Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: David Fine, Economic Development Specialist SUBJECT: Ratify the Midtown Urban Renewal Board’s Awarding a Midtown TIF Assistance Program Grant for the Midtown Apartments Project at 511 W. Peach St.
MEETING DATE: September 11, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Ratify the Midtown Urban Renewal Board’s award of up to $88,482 in incentive funds from the Midtown TIF Assistance Program for the Midtown Apartments Project. BACKGROUND: Pursuant to Resolution 4770, the Bozeman City Commission created the Midtown TIF Assistance Program (the “Program”) and authorized the Midtown Urban Renewal District Board (MURB) to administer the Program. While the Commission authorized the MURB to administer the program, the Commission required the placement of grant awards of over $50,000 on the City Commission consent agenda for ratification of the MURB’s award. The City Commission has final approval over TIF incentives exceeding this threshold. The applicant for this project proposes the demolition of a failing and aesthetically un-appealing single family home, which constitutes a non-conforming use in B-2M zoning. The applicant will replace the blighted structure with a three story, 9 unit apartment building. To make the project feasible, they are requesting $88,482 in TIF assistance to pay for demolition, impact fees, cash-in-lieu of parkland. Based on a our tax generation model, the project generates enough new incremental tax revenue to recoup the investment in just over five years. The recently adopted Midtown Urban Renewal District Action Plan promotes targeted private investment with a specific vision for the corridor, based on the values of the urban renewal plan, which focuses on an increase in housing units and the promotion of urban density mixed use redevelopment. Staff finds that the grant award to the Midtown Apartments aligns with the Midtown Urban Renewal District
71
Plan, the Midtown Action Plan, and the criteria of the Midtown TIF Assistance Program.
UNRESOLVED ISSUES:
In order to reach its full housing impact, this project is dependent on the City Commission adopting parking reductions in Midtown that allow a minimum of one car per unit. The project will only have seven units in the event that the City Commission does not adopt reduced parking requirements in the B-2M zoning district. FISCAL EFFECTS: Funding for the $88,482 grant is available in the FY 2018 Midtown Urban Renewal District Work Plan and Budget. As grants are awarded at the time of occupancy permit, the award will most likely occur in FY 2019 and the proposed work plan and budget for that fiscal year will include specific authorization for this grant award.
ATTACHMENTS: 1. Midtown TIF Assistance Program Grant Application Staff Report for the Midtown Apartments Project 2. Leland Consulting Group tax generation report 3. Midtown Apartments Grant Application LINKS: Resolution 4770 – Midtown TIF Assistance Program Resolution 4781 – Midtown Urban Renewal District Action Plan Midtown Urban Renewal Plan (2015)
72
Midtown TIF Assistance Program Grant Application Staff Report
Midtown Apartments, LLC, 511 W. Peach St
Updated September 1, 2017
Date: August 1, 2017
To: Midtown Urban Renewal District Board
From: David Fine, Economic Development Specialist
Overview
This project application is the second received under the new Midtown TIF Assistance Program. The new
program places special emphasis on the five goals articulated in the urban renewal plan for relieving
blighted conditions in the urban renewal area. Each of these five goals is further refined with particular
criteria for a total of sixteen categories in which points can be received. In many categories, specific
documentation must be received in order to receive points. The new program is designed to move away
from the previous façade grant program to support projects that reinforced the goals of the new urban
renewal plan, as well as projects that create significant new taxable value.
Criteria for TIF Assistance
Overall District Relevance
1. Relevance to the Midtown Urban Renewal Plan: Documentation of the project’s impact in relation
to the goals and objectives of the Midtown Urban Renewal Plan, particularly mixed‐use
development. Urban design elements are also considered, including pedestrian emphasis and
quality of design.
The project eliminates blight by demolishing a failing structure and replacing it with a contemporary
building that adds housing units and intensifies the density of the property use. The project significantly
increases the housing capacity of the site from a small single family home to a 9 unit 17 room apartment
building. The building is moved far closer to the street although its front façade is not particularly
engaging in terms of enhancing the pedestrian experience. The project does not provide a mix of uses
and create spaces for long‐term traded sector jobs. [4 of 5]
Promote Economic Development
2. Tax Generation: The project will increase the taxable value within the District. The increase in
taxable value due to new construction & rehabilitation is estimated by the County Assessor’s office
or State Department of Revenue to determine tax increment generation. Submit documentation of
estimated tax projections to receive points for these criteria.
73
Leland Consulting Group (LCG) created a tax revenue generation model for the Midtown URD. Using
data provided by the property owner, LCG estimates that the property will provide an annual net tax
revenue increase of $26,082 for the TIF district. The new construction value of the new property is
$1,550,000 which represents a $1,270,000 increase in the value of the property. For the assumptions
related to these projections, please see the LGC report. [4 of 4]
3. Elimination of Blight: The project’s direct and indirect impact on the physical and fiscal
deterioration within the Tax Increment Financing District and the community. Submit information
showing current conditions of property.
The project eliminates blight by demolishing a failing and aesthetically unapplealing structure and
replacing it with a contemporary building that adds housing units and intensifies the density of
development on the property. [4 of 4]
4. Employment Generation: Total employment generated by the project assessed in terms of new
permanent and part‐time jobs, and construction jobs. Submit documentation of estimated new jobs
to receive points for this criterion.
