Loading...
HomeMy WebLinkAbout16- Task Order - Tetra Tech - Modification for SVE and Air Sparge System Construction OversightOTETRA TECH Attachment A Task Order Modification for SVE and Air Sparge System Construction Oversight Bozeman Landfill Bozeman, Montana CLIENT: December 9, 2016 CONSULTANT: The City of Bozeman Tetra Tech, Inc. P.O. Box 1230 303 Irene Street Bozeman, Montana 5971 1-1 230 Helena, MT 59601 Attention: Mr. Rick Hixson, PE Attention: Mr. Larry Cawlfield, PE INTRODUCTION The City of Bozeman is currently implementing the selected alternative for remediation of the Bozeman Landfill. Tetra Tech is currently contracted to provide construction oversight and other tasks during and after construction. Since the existing contract was completed, additional tasks were added to the construction contract resulting in time extensions and the need for additional oversight. SCOPE OF WORK This scope of work additional oversight and operation due to the addition of several items to the construction contract that was not previously anticipated. Additionally, Tetra Tech will subcontract with a testing firm to perform a stack emissions test as required by the air permit. Details of the work are described in the following sections. TASK 800 OVERSIGHT AND OPERATION Tetra Tech will continue to supply oversight personnel and to operate the system on completion with the addition of tasks to the construction contract and extensions of the contract. Tetra Tech has estimated that approximately 320 hours of field time with some accompanying project management time are necessary to complete the project. A flare source test will also be conducted by a testing firm subcontractor (Bison Engineering) subcontracted to Tetra Tech. The estimated cost to perform the test, with analyses of the collected samples and reporting is approximately $10,000. COMPENSATION A breakdown of costs for Task 800 is contained in the attached cost estimate. The original task order with scope extensions totaled $425,176. With the addition of this Task 800, compensation shall not exceed $476,076. The services will be conducted on a lump sum basis as described in the April 15, 2014 Contract between the City and Tetra Tech. Special Conditions Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman, dated April 15, 2014. Tetra Tech 303 Irene Street; Helena, MT 59601 Tel 406.443.5210 Fax 406.449.3729 tetratech.com Modification for SVE and Air Sparge System Construction Oversight Bozeman Landfill Remediation February 8, 2016 Page 2 of 3 CLIENT: City of Bozeman CONSULTANT: Tetra Tech l 1 l By. V LW In By: l Date: 3—a —P Its: Project Manager Date: December 9, 2016 NOTICE OF CONFIDENTIALITY This Task Order (including attachments) contains information confidential to Tetra Tech, Inc., its subsidiaries, and subcontractors. It is intended only for City of Bozeman to consider Tetra Tech providing professional services at the Bozeman Landfill. Any other use is prohibited, without the prior written consent of Tetra Tech. TETRA TECH Modification for SVE and Air Sparge System Construction Oversight Bozeman Landfill Remediation February 8, 2016 Page 3 of 3 TABLE 1 ESTIMATED COSTS FOR NEW TASK 800 TASK DESCRIPTION ESTIMATED COST 800 Extended Oversight and Operation Field Labor 40 days x 8 hours per day x $105/hr $33,600 PM Labor 10 days x 4 hours per day x $170/hr $6,800 Travel vehicle, per diem $ 500 Source Testing and Reporting $10,000 Total 1 $50,900 TETRA TECH