Loading...
HomeMy WebLinkAbout17095 Application Materials RIDGE ATHLETIC CLUB PUD AMENDMENT | INDEX 1. Cover Sheet / Routing Sheet 2. Applications and Checklists a. A-1 Development Review Application Revised b. PUDP – PUD Preliminary Plan Required Materials c. SP-Site Plan Required Materials Revised d. SP1-Site Plan Checklist e. Application Fee Included Site Plan Fee f. RC-Revision and Correction Form Revised g. N1-Noticing h. PLS 3. Narratives and Responses a. Project Narrative Revised b. Responses to City DRC letter 3.29.17 (revised 4.14.17). Revised to reflect comments from DRC letter 7.12.17 c. RO-District Amended PUD Relaxations d. Intersection LOS Waiver Request e. Cash-in-Lieu of Water Rights Correspondence 4. Legal Documents a. CCRs b. Easements (see Plat) c. Waiver of Right to Protest Creation of SIDs Revised d. Deeds e. Joint Parking Agreement f. DNRC Water Rights g. Design Guidelines Revised h. Comprehensive Sign Plan i. Title Report 5. Plans a. Site Plan b. Open Space Plan Revised c. Landscape Plan Revised d. Civil Plans Revised e. Photometric Plan f. Irrigation Plan g. Plat Revised 6. Appendices a. Colored Aerial Vicinity Map b. Overall Site Illustration in Color c. Public Notification d. City Zoning Map e. Storm Water Report and Maintenance Plan Revised f. Websoil Survey PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers i PUD MAJOR AMENDMENT RIDGE ATHLETIC CLUB 4181 Fallon Street Bozeman, MT 59718 Prepared For: Steve Roderick The Ridge LLC 225 E. Mendenhall Street Bozeman, MT 59175-3637 Prepared By: CTA Architects Engineers 411 E. Main Street, Suite 101 Bozeman, MT 59175 406.556.7105 www.ctagroup.com Project No. RIDGERND2 Revised July 28, 2017 PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers ii TABLE OF CONTENTS PER PUDP APPLICATION 1.0 PROJECT NARRATIVE ...................................................................................................3 2.0 LIST OF PROPOSED RELAXATIONS .............................................................................5 2.1 2007 Relaxations Ridge Athletic Club ........................................................................................... 5 2.2 2017 Relaxations for PUD Amendment RO District ...................................................................... 6 3.0 PROJECT TEAM ..............................................................................................................6 THE RIDGE ATHLETIC CLUB ....................................................................................................6 MATT HAUSAUER, P.E ..............................................................................................................6 4.0 TITLE REPORT ................................................................................................................7 5.0 DATA REGARDING SITE CONDITIONS .........................................................................7 5.1 Existing Land Use ........................................................................................................................... 7 6.0 OVERALL LAND USE RATIOS ........................................................................................7 7.0 OVERALL PROJECT FLOOR AREA................................................................................8 8.0 DEVELOPMENT SCHEDULE ..........................................................................................8 9.0 PHASING PLAN ...............................................................................................................8 10.0 PHASING TABLES PER PUDP ........................................................................................9 11.0 TABLE OF PROPOSED BUILDINGS ............................................................................. 10 12.0 COLORED AERIAL VICINITY MAP .................................................................................. 10 13.0 OVERALL SITE ILLUSTRATION IN COLOR .................................................................. 10 14.0 STATEMENTS OF OBJECTIVES AND CONFORMANCE TO CITY POLICY AND PLANS .................................................................................................................................... 11 15.0 LAND FORMS, GEOLOGY, SOILS, HYDROLOGY, VEGETATION, NOXIOUS WEEDS, WILDLIFE, AND VIEW-SHEDS. .............................................................................................. 27 16.0 NARRATIVE DESCRIPTIONS OF SITE ACCESS AND OVERALL UTILITIES ............... 27 17.0 INDEX ............................................................................................................................ 28 TABLES Table 1 - Floor Area Ratio ...........................................................................................................8 Table 2 Schedule/Phasing ..........................................................................................................8 Table 3 – Site Plan / Lot Table ....................................................................................................9 Table 4 Lot Setbacks ..................................................................................................................9 Table 5 PUD Open Space ......................................................................................................... 10 Table 6 Table of Proposed Buildings ......................................................................................... 10 PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 3 1.0 PROJECT NARRATIVE This proposal is for an amendment to the existing Planned Unit Development (Project #Z- 06260) associated with The Ridge Athletic Club. This amendment constitutes a major change to the exiting PUD due to the addition of 2.7159 acres of adjacent land area to the PUD, including 3 new building pad sites and associated site improvements, additional open space, and landscaping. Additional changes within the existing PUD include redistribution of open space and the expansion of the Ridge Athletic Club. The PUD is comprised of split RO and BP zoning and current primary uses include The Ridge Athletic Club; Red Chair Café & Bar, Flying Horse Communications offices, and medical offices. The Amended PUD would include professional office space, a daycare facility and additional health services facilities. Major changes to PUD’s are addressed in the Bozeman Unified Development Code (UDC) in Article 20 – Planned Unit Development, Sec. 38.20.010 – Intent, (2) Major Changes and are defined as follows: (a) Major changes to a planned unit development must follow the same planned unit development review and public notice and comment process required for approval of preliminary plans. The final plan shall not contain any changes which would allow increased deviation/relaxation of the requirements of this chapter without being individually noticed and reviewed for the proposed change. (b) Major changes shall be defined as follows: (i) A change in the character of the development; (ii) An increase of greater than five percent in the approved number of residential dwelling units; (iii) An increase of greater than five percent in the approved gross leasable floor areas of retail, service, office and/or industrial buildings; (iv) A reduction in the approved open space and/or affordable housing units provided; (v) A change in the location and placement of buildings; and/or (vi) An increase in the number of lots above what was approved through the preliminary plan review. This is applicable only to zoning PUD plans, not subdivision PUD plats. The final plat, if applicable, may not create any additional lots which were not reviewed as part of the preliminary plan submittal. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 4 Response: Key amendments to the existing PUD include:  The addition of 2.7159 acres of adjacent area lying immediately to the west of the existing Ridge campus (Lot 2C of Minor Sub 365) to the PUD.  Incorporation of three (3) additional building pad sites identified as lots 2A, 7A, 9 on the amended Plat and Site Plan.  Combing pad sites 1 and 2 of the existing BP PUD. Bozeman Deaconess Hospital is leaving pad site 2 and the desire is to allow for expansion and enhancement of the Ridge Health Club Facilities.  Once the PUD is approved a boundary line adjustment / lot aggregation would be completed to amend/eliminate the existing lot boundary between pads sites 1 (Ridge Athletic Club) and 2 (Bozeman Deaconess Hospital).  Relocation of the Active Recreation Open Space in the middle of the existing parking lot to the west.  Elimination of the existing pad site 7 (currently identified for either office or car wash uses) and conversion of this area into additional open space for the PUD.  The infrastructure (utility services, parking areas, open space areas, landscaping, site lighting, and pad preparation) will be constructed upon approval of the PUD. The pad sites will be developed as they are sold. The expansion of The Ridge Athletic Club is scheduled for 2018/2019. Additionally, the RO Zoning District encourages the development of a mix of uses between residential and compatible office and business land uses. The proposed PUD Amendment does not include residential development but rather proposes to maintain and enhance the existing commercial land uses within the original PUD that include health services, personal services, professional office space, and a daycare center. The definition below defines the intent and purpose of the residential zoning districts and the PUD Amendment requests a relaxation within the current RO zoning to accommodate the proposed building pad sites. ARTICLE 8. RESIDENTIAL ZONING DISTRICTS Sec. 38.08.010 Intent and Purpose. A. 7. The intent of the R-O residential-office district is to provide for and encourage the development of multi-household and apartment development and compatible professional offices and businesses that would blend well with adjacent land uses. The primary use of a lot, as measured by building area, permitted in the R-O district is determined by the underlying growth policy land use designation. Where the district lies over a residential growth policy designation the primary use shall be non-office uses; where the district lies over a nonresidential designation the primary use shall be office PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 5 and other nonresidential uses. Primary use shall be measured by percentage of building floor area. Response: While the underlying zoning district is residential, the proposed PUD amendment does not include any residential development. However, the proposed ancillary development is compatible with the RO zoning as it includes professional offices and commercial business that is compatible with the current PUD and with the surrounding land uses. Surrounding land uses do include a mixed use of residential development including condominium and single family residential. 2.1 LIST OF PROPOSED RELAXATIONS 2.2 2007 Relaxations Ridge Athletic Club The Original PUD relaxations (City of Bozeman, DRC letter dated March 29, 2017 (revised April 14, 2017)), will continue to apply to the BP portion of the PUD. No new relaxations for the BP zoning district are requested. Original PUD relaxations with old UDC references:  38.10.040 Commercial Lot area and Width-to reduce lot area and width to allow lots configured as building pads.  38.10.050 Commercial Yard Setbacks-to reduce setbacks to zero to allow building pads to accommodate the building foundation only and to reduce the front yard setback requirement on South Ferguson Avenue from 25 feet to 10 feet.  38.17.060 Entryway Corridor Overlay Setbacks-to reduce the corridor overlay setback from 25 feet to 10 feet.  38.24.090 Lot Frontage (38.23.030)-to allow some lots to not front on a public or private street or alley with greenway corridor.  38.24.090-3 Access Spacing-to allow the distance between accesses along an arterial street to be reduced below code requirements.  38.25.040 Parking Space Requirements-to allow an overall 15% reduction to the parking space requirements.  38.26.050 Unbroken Rows of Parking-to allow for longer rows of parking spaces unbroken by interior landscape islands.  38.28.070 Wayfinding Signage-to allow wayfinding signs for a district less than 30 acres.  38.10.020 Residential Use on the Ground Floor-to allow residential uses on the ground floor in the B-2 zoning district.  38.28.060 Building Frontage as applied in sign area calculations-to allow designated/fixed sign square footage for lots that do not have building frontage on a street.  38.10.060.A.2 Building Height-to allow Building E on site a maximum height of 59 feet exceeding the maximum height allowed in this location by 2 feet. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 6 2.3 2017 Relaxations for PUD Amendment RO District  38.08.010 Residential Zoning Districts Intent and Purpose The PUD Amendment requests a relaxation from the underlying growth policy designation of residential.  38.08.050 Yards The PUD Amendment requests a relaxation for Lots 2A, 7A, and 9, to reduce rear yard setbacks from 20' to zero feet to allow building pads to accommodate the building foundation.  38.24.090 Lot Frontage The PUD Amendment requests a relaxation to allow lots not to front on a public or private street or alley with greenway corridor.  38.24.090 B.2 Access - Drive The PUD Amendment requests a relaxation of the 25' legal and physical lot access frontage requirement to be waived.  38.28.070 Wayfinding Signage The PUD Amendment requests to allow wayfinding signage for a district of less than 30 acres.  38.28.060 Signs permitted upon issuance of a sign permit The PUD Amendment requests a relaxation for signage in the R-O zoning district to exceed the total permitted signage allowed.  38.08.030 Lot coverage and floor area. The PUD amendment requests a relaxation for lot 2A to exceed the 60% maximum lot coverage. 3.0 PROJECT TEAM THE RIDGE ATHLETIC CLUB Ridge Campus Property Owners Association Steve Roderick 151 McGee Drive Bozeman, MT 59715 406.570.3636 steve@ridgeathletic.com MATT HAUSAUER, P.E. C&H Engineering & Surveying 1091 Stoneridge Drive Bozeman, MT 59718 406.587.1115 mhausauer@chengineers.com PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 7 4.0 TITLE REPORT Included in Index 4. (i) 5.1 DATA REGARDING SITE CONDITIONS Data regarding site conditions, land characteristics, available community facilities and utilities and other general information about proposed uses, adjacent land uses and the uses of land within one-half mile of the subject parcel of land both existing and proposed. 5.2 Existing Land Use The current property associated with the Ridge PUD is zone B-P and R-O. The property that is proposed to be added to the existing Ridge PUD is currently undeveloped/vacant land zoned R- O with an underlying growth policy designation of residential. Property to the north and west across Ravalli street is zoned R-O and developed with residential duplexes. Property to the South across Fallon Street is undeveloped property zoned UMU. The property lies outside of the entryway corridors, neighborhood boundaries, or historic districts. An 8-inch water main is located in Ravalli Street and a 12-inch water main is located in Fallon Street, both of which can provide domestic and fire service to the property being added to the PUD. Eight-inch sewer is located in Ravalli and Fallon to provide service. Gas, electric and communications are all readily available in the immediate area. 6.1 OVERALL LAND USE RATIOS The Site Plan, Landscape Plan, and Open Space Plan are all included in Index 5 and address the following items:  Existing footprint of existing buildings and structures  Proposed buildings and structures  Driveways and parking areas  Streets, roads, alleys with areas of rights of way identified  Private open spaces for residential uses – N/A  Landscape areas  City Parkland – N/A PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 8 7.0 OVERALL PROJECT FLOOR AREA Table 1 - Floor Area Ratio Table 1 2017 PUD Maximum Lot Area / Maximum Building Area RO District Lot # Lot Area SF Max Lot Coverage 60% SF Max Building Area Gross (SF) 2A 12,245 8,000 (65%) 8,000 7A 11,486 6,892 6,000 9 9,390 5,634 5,633 Lot 2A exceeds the maximum lot coverage allowed of 60%. The lot coverage for lot 2A is 65%. The PUD Amendment requests a relaxation of the 60% lot coverage for lot 2A. 8.0 DEVELOPMENT SCHEDULE The project is requesting concurrent construction of on-site and directly related adjacent public infrastructure for the Phase 1 improvements of all common areas, all landscaping and turf area. The schedule for improvements will begin Summer/Fall of 2017 and will include completion of all infrastructure construction such as utility services, parking areas, open space areas, landscaping, site lighting, and pad preparation upon final approval of the PUD. The pad sites will be further developed as they are sold. The expansion of The Ridge Athletic Club is scheduled for 2018/2019. The subdivision exemption to delineate the three lot realignments will be submitted as a separate application and approval will be sought prior to the initiation of Phase 1 construction. The portion of landscaping that falls between the building pad and the common area will be put in at the time of specific building construction and will be a requirement of each building ownership. All other landscaping requirements for the commons area and outlying areas will be completed during Phase 1 construction. The expansion of The Ridge Athletic Club is scheduled for 2018/2019. Development Schedule/Phasing Plan Table 2 Schedule/Phasing Phase 1 2017/2018 All infrastructure requirements for the overall PUD utility services, parking areas, open space areas, landscaping, site lighting, including the installation of the artificial turf area. Phase 2 2018/2019 Expansion of the Ridge Athletic Club Phase 3 2018- Development of new building pad sites lots 2A, 7A, 9 as they are sold. 9.1 PHASING PLAN There are three phases proposed for the PUD.  