Loading...
HomeMy WebLinkAbout06-05-17 City Commission Packet Materials - C7. Amendment 1 with DOWL for Baxter Right-of-Way Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Right of Way Acquisition Project – Amendment #1 to Task Order Number 10. MEETING DATE: June 5th, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize the acting City Manager to sign Amendment #1 to Task Order Number 10. BACKGROUND: Attached is a copy of the partially executed Amendment #1 to Task Order Number 10 with Dowl for the Right of Way Acquisition Project for parcels on Baxter Lane between Ferguson and Cottonwood. Task order 10 included the acquisition of right of way from the parcels on the north side of Baxter between Ferguson and Cottonwood. Our consultant Dowl, worked with the property owners, but was unable to come to an agreement to obtain the necessary right of way to complete the full street section. The scope of the project was revised to eliminate the sidewalk for now on the north side between Flanders Mill and Cottonwood. Those properties will need to install the sidewalk themselves when they develop. Even with the revised section, a few easements are necessary. Temporary construction easements are required to connect the driveways to the new curb on the north side. This amendment will add the services necessary to obtain those easements. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: The proposed fee for this scope of work is paid on a time and materials basis with a total cost not to exceed amount of $10,375.00. Attachments: Amendment #1 to Task Order Number 10 Report compiled on: 5/17/17 57 58 59 60 61 62 63 64