Loading...
HomeMy WebLinkAbout17331 Application MaterialsWH SOUTH FERGUSON R.O.W.COLLECTOR: 150 FT"THE RIDGE P.U.D."PARKING & COMMON AREAS FUTURE PATIO RE. ROOF PLAN NEW 4" SIDEWALK TO MATCH ADJACENT NEW 4" SIDEWALK TO MATCH ADJACENT EXISTING ACCESSIBLE RAMP TO REMAIN EXISTING CURB & GUTTER TO REMAIN RE-SOD LAWN AS NEEDED EXISTINGPATHWAYTOREMAINEXISTING COMMON AREA SIDEWALKS, BENCH, AND BALLARDS TO REMAIN EXISTING COMMON AREA SIDEWALKS, BENCHES, TREE, AND BALLARDS TO REMAIN PROVIDE ACCESSIBLE SIGNAGE AS NEEDED FOR (2) STALLS. RE A1.2/4 SIDESETBACK5'-0"FRONT SETBACK 5'-0"SIDESETBACK5'-0"FERGUSON SETBACK 42'-0" 90° 00' 00" 117.95' N W 0°31'24"100.00'SW90° 00' 00" 118.86' N E 0° 00' 00"100.00'NEUTILITY EASEMENT 12'-0" COMMUNICATIONS EASEMENT 20'-0"30'-0" 4828 4828 4828 4829 48274 8 2 7 4827 4 8 2 74826 13'-6"13'-6"13'-6"13'-6"IRRIGATION CONTROL VALVE 12" CULVERT FL. OUT = 4825.384' IRRIGATION CONTROL VALVE FND MAG & DISK MARKED 9518 18" CULVERT OUT FROM SOUTH EDGE OF PAVEMENT TOP BACK OF CURB SPRINKLER BOXU 90° 00' 00" 118.86' N W 90° 00' 00" 117.95' N WAWNING EXTENDS 1'-0" BEYOND SETBACK AIR CONDITIONER UNITS SCREENED ELECTRICAL SERVICE SCREENED BY CEDAR SCREEN AND LANDSCAPINGNEW 4" SIDEWALK TOMATCH ADJACENT GAS METER SCREENED BY LANDSCAPING STAIR AND UTILITY SCREENING CLEAR AREA FOR UNDER-STAIR ACCESS DOWNSPOUT W/ LANDSCAPING DOWNSPOUT W/ LANDSCAPING DOWNSPOUT W/ LANDSCAPING DOWNSPOUT W/ LANDSCAPING THIS AREA TO BE PARTIALLY FENCED AND USED FOR TEMPORARY MATERIAL STAGING, CONSTRUCTION TRASH (INCLUDING ROLL-OFF), AND CONTRACTOR PARKING DURING CONSTRUCTION IN ORDER TO MAINTAIN TRAFFIC FLOW AROUND SITE 40 YARD ROLL-OFFTRASH CONTAINER BICYCLE PARKING (2) INVERTED U RACKS ELECTRICSITE UTILITES G A S G A S ELECTRICTEL/COMTEL/COM TEL/COM SS W SS SS SSW W WPROVIDE PAVEMENT MARKING AS NEEDED FOR 2 STALLS STORM WATER FACILITIES SHARED BY PUD SEE C1.0 ZONING MAP PROJECT SITE R-O R-4 R-O BP BP UMU SITE INFORMATION FLOOR AREA RATIO CALCULATION LEVEL 1 LEVEL 2 TOTAL PARCEL RATIO 4,960 SF +040 SF =10,000 SF /11,841 SF =.85 PARCEL SIZE ALLOWABLE LOT COVERAGE PER PUD PROPOSED LOT COVERAGE REMAINING OPEN SPACE PROPOSED TOTAL FLOOR AREA 0.27 ACRES 0.163 ACRES 0.114 ACRES 0.156 ACRES 0.23 ACRES 11,841 SF 7,105 SF 4,960 SF 6,881 SF 10,000 SF 100% 60% 41.9% 58.1% - DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:46:40 PMA1.1 SITE PLAN 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 1" = 10'-0" 1 SITE PLAN NO.DESCRIPTION DATE +/-4831 +/-4833 +/-4 8 3 2 +/-4 8 3 3 DRAINAGE DRAINAGE DRAINAGE DRAINAGE DRAINAGE DRAINAGE DRAINAGE DRAINAGE DRAINAGE UP REF. DWWH UP 2 2 3 3 5 5 6 6 B B C C E E 5 A2.1 5 A2.1 6 A2.1 6 A2.1 3 | A2.1 2 | A2.1 4 | A2.1 1 | A2.1 A A F F 1 1 A A A B B A A A D D 7 7 4 4 2'-9"3'-3"5'-0"7'-0"5'-4"5'-4"5'-4"5'-4"5'-4"5'-4"7'-0"7'-0"5'-6"5'-6"5'-3"5'-3"12'-6"5'-0"5'-0"5'-0"5'-0"5'-0"7'-6"13'-0"6'-0"7'-3"2'-9"10'-0"8'-0"4'-0"4'-0"4'-0"8'-0"5'-0"5'-0" 2'-0"8'-0"7'-6"6'-6"24'-6"4'-6"6'-9"4'-6"5'-6"5'-6"10'-3"LOBBY 100 RECEPTION 101 OFFICE 102 OFFICE 103 STORAGE 104 OFFICE 105 OFFICE 106 OFFICE 107 OFFICE 108 OFFICE 109 OFFICE 110SERVER/STORAGE 124 WORK ROOM 123 RR 127 RR 128 OFFICE 113 OFFICE 116 CONFERENCE 117 JANITOR 125 CLOSET 118 CONFERENCE 119 ASSISTANT CUBES 122 KITCHEN 121 BREAK AREA 112 SALES PIT 115 CLOSET 120 FRAMELESS GLASS WALL & DOOR SPRAY SHOWER UV U V 4'-0" 2'-0" 2 A4.1 3 A4.2 7 A2.1 7 A2.1 OFFICE 111 18'-0"10'-8"10'-8"10'-8"14'-0" 64'-0"10'-3"11'-0"40'-3"22'-0"83'-6"16'-0"10'-0"28'-0"10'-0" 66'-0"13'-0"12'-6"10'-0"10'-0"23'-0"11'-0"79'-6"3'-0" 5'-0" 6'-9"7'-0"1'-3"7'-0"7'-9" 9'-6"3'-9"3'-0"9'-0"170°4'-6"2'-0"11'-9"12'-0"3'-6"4'-6" 6'-0"4'-0"2'-0" 8'-0"5'-3"2'-4"9'-4"100°30" x 50" crawl accessCHASEGAS METER HB HB 6'-0" 12'-0"12'-0"12'-0"14'-0"14'-0"13'-0"12'-6"11'-6"8'-6"16'-0"18'-0"A A A A1.3 1 A1.3 3 ELEC. METER 8 A2.1 8 A2.1 129 FIRE 129 104B 104A 105 106 107 108 116 117A 118 119 123A 124 125 127 128 100A100B102103109110111112113114117B120126123BA C C C CL K L 1'-8"6'-6"100°8 0°4'-9"4'-6"5'-0"ELEVATOR 126 L OFFICE 114 101 B 9'-0"11'-0" CONTRACTOR TO COORDINATE/CONFIRM SPRINKLER SYSTEM REQUIREMENTS RECEPTION DESKBY OWNER 2 2 3 3 5 5 6 6 B B C C E E 5 A2.1 5 A2.1 6 A2.1 6 A2.1 A A F F 1 1DDDD T U V D D D D D D D D 7 7 4 4 4'-3"3'-6"4'-6"1'-9"3'-9"3'-6"2'-9"3'-9"5'-6"2'-9"2'-9"3'-6"3'-9"4'-0"2'-6"4'-6"3'-6"3'-6"3'-3"5'-6"3'-6"4'-0"5'-6"2'-3"8'-9"3'-6"4'-6"2'-6"3'-6"4'-6"2'-3"4'-3"4'-6"2'-3"4'-6"3'-9"3'-6"4'-6"3'-3"6'-3"7'-9"2'-0"5'-6"2'-9"1'-9"2'-9"5'-6"3'-9"2'-9"4'-6"2'-9"4'-9"5'-6"5'-6"2'-3"9'-6"9'-6"3'-0"14'-9"4'-6"3'-6"1'-9"2'-3"3'-6"3'-6"2'-3"4'-3"4'-6"3'-9"2'-9"4'-6"3'-6"4'-3"D