Loading...
HomeMy WebLinkAbout06-05-17 City Commission Packet Materials - C13. Resolution 4804, Change Order 1 with Montana Civil for 5.3 MG Water Tank Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Resolution 4804 authorizing Change Order No. 1 to the 5.3 Million Gallon (MG) Water Storage Tank Project. MEETING DATE: June 5, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4804 authorizing Change Order No. 1 to the 5.3 MG Water Storage Tank Project. BACKGROUND: Attached is a copy of resolution 4804 and change order number 1 for the above referenced project. In the future, the plant staff would like to add additional monitoring equipment at the tank site. In order to accommodate this, a larger control panel will need to be installed at the tank, and the power conduit will need to be increased in size between the plant and the tank to allow for installation of a fiber optic cable. There is no additional contract time being requested with this change. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $2,885.00 from $7,665,349.00 to $7,668,234.00. Attachments: Resolution No 4804, Change Order No 1 Report compiled on: 5/25/17 148 COMMISSION RESOLUTION NO. 4804 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH MONTANA CIVIL CONTRACTORS, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 10th day of April 2017, authorize award of the bid for the City of Bozeman 5.3 MG Water Storage Tank project, to Montana Civil Contractors, Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Montana Civil Contractors, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 149 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 5th day of June, 2017. ______________________________________ CARSON TAYLOR Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ______________________________________ GREG SULLIVAN City Attorney 150 151 152