Loading...
HomeMy WebLinkAbout17- Impact Fee Payment Agreement - East Main Investments, LLC - Highland Boulevard and East Main Street Intersection (Blackmore Bend) h CITY OF BOZEMAN IMPACT FEE PAYMENT AGREEMENT THIS AGREEMENT is made and entered into this 9th day of June,2017,by and between the CITY OF BOZEMAN, MONTANA, a self-governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street,Bozeman, Montana,with a mailing address of PO Box 1230, Bozeman, MT 59771,hereinafter referred to as "City," and, East Main Investments, LLC hereinafter referred to as "Developer." WHEREAS, the Developer desires to complete certain public transportation system improvements to benefit its development project Site Plan Development Application 16-531, Blackmore Marketplace Building (the "Development") and the City desires to make available transportation impact fees to the Developer to assist in paying a portion of the costs of the improvements; and WHEREAS, the improvements include design and construction of traffic signal improvements at the Highland Boulevard and East Main Street intersection and other related street improvements; and WHEREAS, the City's contribution of impact fees to the Developer must comply with Sections 2.06.1600 through 2.06.1700, Bozeman Municipal Code; and WHEREAS, the City has included the improvements in the City's Capital Improvement Plan; and WHEREAS,the City and the Developer desire to set forth the terms of their agreement in writing. NOW THEREFORE, In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree as follows: 1. Incorporation: The foregoing recitals of this Agreement are contractual and are hereby incorporated by reference. Page 1 of 6 2. The Project: The construction of improvements (the "Project") consists of installation of traffic signal improvements at the Highland Boulevard and East Main Street intersection and associated street improvements as shown on the Concept Plans and Specifications attached as Exhibit 1. Prior to construction and any payment by the City Developer must submit to the City Engineering Division a final set of Plans and Specifications for the Project and receive approval of the Plans and Specifications from the City Engineering Division.No occupancy of any structure to be built on the Development will be authorized until the City Engineering Division, in its sole discretion, performs a final inspection, receives final certification by the Developer's engineer, and approves the final Project per the process defined in the City of Bozeman Design Standards and Specifications Policy. 3. Contracts for Design and Construction of Project: The Developer must retain a licensed professional engineer to provide construction inspection and oversight services for the Project and retain a licensed and qualified contractor to construct the Project. The Developer is solely responsible for selection and hiring of the engineer and contractor. 4. Estimated Project Cost and Allocation: The Developer's estimate of the cost of the Project is $241,781 ("Estimated Project Costs"). An itemization of Estimated Project Costs provided by the Developer is attached as Exhibit 2. The payment by the City of impact fees will not be based on Estimated Project Costs;rather,payment by the City will be based on the actual costs of construction of the Project as determined by invoices for material and labor and other evidence ("Actual Project Costs"). For purposes of this Agreement,to establish an understanding between the parties' of each party's Estimated Project Costs prior to construction and prior to a determination of Actual Project Costs, the City and the Developer agree to allocate the Estimated Project Costs as follows: Estimated Developer Costs: $121,781 Estimated City Costs: $120,000 TOTAL: $241,781 5. Allocation of Actual Project Costs: The Actual Project Costs may be less than or more than Estimated Project Costs. As such, the Developer and the City