Loading...
HomeMy WebLinkAbout05-22-17 City Commission Packet Materials - C12. Task Order 1 with HDR for WRF On-Site Engineering Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Project Engineer Craig Woolard, Director of Public Works SUBJECT: Authorize the Interim City Manager to Sign Task Order No. 1 to the Professional Services Master Task Order Agreement for Water Reclamation Facility On-Call Engineering Services with HDR Engineering, Inc. MEETING DATE: May 22, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the Interim City Manager to Sign Task Order No. 1 to the Professional Services Master Task Order Agreement for Water Reclamation Facility On-Call Engineering Services with HDR Engineering, Inc. BACKGROUND: The City Commission on March 20, 2017 approved the Professional Services Master Task Order Agreement for water reclamation facility (WRF) on-call engineering services with HDR (master agreement). The master agreement places HDR under contract to provide engineering services for WRF projects that arise from time to time. Scope and fee for engineering services performed under the master agreement will be individually negotiated with separate Task Orders. Task Order No. 1 (TO-1), attached, contains detailed scope and fee for HDR to deliver a bid package and provide bid services for WRF Small Works Project No. 1, which will make the improvements listed below. It should be noted that TO-1 does not provide for construction inspection services. A separate task order will be negotiated for inspection services at the time a construction contract is awarded. WRF Small Projects No. 1 - Sludge mixer replacements for Digester No. 1 and Digester No. 2 - New launder covers and replacement scum baffles and weirs for secondary clarifiers No. 1, 2, 3, and 4. - Piping modifications to Digester Complex No. 2 - WAS pump replacements in Lift Station No. 1 and Lift Station No. 2 - Digester No. 1 cleaning - Membrane roof replacement for Digester No. 1 and Digester No.2 and associated administration building. - Piping modifications to UV building hot water piping 182 TO-1 also contains engineering design services for modifications to the Unified Fermenation and Thickening (UFAT) system, modifications to the air exchange system in Digester Control Building No. 2, and structural capacity ratings for two different hoist monorails at the WRF. Once these three designs completed, it is anticipated that WRF staff will construct these projects, or hire a contractor directly. These three projects are not included in the Small Works Project No. 1 bid package. Total fee for scope items contained in TO-1 is $31,683.73. UNRESOLVED ISSUES: None. ALTERNATIVES: As suggested by the Commission. FISCAL EFFECTS: The approved FY17 WRF budget contains a line item for project WW70 in the FY17 Wastewater Fund CIP that provides $50,000 for WRF facility engineering and optimization. TO-1 will debit $31,683.73 from the $50,000 allocated to project WW70 in the FY17 WW Fund CIP. Adequate funding exists. ATTACHMENTS: Task Order No. 1 183 184 185 186 187 188 189