Phase 1 includes all infrastructure, parking and landscaping requirements for the entire PUD including the installation of the artificial turf area as shown in the Site Plan and Landscape Plan.  Phase 2 includes the Ridge expansion and is scheduled for 2018/2019. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 9  Phase 3 includes the new building pad sites created by the PUD Amendment which will be constructed as they sell. The Civil Site Plan shows phasing of all site infrastructure with boundaries and limits of construction and is found in Index 5(d). 10.0 PHASING TABLES PER PUDP Table 3 – Site Plan / Lot Table Table 4 Lot Setbacks Lot Ferguson Fallon Ravalli Parking Side Rear 1 42 Feet 25 Feet 5 Feet 5 Feet 2 42 Feet 5 Feet 5 Feet 3 42 Feet 5 Feet 5 Feet 4 42 Feet 5 Feet 5 Feet 5 42 Feet 5 Feet 5 Feet 6 15 Feet 5 Feet 5 Feet 7 15 Feet 8 5 Feet 5 Feet 9 N/A 10 N/A 2A N/A 15 Feet 5 Feet 5 Feet 7A N/A 15 Feet 15 Feet 5 Feet 5 Feet 9 N/A 15 Feet 5 Feet 5 Feet PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 10 Table 5 PUD Open Space See Open Space Plan and Landscape plan found in Index 5 for identification of common areas. 11.0 TABLE OF PROPOSED BUILDINGS Table 6 Table of Proposed Buildings Building Phase Footprint Sq. Ft. Building Sq. Ft. Stories Existing/Proposed Building Use 2A 1 8,000 16,000 2 Proposed Office Building 7A 1 6,000 6,000 1 Proposed Office Building 9 1 5,633 5,633 1 Proposed Office Building 12.0 COLORED AERIAL VICINITY MAP The colored aerial vicinity map is located in the Index tab 6. (a) 13.0 OVERALL SITE ILLUSTRATION IN COLOR The colored overall site illustration is located in the Index tab 6. (b) PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 11 14.1 STATEMENTS OF OBJECTIVES AND CONFORMANCE TO CITY POLICY AND PLANS The overall vision of the Ridge campus and surrounding area is to foster an atmosphere that is desirable for businesses, residents and consumers alike. With the growth of the Bozeman community, and specifically the West side of Bozeman, Bozeman Health Rehabilitation and the Ridge Athletic Club need to expand their current facilities to better serve this growth. The past 15 years have shown that the safest, most efficient and effective use of the P.U.D was to expand with lot 2C to add 2.7 acres of additional property. In doing so, the PUD Amendment will clean up the vacant lot 2C of weeds, gophers, and provide better parking and additional sidewalks, along with expanding the current Ridge facility. This addition will enhance and provide opportunity for additional professional space and child care services. The addition of 2.7 acres lying immediately to the west of the existing campus (Lot 2C of Minor Sub 365) to the PUD includes incorporation of three (3) additional building pad sites identified as building lots 2A, 7A, 9 as shown on the Site Plan. Additional proposed changes include combining pad sites 1 and 2 of the existing PUD, as Bozeman Deaconess Hospital is leaving pad site 2, and the desire is to allow for expansion and enhancement of the Ridge Health Club Facilities. Once the PUD is approved, a boundary line adjustment / log aggregation would be completed to amend/eliminate the existing lot boundary between pads sites 1 and 2. The proposal also includes relocation of the Active Recreation Open Space in the middle of the existing parking lot and moving it to the west. The newly added open space enhances the overall usable open space within the PUD and provides increased connectivity and user amenities. The elimination of the existing pad site 7 (currently identified for either office or car wash uses) and conversion of this area to some of the required open space for the project, enhances the overall aesthetics of the development. Requirements under Item 14 of the PUDP Application Item 14 Statements of objectives and conformance to city policy and plans: a. Statement of applicable City land use policies and objectives achieved by the proposed plan and how it furthers the implementation of the Bozeman Community Plan; provide specific land use goals and objectives in the Community Plan that are furthered by the proposed PUD; Response: The following land use goals and objectives have been identified from the 2009 Bozeman Community Plan to show how the proposed PUD Amendment incorporates and implements the City’s objectives. 2009 Bozeman Community Plan land use policies and objectives: 3.3 : Land Use Goal LU-1: Create a sense of place that varies throughout the City, efficiently provides public and private basic services and facilities in close proximity to where people live and work and minimized sprawl. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 12 Objective LU – 1.3: Encourage positive citizen involvement in their neighborhood and community. Response: The Ridge Complex offers a variety of services to the overall development and the surrounding community including food services, health services, and professional services. The proposed Amendment meets the intent of UDC 38.20.010 (1) (2) and (13) (14) by: (1) ensuring future growth is occurring in accord with the City’s growth policies; (2) increasing greater opportunities within the area by increasing shopping, recreation and employment opportunities, (13) promoting logical development patterns of commercial and office uses that benefit the developer and community as a whole; and (14) to promote the efficient use of land resources, use of urban services, mixed uses, transportation options, and detailed human scale design. Goal LU-2: Designate centers for commercial development rather than corridors to encourage cohesive neighborhood development in conjunction with non- motorized transportation options. Objective LU-2.1: Locate high density community scale service centers on a one-mile radius, and neighborhood services centers on a one-half mile radius to facilitate the efficient use of transportation and public services in providing employment, residential and other essential uses. Response: The Ridge is located within the desired vicinity of residential and commercial development and is able to serve the surrounding community with needed personal and professional services close to their residences, allowing for less vehicles miles traveled and more opportunity for pedestrian and bicycle access. The proposed development will also increase employment opportunities within the area. This meets the intent of UDC 38.20.010 (2) to allow opportunities for innovations in land development and redevelopment so that greater opportunities for high quality housing, recreation, shopping and employment may extend to all citizens of the city area; (3) to foster the safe, efficient and economic use of land and transportation and other public facilities; (6) encouraging patterns of development that decrease automobile travel and reduce traffic congestion, which will help increase air quality. Objective LU-2.2: Provide for a limited number of regional service centers which are appropriately sized and serviced by adequate infrastructure. Response: The Ridge PUD is located within a desired regional service area for the City of Bozeman. The proposed development is able to be adequately serviced with city water and sewer infrastructure. This meets the intent of 38.20.010 (4) which ensures adequate provisions of public services such as water, sewer, electricity, open space and public parks. Goal LU -4: Sustainability, Natural Environment, and Aesthetics Objective LU 4-6: All mixed use areas should be developed on a grid of connectivity, including streets, alleys, drive ways and parking areas that contain multi-model facilities and a high level of connectivity to adjacent development. Shared use, underground, or other structured parking is recommended to reduce surface parking area. Response: The Ridge Complex has been developed to allow inter-connectivity of the complex including parking areas and multi-model facilities such as sidewalks and bicycles. This meets the intent of 38.20.010 (7) promoting the use of bicycles and walking as effective modes of transportation. Objective LU 4-7: Storm water is being designed using low impact development principles. Objective LU 4-9: Recognize the cumulative effects of changes in land use and develop equitable means to evaluate, avoid and/or respond to negative cumulative impacts. Recognize the value of well designed and implemented urban development in minimizing impacts form existing and future development. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 13 Objective LU 4-10: Encourage development throughout Gallatin County to occur within existing municipalities and support ability to address change and growth. 3.4 Land Use Categories Future land use designates the property as “Community Commercial Mixed Use” and “Residential” (DRB minutes 6.24.15). Response: The Ridge development is comprised of a broad range of economic development including: retail, professional services, personal services, health care, and general services. The complex is designed with multiple intended uses and includes an integrated pedestrian corridor for pedestrian travel within and around the facility. The proposal meets the density requirements of FAR .5. 4.3 Community Quality Goals and Objectives Goal C-1: Human scale and compatibility. Response: The Ridge Complex is designed to have mass and scale that is visually appealing to the pedestrians at street level. The buildings shall include design elements that address the Ravalli Street, Fallon Street and Ferguson Avenue streetscapes. Buildings shall have a mass and scale that is visually appealing to pedestrians. (see Index 4(g) Design Guidelines). This meets the intent of 38.20.010 (14) promoting the efficient use of land resources, full use of urban services, mixed uses, transportation options, and detailed and human scale design. Objective C-1.3: Support compatible infill within the existing area of the City rather than developing land requiring expansion of the City’s area. Response: The Ridge Complex is located within the City limits of Bozeman and will develop undeveloped property. The complex will also utilize existing City services for water and sewer. This meets the intent of 38.02.010(4) ensuring adequate provision of public services such as water, sewer, electricity and open space and 38.20.010 (11) encouraging the development of vacant properties within developed areas, including public services. Objective C-1.4: Achieve an environment through urban design that maintains and enhances the City’s visual qualities within neighborhood, community and regional commercial areas. Response: The Ridge Complex will use consistent design including materials, colors and lighting that will be visually compatible with surrounding land uses (Design Guidelines). This meets the intent of 38.20.010 (10) to improve the design, quality, and character of new development and (14) to promote the efficient use of land resources, use of urban services, mixed uses, transportation options, and detailed and human scale designs. Objective C-2: Community Circulation – Create a circulation system both vehicular and pedestrian that is fully connected, integrated, and designed for ease of use. Response: The Ridge development is designed with connected parking and pedestrian pathways to facilitate convenient travel in and around the campus. This meets the intent of 38.20.010 (6) encouraging patterns of development that decrease automobile travel, encourage trip consolidation; and, (7) promoting the use of bicycles and walking as effective modes of transportation. Objective C-2.1: Require adequate and efficient circulation in all subdivision and site plans and provide connectivity between developments and major destinations for both pedestrians and vehicles, including human powered vehicles. Response: The Ridge Complex provides connectivity between buildings for both vehicular and pedestrian traffic. The Complex also provides pedestrian connectivity outside of the development to surrounding services. The Complex is designed to work with the City’s goal of Complete Streets. This meets the intent of 38.02.010(3) promoting safe and efficient use economic use of land, transportation, and other public facilities; (7) PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 14 promoting the use of multi-modal transportation; (14) promoting the efficient use of land resources, full use of urban services, mixed uses, transportation options, and detailed and human scale design. Objective C-2.3: Investigate the expansion of shared use pathways within the City. Response: The Ridge is designed to connect to existing sidewalks allowing expanded pedestrian access and opportunity within the surrounding area. See Site Plan. Objective C-4: Design Guidelines – Create illustrated design guidelines to give clear direction in design and review of residential and non-residential neighborhoods without unduly constraining architectural style and innovation. Response: The Ridge PUD has completed a set of Design Guidelines (Index 4 (g)) that illustrates the PUD’s design intent for site planning, building, signage, and lighting. Goal C-5: Public Landscaping and Architecture. Enhance the urban appearance and environment through the use of architectural excellence, landscaping, trees and open space. Objective C-5-1: Provide Street Trees in all public rights of way to establish a human scale to transportation corridors. Response: See Index 5 (c) for the Landscape Plan. Goal C-6: Support Sustainability - Provide a framework to integrate the functional systems of a development into the site planning and building infrastructure. Objective C-6.3: Encourage and support energy conservation and efficiency in all aspects of development. Response: The Ridge Campus common area lighting has all been upgraded to LED fixtures and all future lighting for common area will follow these standards. 2016 installation qualified for Northwestern Energy and USDA rebates based on meeting reduced energy consumption. A photometric plan is included in Index 5 (e). Objective C-6.4: Continue to develop the design guidelines and ordinances to implement best dark sky lighting practices including utilizing new technologies to reduce impacts to the night sky. Response: The Ridge has incorporated LED lighting practices within the PUD that meets the City’s design guidelines and ordinances, reducing impacts to the night sky. A photometric lighting plan is included in Index 5 (e). This meets the intent of 38.20.010 (8) to reduce energy consumption and (9) to minimize adverse environmental impacts of development and protect special features of the geography. 8.3 Economic Development Goals and Objectives Goal ED-1: Promote and encourage the continued development of Bozeman as a vital economic center. Objective ED-1.1: Support business creation, retention, and expansion. Emphasize small business, ‘green’ businesses, and e-businesses. Response: The Ridge development promotes new job creation by supplying new building space for new businesses that include small business, green business and/or e- business. This meets the intent of 38.20.010 (2) to allow for opportunities for innovations in land development and redevelopment so that greater opportunities for high quality housing, recreation, shopping and employment may extend to all citizens in the area. Objective ED-1.2: Coordinate the provision infrastructure necessary to support economic development. Response: The proposal includes the expansion of all necessary infrastructure such as water, sewer, electricity, natural gas, fiber optic, to support new business development. Objective ED-1.3: Foster a positive economic climate through a well-managed and aesthetically pleasing built environment, and by maintaining a beautiful and healthy PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 15 natural environment to promote and attract businesses with a desirable impact on the community. Response: The Ridge Complex has been a positive benefit to the Bozeman community. The complex is well managed with low vacancy rates and is aesthetically pleasing and blends well with the surrounding environment. This meets the intent of 38.20.010 (10) to improve the design, quality and character of the development. 