Loading...
HomeMy WebLinkAbout17- Task Order 3 - DOWL - Bozeman Sports Park TOP Bond Project ATTACHMENT A Task Order No.3 -Professional Services Agreement with DOWL,LLC for the Bozeman Sports Park Trails, Open Space,and Parks Bond Project THIS AGREEMENT is made as of this day of �M�£'Q. , 2017,between THE CITY OF BOZEMAN, a Municipal Corporation,P.O. Box 1230 Bozeman, Montana,59771-1230 (CITY) and DOWL,LLC,whose address is 2090 Stadium Drive, Bozeman,Montana 59715, (CONSULTANT). WHEREAS,the parties have entered into a Professional Services Agreement dated May 18, 2015, for design and engineering of the Bozeman Sports Park; and WHEREAS,revisions to the scope of services are necessary to complete the Project in accordance with the Master Plan approved by Commission; and WHEREAS, the parties desire to amend the provisions of this Agreement. NOW,THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached Task Order No. 3 for the Scope of Services for the Bozeman Sports Park("Exhibit A") are hereby incorporated in and made part of this agreement. Section 4—Payment: Section 4 of the original agreement is modified to include: Task Order No. I.........$253,480 Task Order No. 2.........$179,460 Task Order No. 3.........$100,000 Contract total..............$532,940 Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. 1 59 IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement. CITY F BOZEMAN DOWL, LLC BY: �1��+ • r — BY: (CN Manager) (Auth ize Signato ) DATE: 6-7 DATE: 4 7 ', -7 ATTEST: B 02''' ( ity Clerk) 1883 co. 2 60 Exhibit A Scope of Work Professional Services Agreement for Bozeman Sports Parr 61 'A' BOWL August 9, 2017 \\BZN-FS\bzn-pioiects\22\11536-01\IOPM\BD\T03 testing proposal.docx Carolyn Poissant Trails, Open Space, and Parks Design & Development City of Bozeman PO Box 1230 Bozeman, MT 59771-1230 Re: Bozeman Sports Park Task Order#3: Construction Administration Services Dear Carolyn: DOWL is pleased to submit this proposal in response to the City for Inspections and Materials Testing Services for the Bozeman Sports Park Phase 1A project. For our proposal, we have based our inspection time and fee on and development of the site plans and specifications. SCOPE In developing our scope of work and cost DOWL has reviewed the Contract Documents, including plans and specifications for the athletic fields, irrigation, utilities, and site-civil work. DOWL will be teaming with Steiner-Thuessen, and Siegfried to provide inspection services for the Phase 1a improvements with a successful outcome. DOWL will perform inspection for certain elements of the project as outlined below: • Project Management • Shop Drawing and Submittal Review • Process RFIs • Review Pay Requests • Change order pricing review • Construction Staking (limited) • Materials Testing —Soils, Concrete and Asphalt • Utility Testing • Irrigation Inspection and Testing 406-586-8834 ■ 406-586-1730(fax) ■ 2090 Stadium Drive ■ Bozeman,Montana 59715 ■ www.dowl.com Alaska-Anchorage,Juneau,Palmer■ Arizona-Tucson,Phoenix■ Montana-Billings,Bozeman,Butte,Great Falls,Helena,Miles City 62 Washington-Seattle ■ Wyoming-Lander,Laramie,Sheridan Bozeman Sports Park Proposal for Construction Administrative Services August 8, 2017 • Control System Programming • Soil Amendment Testing These items are discussed in detail below. Project Management We have included a project management cost item which includes Project Management time associated with attending weekly project meetings (estimated at 16 meetings), Quality Assurance and other assumed project support coordination efforts. Shop Drawing and Submittal Review The design team will review all shop drawings and product submittals required by the specifications to determine compliance with the drawings and specification. Contractor will receive written response from reviewer. Process RFIs The design team will review and respond to any questions that come up from the contractor during construction. Change Order Pricing Review The design team will assist the owner to see if proposed change order amounts provided by subcontractors are reasonable and acceptable. Construction Staking DOWL will provide construction staking for project elements that are not required by the contractor to stake (building pads, fencing, utilities, etc). Offset stakes will be set as requested by the subcontractors. Any re-staking will be responsibility of the Contractor. Materials Testing Includes building pad preparation, backfill and compaction in play fields, parking areas and sidewalks. Compaction testing will be performed with a nuclear density gauge to verify materials below shallow foundations are adequate to achieve the design bearing capacity. Evaluation of soils will be conducted with the combination of moisture-density relationships, sieve analysis, and plasticity determination in the form of Atterberg limits. Concrete flatwork and asphalt will also be tested. Page 2 of 3 - DOWL 63 Bozeman Sports Park Proposal for Construction Administrative Services August 8, 2017 Utility Testing Water main extension will have full-time inspection. Leak testing and line disinfection will be documented for the main to be put into service. Irrigation Inspection and Testing The design team will make site visits during construction of the irrigation system to ensure compliance with the drawings and provide guidance as necessary for field adjustments. It is estimated that 9 site visits will be required for the irrigation system, pump station, plantings ,and seeding components of the project. Control System Programming Steiner-Thuessen will provide basic programming of the central irrigation control system. Changes during construction that necessitate adjustment to the programming will be the responsibility of the contractor. The contractor will be responsible for final station assignments and run times. Soil Amendment Testing Samples will be taken of the amended soil for testing to ensure amendments have been added at the specified rates. COST DOWL proposes to work on a time and material basis not to exceed $100,000.00 DOWL appreciates the opportunity to submit this proposal and is open to any discussion in regard to scope and cost for this work. Sincerely, DOWL Lh Lowe,/P.E. Senior Project Manager Page 3 of 3 A-- DOWL 64