HomeMy WebLinkAbout17- Amendment 1 to PSA - Robert Peccia and Associates - Transportation Master Plan Amendment No. 1 to Professional Services Agreement For Bozeman Transportation Master Plan THIS AGREEMENT is made as of this 9 day of JUAk , 2017, between THE CITY OF BOZEMAN, a Municipal Corporation, Bozeman, Montana, herein referred to as OWNER and Robert Peccia and Associates, an Engineering Consulting Firm of Helena, Montana, herein referred to as ENGINEER. WHEREAS, the parties have entered into a Professional Services Agreement dated August 03, 2015, herein referred to as Original Agreement for professional engineering services; and WHEREAS, the parties desire to further amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached: EXHIBIT A.1 Intersection Standards—Additional Work Completed (Scope of Services) EXHIBIT B.1 Intersection Standards—Additional Work Completed (Fee) EXHIBIT A.2 TMP—Additional Work Completed (Scope of Services) EXHIBIT B.2 TMP—Additional Work Completed (Fee) Are hereby incorporated in and made part of this Agreement. ARTICLE 1 -ENGINEERING SERVICES 1.1. The detailed description of the specific project components is described as follows: Furnish services including all labor, manpower, sub-contractual services, materials, supplies, equipment, travel, transportation, and professional services, and principal's time to develop: • City of Bozeman Intersection Standards —Additional Work Completed: Reviewed best practices and standards in other cities with similar characteristics to Bozeman. Met with City Public Works staff to review findings. Assessed whether intersection standards should be included in the Bozeman Transportation Master Plan. Prepared Technical Memorandum for inclusion in TMP Report appendix. • City of Bozeman TMP—Additional Work Completed:Performed additional work as part of the TMP related to the Kagy Boulevard Reconstruction Project. Completed several iterations of the TMP facility recommendations due to Kagy Boulevard Reconstruction Project being removed to the City's Capital Improvement Plan (CIP) and other additions/deletions to the CIP during the planning process. 1.2. The scope of services under this contract is set forth in this Agreement and the attached EXHIBITS. 1 TMP Amendment No. 1 Page 1 of 11 ARTICLE 6 - COMPENSATION FOR ENGINEERING SERVICE 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for services performed as described in Exhibits A.1 and A.2 pay a total sum in the following amounts for such services: $ 14,272 Intersection Standards—Additional Work Completed $ 30,728 TMP—Additional Work Completed $ 45,000 (Total All Components) 6.1.2 Payment Schedule. Monthly partial payments based on an approved percentage of completion will be made as the work progresses. All costs related to this project are to be in conformance with 48 CFR 31.2 (Federal Procurement Regulations). Payments will be made pursuant to certified invoices in a form acceptable to the OWNER. The original plus two copies of the certified invoices shall be submitted with each billing,along with three copies of the progress report. When the Engineer has completed the work in accordance with the terms of the Contract, they will certify to the completion of the project. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under Exhibits A.1 and A.2 are reimbursable. All other related expenses are included in the Lump Sum Payment for the Basic Services (6.) and are not separately reimbursable. 2 TMP Amendment No.1 Page 2 of 11 Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. IN WITNESS WHEREOF, the parties hereto do make and execute this Amendment on the day and year first above written. CITY OF BOZEMAN,MONTANA ROBERT PECCIA AND ASSOCIATES BY: t 0 BY: n(City Manager) (Preside lit) DATE: J DATE: &-Ay 10r Zo -T ATTEST: $OzElyf'� BY: (City Clerk) 3 TMP Amendment No. 1 Page 3 of 11 Bozeman Transportation Master Plan—Additional Work Completed Exhibit A.1—Scope of Services Intersection Standards - Additional Work Completed SCOPE OF SERVICES INTRODUCTION The City of Bozeman's current intersection standards for developers are based on the intersection Level of Service (LOS) during peak hours.An intersection