9.3 Environmental Quality and Critical Lands Goals and Objectives Objective E-2.4: Ensure that future development will not contaminate soils and water, and encourage the cleanup and redevelopment of existing brownfields to return these lands to productive use. Response: The development within the Complex will utilize best management practices during construction and will ensure that storm water runoff is captured and treated on site. This meets the intent of 38.20.010 (5) to avoid inappropriate development of lands and to provide adequate drainage, water quality and reduction of flood damage. Objective E-2.5: Ensure sufficient water supply is available for future population. Response: The development will be connected to City water service. The City of Bozeman currently has enough water rights and capacity to serve this development. The Ridge Complex utilizes existing individual on site wells for onsite irrigation. Objective E2-6: Protect and enhance air quality in order to minimize health hazards associated with air pollution. Response: The proposal includes a mixed use of office and commercial development that does not include development that would have a negative impact on air quality. Goal E-3: Help address climate change by taking steps towards reducing the City’s greenhouse gas emissions. Objective E3.2- Encourage sustainable development and building practices. Response: The Ridge will follow all applicable building codes and utilize sustainable development and building practices where appropriate. Goal E-4: Promote and Support responsible use of our natural resources. Objective E-4.1: Facilitate the efforts of residents to reduce, reuse and recycle our waste to the extent that it is economically feasible. Response: The proposal will provide appropriate recycle containers for each building unit to encourage recycling efforts. Objective E-4.2: Promulgate efficient land use practices. Response: The Ridge PUD promotes urban design and higher density which is in conformance with the City of Bozeman’s Unified Development Code. Goal E-5: Maintain a natural and attractive aesthetic character for the Bozeman Area. Objective E-5.1: Protect view-sheds and ridgelines by carefully planning development location, type and character. Response: The development will not impede any of the existing view-sheds and the location is consistent with the City’s vision for land development within the area. Character and type of construction will be consistent with surrounding land uses. This meets the intent of 38.20.010 (9) to minimize adverse environmental impacts of development and to protect special features of geography. Objective E-5.3: Ensure a dark evening sky, public safety, and energy efficiency by addressing the issue of light pollution: Response: The Ridge Campus lighting plan will be in conformance with City of Bozeman lighting standards and will utilize energy efficient lighting. Intersections with cross walks will be lit for public safety. Index 5 (e) has the updated Photometric Lighting PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 16 Plan for the PUD. This meets the intent of 38.20.010(8) to reduce energy consumption and demand. Objective E-5.4: Work with utility providers to ensure appropriate locations of new installations. Response: The developer will work with utility providers and the City of Bozeman to ensure that all new installations are not in conflict with any of the above objectives. 10.3 Parks, Recreation, Open Space, and Trails Goal R-1: Provide for accessible desirable, and adequately maintained public parks, open spaces, trail systems, and recreational facilities for residents of the community. Objective R-1.1: Make all City recreational facilities and programs accessible to and affordable for all members of the community. Response: The development proposes approximately 132,653 square feet of open recreational space that will be available for public use. Objective R-1.3: Establish regular and sufficient funding sources to acquire, develop and maintain public parks, trail and recreational facilities and to meet the community’s recreational programming needs. Response: The Ridge Campus has adopted covenants, conditions and restrictions identifying that all Open Space areas will be maintained by the common property owner’s association (see Index 4 (a). 11.3 Transportation Goals and Objectives Goal T-1: Transportation System-Maintain and enhance the functionality of the transportation system. Objective T-1.2: Ensure that the development review process shall coordinate development and transportation services so that necessary facilities, such as pedestrian and vehicular travel ways are provided concurrently with development. Response: The proposal has met all the development review process requirements for the City of Bozeman and will coordinate all improvements in accordance with the City of Bozeman’s Unified Development Code, Development Review Process and Transportation Plan. Objective T-1.3: All development activity shall comply with the right of way standards, road locations, and other policies set forth in the transportation facility plan to ensure that an orderly, efficient, effective transportation system is continued and to avoid future problems with inadequate transportation services and options. Response: The proposal has met all requirements of the City’s Transportation Facility Plan and all development activity will comply with City of Bozeman Transportation Facility Plan and will be approved by the City Engineer. Objective T-1.4: Ensure that adequate interconnections are made throughout the transportation system to ensure a variety of alternatives for trip routing and reduce total travel distance: Response: The proposal provides for interconnectivity within the development and has multiple access points from side arterials (Ravalli and Fallon) in order to increase travel efficiency and reduce travel distance. Goal T-2: Ensure that a variety of travel options exist which allow safe, logical and balanced transportation choices. Objective T-2.1: For the purposes of transportation and land use planning and development, non-motorized travel options and networks shall be of equal importance and consideration as motorized travel options. This balance shall ensure that a variety of travel opportunities are available which do not require the use of automobiles for local trips. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 17 Response: The Ridge proposal incorporates sidewalks in and through the development in an effort to promote and facilitate pedestrian use. Sidewalks also connect the development to surrounding land uses such as commercial centers and residential areas. This meets the intent of 38.20.010 (3), (7), (14). Objective T-2.2: Review and revise parking requirements to ensure provisions of parking consistent with other goals of this plan to support commercial and residential activities in the downtown and other areas. Response: The proposal meets all parking requirements sufficient to serve the development and does not detract from other parking availability within the area. The Site Plan includes a parking table for the PUD. Goal T-4: Pathways – Establish and maintain an integrated system of transportation and recreational pathways, including streets, bicycle and pedestrian trails, neighborhood parks, green belts and open space. Objective T-4.2: Further develop and maintain an interconnected and convenient pedestrian and bicycle network for commuting and recreation as discussed and described in the transportation facility plan and in coordination with the design standards of the transportation facility plan and Parks, Recreation, Open Space, and Trails Plan. Response: The Ridge Development creates a connected pedestrian pathway around and through the development connecting to other existing pedestrian pathways outside the development. The development also provides bicycle parking. This meets the intent of 38.20.010 (7) promoting pedestrian and bicycle transportation. Objective T-4.4: Continue to improve the existing pedestrian network to increase American’s with Disabilities Act Compliance. Response: All sidewalks within the Ridge development are compliant with the Americans with Disabilities Act. Item 14. Statements of objectives and conformance to city policy and plans b. Statement of proposed ownership of public and private open space areas and applicant’s intentions with regard to future ownership of all or portions of the PUD Response: All common area open space, including all parking will be held in common ownership by the property owner’s association. The property owner’s association will be responsible for all repair and maintenance required for the open space and parking areas. c. Estimate number of employees for business, commercial and industrial uses Response: Ridge Campus Pads as follows: Pad 1 Ridge Athletic Club – 120 +/- Pad 2 NA Lot realignment Pad 3 Red Chair – 45 Pad 4 Proposed business office – 15 +/- Pad 5 Flying Horse – 15 +/- Pad 6 Proposed Office Building – 15 +/- Pad 7 n/a – lot realignment Pad 8 Advanced Eye care – 25 +/- Pad 2A Proposed Office Building – 20 +/- Pad 7A Proposed Office Building – 10 +/- Pad 9 Proposed Office Building – 10 +/- d. Description of rationale behind the assumptions and choices made by the applicant; Response: Pads 1, 3, 5 and 8 based on actual business history. Pads 4, 6, and 2A, 7A, 9 are based on similar business use with similar square footage e) The applicant shall submit as evidence of successful completion of the applicable Community Design Objectives and Criteria Section 38.20.090E, documentation pursuant to these regulations for each proposed use; the applicant shall submit written explanation for each PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 18 applicable objectives or criteria as to how the plan does or does not address the objective or criterion; the Director may require, or the applicant may choose to submit evidence that is beyond what is required in that section; any variance from the criterion shall be described; Article 20 Planned Unit Development Sec. 38.20.010 - Intent E. Design objectives and PUD review criteria 38.20.090 1. The City will determine compatibility of a project based up on the evidence presented during evaluation of the community design objectives and criteria of this chapter. 2. In addition to the criteria for all site plan and conditional use review, the following criteria will be used in evaluating all planned unit development applications. a. All development. All land uses within a proposed planned unit development shall be reviewed against, and comply with, the applicable objectives and criterion of the mandatory ‘all development’ group. (1) Does the development comply with all city design standards, requirements and specifications for the following services: water supply, trails/walks/bike ways, sanitary supply, irrigation companies, fire protection, electricity, flood hazard areas, natural gas, telephone, storm drainage, cable television, and streets? Response: Yes, the proposed PUD Amendment complies with city design standards including the Bozeman Community Plan, Design Objectives Plan and Unified Development Code. The PUD will connect to existing city services for water and sanitary sewer. Fire protection will follow the Uniform Fire Code. Electrical, gas, cable, and telephone services are available to the site and will provide service to the new building pad sites. (2) Does the project preserve or replace existing natural vegetation? Response: The project is partially landscape from previous development. All newly disturbed ground will be replaced with native soils and vegetation will be put back in place per the approved Landscape Plan (Index 5 (c). (3) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to produce an efficient, functionally organized and cohesive planned unit development? Response: The PUD has been designed to maximize efficiency and reduce the number of vehicle miles traveled per visit. There are connected parking lot and pathways between buildings to encourage pedestrian travel in and around the development. (4) Does the design and arrangement of the elements of the site plan (e.g., building construction, orientation, and placement; transportation networks; selection and placement of landscape materials; and/or use of renewable energy sources: etc.) contribute to the overall reduction of energy use by the project? Response: Yes. The Ridge Campus Site Plan has been designed to ensure human scale design and transportation efficiency. See Site Plan Index 5(a). (5) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping etc.) designed and arranged to maximize the privacy of the residents of the project? Response: The proposed PUD Amendment does not include any residential development. (6) Park land. Does the design and arrangement of buildings and open space areas contribute to the overall aesthetic quality of the site configuration, PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 19 and has the area of the park land or open space been provided for each proposed dwelling as required by section 38.27.020. Response: Yes, the open space and landscape plan provides more than the required open space for the PUD and includes an aesthetically pleasing design and selection of native plants and materials. See Landscape Plan Index 5(c). (7) Performance. All PUDS shall earn at least 20 performance points. Nonresidential developments within the North 19th Avenue/Oak Street corridor shall earn 30 points. Points may be earned in a combination of the following. The applicant shall select the combination of methods but the city may require documentation of performance, modifications to the configuration of open space, or other assurances that the options selected shall perform adequately. (a) Provision of affordable housing. Exclusive of housing used to satisfy chapter 38, article 43: (i) Four points of reach percent of dwellings to be constructed in the residential development which are provided by donation to the city; or one point for each build ready lot donated to the city for affordable housing provided by a residential or nonresidential development; or (ii) One point for each percent of dwellings to be constructed in the residential development which are provided by long term contractual obligation to an affordable housing agency, for a period of not less than 20 years with a written plan assuring on going affordability pricing and eligibility monitoring and annual re-certification. The City’s affordability guidelines and subsequent revisions shall establish affordability and eligibility; Response: The proposed PUD Amendment does not propose any residential development. (b) Additional open space (i) One point for each percent of the project area that is provided as nonpublic open space; or 1 ¼ points for each percent of the project area that is provided as publicly accessible open space. (ii) The portion of the project to be considered in determining the size of area to be provided for open space shall be the gross project area less areas dedicated and transferred to the public, and/or used to meet the park land requirements of subsection E.2.a(6) of this section. The area provided for open space shall be exclusive of yard setbacks on individually owned lots and interior parking lot landscaping, and subject to the performance standards of article 27 of this chapter. The area may be provided through a combination of one or more of the following means: PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 20 (A) Open space within the project boundaries and commonly held by the property owner’s association for the use of owners, residents and their guests; Response: The PUD exceeds the required 20 performance points for open space dedication by providing 92.9 performance points. The overall square footage of the development is 14.93 acres or 650,350 square feet. There is 132,653 square feet of open space provided.See Open Space Plan. (B) Open space within the project boundaries and developed as usable recreation space with a corresponding public use easement; Response: The project includes the required useable recreation space and open space. Most of the open space associated with the PUD is for private use, however, the open space dedicated along Ferguson Street is dedicated public open space. (C) Outside of the project boundaries as an addition to an existing off site park adequate in location and size to meet the recreational needs to the residents; Response: N/A (D) Cash in lieu of open space subject to the standards of section 38.27.030; or Response: N/A (E) Open space outside of the project boundaries adequate in size and location to meet the recreational needs of the residential development. The site is subject to the standards of article 27 of this chapter and must demonstrate a geographic and service relationship to the residential development. (c) Adaptive reuse of historic buildings. Response: N/A (d) Underutilized and brownfield sites. Response: N/A (e) Designed to meet LEED-ND and be conditionally