D D D D D D D DDDDDDD VU OFFICE 202 OFFICE 203 OFFICE 204 OFFICE 205 OFFICE 206 OFFICE 207 OFFICE 208 OFFICE 209 OFFICE 210 CONFERENCE 219 RR 225 RR 226 OFFICE 213 OFFICE 214 OFFICE 215 OFFICE 216 OFFICE 217 OFFICE 218 CONFERENCE 221 BREAK AREA 212 WORK AREA 222 RECEPTION 201 2 A4.1 3 A4.2 7 A2.1 7 A2.1 D D D D D D D D 7'-6"4'-0" 6'-9"7'-0"1'-3"7'-0"7'-9"4'-0"4'-6"4'-0"4'-0"4'-0"2'-6" 5'-0" 15'-9"3'-6"4'-6"6'-0"100°8 0 °5'-3"8'-2"3'-6"4'-0"2'-6"14'-0"10'-0"12'-0"14'-0"14'-0" 64'-0"22'-0"24'-6"11'-6"12'-6"15'-0"85'-6"16'-0"5'-6"4'-6"12'-0"10'-0"18'-0" 66'-0"15'-0"4'-6"11'-0"10'-3"10'-6"8'-9"11'-9"12'-3"84'-0"CHASE12'-0"12'-0"12'-0"14'-0"14'-0"13'-0"12'-6"11'-6"8'-6"16'-0"18'-0"A1.3 2 A1.3 4 OFFICE 211 WORK AREA 220 STORAGE S4 STORAGE S3 STORAGE S2 STORAGE S1 MACHINE ROOM 223 ELEVATOR 224 8 A2.1 8 A2.1 4'-0" 205 207 208208 214214215 216217 219 S4 225 226202203204206 222209210211213218218221S3S2S1223224D M K D D D D D D D D D D D L 2'-0" (VARIES BY MANUF.)3'-0" (VARIESBYMANUF.) SPACE FOR BICYCLE PARKING MIN. 2'-0" FASTENED TO CONCRETE SPACE FOR BICYCLE PARKING MIN. 6'-0" SPACE FOR BICYCLE PARKING 2'-0" SPACE FOR BICYCLE PARKING 2'-0" FASTENED TO CONCRETE DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:48:30 PMA1.2 FLOOR PLANS 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 1/8" = 1'-0" 1 LEVEL 1 1/8" = 1'-0" 2 LEVEL 2 NO.DESCRIPTION DATE 1" = 1'-0" 3 INVERTED U BICYCLE PARKING 2 2 3 3 5 5 6 6 B B C C E E 3 | A2.1 2 | A2.1 4 | A2.1 1 | A2.1 1/4" / 12"1/4" / 12" ROOF CRICKET ROOF CRICKET A A F F 1 1 D D 7 7 4 4 1/4" / 12" 12'-0"12'-0"12'-0"14'-0"14'-0"13'-0"12'-6"11'-6"8'-6"16'-0"18'-0"SKYLIGHT SKYLIGHT FLAT ROOF- TYP: (20-YEAR WARRANTY) FULLY-ADHERED, REINFORCED 60-MIL EPDM on PROTECTION BOARD on TAPERED POLY-ISO INSULATION (R-30ci MIN) on STRUCTURE (re: ROOF ASSEMBLY)1/4" / 12"1/4" / 12" 1/4" / 12" 1/4" / 12" ROOF CRICKET ROOF CRICKET ELEVATOR OVER-RUN RTU W/ CRICKET AS NECESSARY RTU W/ CRICKET AS NECESSARY RTU W/ CRICKET AS NECESSARY FRESH AIR PENTHOUSE 1/4" / 12" 1/4" / 12" 1/4" / 12" ROOF CRICKET 1/4" / 12"1/4" / 12" 1/4" / 12" A1.3 6 RTU'S AND FRESH AIR PENTHOUSE SCREENED BY BUILDING PARAPET 6 A2.2 7 A2.2 3'-8" 4 R @ 6 29/32" / 11"16 R @ 6 29/32" / 11"3'-8"AIR CONDITIONER UNITS SCREENED ELECTRICAL SERVICE SCREENED STAIR AND UTILITY SCREENING 6 A2.2 7 A2.2 3'-8" 4 R @ 6 29/32" / 11"16 R @ 6 29/32" / 11"3'-8"8 A2.2 9 A2.2 9R@629/32"/11"4'-0" 8 A2.2 9 A2.2 9R@629/32"/11"9R@629/32"/11"2 R @ 6 29/32" / 11" 4'-0"4'-0"4'-0"1/4" / 12"1/4" / 12" 1/4" / 12" LEVEL 1 100'-0" LEVEL 2 111'-6" CIVIL GRADE 99'-4" 4 A4.1 T.O. WALL (1) 110'-3 1/4" 7 A2.2 AIR CONDITIONER UNITS SCREENED BY CEDAR SCREEN AND LANDSCAPING ELECTRICAL SERVICE SCREENED BY CEDAR SCREEN AND LANDSCAPING DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:49:00 PMA1.3 PARTIAL PLANS & ROOF PLAN 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 1/8" = 1'-0" 5 ROOF PLAN 1/4" = 1'-0" 1 EXTERIOR STAIR - ENLARGED PLAN - LEVEL 1 1/4" = 1'-0" 2 EXTERIOR STAIR - ENLARGED PLAN - LEVEL 2 1/4" = 1'-0" 3 INTERIOR STAIR - ENLARGED PLAN - LEVEL 1 1/4" = 1'-0" 4 INTERIOR STAIR - ENLARGED PLAN - LEVEL 2 1/4" = 1'-0" 6 PARTIAL ROOF PLAN NO.DESCRIPTION DATE 1/4" = 1'-0" 7 PARTIAL EAST ELEVATION - MECH AND STAIR SCREEN LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" 4 A4.1 4 A4.2 DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "DOESKIN" DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "GRAY STEELE" HARDIE PANEL VERTICAL SIDING, SMOOTH, PAINTED TO MATCH "SW DOVETAIL" BRIDGERSTEEL 3/4" CORRUGATED METAL SIDING, PREFINISHED "DARK GRAY" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" 3 A4.3 3'-6"3'-6"3'-6" 3'-6"3'-6"3'-6" 3'-6"3'-6"1'-4"5'-0"1'-4"1'-4"5'-0"1'-4"CEDAR SCREEN, STAINED TO MATCH "P&L DRIFTWOOD GRAY" BRIDGERSTEEL PREFINISHED METAL COPING "LIGHT GRAY" BRIDGERSTEEL 3/4" CORRUGATED METAL SIDING AND TRIM, PREFINISHED "LIGHT BLUE" AMSCO WINDOW FRAME, "BRONZE" OLDCASTLE ALUMINUM STOREFRONT, "DARK BRONZE" LEVEL 1 100'-0" T.O. Footing95'-4" LEVEL 2 111'-6" T.O WALL (2)121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE99'-4" 1 A4.2 3 A4.1 DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "GRAY STEELE" BRIDGERSTEEL 3/4" CORRUGATED METAL SIDING, PREFINISHED "DARK GRAY" HARDIE PANEL VERTICAL SIDING, SMOOTH, PAINTED TO MATCH "SW DOVETAIL" SHIPLAP CEDAR SIDING, STAINED TO MATCH "P&L DRIFTWOOD GRAY" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B126'-10" 2 A4.3 4 A4.3 3'-6"3'-6"3'-6" 3'-6"3'-6"1'-4"5'-0"1'-4"DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "DOESKIN" HARDIE PANEL VERTICAL SIDING, SMOOTH, PAINTED