The project will generate temporary construction jobs. [1 of 3]
Improve Multi‐Modal Transportation
5. Facilitates Public Health and Mobility: Project will construct or improve sidewalks, including ADA
access to buildings. Provide detailed information demonstrating that the current condition inhibits
public health and mobility.
The current building has 4 foot sidewalks and is not ADA accessible. The new building will have 5 foot
sidewalks and feature an at‐grade fully ADA accessible residential unit. [1 of 1]
6. Reduces Resource Demand: Project promotes the use of transit, ride sharing, or car sharing. Provide
plans, agreements or other methods to demonstrate reduction of resource demand.
While locating housing in Midtown places it in a centrally located location, this project does not take
particularly exceptional or innovative measures to promote transit use, ride sharing, or car sharing. [0 of
1]
7. Promotes Active Transportation: Project promotes bicycling as an active transportation option by
constructing or improving bike lanes, providing covered bike parking, and/or participating in a bike
share program. Provide plans, agreements or other methods to demonstrate reduction of resource
demand.
Qualifying covered bike parking is proposed. [1 of 1]
Improve, Maintain, and Support Innovation in Infrastructure
74
8. Infrastructure Improvements: Project promotes innovation in infrastructure and/or reduces long
term costs of maintenance. Provide plans and descriptions of innovations proposed.
The project proposes the installation of wet utility service lines and on‐site stormwater treatement.
These improvements are necessary and not particularly innovative. The project also is not proposing any
improvements beyond sidewalk widening to enhance the streetscape or pedestrian experience. The
proposed roof design is ready for photovoltaic cells, but the cells will not actually be installed during
initial construction. [0 of 2]
Promote Unified Human Scale Urban Design
9. Street Frontage: The project improves the street frontage by eliminating parking between the right‐
of‐way and the building. Provide plans to demonstrate improvement in street frontage.
The building removes a residential driveway from the front of the building and all parking is tucked
under the building with a driveway on the side of the building. Moving parking to the side and rear of
structures is a new code requirement and is consistent with the vision of the Midtown Urban Renewal
Plan. [2 of 2]
10. Vehicular Access Points: The project reduces the number of vehicular access points to the property
and improves the pedestrian experience. Provide plans, agreements or other methods to
demonstrate reduction. [0 of 2]
The project is moving its vehicular access point, but it is not changing the overall number of access
points.
11. Street Orientation: The project enhances the North 7th Ave. entryway corridor by having buildings
oriented toward the street and designed to provide interest and activity.
The proposed structure would orient the structure toward the street and provide new interest and
activity compared to the single‐family residential‐style construction of the existing building.
[2 of 3]
12. Pedestrian Experience: The project enhances the pedestrian experience with elements such as
façade transparency, building articulation, street furniture and/or landscaping. Submit plans and
details that address this criterion.
The project provides some enhanced façade transparency and new landscaping along Peach St.
frontage. The building could do more to engage the street and enhance the public realm through the
use of better landscaping and a more dynamic front façade. In particular the door of the front unit faces
east rather toward the street. The applicant should consider the addition of a front porch and continuing
the weather protection element around the corner further engages the building with the street.
Sidewalk and ADA improvements will enhance the pedestrian experience. [1 of 3]
13. Quality of the Development Exceeds Minimum Requirements. The quality of development and
overall aesthetics (architectural, site design, landscaping, etc.) are beyond that which is minimally
required by the UDC. Submit documentation to demonstrate compliance with this criterion.
75
Based on preliminary renderings, the project as proposed appears to exceed the minimal requirements
of the UDC for architecture, site design, and landscaping. [2 of 2]
Support Compatible Urban Density Mixed Land Uses
14. Increases Housing Units: The project increases housing units within the District. Submit plans
demonstrating an increase in the number of housing units.
The project replaces a single family home with 9 residential units. [4 of 4]
15. Mix of Uses Including Residential: The project has a mix of uses, including residential. Submit plans
detailing the proposed mix of uses within the project.
The project includes residential, but not a mix of uses. [3 of 4]
16. Shared Parking: The project shares parking among compatible uses. Provide details demonstrating
compliance with the UDC and as well as total number of parking spaces reduced because of a shared
arrangement.
The project provides parking for its uses and does not share parking among compatible uses. Future
more detailed plans for parking could show a shared parking arrangement to receive points for this
category. [0 of 2]
Total Points (27/44)
Staff Recommendation
The Midtown TIF Assistance Program allows the payment of eligible costs of development to
incentivize development that meets the goals of the urban renewal plan. The applicant is applying for
five (5) eligible cost areas which include:
Impact fees: $42,661
Demolition: $41,365
Cash in Lieu of Parkland: $4,455.61
Stormtech drainage: $33,628
Water and Fire line: $17,704
The applicant requested funding for two items stormtech drainage and a water and fire line that, while
possibly eligible for funding, have benefits that are predominately internal to the project. For this
reason, staff does not recommend funding these items for this project. Excluding these items, the total
funding request would be $88,481.61.