approved or have certification by the authority (15 points). Response: N/A (f) Inclusion of a low impact development plan (6 points) that includes the following: PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 21 (i) On-site storm water treatment systems that exceed the requirements of chapter 40, article 4 Storm Water, including but not limited to: incorporating drainage methods and technologies that treat, detain, and /or infiltrate storm water as close as possible to the source of run-off an d the use of natural drainage systems across sites, rather than underground closed pipe systems. (ii) The low-impact development plan shall be integrated with the snow storage and management plan. (iii) At least 75 percent of new planting should be chosen from the list of Drought Tolerant Plants & Xeriscaping in Montana (2010), produced by the Montana Nursey and Landscape Association, or approved/updated equivalent list approved by the City of Bozeman. Any species listed as noxious or invasive in the state shall be avoided. (iv) Inclusion of weather based irrigation controllers. (v) Limitations in the covenants or design guidelines on the amount and type of sod permitted. Response: No on (i),(ii) and (v); Yes on (iii); (iv) yes, automatic sprinkler system with controls (g) Sustainable design and construction. (6 points) (i) Covenants or design guidelines that include a commitment to design the majority of buildings to meet LEED certification requirements or approved equivalent certification approved by the City of Bozeman. Equivalent certification programs will also be considered during preliminary PUD review. (ii) Energy use in reduction. Residential covenants or design guidelines shall include a commitment to build their party certified homes which meet guidelines that make them at least 20 percent more efficient than standard homes. Nonresidential covenants and design guidelines shall include a commitment to build and certify that buildings that meet the EPA’s Energy Star challenge or approved equivalent program. Equivalent programs will also be considered during Preliminary PUD review. (iii) Water user reduction. Covenants or design guidelines shall include a commitment to use EPA’s Water Sense certified products for all kitchen bathroom and irrigation hardware. Equivalent programs will also be considered during preliminary PUD review. (iv) Provision of solar, wind or other alternative energy sources or participation in an approved cash in lieu program. A coordinated and detailed plan on how the development will address this component shall be submitted. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 22 Response: This will not be required in the covenants (h) Integrated and coordinated way-finding measures beyond minimum requirements within the overall project (4 points). Response: None provided. (i) On-site recycling transfer station (4 points). Response: None provided. (j) Public transportation bus station or enhanced covered bus stop. (I point per station or enhanced stop). Response: None provided. (k) Streetscape improvements (6 points): Streetscape design features that exceed the minimum street standards including street furniture, pedestrian lighting, low impact development techniques, on street parking standards, crosswalks, landscape and planting, way-finding, public art or other design elements. Such elements must be installed as part of the street infrastructure. Response: A relaxation to allow wayfinding signage within the PUD has been requested. If the relaxation is granted, wayfinding signage will be incorporated into the PUD as approved by the City and as part of the street infrastructure. (8) Is the development being properly integrated into development and circulation patterns of adjacent and nearby neighborhoods so that this development will not become and isolated ‘pad’ to adjoining development? Response: Yes, the proposed PUD amendment is integrated into the existing PUD and is compatible with the original PUD concept. There is connectivity with shared parking, pedestrian connection and multiple points of access. The PUD also fits surrounding land uses, including existing residential development to the north and west of the PUD. (b) Residential. Planned unit developments in residential areas (R-S, R-1, R-2, R-3, R4, RMH, and R-O zoning districts) may include a variety of housing types designed to enhance the natural environmental, conserve energy, recognize, and to the maximum extent possible, preserve and promote the unique character of neighborhoods, with provisions for a mix of limited commercial development. For purposes of this section, “limited commercial development” means uses listed in the B-1 neighborhood service district (article 10 of this chapter), within the parameters set forth below. All uses within the PUD must be sited and designed such that the activities present will not detrimentally affect the adjacent residential neighborhood. The permitted number of residential dwelling units shall be determined by the provision and proximity to the public services and subject to the following limitations: Response: There are no planned residential units in the PUD Amendment Proposal. The PUD requests a relaxation for the residential component of the RO zoning. The proposed PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 23 building site pads will include a combination of professional office use and a proposed daycare center. The proposed uses are compatible with the existing land use in the original PUD and will enhance the livability of the area and adjacent neighborhoods by providing additional professional service opportunities and jobs. (1) On a net acreage basis, is the average residential density in the project (calculated for residential portion of the site only) consistent with the development densities set forth in the land use guidelines of the city growth policy? Response: The PUD Amendment does not propose any residential development. (2) Does the project provide for private outdoor areas (e.g., private yards, patios and balconies, etc.) for use the by residents and employees of the project which are sufficient in size and have adequate light, sun, ventilation, privacy and convenient access to the household commercial units they are intended to serve? Response: Yes, the PUD Amendment includes 3.1 acres of open space and recreational area to be used by the public and employees utilizing the PUD facilities. (3) Does the project provide for outdoor areas for use by persons living and working in the development for active or passive recreational activities? Response: Yes, the PUD includes 3.1 acres of open space and recreational area to be used by the public and employees utilizing the PUD facilities. (4) If the project is proposing a residential density bonus as described below, does it include a variety of housing types and styles designed to address community wide issues of affordability and diversity of housing stock? Response: There are no residential units proposed. (5) Is the overall project designed to enhance the natural environment, conserve energy and to provide efficient public services and facilities? Response: (6) Residential density bonus. If the project is proposing a residential density bonus (30 percent maximum) above the residential density of the zoning district within which the project is located and which is set forth in article 8 of this chapter, does the proposed project exceed the established regulatory design standards (such as for setbacks, off street parking, open space, etc.) and ensure compatibility with adjacent neighborhood development? The number of dwelling units obtained by the density bonus shall be determined by dividing the lot area required for the dwelling unit type by one plus the percentage of density bonus sought. The minimum lot area per dwelling obtained by this calculation shall be provided within the project. Those dwellings subject to Chapter 38 article 43, shall be excluded in the base density upon which the density bonus is calculated. Response: The proposed PUD does not include any residential development. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 24 (7) Limited commercial. If limited commercial development as defined above is proposed within the project, is less than 20 percent of the gross area of the PUD designated to be used for offices or neighborhood service activities not ordinarily allowed in the particular residential zoning district? Response: The proposed PUD exceeds the 20 percent of gross area for commercial office space and has requested a relaxation from the residential growth policy designation to apply the R-O zoning. The proposal includes 27,633 square feet of commercial development for professional office space, health care facilities and a daycare center. a. If neighborhood services activities are proposed within the project, is a market analysis provided demonstrating that less than 50 percent of the market required to support proposed neighborhood service activities is located outside the immediate area of the PUD and are the neighborhood services of a nature that does not require drive in facilities or justification for through traffic? Response: The proposal does include the addition of a daycare facility to serve the surrounding residential area. There has not been a market analysis done regarding the daycare facility. The daycare facility does not require drive in facilities or through traffic. b. If the project contains limited commercial development, as defined above, is the project located at the intersection of arterial streets, or arterial and collector streets? Response: The project is located near the intersection of Ferguson Avenue, which is designated as a collector roadway and Huffine Lane which is a principal arterial roadway. Additional access to the development is from Ravalli Street and Fallon Street which are designated as local roadways. c. If the project contains limited commercial development, as defined above, has the project been sited and designed such that the activities present will not detrimentally affect the adjacent residential neighborhood and have the commercial activities been developed at a scale compatible with residential development? Response: The project does not contain residential development, however it is compatible with surrounding lands uses and will complement the residential development to the north. (8) Does the overall PUD recognize and, to the maximum extent possible, preserve and promote the unique character of neighborhoods in the surrounding area? Response: Yes, the PUD maintains the character of the surrounding neighborhood. Compatible uses within the neighborhood include professional office space, daycare facility, and professional services. (c) Commercial. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 25 Response: The PUD is not zoned commercial but rather is zoned R-O which allows a commercial component. (d) Industrial. Planned unit industrial developments in industrial areas (M-1, M-2, BP and NEHMU zoning districts) may include employment, wholesaling, manufacturing and utility centers for the community. The particular types or combination of uses shall be determined based upon its merits, benefits, potential impact upon adjacent land uses and the intensity of development. (1) Is the project located adjacent to an arterial or collector street that provides adequate access to the site? Response: The original PUD was zoned BP and RO with primary access served off South Ferguson Avenue. The PUD Amendment is zoned RO and primary access will be from Fallon Street and Ravalli Street. Adequate access to the site is provided. (2) Is the project developed such that the least intense uses shall be located along the arterial streets, where visibility to the public is likely? More intense uses such as heavy industrial uses and warehousing activities will be located away from the arterial streets, buffered by the other uses. Response: The uses within the PUD parcel zoned BP are developed and not proposed to change. The proposed change within the BP parcel is for the expansion of the current Ridge Athletic Club. (3) Does the project utilize a landscaping theme that will tie adjacent uses or projects together? Response: Yes. The Landscape Plan has been updated to provide a consistent and thematic landscape approach to the overall PUD meeting the landscape requirement points for the original PUD (24) and the amended PUD (23). (4) Is the project developed on land substantially surrounded by property approved for development or developed property with existing services and utilities already available? Response: Yes. The proposed PUD parcel is surrounded by the original BP/RO PUD development, which is substantially developed. There are existing services available within the existing BP PUD and services are available and ready to serve the proposed PUD Amendment parcel. (e) Mixed Use. Planned unit developments in mixed use areas (REMU, UMU zoning districts) may include commercial, light industrial, residential and mixes of various primary and accessory uses. The particular types or combination of uses shall be determined based up on its merits, benefits, potential impact up on adjacent land uses and the intensity of development. Response: REMU, UMU zoning districts are not applicable to the PUD. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 26 (1) Is the project substantially consistent with the intent and purpose statements for the underlying zoning district? Response: N/A (2) Is the project located adjacent or within proximity to an arterial or collector street that provides adequate access to the site? Response: N/A (3) Is the project total at least two acres of land? Response: N/A (4) Do the uses relate to each other in terms of location within the PUD, pedestrian and vehicular circulation, architectural design, utilization of common open space and facilities, streetscape, etc.? Response: N/A (5) Does the overall project achieve or exceed the FA ‘floor area ratios’ envisioned for the underlying district? Response: N/A (6) Is it compatible with and does it reflect the unique character of the surrounding area? Response: N/A (7) Is there direct vehicular and pedestrian access between onsite parking areas and adjacent existing or future off-site parking areas which contain more than ten spaces? Response: N/A (8) Does the project encourage infill, or does the project otherwise demonstrate compliance with the land use guidelines of the Bozeman growth policy? Response: N/A (9) Does the project provide for outdoor recreational areas (such as urban plazas, courtyards, landscaped areas, open spaces, or urban trials) for the use and enjoyment of those living in, working in or visiting the development? Response: N/a (10) Does the project provide for private outdoor areas (e.g., private yards, patios and/or balconies, etc.) for use by the residents and employees of the project which are sufficient in size and have adequate light, sun, ventilation, privacy and convenient access to the household or commercial units they are intended to serve? Response: N/A (11) Does the project provide for outdoor areas for use by persons living and working in the development for active or passive recreational activities? Response: N/A (12) Is the overall project designed to enhance the natural environment, conserve energy, and provide efficient public services and facilities? Response: N/A (13) If the project is proposing a residential density bonus as described below, does it include a variety of housing types and urban styles designed to address community wide issues of affordability and diversity of housing stock? (14) Residential density bonus. Response: N/A Item 14. Statements of objectives and conformance to city policy and plans PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 27 f. Detailed description of how conflicts between land uses are being avoided or mitigated Response: There are no conflicts between land uses as the proposed PUD amendment complements surrounding land uses within the BP PUD as well as the surrounding area. Mitigation measures include providing connectivity within the development, consistency in building design and materials, and landscaping that complements existing landscaping within the PUD. g. Statements of design methods to reduce energy consumption, (e.g. home/business, utilities, transportation, fuel, waste, recycling) Response: Current contract with City solid waste which includes recycle containers and pickups. The Ridge Campus common area lighting has all been upgraded to LED fixtures and all future lighting for common area will follow these standards. 2016 Installation qualified for Northwestern Energy and USDA rebates based on meeting reduced energy consumption. This meets the intent of 38.20.010 (8) to reduce energy consumption and demand. 