is considered to be operating at an acceptable level if it is at a LOS of C or better. This standard, however, may be unreasonable for some intersections for a variety of reasons.As an example, the intersection of Main Street and 71'Avenue is constrained by the available right-of-way at the intersection. If the intersection LOS was to become sub-standard, few options are available to improve the intersection. As such, context based LOS standards may be required for the City of Bozeman. This study seeks to identify context based LOS standards that allow flexibility. Context based LOS standards aim to consider more than just one aspect—vehicle delay—of the intersection. These aspects include, but are not limited to, safety, volume, duration of peak hours, scale of importance, and prioritization or functional class of the intersection and its component roadways. This study will make recommendations that are relevant to the City of Bozeman. TASK DESCRIPTIONS The following tasks have been identified to fulfill the scope of services and are based on our understanding of what is needed for City of Bozeman intersection standards to be developed. The following major tasks have been identified and are defined throughout this exhibit: TASK 1: Project Management and Administration TASK 2: Review Best Practices and Standards in Other Cities TASK 3: Develop Recommended Intersection Standards Task 1: Project Management and Administration This task has been created for overall project management aspects associated with this study, both internal and external. General management and coordination duties include the following, and do not logically fall under other tasks/sub-tasks identified for this study: • Phone conversations and email correspondence; • Internal project management duties at RPA to monitor scope, schedule, and budget. • Accounting and secretarial assistance. Sub-Task 1.1 Prepare Scope of Services and Fee Estimate Sub-Task 1.2 General Management and Coordination Duties Task 1 Deliverables: ✓ Scope of Services and Fee Estimate (Electronic) Page 1 of 2 TMP Amendment No. 1 Page 4 of 11 Bozeman Transportation Master Plan—Additional Work Completed Exhibit A.1—Scope of Services Task 2: Review Best Practices and Standards in Other Cities This task will involve a review of the best practices on the subject of intersection standards. Various resources, including Institute of Transportation Engineers(ITE) and Transportation Research Board (TRB), will be searched for relevant information pertaining to standards and best practices. Specific attention will be payed to documents that represent the existing context of Bozeman. Cities with similar characteristics to Bozeman—high growth, semi-urban environment, duration of peak periods, non-motorized volumes, etc.—will be identified. The policies of these cities will be reviewed with attention payed to existing intersection standards and how the cities deal with sub-standard intersections. A meeting will be held with City staff to discuss the results of the best practices and standards review. Comment will be solicited to help direct the development of the recommended intersection standards discussed in Task 3. Sub-Task 2.1 Review Existing Literature and Best Practices Sub-Task 2.2 Review Standards and Experiences of Other Cities _ Sub-Task 2.3 Meet with City Staff to Discuss Review Task 2 Deliverables: ✓ Summary of Best Practices and Standards in Other Cities (Electronic) Task 3: Develop Recommended Intersection Standards Based on the results of Task 2, an intersection standards recommendations technical memorandum will be prepared for the City of Bozeman. The draft recommendations will be presented to the Bozeman City Commission. Sub-Task 3.1 Prepare Draft Recommended Intersection Standards Technical Memorandum Sub-Task 3.2 Present Draft Recommended Intersection Standards to City Commission Sub-Task 3.3 Finalize Recommended Intersection Standards Technical Memorandum Task 3 Deliverables: ✓ Recommended Intersection Standards Technical Memorandum (Electronic) BUDGET RPA proposes to complete the City of Bozeman Intersection Standards as a component to the Bozeman Transportation Master