Leland Consulting Group (LCG) completed a financial analysis of the project (attached) to help staff
evaluate the project. Their report analyzed return on investment (ROI), estimated payback period for
the public assistance and proposed target metrics for the ratio of private investment to public
assistance. Their analysis was based on awarding the applicant’s full assistance request. LCG
recommends a ratio of private investment to public assistance of 10:1 or greater for a multi‐family
residential‐only project; the ratio for this project is 10.294:1. LCG also created a tax generation model
76
for the Midtown URD. According to their model, the project would produce annual taxes of $17,045,
which would allow TIF assistance to be paid back in 5.5 years for new increment‐based payback if
assistance is provided at the staff recommended amount. This level of increment generation to payback
ensures that the proposed project will contribute to the long‐term ability of the District to make
investments in new projects.
Staff scored the application based on the program criteria. Based on our review and the
application materials presented, the project received 27 of 44 available points. The project eliminates
blight and advances the District goal of creating urban density land uses and providing increased housing
stock within the District to drive further commercial development.
Staff recommends authorizing staff to negotiate a development agreement with the Applicant for
presentation to the Bozeman City Commission for approval.
Recommended motion:
“I move to authorize staff to negotiate a development agreement with the Applicant for TIF
Assistance not‐to‐exceed $88,481.61 and to recommend the Midtown Apartments project for TIF
Assistance to the Bozeman City Commission.”
77
Midtown
Apartments,
LLC
Tax
Increment
Analysis
August
16,
2017
Prepared
by:
Andy
Parks,
CPA
Leland
Consulting/GEL
Oregon,
Inc.
on
behalf
of
the
City
of
Bozeman
Economic
Development
Department
Summary
Applicant
plans
to
build
9
unit
apartment
complex
on
property
currently
occupied
by
an
older
home.
Applicant
intends
to
invest
approximately
$1.64
million
and
is
requesting
$148,222
from
the
Agency.
The
following
schedule
summarizes
our
findings
of
our
analysis.
Estimated
costs
to
complete
project 1,673,981$
2017
Market
value
per
assessor 294,000
Net
estimated
increase
in
value 1,379,981
Estimated
net
increase
in
taxable
value 26,082
TIF
tax
rate
-‐
estimated
-‐
FY
2019 653.53
Estimated
incremental
taxes
(TIF)
-‐
annual
17,045
TIF
investment 88,482
ROI
-‐
estimated 19.3%
Estimated
payback
period
5.5
years assumes
4%
interest
rate
on
advanced
amount
Private
investment
to
public
investment
17.92
Metric:
Greater
than
8
to
1
-‐
commercial
Greater
than
5
to
1
-‐
family
wage
jobs
Assumptions
Cost
and
timing
information
provided
in
application
-‐
except
construction
financing
which
is
estimated
Estimated
start
date
Sep-‐17
Estimated
completion
per
application
is
8
months Apr-‐18
Increase
in
property
taxes
applicable
fiscal
year
2019
Construction
Interest
-‐
estimated
12
month
construction
loan
rate 5.49%
Current
property
taxes 2,344
Estimated
Project
Valuation
-‐
Cost
Approach
Construction
Financing
Project
Costs Amount Beg
Month
Ending
Month
Months
of
Interest
Estimated
Interest
Demolition 41,365
-‐
1
8
2,271
Building
construction 1,369,475
1
8
4
25,061
Parking
construction 27,250
8
8
1
125
Landscaping 18,000
8
8
1
82
Design/engineering 77,000
-‐
1
8
2,818
Water
and
fire
line 17,704
1
2
7
567
Storm
water
system 33,628
1
2
7
1,077
Park-‐land
(cash
in
lieu)12,864
-‐
1
8
471
Impact
fees 42,661
-‐
1
8
1,561
Project
financing
costs 34,034
34,034
Estimated
cost
to
complete 1,673,981
Note:
We
did
not
include
mortgage
payoff
or
value
of
demoed
house
in
the
Cost
Approach.
After
reviewing
application
and
costs,
Agency
and
staff
have
concluded
maximum
tax
increment
investment
is
http://gis.gallatin.mt.gov/common/parcel_informati
note:
rate
included
in
Loan
Commitment
Letter
Property
valuation
is
limited
to
the
cost
approach,
i.e.,
cost
to
complete
project
-‐
real
market
value
will
likely
Greater
than
10
to
1
-‐
desired
for
multi-‐family
78
79
80
Midtown Apartments – Project Narrative
Revitalizing Midtown and removing blight from the north 7th entryway corridor is
a difficult task for many reasons. The most obvious challenge is getting development and
infill started. Once developers begin to invest in the area, the snowball of improvement
will continue until the aesthetics and “livability” of Bozeman have permeated into our
most central entryway. The Midtown apartment project is the perfect starting point for
inspiring development in the area but will require help from the TIF program. Without
TIF assistance, the Midtown apartment project will not occur. An increase in
construction in other parts of town have driven building costs beyond what is feasible for
this project given that the owner is aiming for rental rates at or close to what can be
considered workforce housing. A close look at this project shows that it is a worthy
candidate of TIF assistance.
Project overview:
511 W Peach is home to a single family house approximately 2000 square feet.
This property is central to downtown and adjacent to the Midtown corridor. This project
will replace the single family home with a three story 9-unit apartment building 8100
square feet in size. Each unit will be approximately 600 square feet and maintained as
long term rentals. The new building will house 9 single stall garages on the main floor,
one space for each rental unit. This location faces a busy street and as such is not
appropriate for single family residential development. The application process is
underway with the city and, upon determining financial viability, the 8 month single
phase building process could begin as soon as August.
