HomeMy WebLinkAbout17- Memorandum of Understanding - Department of Natural Resources (DNRC), Water Resources Division - Bozeman Creek Streamflow Gage MEMORANDUM OF UNDERSTANDING
between
CITY OF BOZEMAN
and
STATE OF MONTANA, DEPARTMENT OF NATURAL RESOURCES
WATER RESOURCES DIVISION
Whereas the Montana Department of Natural Resources (herein referred to as DNRC) is
committed to obtaining water-quantity data in efforts to quantify and assess water supply and
availability throughout the state.
Whereas the City of Bozeman (herein referred to as the Collaborator) is committed to long-
term monitoring of the flow of Bozeman Creek as it is a critical municipal water supply source, a
receiving waterbody for municipal stormwater discharges, and contains a regulated floodplain
mapped by the Federal Emergency Management Agency.
Whereas the Collaborator uses and relies on water-quantity data collected and maintained by
DNRC; and;
Whereas DNRC has expertise in the installation and operation of stream flow monitoring
equipment, and has interest in collecting long-term monitoring data for Bozeman Creek.
Whereas the gage will be integrated into DNRC's statewide real-time streamflow gaging
program.
These parties enter into this Memorandum of Understanding (MOU) effective on the date last
executed below. The primary goal of the MOU is to install monitoring equipment and allow
cooperative data collection to support DNRC and Collaborator programs, to improve data
consistency between the parties, enhance data sharing, and to generally increase the efficiency of
high quality, real-time data collection on Bozeman Creek.
Activities under this MOU will be conducted under the terms and conditions set forth below:
1. Scope of Work. DNRC will provide staff support to specify, install, and maintain one (1)
year round real-time streamflow gage on Bozeman Creek at a location mutually agreed by
DNRC and Collaborator near the confluence with the East Gallatin River. The Collaborator
will reimburse DNRC for the cost of purchasing real-time streamflow monitoring equipment
specified by DNRC and will reimburse DNRC for materials and supplies needed to install
the monitoring equipment.
a. DNRC will specify the needed monitoring equipment to be compatible with its real-
time streamflow gaging network and obtain quotes from the equipment vendor.
b. The Collaborator will reimburse DNRC for the cost of purchasing the specified
monitoring equipment upon a submittal of an invoice by DNRC to the Collaborator
containing paid receipts up to $12,000.
c. The Collaborator will reimburse DNRC for its materials and supplies costs needed to
initially install the monitoring equipment upon a submittal of an invoice by DNRC to
the Collaborator containing paid receipts up to $12,000.
d. The Collaborator will be responsible for covering any incidental costs related to the
repair or replacement of the monitoring equipment as needed. DNRC will be
responsible for coordinating with the Collaborator in advance of completing incidental
repairs or replacements. The Collaborator will reimburse DNRC for its incidental
costs upon a submittal of an invoice by DNRC to the Collaborator containing paid
receipts up to $12,000.
e. The Total Maximum amount of reimbursement to DNRC for all authorized costs will
not exceed $12,000.
f. DNRC will provide staff to install and set up monitoring equipment, including travel.
Installation may necessitate incidental trimming of understory vegetation in order to
transport materials and equipment to the installation site, and to optimize a satellite
signal to the gage site. Vegetative trimming will be agreed to by DNRC and the
Collaborator, prior to undertaking trimming.
g. DNRC will obtain approval for any required stream permits necessary to properly
install and set up monitoring equipment.
h. DNRC will conduct site visits on at least a quarterly basis (every three months)to
maintain and inspect monitoring equipment.
i. DNRC will process the gage data and upload the processed data to the Montana
Surface Water Assessment and Monitoring Program (SWAMP)real-time website
(http://data.mbmg.mtech.edu/mapper/mapper.asp?view=Swamp&) for access by
Collaborator and the public.
j. The Collaborator desires to collect selected real-time water quality data at the gaging
site in the future by deploying a water quality data sonde. The Collaborator will
coordinate the data sonde deployment with the DNRC to ensure component and site
compatibility. DNRC agrees to integrate the real-time water quality sonde data into
the overall data stream collected and transmitted by the monitoring equipment and
make it publicly available on the SWAMP website. The Collaborator is solely
responsible for the deployment, maintenance, and QA/QC of the water quality sonde
data. The Collaborator will coordinate in advance any sonde-related activities with the
DNRC.
k. DNRC will maintain the Bozeman Creek gage to collect year-round data. Winter data
collection(November-March) will likely be challenging. Winter data may not be
available on a real-time basis due to these challenges and the Collaborator will be
notified. DNRC hydrologist will process and qualify winter data in a timely manner.
1. The DNRC and Collaborator agree to work jointly to obtain any easements or
agreements needed to install, access, maintain, or otherwise operate the monitoring
equipment should the installation, access, maintenance or operation of the monitoring
equipment necessitate the use of private property.
2. Agreement Period. This MOU will become effective beginning on the date last executed
below. This agreement will expire on June 30, 2023, unless the parties agree in writing to
extend or otherwise change the ending date.
3. Liaisons. DNRC and Collaborator contacts for technical issues are:
DNRC
Name: Matt Norberg, Stream Gage Program Mgr
Address: Montana DNRC
1424 9th Avenue
Helena, Montana 59620-1601
Phone: 406 444-6041
Fax: 406 444-0533
Email: mnorberggmt.gov
Collaborator
Name: Brian Heaston, PE
Address: City of Bozeman Engineering Department
20 East Olive Street
Bozeman, MT 59715
Phone: 406 582-2280 ,' .:'
Fax: 406 582-2X3` ,t
Email: bheaston(iOozefnan..net
4. Publication and Confidentiality. The parties each have the right to use and publish any and
all data, information, conclusions and developments resulting from work conducted under
this MOU. All data and information collected by DNRC pursuant to this MOU is public
information.
5. Modification. This Agreement may not be modified or amended, except by written
agreement signed by the parties hereto.
6. Governing Law. The validity, operation and performance of this Agreement shall be
governed and controlled by the laws of the State of Montana, and the terms and conditions of
this agreement shall be construed and interpreted in accordance with the laws of Montana.
7. Non-Discrimination,Legal Compliance And Indemnification. The parties agree to
comply with all federal, State of Montana and local laws applicable to this Agreement,
including but not limited to all federal, state, and local non-discrimination laws, Montana
public agency contract audit access requirements, and insurance.
The Parties shall maintain reasonable records of its performance under this MOU. The
Collaborator agrees that DNRC,the Montana Legislative Auditor,or the Montana Legislative
Fiscal Analyst may audit all records,reports, and other documents which the Collaborator
maintains under or in the course of this MOU to ensure compliance with this MOU. The
DNRC agrees to allow the same access to the Collaborator's auditors. Such records,reports,
and other documents may be audited at any reasonable time.
Each party to this MOU shall be responsible for any damages or injuries arising out of the
conduct of activities governed by this MOU, only to the extent that such damages and/or
injuries were caused by the negligent or wrongful acts or omissions of its employees, agents
or officers.
The DNRC shall not be liable for any accidents,property damage, or injuries that occur
during the term of this agreement unless the accident,property damage or injuries are caused
by direct action of the DNRC.
The Collaborator shall not be liable for any accidents,property damage, or injuries that occur
during the term of this agreement unless the accident,property damage or injuries are caused
by direct action of the Collaborator.
8. Signatures.
ate-t/ ate
City Manager Admi ' trator
City of Bozeman Water Resources Division
Montana DNRC