Plan for the lump-sum fee of$14,272. Exhibit BA contains a detailed fee summary. SCHEDULE The schedule for the additional work completed was incorporated into the overall study. All work on the project ceased on May 1, 2017 (the date of City Commission adoption of the TMP Report). Page 2 of 2 TMP Amendment No. 1 Page 5 of 11 EXHIBIT 6.1 PROJECT:Intersection Standards Additional Work Completed) DATE:10/27/2016 PROJECT NO:Amendment 1 to Bozeman TMP EST.PREPARED BY:Scott Randall,PE,PTOE RPA COST ESTIMATE Manager/ Trans. Group Senior Traffic Engineer/ Staff Task ID Tasks Total Hours Manager Engineer Planner Accountant TASK1 PROJECT MANAGEMENTAND ADMINISTRATION 1.1 Prepare Scope of Services and Fee Estimate 5.0 1.0 2.0 1.0 1.0 1.2 General Management and Coordination Duties 4.0 2.0 2.0 0.0 SUBTOTAL(HOURS) 9.0 3.0 4.0 1.0 1.0 0.0 0.0 0.0 0.0 0.0 TASK 2 REVIEW BEST PRACTICES AND STANDARDS IN OTHER CRIES 2.1 Review ousting Literature and Best Practices 25.0 1.0 8.0 16.0 2.2 Review Standards and Expenences of Other Cities 25.0 1.0 8.0 16.0 2.3 Meet with Cty Staff to Discuss Review 14.0 6.0 6.0 2.0 0.0 SUBTOTAL(HOURS) 64.0 8.0 22.0 34.0 0.0 0.0 0.0 0.0 0.0 0.0 TASK 3 DEVELOP RECOMMENDED INTERSECTION STANDARDS 3.1 Prepare Draft Recommended Intersection Standards Technical 26.0 2.0 L2.0 16.0 Memorandum 3.2 Present Draft Recommended Intersection Standards to City 16.0 8.0 Commission 3.3 Finalve Recommended Intersection Standards Technical 70 1.0 4.0 Memorandum 0.0 SUBTOTAL(HOURS) 49.0 11.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 COSTSUMMARY Ttle Name Hours Rate Extension Project Manager/Group Manager Jeff Key,PE 22.0 $ 50.22 $ 1,105 Senior Traffic Engineer Scott Randall,PE,PTOE 44.0 $ 42.77 $ 1,882 Trans.Engineer/Planner Shane Forsyth,El 55.0 $ 29.79 $ 1,638 Staff Accountant Toni Ballard 1.0 $ 35.56 $ 36 Total Hours 122.0 Labor Subtotal $ 4,661 Salary Adjustments $ - General Overhead 1.65 $ 7,690 TOTAL LABOR/OVERHEAD $ 12,361 DIRECT NONLABOR Computer Hours 99 Per Hour $ 2.25 $ 223 Mileage(2 Round Trips at 200 miles each) Miles 400 Per Mile $ 0.54 $ 216 Per Diem-Day Days 0 Per Day $ 23.00 $Per Diem-Lodging Days 0 Per Day $ 150.00 $ - Printing Each 0 Per Color copy $ 1.00 $ - Other TOTAL DIRECT NONLABOR $ 439 OUTSIDE SERVICES AND SUBCONTRACTS TOTAL OUTSIDE SERVICES AND SUBCONTRACTS $ RECAPITULATION Total Labor/Overhead $ 12,351 Total Direct Non Labor $ 439 Total Outside Services and Subcontracts $ Profit(Applied to Total Labor Costs) 12% $ 1.482 TOTAL ESTIMATED COST $ 14,272 TMP Amendment No. 1 Page 1 of 1 Page 6 of 11 Bozeman Transportation Master Plan—Additional Work Completed Exhibit A.2—Scope of Services Transportation Master Plan - Additional Work Completed SCOPE OF SERVICES INTRODUCTION Over the course of developing the Transportation Master Plan (TMP), additional work was completed due to the dynamic nature of the Kagy Boulevard Reconstruction Project design development. The decision was made by the City to remove the Kagy Boulevard Reconstruction Project from the"committed" project list during the middle of the TMP planning process, and there were subsequent trickle-down effects on the TMP. Projects contained in the City's Capital Improvement Plan (CIP) changed between November 2015 and November 2016 due to the Kagy Boulevard reconstruction project being pulled from the CIP. Accordingly, RPA completed unanticipated iterations of the Facility Recommendations Technical Memorandum; this memorandum directly rolled into the Draft and Final TMP Report.Additionally, unanticipated time and effort was made reviewing and coordinating the travel demand modelling effort with the City, MDT and their consultants on the Kagy Boulevard Reconstruction Project. TASK DESCRIPTIONS The following tasks are those that included additional work as part of the TMP planning effort. Note that task numbers correspond to the original task numbers in the approved scope of services. TASK 1: Project Management and Administration TASK 5: Travel Demand Modeling of Existing and Projected Conditions TASK 8: Alternative Network Modeling and Assessment TASK 11: Develop Recommendations and Major Street Network Task 1: Project Management and Administration