Why this project helps Midtown:
Once completed, this project will result in a 5-fold increase in population density
for the property. Adding higher density to Midtown provides both customers as well as
employees for businesses along north 7th. Increasing the customer and employee base for
the District is the foundation upon which Midtown development will be built. The
Midtown Apartments project meets all of the Midtown TIF Assistance Program
objectives. This project involves substantial private investment in commercial property.
The property owner is pledging the land valued at $285,000 as well as an additional
$600,000 to finance the construction. The attached property tax increase estimate
indicates that the completion of this project will potentially increase the tax base by
$100,000 over ten years. Finally, by demolishing and removing the failing structure on
the property and replacing it with a contemporary building, this project will help reduce
blight in the area.
Where TIF money will be spent:
• Impact fees: $42,661.00
• Demolition: $41,365.00
• Stormtech Drainage: $33,628.00
• Water and Fire line: $17,704.00
• Cash in Lieu of Parkland: $4,455.61
• Total= $139,813.61
81
This project meets the project objectives as stated in the Midtown Tax Increment
Financing (TIF) Assistance program as follows:
1. Encourage private investment in commercial property in the District
through the use of public incentives: The owner of this property is
investing the property valued at $285,000 as well as up to $600,000 of
private capital to fund this project if it is financially viable. The financial
viability of this project is contingent on TIF assistance.
2. Expand the property tax base in the District through private investment in
income producing properties: The increase value of this property will
increase the tax base in the district by up to $100,000 over the next 10
years.
3. Stimulate economic and business development within the District: This
project will provide a 5-fold increase in population density for the
property. That increase in population density will increase the customer
base for businesses in the area in turn stimulating economic and business
development in the district.
4. Reduce blighting influences in the District: The property is currently
home to a 1950’s single family home with a failing foundation,
deteriorating siding, and design standard that detracts from the district.
The replacement building will be of contemporary design promoting urban
style development thus reducing blight within the District.
The owners and developer of this project intend to be transparent with their intentions
and financial projections. Please do not hesitate to reach out for clarification regarding
any part of this project.
Sincerely
Luke Welborn
Owner
Midtown Apartments LLC
P.O. Box 6507
Bozeman, MT 59771
303-482-7533
lukewelborn@gmail.com
82
MIDTOWN TAX INCREMENT FINANCI NG (TIF) ASSISTANCE PROGRAM
INTRODUCTION
The Midtown Urban Renewal Plan (“Plan”), adopted by the Bozeman City Commission on
November 16, 2015, authorized the Midtown Urban Renewal Board (“Board”) to establish
monetary incentives in the Midtown Urban Renewal District (“District”) in support of the Plan’s
goal to promote economic development. The Board established and administers this Tax
Increment Financing (“TIF”) assistance program for the redevelopment and rehabilitation of
properties within the District.
TIF assistance applications are subject to program eligibility criteria and project guidelines listed
below. Applications will be accepted and processed in the order in which they are received and
approved based on the availability of funds for the program.
PURPOSE
The purpose of the TIF assistance program is to encourage desirable
development/redevelopment projects, as well as assist projects that would not otherwise occur
“but for” the assistance provided through tax increment financing. The purpose of this
document is to provide guidelines for the Board to offer monetary incentives for development
activities in the District in the form of TIF assistance funds.
This policy shall be used as a guide in processing and reviewing applications requesting TIF
assistance. The Board shall have the option of amending or waiving sections of this policy when
it determines, in its sole discretion, such an amendment or waiver is necessary or appropriate.
In amending or waiving any sections of this policy, the Board shall document the reason for the
deviation.
The provision of financial assistance is at the sole discretion of the Board. The Board reserves
the right to reject or approve applications on a case-by-case basis, taking into account
established policies, specific project criteria and the demand on District services in relation to
the potential benefits to be received from the proposed project. Meeting policy guidelines or
other criteria does not guarantee the award of TIF assistance. Furthermore, the approval or
denial of one application is not intended to set precedent for approval or denial of another
application.
83
Page 2 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
PROGRAM OBJECTIVES
The primary objective of the TIF assistance program is to encourage investment in development
and redevelopment of commercial and mixed use property within the District in accordance
with the provisions of the Montana Urban Renewal Law (7-15-4209, 7-15-4233, and 7-15-4288,
M.C.A.). Additional District objectives are to:
• Encourage private investment in commercial property in the District through the use of
public incentives;
• Expand the property tax base in the District through private investment in income
producing properties;
• Stimulate economic and business development within the District; and
• Reduce blighting influences in the District
The grants are awarded at the discretion of the Board as authorized by the Bozeman City
Commission, based upon review of the Applicant's compliance with program objectives,
eligibility requirements, and eligible construction activities.
GENERAL POLICIES
1. TIF assistance priority will be given to projects that do not have the financial feasibility to
proceed without the benefit of the assistance.
2. The applicant shall provide any market and financial feasibility studies, appraisals or other
information provided to private lenders for the project as well as any other information or
data which the Board, or its financial consultants, may require in order to review the need
for TIF assistance.
3. TIF assistance will not be used for projects that place extraordinary demands on District
infrastructure or services.
4. The applicant must be able to demonstrate, to the Board’s satisfaction, an ability to
construct, operate and maintain the proposed project based upon past experience, general
reputation and credit history.
5. The applicant shall provide sufficient market, financial, environmental and other data
relative to the successful operation of the project.
