Commission. Protests must be delivered to the Bozeman City Clerk, 121 North Rouse Ave., PO Box 1230, Bozeman, MT 59771-1230. APPENDIX A - NOTICING AND PUBLIC COMMENT Notice has been provided by posting the site, mailing a notice via USPS first class mail to all owners of property within 200 feet, and publication of notice in the Bozeman Daily Chronicle. All notices were provided at least 15 days and not more than 45 days before any Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 9 of 11 public hearing relevant to this project. No public comment has been received as of the writing of this report. A photo of the site posted notice is below. Notice was placed along Cottonwood Road as Flanders Mill to the east is under construction and not available to the public. APPENDIX B - PROJECT GROWTH POLICY AND PROPOSED ZONING Adopted Growth Policy Designation: The property is designated as “Residential” in the Bozeman Community Plan. The Plan indicates that: “This designates places where the primary activity is urban density dwellings. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. High density residential areas should be established in close proximity to commercial centers to facilitate the provision of services and employment opportunities to persons without requiring the use of an automobile. Implementation of this category by residential zoning should provide for and coordinate intensive residential uses in proximity to commercial centers. The residential designation Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 10 of 11 indicates that it is expected that development will occur within municipal boundaries, which may require annexation prior to development. The dwelling unit density expected within this classification varies between 6 and 32 dwellings per net acre. A higher density may be considered in some locations and circumstances. A variety of housing types can be blended to achieve the desired density. Large areas of single type housing are discouraged. In limited instances the strong presence of constraints and natural features such as floodplains may cause an area to be designated for development at a lower density than normally expected within this category. All residential housing should be arranged with consideration of compatibility with adjacent development, natural constraints such as watercourses or steep slopes, and in a fashion which advances the overall goals of the Bozeman growth policy. The residential designation is intended to provide the primary locations for additional housing within the planning area.” As Table C-16 from the growth policy shows, the proposed zoning of PLI is an implementing district for the future land use designation of Residential. Note in the first paragraph of the description that schools are explicitly considered to be acceptable within this designation. Proposed Zoning Designation and Land Uses: Staff Report for the 2017 Second High School Annexation and Zone Map Amendment Page 11 of 11 The applicant has requested zoning of PLI, Public Lands and Institutions District, in association with the annexation of the property. The intent of the PLI public lands and institutions district is to provide for major public and quasi-public uses outside of other districts. Not all public and quasi-public uses need to be classified PLI. Some may fit within another district, however larger areas will be designated PLI. The proposed use of the property is for a school. Adjacent uses include a public school to the south, a large public park to the north, and residential development to the east and west. APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF Owner/Applicant: Bozeman High School District 7, 404 West Main Street, Bozeman MT 59715 Representative: TD&H Engineering, Inc. 234 East Babcock Street, Bozeman MT 59715 Report By: Chris Saunders, Community Development Manager FISCAL EFFECTS No presently budgeted funds will be changed by this Annexation or Zone Map Amendment. The City has made substantial investments in the area in expanding street capacity and additional investments for streets and utilities are planned. These will be evaluated during the appropriate capital facility planning and budgeting process. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application Materials