This task has been created for overall project management aspects associated with the study, both internal and external. General management and coordination duties include the following, and do not logically fall under other tasks/sub-tasks identified for this study: • Phone conversations and email correspondence. • Internal project management duties at RPA to monitor scope, schedule and budget. • Accounting and secretarial assistance. Sub-Task 1.1 Prepare Scope of Services, Fee Estimate, and Schedule Sub-Task 1.2 General Management and Coordination Duties Sub-Task 1.3 Project Invoicing and Final Progress_ R_eport_y Sub-Task 1.4 Project Setup and Closeout _ ___77 Page 1 of 3 TMP Amendment No. 1 Page 7 of 11 Bozeman Transportation Master Plan—Additional Work Completed Exhibit A.2—Scope of Services Task 5: Travel Demand Modeling of Existing and Projected Conditions Reviewed and revised committed improvements in the model based on Kagy Boulevard decision. Worked with MDT Statewide and Urban Planning Section to review and calibrate additional modeling work, interpretation, and post-processing of model output. Made numerous iterations based on Kagy Boulevard coordination needs. Provided City and MDT with input data for creating the modified "no build" and modified "existing plus committed" model for the planning horizon years based on Kagy Boulevard decision. Collaborated with City, MDT and Kagy Boulevard consultant via conference calls, face-to-face meetings, and general technical discussions about both work efforts. I DESCRIPTION Sub-Task 5.1 Miscellaneous Meetings with MDT Travel Demand Modeler Sub-Task 5.2 Identify Committed Project List and Deliver to MDT for Baseline Model Sub-Task 5.3 Not Used Sub-Task 5.4 Assess Model Validation According to Accepted Calibration Methods Sub-Task 5.5 Not Used Sub-Task 5.6 Not Used Sub-Task 5.7 Not Used Task 8: Alternative Network Modeling and Assessment As noted in Task 5, worked with MDT Statewide and Urban Planning Section to make changes to model based on Kagy Boulevard analysis and related work. Included assisting with calibration assessment and review, interpretation, and post-processing of model output. Examined effects of Kagy Boulevard scenarios. Reviewed, post-processed and evaluated model results and reported the findings. Sub-Task 8.1 Develop Modeling Alternatives (up to 10) Sub-Task 8.2 Meet with MDT Travel Demand Modeler to Incorporate Alternatives Sub-Task 8.3 Analyze Alternative Network Modeling Results Sub-Task 8.4 Not Used Sub-Task 8.5 Not Used Sub-Task 8.6 Not Used Task 11: Develop Recommendations and Major Street Network Completed several iterations of short-and long-term recommendations based on Kagy Boulevard decision. Prepared three version s of the Facility Recommendations Technical Memorandum once CIP changed in November of 2016. Engineering and construction cost estimates were completed and subsequently modified as part of this work task. Page 2 of 3 TMP Amendment No. 1 Page 8 of 11 Bozeman Transportation Master Plan—Additional Work Completed Exhibit A.2—Scope of Services DESCRIPTION Sub-Task 11.1 Not Used Sub-Task 11.2 Develop Preliminary Transportation System Management (TSM) j Recommendations Sub-Task 11.3 Develop Preliminary Major Street Network(MSN) Recommendations Sub-Task 11.4 Develop Planning Level Cost Estimates Sub-Task 11.5 Not Used Sub-Task 11.6 Not Used _ Sub-Task 11.7 Prepare Draft Preliminary Recommendations Technical Memorandum Sub-Task 11.8 QA/QC Draft Preliminary Recommendations Technical Memorandum Sub-Task 11.9 Prepare Final Preliminary Recommendations Technical Memorandum BUDGET RPA proposes to complete the Bozeman Transportation Master Plan—Additional Work Completed for the lump-sum fee of$30,728. Exhibit B.2 contains a detailed fee summary. SCHEDULE The schedule for the additional work completed was incorporated into the overall study. All work on the project ceased on May 1, 2017 (the date of City Commission adoption of the TMP Report). Page 3 of 3 TMP Amendment No. 1 Page 9 of 11 EXHIBIT B.2 PROJECT:Transportation Master Plan Additional Work Completed) DATE:05/10/2017 PROJECT NO:Amendment 1 to TMP EST.PREPARED BY:Jeff Key,PE WORK