TO MATCH "SW DOVETAIL" DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "GRAY STEELE" HARDIE PANEL VERTICAL SIDING, SMOOTH, PAINTED TO MATCH "SW DOVETAIL" CEDAR SCREEN, STAINED TO MATCH "P&L DRIFTWOOD GRAY" BRIDGERSTEEL PREFINISHED METAL COPING "LIGHT GRAY" 2 A4.2 BRIDGERSTEEL 3/4" CORRUGATED METAL SIDING AND TRIM, PREFINISHED "LIGHT BLUE" AMSCO WINDOW FRAME, "BRONZE" OLDCASTLE ALUMINUM STOREFRONT, "DARK BRONZE" A1.3 7 LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" 1 A4.1 HARDIE PANEL VERTICAL SIDING, SMOOTH, PAINTED TO MATCH "SW DOVETAIL" BRIDGERSTEEL 3/4" CORRUGATED METAL SIDING, PREFINISHED "DARK GRAY" CEDAR SCREEN, STAINED TO MATCH "P&L DRIFTWOOD GRAY" BRIDGERSTEEL PREFINISHED METAL COPING "LIGHT GRAY" AMSCO WINDOW FRAME, "BRONZE" BRIDGERSTEEL PREFINISHED METAL TRIM, "DARK GRAY" HOLLOW METAL DOORS, PAINTED TO MATCH "SW DOVETAIL" LEVEL 1 100'-0" T.O. Footing95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" 1 A4.3 3'-6"3'-6" 3'-6" DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "DOESKIN" DRYVIT EIFS/STUCCO, TEXTURE: "SANDBLAST" COLORED TO MATCH "GRAY STEELE" HARDIE PANEL VERTICAL SIDING, SMOOTH, PAINTED TO MATCH "SW DOVETAIL" SHIPLAP CEDAR SIDING, STAINED TO MATCH "P&L DRIFTWOOD GRAY" BRIDGERSTEEL PREFINISHED METAL COPING "LIGHT GRAY" 5 A4.2 BRIDGERSTEEL 3/4" CORRUGATED METAL SIDING AND TRIM, PREFINISHED "LIGHT BLUE" AMSCO WINDOW FRAME, "BRONZE" OLDCASTLE ALUMINUM STOREFRONT, "DARK BRONZE" LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" LEVEL 1100'-0" T.O. Footing 95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10"A2.2 1 DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:49:21 PMA2.1 ELEVATIONS & SECTIONS 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 1/8" = 1'-0" 1 WEST ELEVATION 1/8" = 1'-0" 2 EAST ELEVATION 1/8" = 1'-0" 3 NORTH ELEVATION 1/8" = 1'-0" 4 SOUTH ELEVATION 1/8" = 1'-0" 5 Building Section 1 1/8" = 1'-0" 6 Building Section 2 1/8" = 1'-0" 7 Building Section 3 1/8" = 1'-0" 8 Building Section 4 NO.DESCRIPTION DATE LEVEL 1100'-0" T.O. Footing95'-4" LEVEL 2111'-6" T.O WALL (2) 121'-9 1/4" 2 ROOF PLAN 122'-9 7/8" CIVIL GRADE99'-4" 1 T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10"7'-11 21/32" GUARDRAIL HEIGHT - 3'-6" MAXIMUM OPENENG - 4" HANDRAIL HEIGHT - 3'-0" LEVEL 1100'-0" T.O. Footing95'-4" LEVEL 2111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE99'-4" F T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" GUARDRAIL HEIGHT - 3'-6" MAXIMUM OPENENG - 4" HANDRAIL HEIGHT - 3'-0" LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" B ROOF PLAN122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" GUARDRAIL HEIGHT - 3'-6" MAXIMUM OPENENG - 4" HANDRAIL HEIGHT - 3'-0" LEVEL 1 100'-0" T.O. Footing 95'-4" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1) 110'-3 1/4" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" GUARDRAIL HEIGHT - 3'-6" MAXIMUM OPENENG - 4" HANDRAIL HEIGHT - 3'-0" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" 2X FRAMING SKYLIGHT, RE. WINDOW SCHEDULE RE. STRUCTURAL FOR ROOF FRAMING TAPERED EDGE -CUT AND TAPE GWB TO ACHIEVE DESIRED EDGE TAPERED EDGE -CUT AND TAPE GWB TO ACHIEVE DESIRED EDGE 2X FRAMING 2X INT. WALL - TYP SPACER AS NEEDED FOR CONSISTENT HEIGHT AT TAPERED EDGE TAPERED EDGE DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:49:38 PMA2.2 PARTIAL SECTIONS & ROOM SCHEDULE 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 1/4" = 1'-0" 6 Section 9 1/4" = 1'-0" 7 Section 10 1/4" = 1'-0" 8 Section 11 1/4" = 1'-0" 9 Section 12 Room Schedule Room #Room Name Floor Finish Base Finish Wall Finish Ceiling Finish Comments 100 LOBBY POLISHED CONCRETE RUBBER BASE TBD OPN FRM 101 RECEPTION CARPET TILE RUBBER BASE TBD OPN FRM & GWB 102 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 103 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 104 STORAGE POLISHED CONCRETE RUBBER BASE TBD OPN FRM 105 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 106 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 107 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 108 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 109 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 110 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 111 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 112 BREAK AREA CARPET TILE RUBBER BASE TBD GWB 113 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 114 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 115 SALES PIT CARPET TILE RUBBER BASE TBD GWB 116 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 117 CONFERENCE