Loading...
HomeMy WebLinkAbout17- Amendment 1 to Construction Contract - Highland Construction Services, LLC - Bozeman Creek Enhancements at Bogert Park ATTACHMENT A Amendment No. 1 to Construction Contract with Highland Construction Services, LLC for Bozeman Creek Enhancement at Bogert Park Trails, Open Space, and Parks Bond Project THIS AGREEMENT is made as of this 10W-day of u , 2017, between THE CITY OF BOZEMAN, a Municipal Corporation, whose address is P.O. Box 1230 Bozeman, Montana, 59771-1230 (CITY) and Highland Construction Services, LLC whose address is 7400 Thorpe Road, PO Box 141, Belgrade,MT 59714 (CONTRACTOR). WHEREAS,the parties have entered into an Agreement dated September 20, 2016 for construction services for the Bozeman Creek Enhancement at Bogert Park Project; and WHEREAS,revisions to the scope of services are necessary to complete the Project in accordance with the site plan approved by Commission and to best serve the public; and WHEREAS,the parties desire to amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in Amendment No. 1 to Scope of Work for Bozeman Creek Enhancement at Bogert Park Project("Exhibit A") are hereby incorporated in and made part of this agreement. Article 3—Contract Price: Article 5 of the original agreement is modified to include $443,905 plus $42,278.71, for a contract total of$486,183.71 Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. 1 IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement. CITY OF BOZEMAN HIGHLA CONSTRUCTION SERVICES, LLC BY: & BY: Dennis Taylor Interim City Manager Authorized Signatory DATE: Imi. 1c _ 2,-0 1� DATE: ATTEST: BY: •� r Robin Crough City Clerk 2 EXHIBIT A Additional Scope of Work 1. 5.5 additional trees at $500.00.... ............$ 2,750.00 2. Root removal and protection......labor..................... 2,734.57 3. Excavator for root removals..... ....................... ..... 200.00 4. Electrical contractor install cable............................ 2.761.50 5. Add wattle to floodplain area................................. 769.28 Labor 197.28 Materials 572.00 6. Add closure to bridge rail at bottom per Shea...... 195.20 Labor 175.32 Materials 19.88 7. Fence path to bridge......................... ...... 634.64 Labor 517.84 Materials 116.80 8. ADA bucket seats for 2 swings......................$ 1,345.50 9. Electrical adjustments to pump station............ 1,186.50 10. Tree removals......................................... 2,500.00 11. Additional excavation and rock work............. 5,933.02 12. Bridge abutment revisions.......................... 2,771.17 13. Relocate water line.................................. 1,820.88 14. Add bridge rail sections............................ 2,676.45 15. Sod-approx.. 20,000 sf @ 0.60/sf .............. 12,000.00 16. Repair drinking fountain water line............... 500.00 17. Add gravel in front of pavilion.................... 500.00 18. Additional playground curb-501f @ $20/lf ... 1,000.00 TOTAL..................................................$42,278.71 3