15.1 LAND FORMS, GEOLOGY, SOILS, HYDROLOGY, VEGETATION, NOXIOUS WEEDS, WILDLIFE, AND VIEW-SHEDS. The property that is proposed to be added to the Ridge PUD is generally flat sloping to the Northwest at less than 2% slope. A geology map of the Bozeman area indicates that the mapped geology within the vicinity the project area consists of Quaternary and Tertiary-aged alluvial fan deposits (Slade – 1993). The Gallatin Area Soil Survey map 457A indicates a Turner Loam soil with the following soil profile:  A - 0-6 inches: loam  Bt - 6-12 inches: clay loam  Bk - 12 to 26 inches: clay loam  2C – 26 to 60 inches: very gravelly loam sand The nearest water body is Baxter Creek located approximately 370’ west of the property. The property is located in FIRM Panel 30031C0811D with No Special Flood Hazard Areas. During the time of this application, the undeveloped portion of the proposed PUD amendment was covered with snow, so an exact determination of existing vegetation or the presence of noxious weeds was not possible. The property to the north and east is well developed. The planned addition to the development is not expected to negatively impact wildlife habitat as this is within an urban area planned for development. Similarly, the proposed development will not impact view-sheds. 16.1 NARRATIVE DESCRIPTIONS OF SITE ACCESS AND OVERALL UTILITIES Site Access  Existing site access for the Ridge PUD consists of a full service access off of South Ferguson Road, a full service access off of Ravalli Street and a full access off of Fallon Street. Access for the addition to the PUD will be through the existing PUD and an additional access along Fallon Street. PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 28 Utilities  Public water is available for the proposed addition to the Ridge PUD along Ravalli Street and Fallon Street. The proposed buildings will have service connections to either. No public water extensions are anticipated for this development.  Public sewer is available along Ravalli Street and Fallon Street. The proposed buildings will have service connection to either. No public sewer extensions are anticipated for this development.  Water and sewer service connections will be designed and constructed in accordance with MPWSS and City of Bozeman modifications to the MPWSS.  The existing Ridge PUD utilizes onsite retention and infiltration ponds to manage storm water. The proposed addition will expand the existing onsite facilities to manage the additional runoff generated by the development of the additional area. Storm water management facilities will be constructed in accordance with City of Bozeman requirements. 17.1 INDEX 1. Cover Sheet / Routing Sheet 2. Applications and Checklists a. A-1 Development Review Application b. PUDP – PUD Preliminary Plan Required Materials c. SP-Site Plan Required Materials d. SP1-Site Plan Checklist e. Application Fee f. RC-Revision and Correction Form g. N-1 Noticing Requirement Form h. PLS 3. Narratives and Responses a. Project Narrative b. Responses to City DRC letter 3.29.17 (revised 4.14.17) c. RO-District Amended PUD Relaxations d. Intersection LOS Waiver Request e. Cash in Lieu of Water Rights Correspondence 4. Legal Documents a. CCRs b. Easements c. Waiver of Right to Protest Creation of SIDs d. Deeds e. Joint Parking Agreement f. DNRC Water Rights g. Design Guidelines h. Comprehensive Sign Plan i. Title Report 5. Plans a. Site Plan b. Open Space Plan c. Landscape Plan d. Civil Plans e. Photometric Plan PUD Major Amendment The Ridge RIDGERND2 CTA Architects Engineers 29 6. Appendices a. Colored Aerial Vicinity Map b. Overall Site Illustration in Color c. Public Notification d. City Zoning Map e. Stormwater Report and Maintenance Plan f. Websoil Survey CTA Architects Engineers 30 Ridge Athletic Club Planned Unit Development (PUD) Relaxation Requests for Amended PUD RO Zoning UDC Title Relaxation Request 38.08.010 Residential Zoning Districts Intent and Purpose The PUD Amendment requests a relaxation from the underlying growth policy designation of residential. 38.08.050 Yards The PUD Amendment requests a relexation for Lots 11, 12, 13, to reduce rear yard setbacks from 20' to zero feet to allow building pads to accommodate the building foundation. 38.24.090 Lot Frontage The PUD Amendment requests a relaxation to allow lots not to front on a public or private street or alley with greenway corridor. 38.24.090 B.2 Access - Drive The PUD Amendment requests a relaxation of the 25' legal and physical lot access frontage requirement to be waived. 38.28.070 Wayfinding Signage The PUD Amendment requests to allow wayfinding signage for a district of less than 30 acres. 38.08.030 Lot coverage and floor area The PUD Amendment requests to allow lot 2A to exceed the maximum 60% lot coverage for the RO District. 38.28.060 Signs permitted upon issuance of a sign permit The PUD Amendment requests a relaxation for signage in the R-O zoning district to exceed the total permitted signage allowed. EXHIBIT A LEGAL DESCRIPTION EXHIBIT B DESIGN GUIDELINES EEE ENORTHREF.SITE PLAN 5SITE DESIGN 05/25/2017 RECORD OF CHANGES1235ADDED PARKINGINCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES5321676AMENDED PUD RODISTRICT7FORMER LOT 7 ISNOW OPEN SPACE Common NameQtySize5 Gal.5Barberry, Cherry BombShrub, Deciduous1PicnicTableRecreation6BoulderSPaver, Pavers6Mum, Purple Pink5Daylily, StellaFlower, Perennial22Grass, Overdam Feather ReedFlower, Grass16FencePost2FenceGateR3613Fence844Fence721Fence60DeckSizeQtyCommon NameLegend10 Gal.4Spruce, Blue Colorado Snow KissTree, Evergreen2"8Willow, Weeping2"18Maple2"3Maple, Autumn Flame2"3Linden, Greenspire2"5Cherry, Canada Red2"12Aspen, QuakingTree, Deciduous5 Gal.11Potentilla Mango TangoShrub, Evergreen Broadleaf5 Gal.5Spirea, Goldflame5 Gal.1Ninebark, Eldiablo5 Gal.4Cinquefoil, Bush, Red Sunset5 Gal.6Burning Bush, DwarfShrub, Deciduous1 Gal.8Daylily, 'Happy Returns'Flower, Perennial1 Gal.52Grass, Feather ReedFlower, Grass8EEEE146101097997910101010101010101010126101010101010102108656881095555555564666610101010101022151983101066552111067735858899LOTS TO BE DEVELOPEDIN FUTURE PHASENORTH REFASTROTURFLINE OF SIGHT1 gal.1 gal.5 gal.cHANGE OF PARKING LOT DESIGN:pLANTSTHAT WERE MISSING WILL BE ADDED TO THESE BEDS... aLLPLANTS FROM ORIGINAL pud ARE MISSING. tHIS WILL NOT ALTER ANYPOINTS.LOT 2ALOT 7ALOT 9BoulderBoulderBoulder WallBoulderBoulderBoulderBoulderBoulderTree Grate in SidewalkBenchTree Grate in SidewalkTree Grate in SidewalkBenchBenchStamped Concrete PadPicnic TableRetaining PondSizeQtyCommon Name original pud missing/dead plants102"17'*POINTS WILL REMAIN THE SAME AS THE ORIGINAL POINT CALCULATION AS ALL THE ORIGINAL PLANTS WILL BE USED AND THE DEAD WILL BE REPLACED.total bushes:2"6total trees:2"21SPIREA, GOLDFLAME2"22"3GRASS, FEATHER REEDPOTENTILLA308blue sprucelilac2 Gal.ASH- WILL SUBSTITUTE WITH linden, greenspire41linden, greenspire2WILLOW, weeping484jUNIPER2 Gal.13aspen , QUAKINGbrandon ELM 1 Gal.3CHERRY, Canadian Red norway maple2 Gal.2 Gal.2"2"1" = 20' Scale:6/15/2017Date:6Revision #:8Amanda ShearmanRIDGE PUDLandscape Plan:Shearman LLC.Landscape Design by:LOT 7LOT 8LOT 1LOT 4LOT 3LOT 6LOT 5Amended PUD Landscape points tabulation:*5 points for 3 plazas, 2 Benches, Picnic Table and public area in Lot 2c as per U.D.018.48.060.C4. pICNIC TABLE LOCATED IN CENTER PARKING LOT ISLAND OF NEW PUD, BENCHES LOCATED IN LOT 9'S AND 7A'S PLAZAS. 3 PLAZAS ARE LOCATED BY LOT 9, LOT 7A AND LOT 2A.*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR BOULDERS WITH A MINIMUM OF 3' DIAMETER. THERE ARE 6 BOULDERS. 2 ARE LOCATED INBETWEEN LOT 7A and 9, 2 are located nORTHwEST of lot 9, 1 is located south of 7a and another located in the center pRKING LOT ISLAND OF THE NEW PUD.*5 POINTS FOR DROUGHT TOLERANT PLANTS- 151 out of 175 (86%) plants are drought tolerant. All points were calculated using the city of bozeman's code ordinance under chapter 38, article 26 and Sec. 38.26.060.*all landscaped areas will recieve waterby means of automatic underground irrigation system.*no tree will be planted within 10 feet of any underground utility line.*All deciduous trees will be staked with two tree stakes per tree and all evergreen trees will be staked with three stakes per tree.*All trees planted within the R.O.W will require a street tree planting permit from the city of bozeman.*All planting beds will require "Typar" weed barrier fabric, or equivalent. Planting beds will be edged with a high quality black vinyl edging, and will be mulched with 1 3/4" washed landscape rock to match the original ridge PUD.*All areas of open space will be seeded with a lawn mis suited for the bozeman area. Seeding will take place between the months of may through september to ensure healthy growth.*The open space of lot 2c will have an area for sun shades. the sun shades will be installed with landscaping and will be made to take down during the winter or large community events if needed. *Lot 2 will become a sports field and astroturf will be installed. benches will be on the North side of the field with shrubs and trees behind to stop any sport activities from entering the oncoming traffic.*All buildings are landscaped with beds around at least 75%.*all boulevard trees meet city forestry division standards and permits will be obtained prior to installation.= MISSING/DEAD PLANTS ON ORIGINAL PUDORIGINAL PUD Landscape points tabulation:*4 POINTS FOR PLAZA AND PUBLIC AREA as per U.D.018.48.060.C4*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR 6 BOULDERS WITH A MINIMUM OF 3' DIAMETER*5 POINTS FOR DROUGHT TOLERANT PLANTS-506 OF 536 (79%) plants are drought tolerant. 9831010665521110677358588899EEE E14610109799791010101010101010101012610101010 865686810955555564666101010101010151NORTHREF.OPEN SPACE PLAN 20OPEN SPACE 05/25/2017 RECORD OF CHANGES123INCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES321 EXHIBIT D PARKING TABLE Ridge Campus Owner’s Association - Ownership Percentage Based on Total Allowable Building Area Per Lot LOT # ** Gross Buildable Area- Square Feet % Ownership 1 72,000 48.44% 2A 16,000 10.76% 3 5,000* 3.36% 4 10,000 6.73% 5 10,000 6.73% 6 12,000 8.07% 7A 6,000 4.04% 8 12,000 8.07% 9 5,633 3.8% TOTAL 148,633 100% *for voting purposes only-not actual as-built square footage EXHIBIT F LANDSCAPE PLAN EXHIBIT G COMPREHENSIVE SIGN PLAN Comprehensive Sign Plan The Ridge Athletic Club PUD Campus The comprehensive sign plan for the Ridge Athletic Club PUD Campus will provide a framework for consistent campus signage within the Ridge PUD. A description of sign types, lighting, color, style will be listed. The use of wayfinding signs and light pole banners within the district will contribute to a sense of place. • General Requirements 1. All proposed signs must be submitted to the property owner and Ridge Campus Property Owners Association for approval: Ridge Campus Property Owners Association Attention: Steve Roderick 151 Mc Gee Drive, Bozeman, Mt 59715 steve@ridgeathletic.com 406-570-3636 2. Signs shall be constructed in compliance with the UL Laboratories, the National Electric Code (NEC) and the Uniform Building Codes. 3. No sign shall be installed without City of Bozeman required Planning and Building Permits. 4. All permanent sign installation shall be inspected by the City of Bozeman Building Department per City Code. 5. All signs are to be maintained in an attractive manner by each business. Signs are to be removed within 30 days of vacating a business premise. • General Guidelines for Sign Design The purpose of the Comprehensive Sign Plan is to foster sign designs that are architecturally compatible, encourage creativity, are attractive and promote sign diversity. The aim is to provide a framework for size, type of sign and their placement on the Ridge Campus buildings, directional and banners. This will apply a level of concert for current and future buildings. 1. Wall Sign is a building mounted sign attached to an exterior wall. It can be dimensional with different layers and depths. Signs can be one dimension. Signs can be constructed of individual letters, graphic components or panels with cut out shapes. Push through should be dimensional translucent letters which extend through the routered opaque sign face. 2. Window graphics are allowed as long as they do not occupy more than 25 percent of the area of the window it occupies. If it exceeds 25 percent of the area of a window, it will be classified as a wall sign which will require permission from the Ridge Campus. A City Permit will also be required. Any sign or graphic placed closer than 4 feet of a windowpane is considered a sign and requires Ridge Campus approval and a City Permit 3. Monument Signs with different layers and depths are encouraged. 4. Projecting Signs can have a maximum area of 8 square feet. The maximum allowed projection distance off the wall is 4 feet. Projecting Signs shall provide a minimum clearance from the lowest part of the sign of 8 feet. Projecting Signs must be designed structurally to withstand wind loads appropriate to the local area. One projecting sign is allowed per tenant. The sign area of projecting signs will count against the total allowed square footage. 5. Lighting A) Channel Letters -LED’s B) Reverse Channel Letters -LED’s C) Halo - LED’s D) Push Through – LED’s E) Logo Identification Cabinets – LED’s F) Projecting Signs – LED’s G) Combination of illuminated and non-illuminated elements H) Externally mounted fixtures I) Individual letters or sandblasted signs can be externally illuminated J) Signs can be non-illuminated K) The use of neon is not permitted L) Monument Signs -LED’s 6. Sign can be manufactured using of metal, acrylic, HDU, glass, vinyl, tile, wood or stone A) Signs should be fabricated such that seams, welds, and attachments are concealed. B) Material thickness should be of such to prevent Oil Canning on exposed surfaces. C) Sign lighting that is internal must be uniform. There should be no hotspots or shadowing. 7. The use of paint is an important aspect to the beauty of a sign. Paint can create and enhance a sign design by using imaginative colors and finishes. Painted surfaces need to be free of blemishes, runs, drips or orange peel. • Wayfinding Sign The Ridge Campus wayfinding signs help to enhance the experience of visitors to the Campus. Wayfinding signs help people walking, riding bicycles and in automobiles navigate the campus. The wayfinding signs may include district identification signs, directory signs and information kiosks. • Banner The Campus will use Banners on street lights or poles to enhance the feeling of community. They provide visitors with a sense of warmth and belonging. Banners can be up to 8 square feet and double sided. The banners are for the enhancement of the entire Ridge Campus. • Signage Allocation Signage allocation for the Ridge PUD was granted a sign area relaxation. This allows all the lots within the subdivision up to 250 square feet of signage each (B-P and RO zoned lots). Wall signs are to be calculated at 1.5 square feet for every 1 foot of linear building frontage. 1.Lots 1, 5, 6, and 7A qualify for a 35% additional wall sign area due to additional street frontage. The additional area can only be utilized on the public street facing side of the building. 2.Sign area allocation for a multi-tenant building is based upon unit square footage. The available sign footage is allocated based upon tenant space as a percentage of total building floor area. See Chapter 38 Article 28 Section 38.28.090 of the Unified Development Code • Sign Location Each tenant is allowed signage on the exterior of the building. Secondary signage such as projecting signs and window graphics are encouraged. • Existing Signs The Ridge Athletic Club has an existing monument sign, as well as wall mounted signs. New standards have been established for the remainder of the Campus • Temporary Signs Temporary signs are permitted within the common areas with the Property Owners Association approval and with a City of Bozeman Sign Permit. • Building Address All buildings shall display the street number address on the building. The address numbers shall be at least 6 inches in height and constructed out of aluminum. • Removal Removal of a sign is the responsibility of the sign owner upon vacating the building. Signs need to be removed on or before the last day of occupancy. EXHIBIT H STORMWATER MAINTENANCE PLAN INSPECTION AND MAINTENANCE FOR STORMWATER MANAGEMENT FACILITIES The Property Owners Association shall be responsible for the maintenance of the stormwater drainage facilities within the Ridge Athletic Club Campus. Storm Water Facilities: 1. Drainage swales slope toward retention and detention ponds to collect storm water runoff and channel it to the retention or detention pond. 2. Retention Ponds collect storm water runoff and store the water until it evaporates and/or infiltrates into the ground. 3. Detention ponds collect storm water runoff while allowing some water to drain to another location. 4. Culverts are pipes which channel storm water from ditches or swales under roads. 5. Pipe Networks convey storm water to different discharge locations underground. 6. Inlets are facilities where storm water runoff enters a pipe network. Inlets include storm water manholes and drains. 7. Catch Basins are sumps typically located directly below storm water inlets and allow sediment to settle before storm water enters the pipe network. 