CARPET TILE RUBBER BASE TBD GWB 118 CLOSET CARPET TILE RUBBER BASE TBD OPN FRM 119 CONFERENCE CARPET TILE RUBBER BASE TBD 2'x2' ACT 120 CLOSET CARPET TILE RUBBER BASE TBD OPN FRM 121 KITCHEN CARPET TILE RUBBER BASE TBD GWB 122 ASSISTANT CUBES CARPET TILE RUBBER BASE TBD GWB 123 WORK ROOM CARPET TILE RUBBER BASE TBD 2'x2' ACT 124 SERVER/STORAGE CARPET TILE RUBBER BASE TBD GWB 125 JANITOR POLISHED CONCRETE RUBBER BASE FRP & TBD OPN FRM 126 ELEVATOR NA NA NA NA 127 RR FLOOR TILE TBD COVED TILE WALL TILE TBD 2'x2' ACT 128 RR FLOOR TILE TBD COVED TILE WALL TILE TBD 2'x2' ACT 129 FIRE POLISHED CONCRETE RUBBER BASE TBD OPN FRM 201 RECEPTION CARPET TILE RUBBER BASE TBD OPN FRM 202 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 203 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 204 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 205 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 206 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 207 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 208 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 209 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 210 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 211 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 212 BREAK AREA CARPET TILE RUBBER BASE TBD GWB 213 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 214 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 215 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 216 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 217 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 218 OFFICE CARPET TILE RUBBER BASE TBD OPN FRM& 2' ACT 219 CONFERENCE CARPET TILE RUBBER BASE TBD GWB 220 WORK AREA CARPET TILE RUBBER BASE TBD GWB 221 CONFERENCE CARPET TILE RUBBER BASE TBD GWB 222 WORK AREA CARPET TILE RUBBER BASE TBD OPN FRM 223 MACHINE ROOM TBD TBD TBD OPN FRM 224 ELEVATOR NA NA NA NAN 225 RR FLOOR TILE TBD COVED TILE WALL TILE TBD 2'x2' ACT 226 RR FLOOR TILE TBD COVED TILE WALL TILE TBD 2'x2' ACT S1 STORAGE SHEET FLOORING RUBBER BASE TBD OPN FRM S2 STORAGE SHEET FLOORING RUBBER BASE TBD OPN FRM S3 STORAGE SHEET FLOORING RUBBER BASE TBD OPN FRM S4 STORAGE SHEET FLOORING RUBBER BASE TBD OPN FRM 1" = 1'-0" 1 SKYLIGHT SECTION DETAIL NO.DESCRIPTION DATE LEVEL 1 100'-0" LEVEL 2 111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE 99'-4" T.O. WALL (1)110'-3 1/4" SILL HEIGHT: 6' 10" SILL HEIGHT: 2' 5" SILL HEIGHT: 0' 6" SILL HEIGHT: 6' 10" SILL HEIGHT: 2' 5" SILL HEIGHT: 0' 6" S T U V ST T 2'-6"6"4'-9"2'-9"1'-0" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" S T UV S 3'-6"3"3'-6"3'-3"1'-0"7'-1"1'-5"4'-11"1'-5"3'-9"1'-5"4'-11"1'-5"6"LEVEL 1100'-0" LEVEL 2111'-6" T.O WALL (2) 121'-9 1/4" ROOF PLAN 122'-9 7/8" CIVIL GRADE99'-4" T.O. WALL (1) 110'-3 1/4" T U S TT T S T V SILL HEIGHT: 2' 5" SILL HEIGHT: 6' 10" SILL HEIGHT: 0' 6" SILL HEIGHT: 2' 5" SILL HEIGHT: 6' 10" SILL HEIGHT: 0' 6" 3'-4"2'-8"3'-6"5'-9"6" T.O. PARAPET A 125'-10" T.O. PARAPET B 126'-10" S V T U 1'-3"3'-0"3'-3"4'-3"4'-8"1'-3" HEADER -SEE STRUCT. FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW RIGID INSULATION FURRING CHANNEL VERTICAL CEDAR SIDING 2X2 BLOCKING DRIP EDGE DRIP EDGE, SLOPE TO DRAIN RIGID INSULATION FURRING CHANNEL CEDAR SIDING 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. JOINT SEALANT RIGID INSULATION FURRING CHANNEL VERTICAL CEDAR SIDING 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. HEADER -SEE STRUCT. FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW RIGID INSULATION HORIZONTAL CORRUGATED METAL SIDING 2X2 BLOCKING DRIP EDGE DRIP EDGE, SLOPE TO DRAIN RIGID INSULATION HORIZONTAL CORRUGATED METAL SIDING 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. JOINT SEALANT RIGID INSULATION HORIZONTAL CORRUGATED METAL SIDING 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. HEADER -SEE STRUCT. FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW RIGID INSULATION FURRING CHANNEL FIBER CEMENT PANEL 2X2 BLOCKING DRIP EDGE DRIP EDGE, SLOPE TO DRAIN RIGID INSULATION FURRING CHANNEL FIBER CEMENT PANEL 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. JOINT SEALANT RIGID INSULATION FURRING CHANNEL FIBER CEMENT PANEL 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. HEADER -SEE STRUCT. FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW EIFS STUCCO FINISH TO TAPER AND WRAP BLOCKING 2X2 BLOCKING DRIP EDGE DRIP EDGE, SLOPE TO DRAIN EIFS STUCCO FINISH TO TAPER AND WRAP BLOCKING 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. JOINT SEALANT EIFS STUCCO FINISH TO TAPER AND WRAP BLOCKING 2X2 