HomeMy WebLinkAbout05-22-17 City Commission Packet Materials - A2. Spratt CUP for Services - Revised Materials (Distributed at Meeting) BOZE MAN M
Planning
MEMORANDUM
---------------------------------------------------------------------------------------------------------------------
TO: City Commission
FROM: ADDI JADIN,ASSOCIATE PLANNER
RE: CORRECTION TO CUP CONDITION OF APPROVAL #3,
17131 STAFF REPORT FOR SPRATT OFFICE BUILDING
DATE: May 22, 2017
--------------------------------------------------------------------------------------------------------------------
Existing Condition #3 on page 6 of staff report (page 196 of Commission Packet)
If the special improvement district to upgrade Manley Road to a City Standard Collector
Street is not approved prior to the occupancy request, the asphalt path adjacent to the
property along Manley Road must be replaced by the applicants with a concrete surface per
the City of Bozeman Concrete Class 1 Trail per standard drawing 02529-17 or applicants
must provide financial guarantee of improvements through an approved improvements
agreement meeting the requirements of Bozeman Municipal Code.
Proposed Condition #3:
Prior to occupancy, the asphalt path adjacent to the property along Manley Road must be
replaced with a concrete surface per the City of Bozeman Concrete Class 1 Trail per
standard drawing 02529-17.
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.