6. The Applicant must retain ownership of the project long enough to complete it, to stabilize
its occupancy, to establish the project management, and to initiate payment of taxes based
on the increased project value. This application must be signed by both the applicant(s) and
the property owner(s) (if different).
7. Project plans and construction must comply with all applicable code and permit
requirements. Applicant is advised to consult with the City of Bozeman planning and
84
Page 3 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
building departments, licensed architects, engineers, or building contractors before
proceeding with final plans or construction.
8. The Applicant must demonstrate significant leverage of private investment through the use
of public dollars.
ELIGIBLE COSTS
TIF eligible expenses are defined by Montana Code Annotated, 7-15-4288 and further limited
by the Plan. The project seeking TIF assistance must be located within the boundary of the
District.
Costs related to the following are eligible for financial assistance:
1. Demolition and removal of structures
2. Construction and improvement of public improvements or infrastructure, including
streets, curbs, gutters, sidewalks, alleys, parking lots and off-street parking facilities,
sewer lines, storm sewers, waterlines, and impact fees
Requests for funding above $50,000 will require the ratification of the Bozeman City
Commission.
DISBURSEMENT OF ASSISTANCE FUNDS
The TIF assistance program is a reimbursement program. No funds will be disbursed until all
completion criteria have been satisfactorily met as determined by the Board in its sole
discretion. At the end of the project, the recipient will submit a Certificate of Completion and
required supporting documentation to the Board including itemized invoices and other
documentation as the Board may reasonably request.
USE OF ASSISTANCE FUNDS
The award of TIF assistance funds is subject to the Applicant entering into a grant agreement
with the District. The grant agreement will include requirements that the grantee comply with
(i) applicable City of Bozeman procurement regulations related to bidding, hiring, and prevailing
wages; (ii) the City’s nondiscrimination policy; and (iii) State of Montana public records laws.
The grant agreement will include such additional terms as the District in its sole discretion
determines are prudent or necessary to fulfill the goals of the TIF assistance program.
TIF assistance funds must be used within two years of the date of the Letter of Award. Any
funds not disbursed to the Applicant within that time will remain in the District fund. The
Board, in its sole discretion, may provide an extension of up to one year to the original two year
timeframe.
Use of TIF assistance funds must be in compliance with the terms of the grant agreement
85
Page 4 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
between the Applicant and the District.
REVOCATION OF AWARD
The grant agreement will include terms providing that an award of TIF assistance may be
revoked by the Board if the Board finds, in its sole discretion, that Applicant has failed to
comply with any of the terms of the assistance program or grant agreement, or has failed to
provide information or provided inaccurate information on the application. Upon such a
finding, the Board will provide Applicant with notice of the default and a 30-day opportunity to
cure before the award is revoked. The grantee will be required to return TIF assistance funds
already disbursed pursuant to the terms of the grant agreement.
DISCLAIMER: Neither the Board nor the City of Bozeman will be responsible for the planning,
design, or construction proposed by any work conducted as part of the TIF assistance
program. No warrantees or guarantees are expressed or implied by the description of,
application for, award of or participation in the TIF assistance program.
APPLICATION PROCESS AND PROCEDURE
Application for TIF assistance shall be made on the forms provided by the Board and submitted
to the Economic Development Department for review and comment. Deadlines for submittals
shall be as published and posted by the Board. Incomplete forms will be returned to the
applicant with an explanation on additional information as may be required.
For projects seeking TIF assistance for demolition or payment of impact fees, the City of
Bozeman Economic Development Department will review the application and provide a
recommendation to the Board and, if applicable, the Bozeman City Commission.
If approved by the Board, or City Commission, a “letter of intent” outlining the specific terms
and conditions of the TIF assistance will be provided to the applicant.
SUBMITTAL INFORMATION
There are two parts to the attached application. All applicants must complete Part 1. Applicants
requesting TIF assistance above $50,000 must complete and include information identified in
Part 2.
Part 1 – All Applications
Part 2 – Applications requesting funding over $50,000
86
Midtown Urban Renewal District
TAX INCREMENT FINANCING APPLICATION
PART 1
Property Information
Property Address: ____________________________________________________________
Property Owner: _____________________________________________________________
Legal Description: ____________________________________________________________
Property Geo-Code: __________________________________________________________
County Tax ID #: ____________________________________________________________
Applicant Information
Property Owner
Tenant
Developer
Other
Applicant’s primary contact:
Name: ________________________________________________________________________
Business Name:
_________________________________________________________________
Business Phone: _______________________________Cell Phone: _______________________
Email: ________________________________________
Project Representative (if not applicant):
Name: ________________________________________________________________________
Business Name:
_________________________________________________________________
Business Phone: _______________________________Cell Phone: _______________________
Email: ________________________________________
Property Owner (if not applicant):
Name: ________________________________________________________________________
Business Name:
_________________________________________________________________
Business Phone: _______________________________Cell Phone: _______________________
Email: ________________________________________
87
Page 6 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
Please attach a list of all other property owners, business partners, developers and/or investors
associated with this project, with the above information provided for each.
This application must be signed by both the applicant(s) and the property owner(s) (if
different).
I (we), by signature below, certify that the information supplied in this application is, to the best
of my (our) knowledge, true, accurate, and complete, and is provided for the purpose of
obtaining approval to participate in the Midtown Urban Renewal District TIF assistance
program. I (we) understand that failure to comply with the terms of the TIF assistance program
may result in revocation of an award.