BLOCKING FIBERGLASS FRAME & ASSEMBLY -SEE SCHEDULE 5/8" GYP TERM AT WINDOW SILL -SEE STRUCT. METAL J-TRIMCORRUGATED METAL SIDING HM FRAME & DOOR ASSEMBLY 3x JAMB -SEE STRUCT. CAULK 2x HEADERS -SEE STRUCT. CAULK DRIP EDGE CORRUGATED METAL SIDING HM FRAME & DOOR ASSEMBLY FF CASEMENTSINGLE HUNG FIXED SCREENS SCREENS DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:50:16 PMA3.1 WINDOWS & DOORS 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 Window Schedule Type Mark Description Count R.O. Material Sill CommentsWidthHeight A SINGLE HUNG 10 4'-0"4'-0"Metal - Steel - ASTMA992 3'-0"SURROUNDINGMATERIAL - CORRUGATED B SINGLE HUNG 3 5'-0"4'-0"FIBERGLASS 3'-0"SURROUNDING MATERIAL - CEDAR C SINGLE HUNG 4 2'-6"4'-0"FIBERGLASS 3'-0"SURROUNDING MATERIAL - CEDAR D SINGLE HUNG 45 2'-6"5'-0"FIBERGLASS 2'-6"SURROUNDINGMATERIAL - FIBER CEMENT K STOREFRONT GLAZING ASSEMBLY 2 10'-8"7'-10"EXTRUDED ALUMINUM 0'-6"SURROUNDINGMATERIAL - STUCCO L STOREFRONT GLAZING ASSEMBLY 4 7'-2"7'-10"EXTRUDED ALUMINUM 0'-6"SURROUNDINGMATERIAL - STUCCO M STOREFRONT GLAZING ASSEMBLY 1 3'-8"7'-10"EXTRUDED ALUMINUM 0'-6"SURROUNDINGMATERIAL - STUCCO N ROOF SKYLINGHT 2 3'-0"3'-0"FIBERGLASS N/A SURROUNDINGMATERIAL - ROOFING S FIXED 7 3'-0"1'-6"FIBERGLASS RE. ELEVATIONS SURROUNDINGMATERIAL - STUCCO T FIXED 10 1'-6"1'-6"FIBERGLASS RE. ELEVATIONS SURROUNDINGMATERIAL - STUCCO U CASEMENT 4 4'-0"4'-0"FIBERGLASS 2'-5"SURROUNDINGMATERIAL - STUCCO V CASEMENT 4 1'-6"4'-0"FIBERGLASS 2'-5"SURROUNDINGMATERIAL - STUCCO Door Schedule Description Function Door Hardwar e Groups Fame Comm entsWidthHeightMaterialFinishMaterialFinish 100A STOREFRONT W/ GLAZING ABOVE Exterior 3'-9 7/8" 6'-10" GLASS N/A 1 EXTRUDED ALUMINUM PAINT 100B SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 101 STOREFRONT W/ GLAZING ABOVE Exterior 2'-11 5/32" 10'-6" GLASS N/A 1 EXTRUDED ALUMINUM PAINT 102 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 103 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 104A SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 104B DOUBLE FLUSH Interior 6'-0"7'-0"HOLLOW METAL PAINT EXTRUDED ALUMINUM PAINT 105 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 106 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 107 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 108 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 109 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 110 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 111 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 112 STOREFRONT W/ GLAZING ABOVE Exterior 3'-4"6'-10" GLASS N/A 1 EXTRUDED ALUMINUM PAINT 113 WALL OPENING Interior 3'-0"6'-8"N/A N/A NO FRAME N/A 114 WALL OPENING Interior 3'-0"6'-8"N/A N/A NO FRAME N/A 116 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 117A SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 117B SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 118 SINGLE FLUSH Interior 2'-6"6'-8"WOOD PAINT WOOD PAINT 119 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 120 SINGLE FLUSH Interior 2'-6"6'-8"WOOD PAINT WOOD PAINT 123A WALL OPENING Interior 4'-0"6'-8"N/A N/A NO FRAME N/A 123B WALL OPENING Interior 3'-0"6'-8"N/A N/A NO FRAME N/A 124 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 125 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 126 ELEVATOR OPENING Interior 3'-0"6'-8"N/A N/A NO FRAME N/A 127 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 128 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 129 SINGLE FLUSH Exterior 3'-0"6'-8"HOLLOW METAL PAINT EXTRUDED ALUMINUM PAINT 202 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 203 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 204 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 205 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 206 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 207 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 208 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 209 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 210 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 211 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 213 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 214 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 215 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 216 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 217 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 218 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 219 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 221 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 