Loading...
HomeMy WebLinkAbout06-12-17 City Commission Packet Materials - C2. NOA to AV Construction for 2017 Sidewalk Improvements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Rick Hixson, City Engineer Craig Woolard, Director of Public Works SUBJECT: Authorize the City Manager to sign the Notice of Award to award the contract for the 2017 Sidewalk Improvements Project to AV Construction Inc., Bozeman, MT, in the amount of $278,375.70. MEETING DATE: June 12, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the 2017 Sidewalk Improvements Project to AV Construction Inc., Bozeman, MT, in the amount of $278,375.70. BACKGROUND: Bids were opened May 24, 2017, for the 2016 Sidewalk Improvements Project. The project consists of installation of a new concrete sidewalk along the Bronken Park frontage of Cottonwood Road (Schedule 1), sidewalk repairs that were ordered at various locations (Schedule 2), installation of street corner pedestrian ramps (Schedule 3), and widening of the sidewalk on the south side of Oak Street from N. 7th to N. 5th. Four bids were received for the project, with the low bid being submitted by AV Construction Inc, Bozeman, MT, in the amount of $278,375.70. The bids appear to be competitive with the low bid being approximately 1.5% above the construction estimate ($278,342.00). A copy of the Certified Bid Tabulation is attached. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The cost of Schedule 1 (Bronken Park sidewalk) has been budgeted for in the Parks Budget. The cost of Schedule 2 (sidewalk repairs) will be billed to property owners, with some repairs that are the responsibility of the city funded out of Street Maintenance. The cost of Schedule 3 (street corner ramps) will be funded by Street Maintenance and Stormwater funds. The cost of Schedule 4 (Oak St sidewalk widening) will be funded by the N. 7th TIF district. 84 Attachments: Bid Tabulation Notice of Award (3) Project Map Report compiled on May 30, 2017 85 86 NOTICE OF AWARD Dated: __________________________ TO: AV Construction, Inc. ADDRESS: P.O. Box 11966, Bozeman, MT 59719 PROJECT: City of Bozeman 2017 Sidewalk Improvements Project CONTRACT FOR: installation and repair of concrete sidewalks, and installation of street corner pedestrian ramps (Schedules 1, 2, 3, and 4). You are notified that your Bid dated May 24, 2017, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for installation and repair of concrete sidewalks, and installation of street corner pedestrian ramps The Contract Price of your Contract is: two hundred eighty two thousand three hundred seventy five and 70/100 Dollars ($282,375.70). Three copies of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . 1. You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (page 7), General Conditions (paragraph 5.01) and Supplementary Conditions (paragraph SC-5.02). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (paragraph 5.03) and Supplementary Conditions (paragraph SC-5.04). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: ____________________________ (INTERIM CITY MANAGER) (CITY CLERK) DATE: _______________________________ 87 88