Loading...
HomeMy WebLinkAbout05-22-17 City Commission Packet Materials - A2. Spratt CUP for Services - Revised Materials (Distributed at Meeting) BOZE MAN M Planning MEMORANDUM --------------------------------------------------------------------------------------------------------------------- TO: City Commission FROM: ADDI JADIN,ASSOCIATE PLANNER RE: CORRECTION TO CUP CONDITION OF APPROVAL #3, 17131 STAFF REPORT FOR SPRATT OFFICE BUILDING DATE: May 22, 2017 -------------------------------------------------------------------------------------------------------------------- Existing Condition #3 on page 6 of staff report (page 196 of Commission Packet) If the special improvement district to upgrade Manley Road to a City Standard Collector Street is not approved prior to the occupancy request, the asphalt path adjacent to the property along Manley Road must be replaced by the applicants with a concrete surface per the City of Bozeman Concrete Class 1 Trail per standard drawing 02529-17 or applicants must provide financial guarantee of improvements through an approved improvements agreement meeting the requirements of Bozeman Municipal Code. Proposed Condition #3: Prior to occupancy, the asphalt path adjacent to the property along Manley Road must be replaced with a concrete surface per the City of Bozeman Concrete Class 1 Trail per standard drawing 02529-17. Bozeman, MT 59771-1230 TDD: 406-582-2301 THE MOST LIVABLE PLACE.