222 SINGLE FLUSH Exterior 3'-0"6'-8"HOLLOW METAL PAINT EXTRUDED ALUMINUM PAINT 223 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 224 ELEVATOR OPENING Interior 3'-0"6'-8"N/A N/A NO FRAME N/A 225 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT 226 SINGLE FLUSH Interior 3'-0"6'-8"WOOD PAINT WOOD PAINT S1 SINGLE FLUSH Interior 2'-6"6'-8"WOOD PAINT 2 WOOD PAINT S2 SINGLE FLUSH Interior 2'-6"6'-8"WOOD PAINT 2 WOOD PAINT S3 SINGLE FLUSH Interior 2'-6"6'-8"WOOD PAINT 2 WOOD PAINT S4 SINGLE FLUSH Interior 2'-6"6'-8"WOOD PAINT 2 WOOD PAINT 1/4" = 1'-0" 1 PARTIAL SOUTH ELEVATION 1/4" = 1'-0" 2 PARTIAL WEST ELEVATION 1 1/2" = 1'-0" 7 WINDOW HEAD, SILL & JAMB @ CEDAR SIDING 1 1/2" = 1'-0" 8 WINDOW HEAD, SILL & JAMB @ CORRUGATED SIDING 1 1/2" = 1'-0" 3 WINDOW HEAD, SILL & JAMB @ FIBER CEMENT 1 1/2" = 1'-0" 4 WINDOW HEAD, SILL & JAMB @ STUCCO/EIFS 1 1/2" = 1'-0" 5 DOOR JAMB - EXTERIOR TYP 1 1/2" = 1'-0" 6 DOOR HEAD - EXTERIOR TYP NO.DESCRIPTION DATE 1/4" = 1'-0" 9 WINDOW TYPES 1-1/2" RIGID INSULATION 3/4" METAL OR WOOD FURRING CHANNEL W/ PANEL CLIPS 5/8" FIBER CEMENT PANEL METAL CORNER TRIM SOFFIT MATERIAL -5/8" FIBER CEMENT PANEL 3/4" METAL OR WOOD FURRING CHANNEL W/ PANEL CLIPS JOINT SEALANT 4" VERTICAL NATURAL CEDAR SIDING 1-1/2" RIGID INSULATION 2X6 EXT. WALL - TYP 2X6 EXT. WALL - TYP RE.STRUCTURAL14"TJIFLOOR ASSEMBLY PROVIDE INSULATION AS NEEDED 1-1/2" RIGID INSULATION 3/4" METAL OR WOOD FURRING CHANNEL W/ PANEL CLIPS 5/8" FIBER CEMENT PANEL METAL TRIM 3/4" CORRUGATED METAL ROOF PANEL ON SLOPED SLEEPER 3/4" PLYWOOD SHEATHING FASTENED TO B.O. FLOOR JOISTS 3/4" CORRUGATED METAL SOFFIT PANEL 3/4" WOOD OR METAL FURRING CHANNELS 1-1/2" RIGID INSULATION 4" VERTICAL NATURAL CEDAR SIDING JOINT SEALANT METAL J-TRIM JOINT SEALANT 2X6 EXT. WALL - TYP 2X6 EXT. WALL - TYP RE.STRUCTURAL14"TJIFLOOR ASSEMBLY METAL TRIM 3/4" CORRUGATED METAL ROOF PANEL ON SLOPED SLEEPER 3/4" PLYWOOD SHEATHING FASTENED TO B.O. FLOOR JOISTS 3/4" CORRUGATED METAL SOFFIT PANEL DRIP EDGE JOINT SEALANT METAL J-TRIM JOINT SEALANT 3/4" HORIZONTAL CORRUGATED METAL SIDING 2" EIFS 2" EIFS 2X6 EXT. WALL - TYP 2X6 EXT. WALL - TYP DRIP EDGE RE.STRUCTURAL14"TJIFLOOR ASSEMBLY METAL TRIM 3/4" CORRUGATED METAL ROOF PANEL ON SLOPED SLEEPER 3/4" PLYWOOD SHEATHING FASTENED TO B.O. FLOOR JOISTS 3/4" CORRUGATED METAL SOFFIT PANEL DRIP EDGE JOINT SEALANT METAL J-TRIM JOINT SEALANT DRIP EDGE 3/4" HORIZONTAL CORRUGATED METAL SIDING 2" EIFS 2X6 EXT. WALL - TYP 2X6 EXT. WALL - TYP 1-1/2" RIGID INSULATION 3/4" METAL OR WOOD FURRING CHANNEL W/ PANEL CLIPS 5/8" FIBER CEMENT PANEL RE.STRUCTURAL14"TJIFLOOR ASSEMBLY METAL TRIM 3/4" CORRUGATED METAL ROOF PANEL ON SLOPED SLEEPER 3/4" PLYWOOD SHEATHING FASTENED TO B.O. FLOOR JOISTS 3/4" CORRUGATED METAL SOFFIT PANEL DRIP EDGE JOINT SEALANT METAL J-TRIM JOINT SEALANT DRIP EDGE 3/4" HORIZONTAL CORRUGATED METAL SIDING 1-1/2" RIGID INSULATION 3/4" METAL OR WOOD FURRING CHANNEL W/ PANEL CLIPS 5/8" FIBER CEMENT PANEL 2" EIFS 2X6 EXT. WALL - TYP 2X6 EXT. WALL - TYPRE.STRUCTURAL14"TJIFLOOR ASSEMBLY METAL J-TRIM 3/4" CORRUGATED METAL ROOF PANEL ON SLOPED SLEEPER 3/4" PLYWOOD SHEATHING FASTENED TO B.O. FLOOR JOISTS 3/4" CORRUGATED METAL SOFFIT PANEL DRIP EDGE JOINT SEALANT METAL J-TRIM DRIP EDGE 3/4" HORIZONTAL CORRUGATED METAL SIDING 1-1/2" RIGID INSULATION 3/4" METAL OR WOOD FURRING CHANNEL W/ PANEL CLIPS 5/8" FIBER CEMENT PANEL 2" EIFS 2X6 EXT. WALL - TYP 2X6 EXT. WALL - TYPRE.STRUCTURAL14"TJIFLOOR ASSEMBLY METAL TRIM 3/4" CORRUGATED METAL ROOF PANEL ON SLOPED SLEEPER 3/4" PLYWOOD SHEATHING FASTENED TO B.O. FLOOR JOISTS 3/4" CORRUGATED METAL SOFFIT PANEL DRIP EDGE JOINT SEALANT METAL J-TRIM JOINT SEALANT DRIP EDGE 3/4" HORIZONTAL CORRUGATED METAL SIDING 2" EIFS, SLOPE BELOW SILL 2" EIFS ALUMINUM STOREFRONT SYSTEM -SILL 2X6 EXT. WALL - TYPRE.STRUCTURAL14"TJIFLOOR ASSEMBLY DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:50:46 PMA5.3 SECTION DETAILS 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 1 1/2" = 1'-0" 2 CEDAR RAINSCREEN - FIBER CEMENT W/ OVERHANG - DETAIL 1 1/2" = 1'-0" 3 CEDAR RAINSCREEN - FIBER CEMENT W/ EXTENDED CANOPY - DETAIL 1 1/2" = 1'-0" 4 STUCCO - STUCCO W/ CANOPY - DETAIL 1 1/2" = 1'-0" 1 STUCCO & STOREFRONT - FIBER CEMENT W/ CANOPY OVERHANG - DETAIL 1 1/2" = 1'-0" 5 STUCCO & STOREFRONT - FIBER CEMENT W/ OVERHANG 2 - DETAIL 1 1/2" = 1'-0" 6 STUCCO & STOREFRONT - FIBER CEMENT W/ CANOPY - DETAIL 1 1/2" = 1'-0" 7 STUCCO & STOREFRONT - STUCCO & STOREFRONT W/ CANOPY - DETAIL NO.DESCRIPTION DATE 9831010665521110677358588899 PROJECT TEAM OWNER ARCHITECT STRUCTURAL CIVIL MECHANICAL