8. Outlets are points where storm water exits a pipe network. 9. Drywells are underground storm water collection facilities that collect and temporarily store runoff from roof tops and landscaped areas before allowing storm water to infiltrate into the ground. Post Construction Inspection: 1. Observe drain time in retention ponds for a storm event after completion of the facility to confirm that the desired drain time has been obtained. If excessively slow infiltration rates are observed then excavate a minimum 5 ft by 5 ft drain to native gravels (or native well-draining material) and backfill with well-draining material (pit-run). 2. Observe that drywells, catch basins, and outlet structures are clear of any material or obstructions in the drainage slots. Inspect these structures to insure proper drainage following a storm event. Immediately identify and remove objects responsible for clogging if not draining properly. Semi-Annual Inspection: 1. Check retention ponds and dry wells three days following a storm event exceeding ¼ inch of precipitation. Failure for water to percolate within this time period indicates clogging or poor-draining soils. Clear any clogs and replace any poor-draining soils with well-draining gravely soils. 2. Check for grass clippings, litter, and debris in drainage swales, catch basins, dry wells, culverts and retention ponds. Flush and/or vacuum drywells or storm water pipes if excessive material is observed in the facilities. Standard Maintenance: 1. Remove sediment and oil/grease from retention ponds and detention 2. Inspect and remove debris from drainage swales, catch basins, dry wells, and retention ponds. Use a vacuum truck to clean catch basins and dry wells. 3. Monitor health of vegetation and revegetate as necessary to maintain full vegetative cover. 4. Inspect for the following issues: differential accumulation of sediment, drain time, signs of petroleum hydrocarbon contamination (odors, oil sheen in pond water), standing water, trash and debris. Sediment accumulation: In most cases, sediment from a retention pond does not contain toxins at levels posing a hazardous concern. However, sediments should be tested for toxicants in compliance with current disposal requirements and if land uses in the drainage area include commercial or industrial zones, or if visual or olfactory indications of pollution are noticed. Sediments containing high levels of pollutants should be disposed of in accordance with applicable regulations and the potential sources of contamination should be investigated and contamination practices terminated. EXHIBIT I LIGHTING PLAN Ridge Campus Site Lighting CalcDesignerDate4/5/2017ScaleNot to ScaleDrawing No.Summary2 of 20.10.10.10.10.10.10.10.10.10.10.20.20.20.10.10.10.10.10.10.10.10.30.40.30.30.20.10.10.10.10.20.10.20.30.70.60.50.40.30.20.10.10.10.20.40.30.31.00.90.80.60.50.40.20.10.10.10.20.30.40.61.21.31.10.90.80.60.40.30.10.10.10.20.30.40.52.11.61.71.41.10.90.70.50.20.10.10.10.10.20.20.41.62.21.81.81.61.31.10.80.50.10.10.10.10.20.20.20.61.71.81.91.81.71.41.10.80.10.10.10.10.10.20.20.20.31.41.61.91.91.81.81.91.20.40.20.10.10.10.10.10.20.30.20.31.21.61.71.81.91.91.91.81.20.40.20.20.10.10.10.10.30.30.51.11.71.71.81.91.92.02.02.30.80.30.30.20.10.10.10.20.40.61.11.92.11.91.81.82.02.01.91.00.60.40.30.10.10.10.10.20.30.51.12.42.02.11.91.81.81.81.80.80.60.60.50.30.20.10.10.10.10.20.30.20.61.92.22.11.91.81.61.61.61.31.10.60.60.50.40.30.10.10.10.10.10.20.20.20.30.91.92.12.01.81.71.51.31.10.91.11.41.20.90.60.40.30.10.10.10.10.10.20.20.20.20.71.51.82.01.91.61.41.30.90.70.91.41.72.32.00.90.50.40.10.10.10.10.10.20.30.20.40.91.31.61.81.91.91.61.30.90.60.70.91.21.61.82.21.40.70.40.20.10.10.10.10.10.20.40.51.01.31.71.71.81.92.01.51.10.40.40.50.71.01.31.71.91.61.10.50.10.20.10.10.10.10.30.40.61.32.01.91.81.91.92.12.01.50.50.30.30.30.40.71.11.41.71.61.60.90.20.20.10.10.10.10.20.30.30.72.21.92.01.91.92.02.02.41.10.40.20.20.20.30.50.81.31.51.61.61.30.40.20.20.10.10.10.20.20.41.21.61.81.71.71.81.82.02.10.90.40.30.20.10.20.30.61.01.41.71.91.60.70.40.20.10.10.10.20.20.30.61.31.81.61.41.41.51.41.40.70.50.30.20.10.10.10.20.50.91.21.61.82.20.90.50.20.10.10.10.20.30.41.01.21.31.31.21.11.21.10.50.30.40.30.10.10.10.10.20.40.81.11.51.72.20.90.50.20.10.10.20.30.40.81.01.21.31.31.10.90.90.40.40.30.30.20.20.10.10.10.20.40.71.01.41.71.40.50.40.20.10.10.20.40.60.91.11.21.31.31.31.00.50.30.40.40.30.30.20.30.20.20.30.50.70.91.11.21.00.40.20.20.10.10.40.71.01.21.31.41.31.31.30.80.60.50.50.30.30.20.30.40.40.40.40.60.70.80.90.70.20.20.10.10.10.10.20.81.11.31.41.41.31.31.41.41.61.00.60.50.30.40.60.80.90.70.60.50.50.60.60.50.10.10.10.10.10.10.31.21.61.71.51.41.41.51.61.92.31.00.80.91.11.42.12.21.61.21.11.00.90.70.50.10.10.10.10.10.10.30.61.71.71.81.61.51.51.61.81.81.70.90.91.11.51.51.51.51.41.00.90.80.60.40.10.10.10.10.10.20.20.51.42.31.61.61.41.41.51.61.71.51.40.90.91.11.21.21.21.00.80.70.60.50.30.20.10.10.10.20.20.40.41.51.61.61.21.11.21.31.41.31.21.10.90.80.80.80.80.80.70.50.50.30.20.10.10.10.10.20.20.40.40.71.10.90.90.91.01.01.00.90.90.80.60.50.50.50.50.50.40.30.20.20.10.10.10.10.20.20.20.20.50.70.60.70.80.80.70.70.70.50.40.30.20.20.20.30.30.20.20.10.10.10.10.20.20.10.10.30.50.50.50.50.50.50.40.30.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.30.30.30.30.30.20.20.10.10.10.10.10.10.10.20.20.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.10.10.10.10.10.10.10.10.10.20.20.30.20.20.10.10.10.20.10.10.10.10.20.30.40.40.40.30.20.20.20.20.20.10.10.10.10.10.30.40.50.50.60.50.40.40.40.40.30.20.10.10.10.10.10.50.60.70.70.70.70.60.50.50.50.40.30.20.10.10.10.10.60.80.90.91.00.90.80.80.70.60.40.30.20.10.10.10.10.20.91.11.21.21.31.21.11.10.90.80.60.40.20.10.10.20.20.41.01.51.51.61.61.71.51.51.41.10.80.40.20.10.10.20.30.61.61.71.71.61.81.92.32.11.71.30.80.40.20.10.10.20.50.92.21.71.71.71.82.13.52.91.91.30.80.50.20.10.10.10.20.40.72.01.71.71.71.92.13.02.61.91.30.80.50.20.10.10.10.10.10.10.10.10.30.30.51.31.91.71.81.92.12.02.01.61.40.90.50.20.10.10.10.10.10.20.20.10.10.10.10.10.10.20.20.20.10.20.20.20.31.01.31.51.71.81.61.51.51.41.20.90.60.30.10.10.10.20.20.30.30.30.30.30.30.30.40.40.30.20.20.20.20.20.20.91.21.31.41.61.51.31.31.21.10.80.60.30.10.10.10.10.20.20.30.40.50.60.60.60.60.60.60.50.40.30.30.20.20.20.20.71.01.11.31.41.41.21.21.21.00.70.50.30.10.10.10.10.20.30.40.50.60.80.91.01.01.00.90.70.50.40.30.20.20.20.10.60.91.11.31.41.41.31.31.21.00.80.60.30.10.10.10.20.30.40.60.81.11.31.51.51.41.10.80.60.50.30.20.20.10.10.50.81.11.31.51.51.51.41.21.10.90.60.30.10.10.10.20.30.50.60.91.01.41.91.91.61.20.90.70.50.30.20.20.10.10.40.81.11.51.82.01.71.71.61.30.90.50.30.10.10.10.20.30.40.61.12.02.01.30.80.60.40.20.20.10.10.10.10.50.81.11.41.82.02.62.21.81.30.80.50.20.10.10.10.20.20.41.01.00.70.50.40.20.10.10.10.10.10.10.60.91.21.51.82.12.72.01.30.80.50.20.10.10.10.10.20.30.40.90.90.80.60.40.30.10.10.10.10.20.20.81.11.31.61.92.23.02.41.91.30.80.50.20.10.10.20.20.30.41.00.90.80.70.40.30.10.10.10.20.20.31.01.41.61.81.92.21.91.81.61.30.90.50.20.10.10.20.30.20.51.21.30.90.70.40.20.10.10.10.20.30.51.41.91.91.81.71.51.41.41.21.10.80.50.30.10.10.10.20.40.91.51.41.00.60.40.20.10.10.10.20.40.82.11.91.91.71.61.41.21.21.11.00.70.50.30.10.10.10.10.20.41.51.91.51.00.70.40.20.10.10.10.20.40.82.21.91.81.61.51.31.11.11.10.90.70.50.30.10.10.10.10.20.41.11.61.51.00.60.40.20.10.10.10.20.30.51.51.91.81.61.51.31.11.11.10.90.70.50.30.10.10.10.10.20.20.61.31.31.00.70.40.20.10.10.10.20.20.31.01.51.61.61.61.41.21.21.11.00.80.50.30.10.10.10.10.20.20.41.00.90.80.60.40.20.10.10.10.20.20.20.81.21.41.61.71.61.51.51.31.20.90.50.30.10.10.10.20.20.30.80.70.60.50.40.30.20.20.20.20.20.20.60.91.11.51.82.12.22.01.71.40.90.50.20.10.10.10.20.20.30.70.70.60.50.50.40.30.30.40.40.40.30.60.91.11.41.82.23.42.72.01.30.80.50.20.10.10.10.10.20.20.40.70.80.80.70.70.60.60.60.60.60.60.60.71.01.21.52.02.43.02.11.30.80.50.20.10.10.10.20.20.30.40.70.81.00.90.90.90.90.90.80.80.80.91.01.21.41.72.12.32.62.41.81.40.80.50.20.10.10.20.30.30.50.70.91.11.21.21.21.21.11.01.01.01.11.31.41.62.02.12.11.91.81.61.20.90.50.20.10.10.10.20.30.50.70.91.51.51.61.61.61.31.11.11.21.41.61.82.02.02.01.71.61.51.21.00.70.40.20.10.10.10.20.30.50.71.01.21.82.32.01.41.31.21.21.21.31.62.12.21.91.71.51.31.11.00.70.50.40.20.10.10.10.20.50.70.70.70.60.30.20.20.30.40.81.51.51.10.80.70.60.60.60.50.40.30.20.10.10.10.10.20.30.40.40.20.20.10.10.20.20.40.60.70.50.50.40.40.40.40.40.30.20.10.10.10.10.20.20.20.20.20.20.20.20.20.20.30.30.30.40.40.50.30.30.20.20.30.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.20.20.30.20.20.10.10.10.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.03.73.7Plan ViewScale - 1" = 35' EXHIBIT J OPEN SPACE 9831010665521110677358588899EEE E14610109799791010101010101010101012610101010 865686810955555564666101010101010151NORTHREF.OPEN SPACE PLAN 20OPEN SPACE 05/25/2017 RECORD OF CHANGES123INCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES321 EXHIBIT K SITE PLAN EEE ENORTHREF.SITE PLAN 5SITE DESIGN 05/25/2017 RECORD OF CHANGES1235ADDED PARKINGINCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES5321676AMENDED PUD RODISTRICT7FORMER LOT 7 ISNOW OPEN SPACE EXHIBIT 2F RECIPROCAL EASEMENT FOR SHARED ACCESS, PARKING, AND FACILITIES EEE ENORTHREF.SITE PLAN 5SITE DESIGN 05/25/2017 RECORD OF CHANGES1235ADDED PARKINGINCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES5321676AMENDED PUD RODISTRICT7FORMER LOT 7 ISNOW OPEN SPACE Common NameQtySize5 Gal.5Barberry, Cherry BombShrub, Deciduous1PicnicTableRecreation6BoulderSPaver, Pavers6Mum, Purple Pink5Daylily, StellaFlower, Perennial22Grass, Overdam Feather ReedFlower, Grass16FencePost2FenceGateR3613Fence844Fence721Fence60DeckSizeQtyCommon NameLegend10 Gal.4Spruce, Blue Colorado Snow KissTree, Evergreen2"8Willow, Weeping2"18Maple2"3Maple, Autumn Flame2"3Linden, Greenspire2"5Cherry, Canada Red2"12Aspen, QuakingTree, Deciduous5 Gal.11Potentilla Mango TangoShrub, Evergreen Broadleaf5 Gal.5Spirea, Goldflame5 Gal.1Ninebark, Eldiablo5 Gal.4Cinquefoil, Bush, Red Sunset5 Gal.6Burning Bush, DwarfShrub, Deciduous1 Gal.8Daylily, 'Happy Returns'Flower, Perennial1 Gal.52Grass, Feather ReedFlower, Grass8EEEE146101097997910101010101010101010126101010101010102108656881095555555564666610101010101022151983101066552111067735858899LOTS TO BE DEVELOPEDIN FUTURE PHASENORTH REFASTROTURFLINE OF SIGHT1 gal.1 gal.5 gal.cHANGE OF PARKING LOT DESIGN:pLANTSTHAT WERE MISSING WILL BE ADDED TO THESE BEDS... aLLPLANTS FROM ORIGINAL pud ARE MISSING. tHIS WILL NOT ALTER ANYPOINTS.LOT 2ALOT 7ALOT 9BoulderBoulderBoulder WallBoulderBoulderBoulderBoulderBoulderTree Grate in SidewalkBenchTree Grate in SidewalkTree Grate in SidewalkBenchBenchStamped Concrete PadPicnic TableRetaining PondSizeQtyCommon Name original pud missing/dead plants102"17'*POINTS WILL REMAIN THE SAME AS THE ORIGINAL POINT CALCULATION AS ALL THE ORIGINAL PLANTS WILL BE USED AND THE DEAD WILL BE REPLACED.total bushes:2"6total trees:2"21SPIREA, GOLDFLAME2"22"3GRASS, FEATHER REEDPOTENTILLA308blue sprucelilac2 Gal.ASH- WILL SUBSTITUTE WITH linden, greenspire41linden, greenspire2WILLOW, weeping484jUNIPER2 Gal.13aspen , QUAKINGbrandon ELM 1 Gal.3CHERRY, Canadian Red norway maple2 Gal.2 Gal.2"2"1" = 20' Scale:6/15/2017Date:6Revision #:8Amanda ShearmanRIDGE PUDLandscape Plan:Shearman LLC.Landscape Design by:LOT 7LOT 8LOT 1LOT 4LOT 3LOT 6LOT 5Amended PUD Landscape points tabulation:*5 points for 3 plazas, 2 Benches, Picnic Table and public area in Lot 2c as per U.D.018.48.060.C4. pICNIC TABLE LOCATED IN CENTER PARKING LOT ISLAND OF NEW PUD, BENCHES LOCATED IN LOT 9'S AND 7A'S PLAZAS. 3 PLAZAS ARE LOCATED BY LOT 9, LOT 7A AND LOT 2A.*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR BOULDERS WITH A MINIMUM OF 3' DIAMETER. THERE ARE 6 BOULDERS. 2 ARE LOCATED INBETWEEN LOT 7A and 9, 2 are located nORTHwEST of lot 9, 1 is located south of 7a and another located in the center pRKING LOT ISLAND OF THE NEW PUD.*5 POINTS FOR DROUGHT TOLERANT PLANTS- 151 out of 175 (86%) plants are drought tolerant. All points were calculated using the city of bozeman's code ordinance under chapter 38, article 26 and Sec. 38.26.060.*all landscaped areas will recieve waterby means of automatic underground irrigation system.*no tree will be planted within 10 feet of any underground utility line.*All deciduous trees will be staked with two tree stakes per tree and all evergreen trees will be staked with three stakes per tree.*All trees planted within the R.O.W will require a street tree planting permit from the city of bozeman.*All planting beds will require "Typar" weed barrier fabric, or equivalent. Planting beds will be edged with a high quality black vinyl edging, and will be mulched with 1 3/4" washed landscape rock to match the original ridge PUD.*All areas of open space will be seeded with a lawn mis suited for the bozeman area. Seeding will take place between the months of may through september to ensure healthy growth.*The open space of lot 2c will have an area for sun shades. the sun shades will be installed with landscaping and will be made to take down during the winter or large community events if needed. *Lot 2 will become a sports field and astroturf will be installed. benches will be on the North side of the field with shrubs and trees behind to stop any sport activities from entering the oncoming traffic.*All buildings are landscaped with beds around at least 75%.*all boulevard trees meet city forestry division standards and permits will be obtained prior to installation.= MISSING/DEAD PLANTS ON ORIGINAL PUDORIGINAL PUD Landscape points tabulation:*4 POINTS FOR PLAZA AND PUBLIC AREA as per U.D.018.48.060.C4*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR 6 BOULDERS WITH A MINIMUM OF 3' DIAMETER*5 POINTS FOR DROUGHT TOLERANT PLANTS-506 OF 536 (79%) plants are drought tolerant. 9831010665521110677358588899EEE E14610109799791010101010101010101012610101010 865686810955555564666101010101010151NORTHREF.OPEN SPACE PLAN 20OPEN SPACE 07/26/2017 RECORD OF CHANGES123INCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES321 Comprehensive Sign Plan The Ridge Athletic Club PUD Campus The comprehensive sign plan for the Ridge Athletic Club PUD Campus will provide a framework for consistent campus signage within the Ridge PUD. A description of sign types, lighting, color, style will be listed. The use of wayfinding signs and light pole banners within the district will contribute to a sense of place. • General Requirements 1. All proposed signs must be submitted to the property owner and Ridge Campus Property Owners Association for approval: Ridge Campus Property Owners Association Attention: Steve Roderick 151 Mc Gee Drive, Bozeman, Mt 59715 steve@ridgeathletic.com 406-570-3636 2. Signs shall be constructed in compliance with the UL Laboratories, the National Electric Code (NEC) and the Uniform Building Codes. 3. No sign shall be installed without City of Bozeman required Planning and Building Permits. 4. All permanent sign installation shall be inspected by the City of Bozeman Building Department per City Code. 5. All signs are to be maintained in an attractive manner by each business. Signs are to be removed within 30 days of vacating a business premise. • General Guidelines for Sign Design The purpose of the Comprehensive Sign Plan is to foster sign designs that are architecturally compatible, encourage creativity, are attractive and promote sign diversity. The aim is to provide a framework for size, type of sign and their placement on the Ridge Campus buildings, directional and banners. This will apply a level of concert for current and future buildings. 1. Wall Sign is a building mounted sign attached to an exterior wall. It can be dimensional with different layers and depths. Signs can be one dimension. Signs can be constructed of individual letters, graphic components or panels with cut out shapes. Push through should be dimensional translucent letters which extend through the routered opaque sign face. 2. Window graphics are allowed as long as they do not occupy more than 25 percent of the area of the window it occupies. If it exceeds 25 percent of the area of a window, it will be classified as a wall sign which will require permission from the Ridge Campus. A City Permit will also be required. Any sign or graphic placed closer than 4 feet of a windowpane is considered a sign and requires Ridge Campus approval and a City Permit 3. Monument Signs with different layers and depths are encouraged. 4. Projecting Signs can have a maximum area of 8 square feet. The maximum allowed projection distance off the wall is 4 feet. Projecting Signs shall provide a minimum clearance from the lowest part of the sign of 8 feet. Projecting Signs must be designed structurally to withstand wind loads appropriate to the local area. One projecting sign is allowed per tenant. The sign area of projecting signs will count against the total allowed square footage. 