I (we) understand the work to be undertaken must be in accordance with all applicable
requirements of the Bozeman Municipal Code and any special conditions established by the
approval authority, and must receive all required approvals prior to commencing the work. I
(we) understand if approved for TIF assistance, the work to be performed must also be in
accordance with TIF assistance program procedures and the general design guidelines for the
District, as well as the specific plans approved for the project. I (we) acknowledge that the City
has an Impact Fee Program and impact fees may be assessed for my project. Further, I (we)
agree to grant City personnel and other review agency representative’s access to the subject
site during the course of the review process (Section 38.34.050, BMC).
Applicant (s) (Print Name)
Signature of Applicant Date
Property Owner(s) (Print Name)
Signature of Property Owner Date
88
Page 7 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
Company Profile
Business Location
New business establishing itself in Bozeman
Existing business
Expanding/remodeling at same location
Expanding to an additional location
Existing business relocating from (identify location):
Street Address:
City: State: Zip:
Other:
Year Business Established:
Type of Business (Describe):
Has a business plan been developed in relation to the proposed project?
No (Development of a business plan may be required as part of the application process.)
Yes (Include a copy with the application.)
89
Page 8 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
Project Detail
Property Status:
Vacant land
Building on leased land – Describe:
Land and building(s) – Describe:
Type of TIF Assistance Sought:
Requesting assistance for public infrastructure costs
Building demolition
Value of TIF Assistance Sought:
$
Will this project proceed if TIF assistance is not granted?
No
In a limited fashion (explain):
Yes, but at a later date (explain):
Yes, as scheduled
Other:
1. Project Narrative
Provide an overview of the project in narrative format. The narrative must include a
description of the following aspects of the project:
Proposed use(s) or project (e.g. industrial, commercial, retail, office, mixed use,
residential for sale or for rental, etc.)
Construction information about the project including size of any existing structure to be
demolished or rehabbed; sized of any new construction; types of construction materials
(structural and finish); delineation of square foot allocation by use;
Total number and individual square footage of residential units; type of residential units
(e.g. for-sale, rental, condominium, single-family, etc.); number and type of parking
spaces provided; and construction phasing.
90
Page 9 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
2. Site Maps and Building Plans
The Applicant must submit a completed Conceptual Review Application to the Board and
concurrently to the Community Development Department. The Conceptual Review
application must include, at minimum:
Photographs of project site and/or building
Map showing the location of the site and its immediate surroundings
Proposed development plans including site plans, floor plans indicating square
footage and layout, building elevations
Description of parking accommodations for residential units and commercial uses
Estimated date of occupancy
Prior to Board action on the grant application, the Applicant must have obtained and provide
to the Board the Community Development Director’s written comments on the proposed
development from the Conceptual Review Application.
91
Page 10 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
CRITERIA FOR TIF ASSISTANCE
In reviewing the TIF assistance application the Board will evaluate each project utilizing the
following criteria and point system. Points can range from 0 to the maximum shown below in
each category. Please rate your project according to the following criteria. To receive points for
any given item, documentation demonstrating adherence to the criteria must be submitted
with the application. The Board will use this information to evaluate the project.
Overall District Relevance Points
1. Relevance to the Midtown Urban Renewal Plan – Documentation of the
project’s impact in relation to the goals and objectives of the Midtown Urban
Renewal Plan, particularly mixed-use development. Urban design elements
will also be considered, including pedestrian emphasis and quality of design.
/5
Promote Economic Development
2. Tax Generation: The project will increase the taxable value within the District.
The increase in taxable value due to new construction & rehabilitation is
estimated by the County Assessor’s office or State Department of Revenue to
determine tax increment generation. Submit documentation of estimated
tax projections to receive points for this criteria
/4
3. Elimination of Blight – The project’s direct and indirect impact on the physical
and fiscal deterioration within the Tax Increment Financing District and the
community. Submit information showing current conditions of property.
/4
4. Employment Generation – Total employment generated by the project
assessed in terms of new permanent and part-time jobs, and construction
jobs. Submit documentation of estimated new jobs to receive points for this
criterion.
/3
Improve Multi-Modal Transportation
5. Facilitates Public Health and Mobility: Project will construct or improve
sidewalks, including ADA access to buildings. Provide detailed information
demonstrating that the current condition inhibits public health and mobility.
/1
6. Reduces Resource Demand: Project promotes the use of transit, ride sharing,
or car sharing. Provide plans, agreements or other methods to demonstrate
reduction of resource demand.
/1
7. Promotes Active Transportation: Project promotes bicycling as an active
transportation option by constructing or improving bike lanes, providing
covered bike parking, and/or participating in a bike share program. Provide
plans, agreements or other methods to demonstrate reduction of resource
demand.
/2
Improve, Maintain and Support Innovation in Infrastructure
8. Infrastructure Improvements: Project promotes innovation in infrastructure
and/or reduces long term costs of maintenance. Provide plans and
descriptions of innovations proposed.
/2
92
Page 11 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
Promote Unified Human Scale Urban Design
9. The project improves the street frontage by eliminating parking between the
right-of-way and the building. Provide plans to demonstrate improvement in
street frontage.
/2
10.
The project reduces the number of vehicular access points to the property
and improves the pedestrian experience. Provide plans, agreements or other
methods to demonstrate reduction.
