Loading...
HomeMy WebLinkAbout07-24-17 City Commission Packet Materials - C9. Release of Easements with Boise Airport Center for Cannery District Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Shawn Kohtz, Project Engineer Richard Hixson, City Engineer SUBJECT: Cannery District Phase 2 Release and Reconveyance of Easement MEETING DATE: July 24, 2017 AGENDA ITEM TYPE: Consent Agenda RECOMMENDATION: Authorize City Manager to sign BACKGROUND: Attached is a copy (original to City Clerk) of the Release and Reconveyance of Easements to release an easement for an existing fire hydrant that is being relocated as part of the Cannery District Phase 2 project. The existing hydrant is being relocated due to a conflict with the proposed Cannery District Building K location. The Cannery District developer will relocate the fire hydrant at their cost and provide a new easement for the relocated hydrant and associated water main. Engineering staff reviewed the release and reconveyance of easement and found it to be acceptable. The City Manager must only sign and file the easement after the existing hydrant has been relocated to maintain legal access to the hydrant until it is relocated. FISCAL EFFECTS: N/A ALTERNATIVES: As suggested by the City Commission. Attachments: Release and Reconveyance of Easement and associated documentation Report compiled on: 7/11/17 99 100 101 102 103 104 105 106 107