5. Lighting A) Channel Letters -LED’s B) Reverse Channel Letters -LED’s C) Halo - LED’s D) Push Through – LED’s E) Logo Identification Cabinets – LED’s F) Projecting Signs – LED’s G) Combination of illuminated and non-illuminated elements H) Externally mounted fixtures I) Individual letters or sandblasted signs can be externally illuminated J) Signs can be non-illuminated K) The use of neon is not permitted L) Monument Signs -LED’s 6. Sign can be manufactured using of metal, acrylic, HDU, glass, vinyl, tile, wood or stone A) Signs should be fabricated such that seams, welds, and attachments are concealed. B) Material thickness should be of such to prevent Oil Canning on exposed surfaces. C) Sign lighting that is internal must be uniform. There should be no hotspots or shadowing. 7. The use of paint is an important aspect to the beauty of a sign. Paint can create and enhance a sign design by using imaginative colors and finishes. Painted surfaces need to be free of blemishes, runs, drips or orange peel. • Wayfinding Sign The Ridge Campus wayfinding signs help to enhance the experience of visitors to the Campus. Wayfinding signs help people walking, riding bicycles and in automobiles navigate the campus. The wayfinding signs may include district identification signs, directory signs and information kiosks. • Banner The Campus will use Banners on street lights or poles to enhance the feeling of community. They provide visitors with a sense of warmth and belonging. Banners can be up to 8 square feet and double sided. The banners are for the enhancement of the entire Ridge Campus. • Signage Allocation Signage allocation for the Ridge PUD was granted a sign area relaxation. This allows all the lots within the subdivision up to 250 square feet of signage each (B-P and RO zoned lots). Wall signs are to be calculated at 1.5 square feet for every 1 foot of linear building frontage. 1.Lots 1, 5, 6, and 7A qualify for a 35% additional wall sign area due to additional street frontage. The additional area can only be utilized on the public street facing side of the building. 2.Sign area allocation for a multi-tenant building is based upon unit square footage. The available sign footage is allocated based upon tenant space as a percentage of total building floor area. See Chapter 38 Article 28 Section 38.28.090 of the Unified Development Code • Sign Location Each tenant is allowed signage on the exterior of the building. Secondary signage such as projecting signs and window graphics are encouraged. • Existing Signs The Ridge Athletic Club has an existing monument sign, as well as wall mounted signs. New standards have been established for the remainder of the Campus • Temporary Signs Temporary signs are permitted within the common areas with the Property Owners Association approval and with a City of Bozeman Sign Permit. • Building Address All buildings shall display the street number address on the building. The address numbers shall be at least 6 inches in height and constructed out of aluminum. • Removal Removal of a sign is the responsibility of the sign owner upon vacating the building. Signs need to be removed on or before the last day of occupancy. INSTALLED 1"WATER30' PUBLIC SEWERCommon NameQtySize5 Gal.5Barberry, Cherry BombShrub, Deciduous1PicnicTableRecreation6BoulderSPaver, Pavers6Mum, Purple Pink5Daylily, StellaFlower, Perennial22Grass, Overdam Feather ReedFlower, Grass16FencePost2FenceGateR3613Fence844Fence721Fence60DeckSizeQtyCommon NameLegend10 Gal.4Spruce, Blue Colorado Snow KissTree, Evergreen2"8Willow, Weeping2"18Maple2"3Maple, Autumn Flame2"3Linden, Greenspire2"5Cherry, Canada Red2"12Aspen, QuakingTree, Deciduous5 Gal.11Potentilla Mango TangoShrub, Evergreen Broadleaf5 Gal.5Spirea, Goldflame5 Gal.1Ninebark, Eldiablo5 Gal.4Cinquefoil, Bush, Red Sunset5 Gal.6Burning Bush, DwarfShrub, Deciduous1 Gal.8Daylily, 'Happy Returns'Flower, Perennial1 Gal.52Grass, Feather ReedFlower, Grass8EEEE146101097997910101010101010101010126101010101010102108656881095555555564666610101010101022151983101066552111067735858899NORTH REFASTROTURF1 gal.1 gal.5 gal.cHANGE OF PARKING LOT DESIGN:pLANTSTHAT WERE MISSING WILL BE ADDED TO THESE BEDS... aLLPLANTS FROM ORIGINAL pud ARE MISSING. tHIS WILL NOT ALTER ANYPOINTS.LOT 2ALOT 7ALOT 9BoulderBoulderBoulder WallBoulderBoulderBoulderBoulderBoulderTree Grate in SidewalkBenchTree Grate in SidewalkBenchBenchStamped Concrete PadPicnic TableRetaining PondSizeQtyCommon Name original pud missing/dead plants102"17'*POINTS WILL REMAIN THE SAME AS THE ORIGINAL POINT CALCULATION AS ALL THE ORIGINAL PLANTS WILL BE USED AND THE DEAD WILL BE REPLACED.total bushes:2"6total trees:2"21SPIREA, GOLDFLAME2"22"3GRASS, FEATHER REEDPOTENTILLA308blue sprucelilac2 Gal.ASH- WILL SUBSTITUTE WITH linden, greenspire41linden, greenspire2WILLOW, weeping484jUNIPER2 Gal.13aspen , QUAKINGbrandon ELM 1 Gal.3CHERRY, Canadian Red norway maple2 Gal.2 Gal.2"2"1" = 20' Scale:7/30/2017Date:6Revision #:8Amanda ShearmanRIDGE PUDLandscape Plan:Shearman LLC.Landscape Design by:LOT 7LOT 8LOT 1LOT 4LOT 3LOT 6LOT 58SCALE: NTSC3.OTYPICAL ASPHALT CROSS-SECTIONTYPICAL SIDEWALK CROSS-SECTIONSIGN POST AS SPECIFIED0' 0.0833"0' 0.1250"2SCALE: NTSSCALE: NTSC3.OC3.OHANDICAPPED ACCESSIBLE RAMP IN SIDEWALK6C3.OSCALE: NTSSCALE: NTSC3.O12HANDICAPPED ACCESSIBLE RAMPSEWER CLEANOUTSCALE: NTS1SCALE: NTS C.O.B. STD. DWG. NO. 02528-1C3.OCONCRETE CURB & GUTTER5.4" (0.45')3"R4"R3/4"9.5"6"7.5"4.5"CRUSHED GRAVEL\PBASE - 3" MIN.SUB-BASE COURSE\PAS REQUIRED12"4"9"24"9"2"39C3.OSCALE: NTSSTORMWATER DRYWELL5C3.OSCALE: NTSSIGN POST SETTING DETAIL6"4'-0"5"18"5' WASHED GRAVEL2%SLOPE AWAY FY FROM BUILDING4" THICK P.C.C SIDEWALKMIN. 3" OF 1" CRUSHED AGGREGATE BASECOMPACTED SUB-GRADECURB10%MA MAX10%MA MAXCURBGUTTERSIDEWALK12" - 6" MINUS BASE GRAVELCOMPACTED SUB-BASE3" ASPHALT6" PVC C.O. PIPE6" PVC PIPE10C3.OSCALE: NTSSWALE CROSS SECTION DETAILSCALE: NTSC3.O4C3.OSCALE: NTSSIDEWALK CURB DETAILVARIES2% SLOPE OR AS SPECIFIED4"2% SLOPE OR AS SPECIFIED6"SLOPE FILL 3:1 MAX.SLOPE CUT 3:1 MAX.(VARIES)(VARIES)20'-0"13C3.OSCALE: NTSCONSTRUCTION DUMPSTER DETAIL 3021C.O.Tree Grate in Sidewalk4Vision TriangleNAExisting WaterNAProposed Water Utility LinesSSBLDG SIGN2" CURB6" MJxMJSTOPGATE VALVECCSSSSSSSSSSSSSSSSSSECCCSTFCSTSTSTSTSSSSSSSS30' PUBLIC SEWERINSTALLED 4" FIRE LINEINSTALLED 4" FIRE LINEINSTALLED 4" FIRE LINESERVICEINSTALLED 1" WATERSERVICEINSTALLED 1" WATERSERVICE8Bollard LightsAmended PUD Landscape points tabulation:*5 points for 3 plazas, 2 Benches, Picnic Table and public area in Lot 2c as per U.D.018.48.060.C4. pICNIC TABLE LOCATED IN CENTER PARKING LOT ISLAND OF NEW PUD, BENCHES LOCATED IN LOT 9'S AND 7A'S PLAZAS. 3 PLAZAS ARE LOCATED BY LOT 9, LOT 7A AND LOT 2A.*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR BOULDERS WITH A MINIMUM OF 3' DIAMETER. THERE ARE 6 BOULDERS. 2 ARE LOCATED INBETWEEN LOT 7A and 9, 2 are located nORTHwEST of lot 9, 1 is located south of 7a and another located in the center pRKING LOT ISLAND OF THE NEW PUD.*5 POINTS FOR DROUGHT TOLERANT PLANTS- 151 out of 175 (86%) plants are drought tolerant. All points were calculated using the city of bozeman's code ordinance under chapter 38, article 26 and Sec. 38.26.060.*all landscaped areas will recieve waterby means of automatic underground irrigation system.*no tree will be planted within 10 feet of any underground utility line.*All deciduous trees will be staked with two tree stakes per tree and all evergreen trees will be staked with three stakes per tree.*All trees planted within the R.O.W will require a street tree planting permit from the city of bozeman.*All planting beds will require "Typar" weed barrier fabric, or equivalent. Planting beds will be edged with a high quality black vinyl edging, and will be mulched with 1 3/4" washed landscape rock to match the original ridge PUD.*All areas of open space will be seeded with a lawn mis suited for the bozeman area. Seeding will take place between the months of may through september to ensure healthy growth.*The open space of lot 2c will have an area for sun shades. the sun shades will be installed with landscaping and will be made to take down during the winter or large community events if needed. *Lot 2 will become a sports field and astroturf will be installed. benches will be on the North side of the field with shrubs and trees behind to stop any sport activities from entering the oncoming traffic.*All buildings are landscaped with beds around at least 75%.*all boulevard trees meet city forestry division standards and permits will be obtained prior to installation.= MISSING/DEAD PLANTS ON ORIGINAL PUDORIGINAL PUD Landscape points tabulation:*4 POINTS FOR PLAZA AND PUBLIC AREA as per U.D.018.48.060.C4*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR 6 BOULDERS WITH A MINIMUM OF 3' DIAMETER*5 POINTS FOR DROUGHT TOLERANT PLANTS-506 OF 536 (79%) plants are drought tolerant. Plaza is 177 SFPlaza is 177 SFPlaza is 177 SF EEE ENORTHREF.SITE PLAN 5SITE DESIGN 05/25/2017 RECORD OF CHANGES1235ADDED PARKINGINCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES5321676AMENDED PUD RODISTRICT7FORMER LOT 7 ISNOW OPEN SPACE8PHASE I - PARKING,LANDSCAPING,ARTIFICIAL TURFAREA.9PHASE II - RIDGEEXPANSION10PHASE III - NEWBUILDING LOTS8910101088 9831010665521110677358588899EEE E14610109799791010101010101010101012610101010 865686810955555564666101010101010151NORTHREF.OPEN SPACE PLAN 20OPEN SPACE 07/26/2017 RECORD OF CHANGES123INCLUDED IN OPEN SPACECALCULATIONSREVISED OPEN SPACEUPDATED/ADDED TABLES321 INSTALLED 1"WATER30' PUBLIC SEWERCommon NameQtySize5 Gal.5Barberry, Cherry BombShrub, Deciduous1PicnicTableRecreation9BouldersPaver, Pavers6Mum, Purple Pink5Daylily, StellaFlower, Perennial22Grass, Overdam Feather ReedFlower, Grass16FencePost2FenceGateR3613Fence844Fence721Fence60DeckSizeQtyCommon NameLegend10 Gal.4Spruce, Blue Colorado Snow KissTree, Evergreen2"8Willow, Weeping2"18Maple2"3Maple, Autumn Flame2"3Linden, Greenspire2"5Cherry, Canada Red2"12Aspen, QuakingTree, Deciduous5 Gal.11Potentilla Mango TangoShrub, Evergreen Broadleaf5 Gal.5Spirea, Goldflame5 Gal.1Ninebark, Eldiablo5 Gal.4Cinquefoil, Bush, Red Sunset5 Gal.6Burning Bush, DwarfShrub, Deciduous1 Gal.8Daylily, 'Happy Returns'Flower, Perennial1 Gal.52Grass, Feather ReedFlower, Grass8EEEE146101097997910101010101010101010126101010101010102108656881095555555564666610101010101022151983101066552111067735858899NORTH REFASTROTURF1 gal.1 gal.5 gal.cHANGE OF PARKING LOT DESIGN:pLANTSTHAT WERE MISSING WILL BE ADDED TO THESE BEDS... aLLPLANTS FROM ORIGINAL pud ARE MISSING. tHIS WILL NOT ALTER ANYPOINTS.LOT 2ALOT 7ALOT 9BoulderBoulderBoulder WallBoulderBoulderBoulderBoulderBoulderTree Grate in SidewalkBenchTree Grate in SidewalkBenchBenchStamped Concrete PadPicnic TableRetaining PondSizeQtyCommon Name original pud missing/dead plants102"17'*POINTS WILL REMAIN THE SAME AS THE ORIGINAL POINT CALCULATION AS ALL THE ORIGINAL PLANTS WILL BE USED AND THE DEAD WILL BE REPLACED.total bushes:2"6total trees:2"21SPIREA, GOLDFLAME2"22"3GRASS, FEATHER REEDPOTENTILLA308blue sprucelilac2 Gal.ASH- WILL SUBSTITUTE WITH linden, greenspire41linden, greenspire2WILLOW, weeping484jUNIPER2 Gal.13aspen , QUAKINGbrandon ELM 1 Gal.3CHERRY, Canadian Red norway maple2 Gal.2 Gal.2"2"1" = 20' Scale:7/31/2017Date:6Revision #:8Amanda ShearmanRIDGE PUDLandscape Plan:Shearman LLC.Landscape Design by:LOT 7LOT 8LOT 1LOT 4LOT 3LOT 6LOT 58SCALE: NTSC3.OTYPICAL ASPHALT CROSS-SECTIONTYPICAL SIDEWALK CROSS-SECTIONSIGN POST AS SPECIFIED0' 0.0833"0' 0.1250"2SCALE: NTSSCALE: NTSC3.OC3.OHANDICAPPED ACCESSIBLE RAMP IN SIDEWALK6C3.OSCALE: NTSSCALE: NTSC3.O12HANDICAPPED ACCESSIBLE RAMPSEWER CLEANOUTSCALE: NTS1SCALE: NTS C.O.B. STD. DWG. NO. 02528-1C3.OCONCRETE CURB & GUTTER5.4" (0.45')3"R4"R3/4"9.5"6"7.5"4.5"CRUSHED GRAVEL\PBASE - 3" MIN.SUB-BASE COURSE\PAS REQUIRED12"4"9"24"9"2"39C3.OSCALE: NTSSTORMWATER DRYWELL5C3.OSCALE: NTSSIGN POST SETTING DETAIL6"4'-0"5"18"5' WASHED GRAVEL2%SLOPE AWAY FY FROM BUILDING4" THICK P.C.C SIDEWALKMIN. 3" OF 1" CRUSHED AGGREGATE BASECOMPACTED SUB-GRADECURB10%MA MAX10%MA MAXCURBGUTTERSIDEWALK12" - 6" MINUS BASE GRAVELCOMPACTED SUB-BASE3" ASPHALT6" PVC C.O. PIPE6" PVC PIPE10C3.OSCALE: NTSSWALE CROSS SECTION DETAILSCALE: NTSC3.O4C3.OSCALE: NTSSIDEWALK CURB DETAILVARIES2% SLOPE OR AS SPECIFIED4"2% SLOPE OR AS SPECIFIED6"SLOPE FILL 3:1 MAX.SLOPE CUT 3:1 MAX.(VARIES)(VARIES)20'-0"13C3.OSCALE: NTSCONSTRUCTION DUMPSTER DETAIL 3021C.O.Tree Grate in Sidewalk4Vision TriangleNAExisting WaterNAProposed Water Utility LinesSSBLDG SIGN2" CURB6" MJxMJSTOPGATE VALVECCSSSSSSSSSSSSSSSSSSECCCSTFCSTSTSTSTSSSSSSSS30' PUBLIC SEWERINSTALLED 4" FIRE LINEINSTALLED 4" FIRE LINEINSTALLED 4" FIRE LINESERVICEINSTALLED 1" WATERSERVICEINSTALLED 1" WATERSERVICE13Bollard LightsAmended PUD Landscape points tabulation:*5 points for 3 plazas, 2 Benches, Picnic Table and public area in Lot 2c as per U.D.018.48.060.C4. pICNIC TABLE LOCATED IN CENTER PARKING LOT ISLAND OF NEW PUD, BENCHES LOCATED IN LOT 9'S AND 7A'S PLAZAS. 3 PLAZAS ARE LOCATED BY LOT 9, LOT 7A AND LOT 2A.*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR BOULDERS WITH A MINIMUM OF 3' DIAMETER. THERE ARE 9 BOULDERS. 2 ARE LOCATED INBETWEEN LOT 7A and 9, 2 are located nORTHwEST of lot 9, 1 is located south of 7a, 3 tall ones in the center of each plaza, and another located in the center paRKING LOT ISLAND OF THE NEW PUD.*5 POINTS FOR DROUGHT TOLERANT PLANTS- 151 out of 175 (86%) plants are drought tolerant. All points were calculated using the city of bozeman's code ordinance under chapter 38, article 26 and Sec. 38.26.060.*all landscaped areas will recieve waterby means of automatic underground irrigation system.*no tree will be planted within 10 feet of any underground utility line.*All deciduous trees will be staked with two tree stakes per tree and all evergreen trees will be staked with three stakes per tree.*All trees planted within the R.O.W will require a street tree planting permit from the city of bozeman.*All planting beds will require "Typar" weed barrier fabric, or equivalent. Planting beds will be edged with a high quality black vinyl edging, and will be mulched with 1 3/4" washed landscape rock to match the original ridge PUD.*All areas of open space will be seeded with a lawn mis suited for the bozeman area. Seeding will take place between the months of may through september to ensure healthy growth.*The open space of lot 2c will have an area for sun shades. the sun shades will be installed with landscaping and will be made to take down during the winter or large community events if needed. *Lot 2 will become a sports field and astroturf will be installed. benches will be on the North side of the field with shrubs and trees behind to stop any sport activities from entering the oncoming traffic.*All buildings are landscaped with beds around at least 75%.*all boulevard trees meet city forestry division standards and permits will be obtained prior to installation.= MISSING/DEAD PLANTS ON ORIGINAL PUDORIGINAL PUD Landscape points tabulation:*4 POINTS FOR PLAZA AND PUBLIC AREA as per U.D.018.48.060.C4*10 POINTS FOR PARKING LOT LANDSCAPING. ONE PLANT GROUPING PLUS ONE ADDITIONAL LARGE CANOPY TREE FOR EVERY 16 SPACES.*5 POINTS FOR 6 BOULDERS WITH A MINIMUM OF 3' DIAMETER*5 POINTS FOR DROUGHT TOLERANT PLANTS-506 OF 536 (79%) plants are drought tolerant. Plaza is 177 SFPlaza is 177 SFPlaza is 177 SF*All plaza's are 177 square feet in size. Bollard lights are added to plazas to ensure pedestian safety and to meet city requirements.*Textured paving will be added to all pedestrian crossing points in drive aisles. TEXTURED PAVINGTEXTURED PAVINGTEXTURED PAVING Ridge Campus Site Lighting CalcDesignerDate4/5/2017ScaleNot to ScaleDrawing No.Summary2 of 20.10.10.10.10.10.10.10.10.10.10.20.20.20.10.10.10.10.10.10.10.10.30.40.30.30.20.10.10.10.10.20.10.20.30.70.60.50.40.30.20.10.10.10.20.40.30.31.00.90.80.60.50.40.20.10.10.10.20.30.40.61.21.31.10.90.80.60.40.30.10.10.10.20.30.40.52.11.61.71.41.10.90.70.50.20.10.10.10.10.20.20.41.62.21.81.81.61.31.10.80.50.10.10.10.10.20.20.20.61.71.81.91.81.71.41.10.80.10.10.10.10.10.20.20.20.31.41.61.91.91.81.81.91.20.40.20.10.10.10.10.10.20.30.20.31.21.61.71.81.91.91.91.81.20.40.20.20.10.10.10.10.30.30.51.11.71.71.81.91.92.02.02.30.80.30.30.20.10.10.10.20.40.61.11.92.11.91.81.82.02.01.91.00.60.40.30.10.10.10.10.20.30.51.12.42.02.11.91.81.81.81.80.80.60.60.50.30.20.10.10.10.10.20.30.20.61.92.22.11.91.81.61.61.61.31.10.60.60.50.40.30.10.10.10.10.10.20.20.20.30.91.92.12.01.81.71.51.31.10.91.11.41.20.90.60.40.30.10.10.10.10.10.20.20.20.20.71.51.82.01.91.61.41.30.90.70.91.41.72.32.00.90.50.40.10.10.10.10.10.20.30.20.40.91.31.61.81.91.91.61.30.90.60.70.91.21.61.82.21.40.70.40.20.10.10.10.10.10.20.40.51.01.31.71.71.81.92.01.51.10.40.40.50.71.01.31.71.91.61.10.50.10.20.10.10.10.10.30.40.61.32.01.91.81.91.92.12.01.50.50.30.30.30.40.71.11.41.71.61.60.90.20.20.10.10.10.10.20.30.30.72.21.92.01.91.92.02.02.41.10.40.20.20.20.30.50.81.31.51.61.61.30.40.20.20.10.10.10.20.20.41.21.61.81.71.71.81.82.02.10.90.40.30.20.10.20.30.61.01.41.71.91.60.70.40.20.10.10.10.20.20.30.61.31.81.61.41.41.51.41.40.70.50.30.20.10.10.10.20.50.91.21.61.82.20.90.50.20.10.10.10.20.30.41.01.21.31.31.21.11.21.10.50.30.40.30.10.10.10.10.20.40.81.11.51.72.20.90.50.20.10.10.20.30.40.81.01.21.31.31.10.90.90.40.40.30.30.20.20.10.10.10.20.40.71.01.41.71.40.50.40.20.10.10.20.40.60.91.11.21.31.31.31.00.50.30.40.40.30.30.20.30.20.20.30.50.70.91.11.21.00.40.20.20.10.10.40.71.01.21.31.41.31.31.30.80.60.50.50.30.30.20.30.40.40.40.40.60.70.80.90.70.20.20.10.10.10.10.20.81.11.31.41.41.31.31.41.41.61.00.60.50.30.40.60.80.90.70.60.50.50.60.60.50.10.10.10.10.10.10.31.21.61.71.51.41.41.51.61.92.31.00.80.91.11.42.12.21.61.21.11.00.90.70.50.10.10.10.10.10.10.30.61.71.71.81.61.51.51.61.81.81.70.90.91.11.51.51.51.51.41.00.90.80.60.40.10.10.10.10.10.20.20.51.42.31.61.61.41.41.51.61.71.51.40.90.91.11.21.21.21.00.80.70.60.50.30.20.10.10.10.20.20.40.41.51.61.61.21.11.21.31.41.31.21.10.90.80.80.80.80.80.70.50.50.30.20.10.10.10.10.20.20.40.40.71.10.90.90.91.01.01.00.90.90.80.60.50.50.50.50.50.40.30.20.20.10.10.10.10.20.20.20.20.50.70.60.70.80.80.70.70.70.50.40.30.20.20.20.30.30.20.20.10.10.10.10.20.20.10.10.30.50.50.50.50.50.50.40.30.