TYPE:Transportation Plan Manager/ Planner/ Trans. Engineering Graphics Group Senior Traffic QA/QC Engineer/ Designer/ Design Staff Admin. Tasks Total Hours Manager Engineer Reviewer Planner Const.Tech Manager Accountant Assistant III PROJECT MANAGEMENT AND ADMINISTRATION Prepare Scope of Services,Fee Estimate,and Schedule 2.0 2.0 General Management and Coordination Duties 1.o 1.0 Project Invoicing and Final Progress Report 2.0 1.0 1.0 Project Setup and Closeout 1.0 1.0 0.0 SUBTOTAL(HOURS) 6.0 4.0 1 0.0 1 0.0 0.0 0.0 0.0 2.0 0.0 0.0 TRAVEL DEMAND MODELING OF EXISTING AND PROJECTED CONDITIONS Miscellaneous Meetings Mth MDT Travel Demand Modeler 8.0 4.0 4.0 Identify Committed Project List and Deliver to MDT for Baseline 6.0 2.0 4.0 Model Develop Socioeconomic and Land Use Assumptions for Travel 0.0 Demand Modeling Assess Model Validation According to Accepted Calibration 20.0 4.0 16.0 Methods Prepare Draft Travel Demand Model Calibration Technical 0.0 Memorandum QA/QC Draft Travel Demand Model Calibration Technical 0.0 Memorandum Prepare Final Travel Demand Model Calibration Technical 0.0 Memorandum 0.0 SUBTOTAL(HOURS) 1 34.0 10.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ALTERNATIVE NETWORK MODELING AND ASSESSMENT Develop Modeling Alternatives(up to 10) 10.0 2.0 8.0 Meet with MDT Travel Demand Modeler to Incorporate Alternatives 5.0 1.0 4.0 Analyze Alternative Nehvrork Modeling Results 37.0 2.0 12.0 23.0 Prepare Draft Alternative Netvrork Modeling Technical 0.0 Memorandum QA/AC Draft Alternative Netvrork Modeling Technical 0 0 Memorandum Prepare Final Alternative Netv,ork Modeling Technical 0.0 Memorandum 0.0 SUBTOTAL(HOURS) 52.0 5.0 24.0 0.0 23.0 0.0 0.0 0.0 0.0 0.0 DEVELOP RECOMMENDATIONS AND MAJOR STREET NETWORK Assess Existing and Future Major Street Nehvork 0.0 Develop Preliminary Transportation System Management(TSM) 48.0 4.0 24.0 20.0 Recommendations Develop Preliminary Major Street Nehvork(MSN) 48.0 4.0 24.0 20.0 Recommendations Develop Planning Level Cost Estimates 12.0 4.0 8.0 Prioritize Recommended Improvements 0.0 Evaluate Recommended Netvmrk Travel Demand Model 0.0 Prepare Draft Preliminary Recommendations Technical 28.0 4.0 24.0 Memorandum QA/QC Draft Preliminary Recommendations Technical 4.0 4.0 Memorandum Prepare Final Preliminary Recommendations Technical 5.0 1.0 4.0 Memorandum 0.0 SUBTOTAL(HOURS) 145.0 21.0 84.0 0.0 40.0 0.0 1 0.0 0.0 0.0 0.0 DATE:05/10/2017 EST.PREPARED BY:Jeff Key,PE WORK TYPE:Transportation Plan Title Name Hours Rate Extension Project Manager/Group Manager Jeff Key,PE 40.0 $ 50.22 $ 2,009 Senior Traffic Engineer Scott Randall,PE,PTOE 132.0 $ 42.77 S 5,646 Environ.Planner/QA/QC Reviewer Dan Nordemd,AICP 0.0 $ 43.25 S - Trans.Engineer/Planner Shane Forsyth,El 63.0 $ 29.79 S 1,877 Engineering Designer/Const.Tech Steven Bakker,El 0.0 $ 26.90 $ - Graphics Design Manager Nick Ladas 0.0 $ 31.23 S - Staff Accountant Toni Ballard 2.0 $ 33.39 S 67 Admin.Assistant III Kan Slyder 0.0 $ 21.86 $ 0.0 5 TMP Amendment No. 1 Page 1 of 2 Page 10 of 11 EXHIBIT B.2 PROJECT:Transportation Master Plan Additional Work Completed) DATE:05/10/2017 PROJECT NO:Amendment 1 to TMP EST.PREPARED BY:Jeff Key,PE WORK TYPE:Transportation Plan Manager/ Planner/ Trans. Englneering Graphics Group Senior Traffic QA/QC Englneer/ Designer/ Design Staff Admin. er Revi Tasks Total Hours Manager Engineewer Planner ConsL Tech Manager Accountant Assistant III Total Hours 237.0 Labor Subtotal $ 9,598 Salary Adjustments General Overhead 1.65 $ 15,837 TOTAL LABORIOVERHEAD = 25 435 Computer Hours 237 Per Hour $ 2.25 $ 533 Mileage Miles Per Mile $ 0.58 $ Per Diem-Day Days Per Day $ 23.00 $Per Diem-Lodging Days Per Day $ 150.00 $ - Printing-Report Production(10 final total copies Q 172 pages each) Each 1720 Per Color copy $ 1.00 $ 1,720 Intersection Turning Movement Counts(Miovision) Locations Per Hour $ 80.50 TOTAL DIRECT NONLABOR ; 2 253 ALTA Planning+Design TOTAL OUTSIDE SERVICES AND SUBCONTRACTS $ Total Labor/Overhead $ 25.435 Total Direct Non Labor $ 2,253 Total Outside Services and Subcontracts $ - Profit(Applied to Total Labor Costs) 12% $ 3,040 TOTAL ESTIMATED COST $ 30,728 TMP Amendment No. 1 Page 2 of 2 Page 11 of 11