/2
11.
The project enhances the North 7th Ave. entryway corridor by having
buildings oriented toward the street and designed to provide interest and
activity.
/3
12.
The project enhances the pedestrian experience with elements such as
façade transparency, building articulation, street furniture and/or
landscaping. Submit plans and details that address this criterion.
/3
13. The quality of development and overall aesthetics (architectural, site design,
landscaping, etc.) are beyond that which is minimally required by the UDC.
Submit documentation to demonstrate compliance with this criterion.
/2
Support Compatible Urban Density Mixed Land Uses
14. The project increases housing units within the District. Submit plans
demonstrating an increase in the number of housing units.
/4
15. The project has a mix of uses, including residential. Submit plans detailing the
proposed mix of uses within the project.
/4
16. The project shares parking among compatible uses. Provide details
demonstrating compliance with the UDC and as well as total number of
parking spaces reduced because of a shared arrangement.
/2
Total Points /44
APPROVAL (For Official Use Only)
Approval Status:
Date Approved:
Date Letter of Award Sent:
Date Certificate of Completion:
Date of Payment Request:
93
Page 12 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
PART 2
FOR PROJECTS REQUESTING OVER $50,000 IN ASSISTANCE
1. Detailed Project Information
Submit the following information regarding the project requesting TIF assistance.
Project Timeline
A project timeline is required. Include anticipated dates for site acquisition, project start
and completion, as well as other project milestones. Multi-phase projects must include
details for each phase. The timeline should also identify any critical or time-sensitive dates
as well as any time constraints facing the applicant.
Public Benefits
Fully describe the public benefits that can be realized by the completion of this project.
Projects with a high degree of public benefits are typically more likely to receive TIF
assistance. Examples of public benefits include, but are not limited to the following:
9 Re-occupancy of a vacant building
9 Elimination of blight
9 Creation of new retail choices
9 Increased tax revenue
9 Job-training opportunities
This statement should include qualitative examples of public benefits as well as quantifiable
and measurable outcomes of the short-term and long-term benefits to the District. Include
documentation in support of estimates of public benefits.
2. Project Financial Information
In order for the Midtown Urban Renewal District Board to adequately review applications
seeking TIF assistance, the following information must be submitted with the application.
Sources & Uses of Funds
Identify the sources of funds used to finance the project. Typical sources include
equity, lender financing, mezzanine financing, other anticipated types of public
assistance, and any other types or methods of financing. Describe the sources of
equity and include a term sheet for lender financing, if available.
TIF assistance is available as a reimbursement after the project is complete. Thus,
the project budget must identify the up-front sources intended to finance the
development costs of the project. If determined, specify the specific line items of the
project budget that each source will finance.
94
Page 13 of 13
Midtown Urban Renewal District TIF Assistance Revised
January 2017
Summarize the uses of funds. General categories to be identified include: acquisition
and related site costs, hard construction costs, and a breakdown of soft costs.
Development Budget
Provide an accurate and detailed development budget for the project that includes a
detailed breakdown of significant line item costs consistent with the sample
included in the application packet. The budget should be arranged to identify
acquisition and site related costs, hard costs, and soft costs. Also, identify all line
items that are performed by the developer, owner, or related entities.
Budget of TIF Eligible Expenses
Identify which of the development budget costs are eligible for reimbursement as
allowed by 7-15-4288, MCA.
Financial Commitments
Submit commitment letters and/or term sheets from all lenders for proposed debt
(such as construction, mezzanine, permanent, and government financing) and all
other financial sources of the project (such as grants, and tax credits). Commitment
letters must clearly specify the nature and terms of the obligations.
95
TIF project evaluation
Overall District Relevance
1.Relevance to the Midtown Urban Renewal Plan – Documentation of the project’s impact in
relation to the goals and objectives of the Midtown Urban Renewal Plan, particularly mixed-use
development. Urban design elements will also be considered, including pedestrian emphasis
and quality of design.
• This project is the foundation upon which commercial growth in the Midtown District
will be built. The Midtown apartment building will add population to the District
thereby ensuring a strong customer base for businesses in the area. This project also
replaces an old, blighted house with a contemporary building with Urban design
elements and pedestrian based infrastructure.
4/5
Promote Economic Development
2.Tax Generation: The project will increase the taxable value within the District. The increase in
taxable value due to new construction & rehabilitation is estimated by the County Assessor’s
office or State Department of Revenue to determine tax increment generation. Submit
documentation of estimated tax projections to receive points for this criteria
• The finished Midtown Apartment property value will be in excess of $1,550,000
compared to the current property value of $280,000. This $1,270,000 increase in
property value will increase the taxable value and potentially result in $173,851.68 in
tax revenue over ten years, a net gain of $135,563.512 over the projected tax revenue if
the property were to be left as is.
4/4
3. Elimination of Blight – The project’s direct and indirect impact on the physical and fiscal
deterioration within the Tax Increment Financing District and the community. Submit
information showing current conditions of property.
• Attached to this application is a picture of the single family home proposed for
replacement. This home has a cracked foundation, deteriorating siding, and is out of
date with the goals for urban revitalization in the District.
4/4
4. Employment Generation – Total employment generated by the project assessed in terms of
new permanent and part-time jobs, and construction jobs. Submit documentation of estimated
new jobs to receive points for this criterion.