PLUMBING ELECTRICAL Architecture 118, LLC 115 East Oak Street, Bozeman, MT 59715 Contact: Scott Hedglin, 406.404.1777 Hyalite Engineers, PLLC 2304 North 7th Avenue, Suite L, Bozeman, MT 59715 Contact: Matt Anderson, 406.587.2781 C&H Engineering and Surveying Inc. 1091 Stoneridge Drive, Bozeman MT 59718 Contact: Matt Hausauer, 406.587.1115 TJ Electric Inc. Contact: Nick Jacobs, 406.586.7731 Bridger Mountain Plumbing Contact: Dal Erickson, 406.451.8000 Comfort Systems 125 Central Avenue, Bozeman, MT 59718 Contact: Michael Boston, 406.522.1114 Andrew Hurlburt 865 Technology Drive, Bozeman, MT 59718 Contact: Andrew Hurlburt, 406.587.1717 AB A/C ACT ADD'L ADDM ADJ AFF AHU AIB ALT ALUM ANOD APPROX ARCH AUTO A/V AVG BD BO BLDG BLKG BRG BSMT BTWN BOW BUR CAB CB CC CDX CF CH CIP CIRC CJ CL CLG CLR CMU CO COL CONC CONST CONT CONTR COORD CPT CT CTR CTRD CW DBL DEG DEMO DEPT DF DIA DIM DISP DL DN DR DS DTL DWG EA EIFS EJ ELEV ELECT ENCL EQ EQUIP (E)/EXIST EST ETR EWC EXH EXP EXT FBO FD FDN Anchor Bolt Air Conditioning Acoustical Ceiling Tile Additional Addendum Adjacent Above Finished Floor Air Handling Unit Air Infiltration Barrier Alternative Aluminum Anodized Approximate(ly) Architect(ural) Automatic Audio / Visual Average Board Bottom Of Building Blocking Bearing Basement Between Bottom of Wall Built Up Roof Cabinet Catch Basin Center to Center Exterior Grade Plywood Cubic Feet Channel Cast In Place Circumference Control Joint Centerline Ceiling Clear Concrete Masonry Unit Clean Out Column Concrete Construction Continuous Contractor Coordinate Carpet Ceramic Tile Center Centered Cold Water Double Degree Demolish, Demolition Department Drinking Fountain Diameter Dimension Dispenser Dead Load Down Door Downspout Detail Drawing Each Exterior Insulation Finish System Expansion Joint Elevation Electric(al) Enclosure Equal Equipment Existing Estimate Existing to Remain Electric Water Cooler Exhaust Expansion Exterior Furnished By Others Floor Drain Foundation FE FEC FIN FIX FLEX FLR FLUOR FO FT FTG FV GA GB GC GALV GL GLU LAM GWB HB HC HD BD HDR HDRW HM HORIZ HR HT HTG HTR HVAC HW ID IN INC INFO INSUL INT JST JT L LAV LB LF LL LTWT LVL MAG MANUF MAS MAT'L MAX MECH MED MEMB MEZZ MDF MIN MIR MISC MO MTD MTL N/A NIC # NOM NTS OC OD OH OPNG OPP PART BD PERF PERIM PERP PKG P/L Fire Extinguisher Fire Extinguisher Cabinet Finish(ed) Fixture Flexible Floor Drain Fluorescent Face Of Foot (Feet) Footing Field Verify Gauge Grab Bar General Contractor Galvanized Glass Glue Laminated Beam Gypsum Wall Board Hose Bibb Hollow Core Hard Board Header Hardware Hollow Metal Horizontal Hour Height Heating Heater Heating, Ventilating, Air Conditioning Hot Water Inside Diameter Inch Include Information Insulation Interior Joist Joint Length Lavatory Pound Lineal/Linear Feet Live Load Lightweight Laminated Veneer Lumber Magnetic Manufacturer Masonry Material Maximum Mechanical Medium Membrane Mezzanine Medium Density Fiberboard Minimum Mirror(ed) Miscellaneous Masonry Opening Mounted Metal Not Applicable Not In Contract Number Nominal Not to Scale On Center Outside Diameter Overhead Opening Opposite Particle Board Perforated Perimeter Perpendicular Parking Property Line PL PLAM PLWD PNL PNT PREFAB PREFIN PSF PSI PSL PT PTD PVC PVMT QTY R RAD RCP RD RDWD RE: RECPT REF REFG REINF REQD RES REV RM RO SAN SCHED SD SF SG SHT SHTG SHWR SIM SIP SNT SOG SPEC SS STD STL STOR STRUCT SUB FLR T T&G TB TEL THRU TJI TO TOW TP TSTAT TV TYP UNFIN UG UNO VAC VCT VERT VB W W/ WB WC WD WNDW W/O WP W/R WT WWF YD Plate Plastic Laminate Plywood Panel Paint Prefabricated Prefinished Pounds per Square Foot Pounds per Square Inch Parallel Strand Lumber Point Paper Towel Dispenser Polyvinyl Chloride Pavement Quantity Riser Radius Reflected Ceiling Plan Roof Drain Redwood Regarding Receptacle Reference Refrigerator Reinforce(d), (ing) Required Resilient Revision, Revised Room Rough Opening Sanitary Schedule Soap Dispenser Square Feet Supply Grille Sheet Sheathing Shower Similar Structual Insulated Panel Sealant Slab on Grade Specifications Stainless Steel Standard Steel Storage Structural Subfloor Tread Tongue and Groove Test Bore Telephone Through Truss Joist Incorporated Top Of Top of Wall Toilet Paper Dispenser Thermostat Television Typical Unfinished Underground Unless Noted Otherwise Vacuum Outlet Vinyl Composite Tile Vertical Vapor Barrier Width With White Board Water Closet Wood Window Without Waterproof Water Resistant Weight Welded Wire Fabric Yard ABBREVIATIONS New construction of a two-story office building intended for multiple tenant use. Building is to be built within an existing PUD. Shared ammeneties for the building, within the PUD INCLUDES: Shared Parking Shared Common/outdoor Space Trash Retainers Pedestrian Walkways. The following items for Site Plan Review are not applicable to the proposed building due to its building type and location within the PUD: Private Residential Residential Open Space Parklands Affordable Housing SUMMARY OF WORK VICINITY MAP PROJECT SITE The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS1 & 2 PLAT J-465 RAVALLIST.FALON ST.S. FERFUSON AVE. 1.Do not scale drawings. If critical dimensions do not appear on the drawings, notify the Architect. 