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.30.30.30.30.30.20.20.10.10.10.10.10.10.10.20.20.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.10.10.10.10.10.10.10.10.10.20.20.30.20.20.10.10.10.20.10.10.10.10.20.30.40.40.40.30.20.20.20.20.20.10.10.10.10.10.30.40.50.50.60.50.40.40.40.40.30.20.10.10.10.10.10.50.60.70.70.70.70.60.50.50.50.40.30.20.10.10.10.10.60.80.90.91.00.90.80.80.70.60.40.30.20.10.10.10.10.20.91.11.21.21.31.21.11.10.90.80.60.40.20.10.10.20.20.41.01.51.51.61.61.71.51.51.41.10.80.40.20.10.10.20.30.61.61.71.71.61.81.92.32.11.71.30.80.40.20.10.10.20.50.92.21.71.71.71.82.13.52.91.91.30.80.50.20.10.10.10.20.40.72.01.71.71.71.92.13.02.61.91.30.80.50.20.10.10.10.10.10.10.10.10.30.30.51.31.91.71.81.92.12.02.01.61.40.90.50.20.10.10.10.10.10.20.20.10.10.10.10.10.10.20.20.20.10.20.20.20.31.01.31.51.71.81.61.51.51.41.20.90.60.30.10.10.10.20.20.30.30.30.30.30.30.30.40.40.30.20.20.20.20.20.20.91.21.31.41.61.51.31.31.21.10.80.60.30.10.10.10.10.20.20.30.40.50.60.60.60.60.60.60.50.40.30.30.20.20.20.20.71.01.11.31.41.41.21.21.21.00.70.50.30.10.10.10.10.20.30.40.50.60.80.91.01.01.00.90.70.50.40.30.20.20.20.10.60.91.11.31.41.41.31.31.21.00.80.60.30.10.10.10.20.30.40.60.81.11.31.51.51.41.10.80.60.50.30.20.20.10.10.50.81.11.31.51.51.51.41.21.10.90.60.30.10.10.10.20.30.50.60.91.01.41.91.91.61.20.90.70.50.30.20.20.10.10.40.81.11.51.82.01.71.71.61.30.90.50.30.10.10.10.20.30.40.61.12.02.01.30.80.60.40.20.20.10.10.10.10.50.81.11.41.82.02.62.21.81.30.80.50.20.10.10.10.20.20.41.01.00.70.50.40.20.10.10.10.10.10.10.60.91.21.51.82.12.72.01.30.80.50.20.10.10.10.10.20.30.40.90.90.80.60.40.30.10.10.10.10.20.20.81.11.31.61.92.23.02.41.91.30.80.50.20.10.10.20.20.30.41.00.90.80.70.40.30.10.10.10.20.20.31.01.41.61.81.92.21.91.81.61.30.90.50.20.10.10.20.30.20.51.21.30.90.70.40.20.10.10.10.20.30.51.41.91.91.81.71.51.41.41.21.10.80.50.30.10.10.10.20.40.91.51.41.00.60.40.20.10.10.10.20.40.82.11.91.91.71.61.41.21.21.11.00.70.50.30.10.10.10.10.20.41.51.91.51.00.70.40.20.10.10.10.20.40.82.21.91.81.61.51.31.11.11.10.90.70.50.30.10.10.10.10.20.41.11.61.51.00.60.40.20.10.10.10.20.30.51.51.91.81.61.51.31.11.11.10.90.70.50.30.10.10.10.10.20.20.61.31.31.00.70.40.20.10.10.10.20.20.31.01.51.61.61.61.41.21.21.11.00.80.50.30.10.10.10.10.20.20.41.00.90.80.60.40.20.10.10.10.20.20.20.81.21.41.61.71.61.51.51.31.20.90.50.30.10.10.10.20.20.30.80.70.60.50.40.30.20.20.20.20.20.20.60.91.11.51.82.12.22.01.71.40.90.50.20.10.10.10.20.20.30.70.70.60.50.50.40.30.30.40.40.40.30.60.91.11.41.82.23.42.72.01.30.80.50.20.10.10.10.10.20.20.40.70.80.80.70.70.60.60.60.60.60.60.60.71.01.21.52.02.43.02.11.30.80.50.20.10.10.10.20.20.30.40.70.81.00.90.90.90.90.90.80.80.80.91.01.21.41.72.12.32.62.41.81.40.80.50.20.10.10.20.30.30.50.70.91.11.21.21.21.21.11.01.01.01.11.31.41.62.02.12.11.91.81.61.20.90.50.20.10.10.10.20.30.50.70.91.51.51.61.61.61.31.11.11.21.41.61.82.02.02.01.71.61.51.21.00.70.40.20.10.10.10.20.30.50.71.01.21.82.32.01.41.31.21.21.21.31.62.12.21.91.71.51.31.11.00.70.50.40.20.10.10.10.20.50.70.70.70.60.30.20.20.30.40.81.51.51.10.80.70.60.60.60.50.40.30.20.10.10.10.10.20.30.40.40.20.20.10.10.20.20.40.60.70.50.50.40.40.40.40.40.30.20.10.10.10.10.20.20.20.20.20.20.20.20.20.20.30.30.30.40.40.50.30.30.20.20.30.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.20.20.30.20.20.10.10.10.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.03.73.7Plan ViewScale - 1" = 35' 9831010665521110677358588899 12Common NameQtySize5 Gal.5Barberry, Cherry BombShrub, Deciduous1PicnicTableRecreation6BoulderSPaver, Pavers6Mum, Purple Pink5Daylily, StellaFlower, Perennial22Grass, Overdam Feather ReedFlower, Grass16FencePost2FenceGateR3613Fence844Fence721Fence60DeckSizeQtyCommon NameLegend10 Gal.4Spruce, Blue Colorado Snow KissTree, Evergreen2"8Willow, Weeping2"18Maple2"3Maple, Autumn Flame2"3Linden, Greenspire2"5Cherry, Canada Red2"12Aspen, QuakingTree, Deciduous5 Gal.11Potentilla Mango TangoShrub, Evergreen Broadleaf5 Gal.5Spirea, Goldflame5 Gal.1Ninebark, Eldiablo5 Gal.4Cinquefoil, Bush, Red Sunset5 Gal.6Burning Bush, DwarfShrub, Deciduous1 Gal.8Daylily, 'Happy Returns'Flower, Perennial1 Gal.52Grass, Feather ReedFlower, Grass8EEEE146101097997910101010101010101010126101010101010102108656881095555555564666610101010101022151983101066552111067735858899LOTS TO BE DEVELOPEDIN FUTURE PHASENORTH REFASTROTURFLINE OF SIGHT1 gal.1 gal.5 gal.CHANGE OF PARKING LOT DESIGN:PLANTSTHAT WERE MISSING WILL BE ADDED TO THESE BEDS... ALLPLANTS FROM ORIGINAL PUD ARE MISSING. THIS WILL NOT ALTER ANYPOINTS.LOT 2ALOT 7ALOT 9BoulderBoulderBoulder WallBoulderBoulderBoulderBoulderBoulderTree Grate in SidewalkBenchTree Grate in SidewalkTree Grate in SidewalkBenchBenchStamped Concrete PadPicnic TableRetaining PondSizeQtyCommon Name original pud missing/dead plants102"17'*POINTS WILL REMAIN THE SAME AS THE ORIGINAL POINT CALCULATION AS ALL THE ORIGINAL PLANTS WILL BE USED AND THE DEAD WILL BE REPLACED.total bushes:2"6total trees:2"21SPIREA, GOLDFLAME2"22"3GRASS, FEATHER REEDPOTENTILLA308blue sprucelilac2 Gal.ASH- WILL SUBSTITUTE WITH linden, greenspire41linden, greenspire2WILLOW, weeping484jUNIPER2 Gal.13aspen , QUAKINGbrandon ELM 1 Gal.3CHERRY, Canadian Red norway maple2 Gal.2 Gal.2"2"LOT 7LOT 8LOT 1LOT 4LOT 3LOT 6LOT 5AREA LANDSCAPE BEDSGALLONS APPLIEDAREA OF TURF 2600 sq/ft25,916 gallonsGallons Applied1,756,509 gallons97,222 SQ/FTSizeQtyLegend128Irrigation timer and controllerWell29Zone 16212Zone 159Zone 149Zone 136Zone 1210Zone 11Zone 108Zone 9Zone 8Pop-ups11Zone 7N/A12Zone 6- Drip Line9Zone 57Zone 4Zone 350043Zone 2Zone 1137Main LineIrrigation Zone and ColorsHeads50045004500450045004N/A5004Pop-upsPop-upsPop-upsPop-upsPop-upsPop-upsPop-upsPop-upsN/AN/A1" = 20' Scale:6/18/2017Date:6Revision #:8Amanda ShearmanRIDGE PUDLandscape Plan:Shearman LLC.Landscape Design by:R R RRR R R RRRR RRRRRRRR RRRRRRRRR R R RRRRR R R R RRRR RRR RRRRRR R R R RR RRR R R RRR RRRRRR R R RRR RRRR R R R R R R R R RR R RRRRRRRR R R R R RRRRRRRRRRRRRR RR RRRRR R RRRRRRRR R R RR RRRR RRRRRRRRRIrrigation Pipe 2" Poly PipeMAIN LINEIrrigation Pipe 2" Poly PipeMAIN LINEIrrigation Pipe 2" Poly PipeMAIN LINEIrrigation Pipe 2" Poly PipeMAIN LINEIrrigation Pipe 1" Poly Pipe(Irrigation Zone=1) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=2) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=3)50 PSI, 15 GPI, 1/2" P/H Irrigation Pipe 1" Poly Pipe (Irrigation Zone=5)50 PSI, 15 GPI, 1/2" P/H Irrigation Pipe 1" Poly Pipe (Irrigation Zone=4)50 PSI, 15 GPI, 1/2" P/H Irrigation Pipe 1" Poly Pipe (Irrigation Zone=7) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=8) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=9) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=10) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=11)50 PSI, 15 GPI, 1/2" P/H Irrigation Pipe 1" Poly Pipe (Irrigation Zone=12) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=13) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=14) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=16) 50 PSI, 15 GPI, 1/2" P/HDRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=6)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H DRIP LINE (Irrigation Zone=5)20 PSI, 5 GPI, 2" P/H Irrigation Pipe 1" Poly Pipe (Irrigation Zone=15) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=3) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=12) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=13) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=10) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=11) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=8) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=9) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=14) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=14) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=15) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=6) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=6) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=1) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=5) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=4) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=16) 50 PSI, 15 GPI, 1/2" P/HR R RRRR RRIrrigation Pipe 1" Poly Pipe (Irrigation Zone=17)50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=10) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=6) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=14) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=2) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=11) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=12) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=8) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=9) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=15) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=5) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=17) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=3) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=6) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=16) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=13) 50 PSI, 15 GPI, 1/2" P/HIrrigation Pipe 1" Poly Pipe (Irrigation Zone=4) 50 PSI, 15 GPI, 1/2" P/H*all landscaped areas will recieve waterby means of automatic underground irrigation system.*no tree will be planted within 10 feet of any underground utility line.*All deciduous trees will be staked with two tree stakes per tree and all evergreen trees will be staked with three stakes per tree.*All trees planted within the R.O.W will require a street tree planting permit from the city of bozeman.*All planting beds will require "Typar" weed barrier fabric, or equivalent. Planting beds will be edged with a high quality black vinyl edging, and will be mulched with 1 3/4" washed landscape rock to match the original ridge PUD.*All areas of open space will be seeded with a lawn mis suited for the bozeman area. Seeding will take place between the months of may through september to ensure healthy growth.*The open space of lot 2c will have an area for sun shades. the sun shades will be installed with landscaping and will be made to take down during the winter or large community events if needed. *Lot 2 will become a sports field and astroturf will be installed. benches will be on the North side of the field with shrubs and trees behind to stop any sport activities from entering the oncoming traffic.*All buildings are landscaped with beds around at least 75%.*all boulevard trees meet city forestry division standards and permits will be obtained prior to installation.= MISSING/DEAD PLANTS ON ORIGINAL PUDIRRIGATION INFORMATION:*All irrigation parts used are in a spreadsheet that is attached. All sprinkler parts will be rainbird. *Main Irrigation lines will be 2" poly pipe.WELLPROPOSED IRRIGATION TIMERPicnic Table.........ORIGINAL TIMERORIGINAL TIMER SHEARMANSTOCK.xls - Product 16/13/2017 16:10:13 SHEARMAN LLC IRRIGATION PRODUCTS Item Description Qty RAINBIRD SPRAY HEADS 1802 1800 2" Spray Head 1/2" Inlet 1804 1800 4" Spray Head 1/2" Inlet 1804PRS 1800 4" Spray Head W/ Pressure Regulator 1804SAM 1800 4" Spray Head W/ Seal-A-Matic 1806 1800 6" Spray Head 1/2" Inlet 1806SAM 1800 6" Spray Head W/ Seal-A-Matic 1812 1800 12" Spray Head 1/2" Inlet RAINBIRD SPRAY NOZZLES MPR NOZZLES 5, 8, 10, 12, 15 MPR Series Nozzles With Screen VAN NOZZLE Van Series Nozzles With Screen HE VAN NOZZLE HE Van Series Nozzles With Screen U NOZZLES Undercut Series Nozzles With Screen RAINBIRD ROTARY NOZZLES R1318 NOZZLES 13-18' Rotary Nozzles With Screen R1724 NOZZLES 17-24' Rotary Nozzles With Screen RVAN1318 NOZZLE 13-18' Variable Arc Rotary Nozzle With Screen RVAN1724 NOZZLE 17-24' Variable Arc Rotary Nozzle With Screen RAINBIRD BUBBLERS 1300AF 1300 Adjustable Flow Full Circle Bubbler 1401 1400 0.25 GPM Full Circle Bubbler 1402 1400 0.50 GPM Full Circle Bubbler RAINBIRD ROTORS 3504PC 3500 4" Part/Full Circle Rotor 1/2" Inlet 5004PC-FC 5000 4" Part & Full Circle Rotor 3/4" Inlet 5004PLPC-FC 5000 Plus 4" Part & Full Circle Rotor 3/4" Inlet 5006PC 5000 Series 6" Part/Reverse Full Circle Rotor 3/4" Inlet 6504 Falcon 4" Part/Full Circle Rotor 1" Inlet 8005 8005 5" Part/Full Circle Rotor 1" Inlet MAXIPAW Part/Full Circle Maxipaw Impact RAINBIRD ROTOR NOZZLES FALCON NOZ Falcon Rotor Nozzles MAXI NOZ Maxipaw Nozzles RAINBIRD FUNNY PIPE & FITTINGS SPXFLEX100 100' Roll Flex Swing Pipe SBE050 1/2" Funny Pipe Barb Elbow SBE075 3/4" Funny Pipe Barb Elbow SBA050 1/2" Funny Pipe Straight Adapter SBA075 3/4" Funny Pipe Straight Adapter SBC 1/2" Funny Pipe Coupler SBT05 1/2" Funny Pipe Tee SBNPTTEE 1/2" Funny Pipe Tee Barb x Barb x MPT SBFE050 1/2" Funny Pipe Female Elbow RAINBIRD VALVES 100DV 1" Electric Valve F x F 100DVSS 1" Electric Valve S x S 100DVMB 1" Electric Valve M x B SHEARMANSTOCK.xls - Product 26/13/2017 16:10:13 100DVA 1" Electric Angle Valve F x F 100HVSS 1" Electric Compact Valve S x S 100HVMB 1" Electric Compact Valve M x B 100DVF 1" Electric Valve W/ Flow Controll F x F 100DVFMB 1" Electric Valve W/ Flow Controll M x B 100PESB 1" PEB Electric Scrubber Valve F x F 150PEB 11/2" PEB Electric Valve F x F 150PGA 11/2" Electric Valve Globe/Angle F x F 200PEB 2" PEB Electric Valve F x F 200PGA 2" Electric Valve Globe/Angle F x F RAINBIRD QUICK COUPLING VALVES 33DK 3/4" Double Lug Valve Key 3RC 3/4" Inlet Rubber Cover QC Valve 44K 1" Valve Key By 1" Male-3/4" Female Top Threads 44RC 1" Inlet Rubber Cover 2 Piece Body QC Valve SH07 3/4" Hose Swivel Ell FPT x MHS SH1 1" x 3/4" Hose Swivel Ell FPT x MHS SH2 1" Hose Swivel Ell FPT x MPT RAINBIRD VALVE BOXES VBP6RND Professional 6" Round Valve Box W/ Cover VB10RND 10" Round Valve Box W/ Cover VBSTD6EXT 6" Std Extension Valve Box (Not Nestable) W/ Cover VBSTD Standard Valve Box W/ Cover VBJMB6EXT 6" Jumbo Extension Valve Box W/ Cover VBJMB Jumbo Valve Box W/ Cover RAINBIRD CONTROLLERS & ACCESSORIES RZX4I Esp-Rzx Series 4 Station Indoor Contoller RZX4 Esp-Rzx Series 4 Station Outdoor Contoller RZX6I Esp-Rzx Series 6 Station Indoor Contoller RZX6 Esp-Rzx Series 6 Station Outdoor Contoller RZX8I Esp-Rzx Series 8 Station Indoor Contoller RZX8 Esp-Rzx Series 8 Station Outdoor Contoller ESP4MEI Esp-Me 4 Station Enhanced Mod. Controller Indoor ESP4ME Esp-Me 4 Station Enhanced Mod. Controller Outdoor ESPSM3 3 Station Module ESPSM6 6 Station Module For Esp-Me Controller Only ESP8LXME Esp LX 8 Station Modular Base Unit Outdoor RBESPLXMSM8 8 Station Module WR2-RC Wireless Rain Sensor System PIGTAIL 6' Grounded Pigtail Power Cord RAINBIRD DRIP 1800RETRO 1800 Body W/ Filter & Pressure Regulator DBC025 1/4" Tubing Bug Cap XQ100 1/4" Distribution Tubing 100' Roll XQ1000 1/4" Distribution Tubing 1000' Roll XQ1000B 1/4" Distribution Tubing 1000' Roll With Bucket EMAGPX Tubing Goof Plug XFD0912100 0.9 GPH PC Emitter @ 12" Spacing 100' Coil XFD0912500 0.9 GPH PC Emitter @ 12" Spacing 500' Coil MDCF50FPT 1/2" FPT x Compression Adapter SHEARMANSTOCK.xls - Product 36/13/2017 16:10:13 MDCF50MPT 1/2" MPT x Compression Adapter MDCF75FHT 3/4" FHT x Compression Adapter MDCF75FPT 3/4" FPT x Compression Adapter MDCF75MPT 3/4" MPT x Compression Adapter MDCFCAP Black Flush Cap Adapter MDCFCOUP Multi-Diameter Compression Coupling MDCFEL Multi-Diameter Compression Ell MDCFTEE Multi-Diameter Compression Tee PC05 5.0 GPH PC Emitter Tan PC07 7.0 GPH PC Emitter Violet PC10 10 GPH PC Emitter Green PC12 12 GPH PC Emitter Brown PC18 18 GPH PC Emitter White PC24 24 GPH PC Emitter Orange PFR12 12" Polyflex Riser PRF075RBY 3/4" Pressure Regulating RBY Filter PRF100RBY 1" Pressure Regulating RBY Filter RS025T Polyflex Stake SPB025 1/4" Self Piercing Barb Connector SXB180 180 Deg. Adj. Stream Bubbler (10-32 Thread) SXB360 360 Deg. Adj. Stream Bubbler (10-32 Thread) TS025 1/4" Tubing Stake UXB360 Umbrella Pattern Xeri-Bubbler (10-32 Thread) X360ADJMST 360 Deg. Adj. Flow Mister (10-32 Thread) XB05PC 0.5 GPH PC Xeri-Bug Emitter Blue XB10PC 1.0 GPH PC Xeri-Bug Emitter Black XB20PC 2.0 GPH PC Xeri-Bug Emitter Red XBD80 Xeri-Bird 8 W/ Plugs & Filter, No Emitters XBF1CONN 1/4" Barb Connector XBF2EL 1/4" Barb Ell XBF3TEE 1/4" Barb Tee XCZ075PRF 3/4" Controll Zone Kit W/ Pressure Regulating Y Filter XCZ100PRF 1" Drip Zone Kit W/ Pres. Regulating Y Filter XS090 90 Deg. Adj. Radius Xeri-Spray (10-32 Thread) XS180 180 Deg. Adj. Radius Xeri-Spray (10-32 Thread) XS360 360 Deg. Adj. Radius Xeri-Spray (10-32 Thread) XS360TS 360 Deg. Adj. Radius True-Spray (10-32 Thread) BACKFLOW PREVENTERS 800M4FR10 2" Watts Pressure Vacuum Breaker W/ Freeze Relief