• This project will indirectly promote employment generation. Employment generation is
caused by the expansion and creation of business and those businesses require
customers. By increasing population density and thereby creating a strong customer
base, the Midtown Apartment building will indirectly spur employment generation in
the District.
96
3/3
Improve Multi-Modal Transportation
5.Facilitates Public Health and Mobility: Project will construct or improve sidewalks, including
ADA access to buildings. Provide detailed information demonstrating that the current condition
inhibits public health and mobility.
• The current building has 4’ sidewalks and is not ADA accessible. The new building will
have 5’ sidewalks and feature an at-grade fully ADA accessible residential unit.
1/1
6. Reduces Resource Demand: Project promotes the use of transit, ride sharing, or car sharing.
Provide plans, agreements or other methods to demonstrate reduction of resource demand.
• By providing a substantial increase in centrally located housing, the Midtown Apartment
project directly reduces resource demand by reducing the distance residents will have
to commute to work or other activities.
1/1
7.Promotes Active Transportation: Project promotes bicycling as an active transportation
option by constructing or improving bike lanes, providing covered bike parking, and/or
participating in a bike share program. Provide plans, agreements or other methods to
demonstrate reduction of resource demand.
• This project provides housing in a location that is “bikeable” to most places of work and
entertainment for residents. Additionally, as you can tell from the attached drawings,
covered bike parking will be provided on site for all residents and a bike share program
will be encouraged amongst residents.
2/2
Improve, Maintain and Support Innovation in Infrastructure
8.Infrastructure Improvements: Project promotes innovation in infrastructure and/or reduces
long term costs of maintenance. Provide plans and descriptions of innovations proposed.
• The design of this building is such that PV (solar panels) can be incorporated on the flat
roof facing peach. This will reduce demand on the grid and move towards sustainability.
2/2
9. The project improves the street frontage by eliminating parking between the right-of-way
and the building. Provide plans to demonstrate improvement in street frontage.
• Parking at this location and much of the N 7th district involves cars in front of buildings.
This design incorporates all of the parking on-site but in garages hidden from view from
97
the street frontage. The street frontage view of this building will not involve any parking
and greatly improve the aesthetics of the District.
2/2
10.The project reduces the number of vehicular access points to the property and improves the
pedestrian experience. Provide plans, agreements or other methods to demonstrate reduction.
• As mentioned above, all of the parking for this building will be in garages hidden from
view. The current property involves a three car wide drive isle often utilized for parking
giving pedestrians a view of parking. The revised plans (attached) show a drive isle
never to be used for parking and street frontage that does not involve parking therefore
greatly improving the pedestrian experience when walking past the Midtown Apartment
building.
2/2
11.The project enhances the North 7th Ave. entryway corridor by having buildings oriented
toward the street and designed to provide interest and activity.
• As explained in the previous two responses, this project orients building design to
showcase urbanization in design and promote aesthetics for the pedestrian experience
creating a welcoming feel to the North 7th Ave district.
3/3
12. The project enhances the pedestrian experience with elements such as façade
transparency, building articulation, street furniture and/or landscaping. Submit plans and
details that address this criterion.
• The attached plans demonstrate how the façade of this building and orientation relative
to parking will enhance the pedestrian experience. Additionally, the landscaping plans
demonstrate significant investment by the developer in enhancing the pedestrian
experience.
3/3
13. The quality of development and overall aesthetics (architectural, site design, landscaping,
etc.) are beyond that which is minimally required by the UDC. Submit documentation to
demonstrate compliance with this criterion.
• So far through the process of DRC and UDC, this building has been well received by the
COB Planning Department with regard to its design and landscaping. The building offers
visible patio space for each unit, a common area open deck space on the front,
contemporary architecture, and a fully landscaped site plan. All of these components
take this project beyond the minimally required design standards and work to improve
the overall aesthetics of the District.
98
2/2
Support Compatible Urban Density Mixed Land Uses
14. The project increases housing units within the District. Submit plans demonstrating an
increase in the number of housing units.
• At its core, the purpose of this project is to increase housing density in the District. The
current site is home to a single family residence and, once complete, this project will
house up to 9 separate housing units resulting in a 5 fold population increase at this
location.
4/4
15. The project has a mix of uses, including residential. Submit plans detailing the proposed mix
of uses within the project.
This project proposes only residential use at this time. The at grade unit holds the potential
for conversion to small scale commercial use in the future. But the impact if drastically
increasing population density in the District with projects such as this will only increase
feasibility of mixed use projects within the District.
1/4
16. The project shares parking among compatible uses. Provide details demonstrating
compliance with the UDC and as well as total number of parking spaces reduced because of a
shared arrangement.
• This is not relevant to this project.
0/2
Total Points
38/44
99
Sources and uses of funds
The primary source of funding for this project will be private equity. The owner of this project
is pledging the land which was purchased for $285,000 and carries a $100,000 note. The owner
will also be leveraging three other properties in Bozeman to bring up to $650,000 in capital to
the project. This will be considered a down payment on a loan through First Security Bank for
the remaining project costs. The owner will work with the bank to ensure TIF eligible expenses
are paid upfront so they can be reimbursed. TIF eligible expenses (outlined in the attached
budget) include:
• Teardown:$41,365.00
• Impact Fees: $42,661.00
• Storm water system: $33,628.00
• Park Land (cash-in-lieu): $12,864.00
• Water/Fire line: $17,704.00