2.Contractor to field verify all dimensions and existing conditions prior to beginning work. Start of work indicates acceptance of existing conditions. 3.If descrepencies exist between drawings or between the drawings and the specifications, notify the Architect immediately for clarification. 4.All dimensions are to face of framing, masonry or concrete wall, centerline of column, or finished floor, unless noted otherwise. 5.Provide all components and accessories needed for a complete and finished installation. Coordinate all work with Subcontractors prior to beginning work. 6.Provide blocking for all wall-mounted casework, millwork, grab bars, hardware, equipment, etc. 7.Penetrations occuring in rated construction assemblies are to be sealed appropriately to maintain fire-rating integrity. 8.The specifications included are an integral part of these Construction Documents. It is the responsibility of the Contractor to review all information. 9.Maintain a clean and safe work site at all times. 10.Notify Owner in writing of any expected disruptions in service or changes in consturction schedule at least 72 hours in advance. 11.Do not block any roads, sidewalks or access to garbage dumpsters. 12.All materials and work shall be installed in accordance with manufacturer's written recommendations. Notify Architect immediately if descrepencies exist. GENERAL NOTES G1.0 G1.1 DRAWING INDEX COVER/GENERAL INFO. GENERAL INFORMATION GENERAL ARCHITECTURAL A1.1 A1.2 A1.3 A1.4 A2.1 A2.2 A3.1 A4.1 A4.2 A4.3 A5.1 A5.2 A5.3 SITE PLAN FLOOR PLANS PARTIAL PLANS & ROOF PLAN REFLECTED CEILING PLANS & LIGHTING ELEVATIONS & SECTIONS PARTIAL SECTIONS & ROOM SCHEDULE WINDOWS & DOORS WALL SECTIONS WALL SECTIONS WALL SECTIONS PLAN DETAILS SECTION DETAILS SECTION DETAILS MECHANICAL PLUMBING ELECTRICAL M1.1 STRUCTURAL S0.1 S0.2 S0.3 S1.1 S1.2 S2.1 S5.1 S5.2 S5.3 S6.1 S6.2 STRUCTURAL COVER SHEET GENERAL NOTES SCHEDULES FOUNDATION/FRAMING PLANS FRAMING PLANS STAIR ELEVATIONS DETAILS DETAILS DETAILS TYPICAL DETAILS TYPICAL DETAILS HVAC ROUTING P1.1 PLUMBING PLANS E1.1 POWER PLANS LANDSCAPE L-1 L-2 LANDSCAPE IRRIGATION CIVIL C1.0 C2.0 C3.0 SITE & UTILITIES PLAN SITE GRADING & DRAINAGE PLAN DETAILS CODE INFORMATION International Building Code (IBC)2012 International Mechanical Code (IMC)2012 National Electrical Code (NEC)2014 Uniform Plumbing Code (UPC)2012 International Fire Code (IFC)2012 International Energy Conservation Code (IECC)2012 International Fuel Gas Code (IFGC)2012 ANSI A117.1 APPLICABLE CODES PROJECT INFORMATION Jurisdiction:City of Bozeman Zoning:BP -Business Park Type of Project:New Office Building Type of Construction:V-B Automatic Sprinkler System:YES Fire Alarm System:YES Area:10,000 sf (gross) Occupancy Group (Use):B Occupant Load:100 total Business Area (100 sf/occupant) Exits Required (Table 1015.1):2 Exits Provided:2Bozeman Code of Ordinances (Offices: 1 space per 250sf) Proposed building:10,000sf gross Required parking:40 Spaces PARKING REQUIREMENTS 389 Ferguson Avenue -Bozeman, MT PERMIT SET MAY 15, 2017 CONSTRUCTION ROUTE/STAGING & BLDG PARKING PROJECT SITERAVALLIST.S. FERGUSON AVE. TO LOCATION: RAVALLI FROM EAST OR WEST TO LOCATION: FERGUSON FROM NORTH TO ELIMINATE LEFT TURNS ACROSS FERGUSON TRAFFIC FROM LOCATION: RAVALLI TO EAST OR WEST, IF EAST, ELIMINATE LEFT TURNS FROM REVALLI ACROSS FERGUSON TRAFFIC FROM LOCATION: FERGUSON TO SOUTH, ELIMINATE LEFT TURNS ACROSS FERGUSON TRAFFIC. 40 PARKING SPACES REQUIRED FOR PROPOSED BUILDING ON LOT4 DRAWING NUMBER: PHASE: DATE: DRAWING TITLE: PROJECT NUMBER: DRAWN BY / CHECKED BY: REVISIONS:0"1"2"6/30/2017 2:52:34 PMG1.0 COVER 16-041 THE RIDGE PUD LOT #4 JUNE 26, 2017 KRB STH PERMIT SET 389 FERGUSON AVE. BOZEMAN, MT 59715 LEGAL: The RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 4, PLAT J-465 PLUS PRIVATE COMMON AREAS 1 & 2 PLAT J-465 OWNER: ANDREW HURLBURT 865 Technology Dr. Bozeman, MT. 59718 406.587.1717 NO.DESCRIPTION DATE