agree: a. The Actual Project Costs will be allocated as follows: no more than $120,000.00 of Actual Project Costs are allocated to and must be paid by the City with the remainder of Actual Project Costs allocated to and must be paid by the Developer. Notwithstanding the above, the City will pay no more than $120,000.00 in Actual Project Costs should the allocation of Actual Project Costs between the parties exceed the allocation of Estimated Project Costs Page 2 of 6 between the parties as shown in Section 4. As such, if the Actual Project Costs, as determined by the City based on invoices and other evidence and accepted by the City, are less than originally estimated, (a)the City will pay$120,000.00 of the amount of Actual Project Costs up to but not to exceed $120,000.00 and (b)the Developer will pay the remainder of the amount of Actual Project Costs incurred including any amount in excess of the City's maximum contribution of$120,000.00. 6. Project Reimbursement/Inspection/Payment: The City will reimburse the Developer for the City's portion of the Actual Project Costs only after construction of the Project has been completed, the Project has been accepted by the City, and Actual Project Costs (including evidence of those costs) is provided to the City. As such: a. The City may inspect the Project at reasonable times and the Developer must not interfere with such inspections. b. The City will only accept the construction of the improvements upon receipt by the City of(a) certification by the Developer's licensed professional engineer that the Project is complete in accordance with the Approved Plans, and (b) evidence of the Actual Project Costs have been delivered to and accepted by the City. c. The City will pay the Developer, by single check, the City's portion of the Project's costs no later than thirty (30) days following the City's determination the requirements of this Agreement are satisfied. 7. Amendment and Waiver: This Agreement may only be amended or modified by a written agreement signed by the City and the Developer. No waiver by any party hereto of any provision or breach of,or default under,this Agreement shall be deemed to have been made unless the same is in writing and signed and delivered by the party charged with making the waiver, and no waiver of any provision or breach of, or default under, this Agreement shall be deemed a waiver of any other provision or breach of, or default under, this Agreement. 8. Representations and Warranties: Each party represents and warrants to the other that: a. Execution of this Agreement does not violate any agreement, bylaw, statute or ordinance binding on or applicable to such party; and b. The individual executing this Agreement on behalf of the party is duly authorized and empowered to execute this Agreement for the party, and following execution and delivery by both parties this Agreement will be a Page 3 of 6 legally binding obligation of the party, enforceable against the party in accordance with its terms. 9. Choice of Law and Venue: This Agreement shall be governed by, and interpreted under, Montana Law, without regard to conflict of law principles. Mandatory and exclusive jurisdiction for any dispute shall be in the Eighteenth Judicial District Court, Gallatin County, Montana. 10. Severability: Each provision of this Agreement shall be considered severable and if for any reason any provision which is not essential to the effectuation of the basic intent of this Agreement is determined to be invalid, such invalidity shall not impair the operation of or effect those provisions of this Agreement which are valid. Dated this !'A day of 2017 EAST MAIN INVESTMENTS By: Do pe, Managing Member Dated this_'day of 2017 CIT OF BOZEMAN By: Dennis Taylor, Interim City Manager Page 4 of 6 Exhibit 1 Construction Proposal (attached) Page 5 of 6 a� �a� � VNVINOW NVW3Z08'1332ilS NIVW'3 bZEl ONIalm 33Vldl3Ml:lVW U 1 311OWNOVIS Q m