Loading...
HomeMy WebLinkAbout07-24-17 City Commission Packet Materials - A3. Oak Street Improvements Conceptual Median Design Review Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Oak Street Improvements Project – 7th to 19th Conceptual Median Design MEETING DATE: July 24th, 2017 AGENDA ITEM TYPE: Action RECOMMENDED MOTION: Provide input and direction to staff. BACKGROUND: In March of 2016, the Commission was presented with the corridor recommendations for Oak Street from Rouse to Cottonwood. During discussion that night, direction was given to complete a concept level design for the addition of medians in the section between 7th and 19th which currently has a two way left turn lane. The consultant, Sanderson Stewart, has complete the concept design as well as an estimate of the cost of the improvements. Tonight they will provide an overview of the layout for further discussion and direction on moving forward. UNRESOLVED ISSUES: None ALTERNATIVES: As recommended by the Commission. FISCAL EFFECTS: If the recommendation is to move forward with the medians, the estimated cost is $600,000 to be added to a future Capital Improvement Plan. Attachments: Concept Median Design and Estimate Report compiled on: 7/14/17 156 157 158 159