w w U) a d IL n n —Z� � rn c C c W N 7 J N ~ N O N O) E @ @ N_ C O a) @ a) 7 Q E C U) p O .a UN E H I co3Nb1,u21300bN S c� 5 z J Wm _ @ W W OE' 6I Hj o < 7 �1m U) = X CDW O 3 O � �J (0 U r % N "C O @ — U a� a�Ixzo Z / AJ / f/ ZD,n �U —Al U Iz I Z s 0 o W W fN,/41�1 J Ul 00 6 @ c N O�c n m ~Q -1 O @ J @ C Z �.0)J m C J m e Q-' F— N > ~ f0 7 N J W (n O7 t] p@ N 2 J@ > w U) a v m U 04 � cp U CH IN NO iy a {LO U N J LL U1 l _ � ' r � ••i c• � tl W li �1Uty 1 /r e + Uo (YjN 0 N. � p i / 01 c-aka. l''`' [fill rn Exhibit 2 Anticipated Project Costs (attached) Page 6 of 6 Exhibit 2 Montana Department of Transportation Page 1 of 1 PRICESBID Junee 2016 Preliminary Estimate June Project Number: 11415006 Prepared By: KU Project Name: Bozeman-East Main Traffic Impact Study(90°Re-align) Date: December 9,2016 UPN Number: County: Gallatin Project Length: Miles District: Design Stage: Preliminary Type of Work: Surfacing,Curb&Gutter,Lighting,and Signals Average Bid Prices Adjusted Unit Prices Item Number Quantity Description Unit G-Match Unit Price Amount Unit Price Amount Dollars Dollars Dollars Dollars 202020353 100 REMOVE CONCRETE SQYD N $21.05 $2,105.00 $2,105.0; 203020100 700 EXCAVATION-UNCLASSIFIED CUYD N $3.98 $2,786.00 $10.00 $7,000.00 301020340 235 CRUSHED AGGREGATE COURSE CUYD N $26.31 $6,183.00 $30.00 $7,050.00 301020625 1410 AGGREGATE TREATMENT SQYD N $0.44 $620.00 $620.00 401020022 255 COMMERCIAL MIX-PG 64-28 TON N $86.13 $21,963.00 $21,963.00 401020300 4 HYDRATED LIME TON N $213.85 $855.00 $855.00 603013453 280 PIPE-PVC 18IN LNFT N $0.00 $60.00 $16,800.00 603013549 1 CONNECT TO EXISTING PIPE EACH N $552.14 $552.00 $552.00 603014242 2 ADJUST VALVE BOX EACH N $433.86 $868.00 $868.00 604000100 4 ADJUST MANHOLE EACH N $666.74 $2,667.00 $2,667.00 604000140 3 REMOVE DROP INLET EACH N $983.81 $2,951.00 $2,951.00 604010220 3 INLET DROP-SPECIAL DESIGN EACH N $3,400.00 $10,200.00 $3,100.00 $9,300.00 608010020 120 SIDEWALK-CONCRETE 4 IN SQYD N $67.22 $8,066.00 $8,066.00 608010110 55 CONCRETE 6 IN SQYD N $76.38 $4,201.00 $4,201.00 608010125 3 DETEC WARNING DEVICES-TYPE 1 SQYD N $400.66 $1,202.00 $1,202.00 609010200 805 CURB AND GUTTER-CONC LNFT N $25.55 $20,568.00 $20,568.00 609010209 152 REMOVE MEDIAN CURB LNFT N $3.58 $544.00 $544.00 617000000 4 FOUNDATION-CONCRETE CUYD Y $1,000.37 $4,001.00 $4,001.00 617503130 2 SIG-TRAF 3 COL-1 WAY 12-12-12 EACH Y $1,068.58 $2,137.00 $2,137.00 617513125 2 SIG TRAF 4 COL 1 W 12-12-12-12 EACH Y $1,312.96 $2,626.00 $2,626.00 617553020 2 SIG-PEDESTRIAN TYPE 2 EACH Y $923.90 $1,848.00 $1,848.00 617695525 1 SIG STANDARD TYPE 2-A-900-0 EACH Y $0.00 $1,600.00 $1,600.00 617781000 2 REMOVE AND SALVAGE MISC ELECTRICAL LS N $7,590.48 $15,181.00 $15,181.00 617783030 1 REMOVE AND RESET MISC ELECTRICAL LS N $3,000.77 $3,001.00 $3,001.00 617903255 2 PUSH BUTTON-PEDESTRIAN-TACTILE EACH Y $1,385.69 $2,771.00 $2,771.00 618030080 1 TRAFFIC CONTROL LS N $21,117.00 $21,117.00 $15,000.00 $15,000.00 619010086 10 SIGNS-ALUM REFLSHEET IV SOFT Y $26.06 $261.00 $261.00 619010200 1 RESET SIGNS EACH Y $200.53 $201.00 $201.00 619010210 1 RESET SIGNS-GUIDE EACH Y $785.75 $786.00 $786.00 620010301 1 CURB MARKING-YELLOW EPDXY GAL Y $254.45 $254.00 $254.00 620011260 6 WORDS AND SYMBOLS-WHITE EPDXY GAL Y $295.94 $1,776.00 $1,776.00 620011265 6 WORDS AND SYMBOLS-YELLOW EPDXY GAL Y $305.06 $1,830.00 $1,830.00 620013955 2380 REMOVE PAVEMENT MARKINGS LNFT N $1.93 $4,593.00 $4,593.00 620013960 7 STRIPING-WHITE EPDXY GAL Y $65.51 $459.00 $459.00 620014960 12 STRIPING-YELLOW EPDXY GAL Y $56.12 $673.00 $673.00 623000155 1 MAILBOX EACH N $205.77 $206.00 $206.00 $150,052.00 $166,516.00 10% Mobilization $15,005.20 $16,651.60 Subtotal $165,057.20 $183,167.60 20% Contingency $33,011.44 $36,633.52 Construction Total $198,068.64 $219,801.12 10% Construction Engineering $21,980.11 Total $241,781.23 User:Dillon McLain File Name:P:\Private\MT\City\Bozeman\11415006 East Main Commercial\G Date: 12/12/2016 9:17