Loading...
HomeMy WebLinkAbout17- Amendment 1 to PSA - Sanderson Stewart - Kagy Boulevard Interim ImprovementsAmendment No. 1 to Professional Services Agreement for Kazv Boulevard Interim Improvements THIS AGREEMENT is made as of this OLT' day of MSN 2017, between THE CITY OF BOZEMAN, a Municipal Corporation, Bozeman, Montana, herein referred to as OWNER and Sanderson Stewart, an Engineering Consulting Firm of Bozeman, Montana, herein referred to as ENGINEER. WHEREAS, the parties have entered into a Professional Services Agreement dated January 23, 2017, herein referred to as Original Agreement for professional engineering services; and WHEREAS, the parties desire to further amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT A (Scope of Services) and EXHIBIT B (Fee Proposal) are hereby incorporated in and made part of this Agreement. ARTICLE 1- ENGINEERING SERVICES 1.1. The detailed description of the specific project components is described as follows: This project is for design and construction administration services for the addition of the water main replacement to the Kagy Boulevard Interim Improvements project. The additional work consists of replacement of the existing 6 -inch water main from 11th Avenue to Greek Way with anew 10 -inch water main. Scope of work items include design, final plans, specifications and estimate (PS&E) submittals, construction inspection and construction staking. 1.2. The scope of services under this contract is set forth in this agreement and the attached EXHIBITS. ARTICLE 6 - COMPENSATION FOR ENGINEERING SERVICE 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $8,996.00 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.3) shall not exceed the following ceilings: $6,297.00 (70% of design fee) until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $8,096.00 (90% of design fee) until the Final Plans and Specifications have been submitted to the OWNER and review authorities. 6,1,3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.1 through 4.3) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Construction Testing, shall be compensated in accordance with the following: 6.2.1 The OWNER shall pay for Construction Phase and Project Documentation Services an amount not to exceed $15,219.00 except as provided under 6.2.1.2 and 6.2.4. 6.2.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.0 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.2.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.2.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 3_0 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the 2 actual amount of the costs incurred up to an amount not to exceed $500.00 which includes $0.00 for consultants employed by the Engineer and $500.00 for all other reimbursable expenses. The estimated reimbursable expenses are identified in Exhibit "B". 6.2.3. Failed Test Expenses. The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.2.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3_0, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 7.3 DIRECT LABOR COSTS Direct Labor Costs used as a basis for payment mean the actual salaries and wages paid to all ENGINEER's personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, drafters, specification writers, estimators, other technical and business personnel; but does not include indirect payroll related costs or fringe benefits. For the purposes of this Agreement the principals and employees of the ENGINEER maximum billable Direct Labor Costs are: Principal $53.50/hour Project Manager $49.77/hour Senior Engineer $49.77/hour Project Engineer $33.46/hour Staff Engineer $27.22/hour CADD Designer $27.83/hour Senior Professional Land Surveyor $39.38/hour Staff Surveyor $26.41/hour Clerical $19.52/hour Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement on the day and year first above written. CITYOF EN N 0� BOZ�, f By CInUUc Wlnh ATTEST; , �c ".� 1-ivv3 CAN MOLMW ,✓ Robin Croughv ' aa3 City Clerk IL • . . • 1 9rIIV0 Co.D APPRO AS RM By: City Attorney ATTEST: By:t SANDERSON SIT WA R T Exhibit A Kagy Boulevard Interim Improvements Amendment No. 1 —Water Main Replacement Scope of Work 3/8/17 Sanderson Stewart is pleased to provide this scope of work for the addition of the water main replacement to the Kagy Boulevard Interim Improvements project. The additional work consists of design and construction services for replacement of the existing 6 -inch water main from 11th Avenue to Greek Way with a new 10 -inch water main. A detailed scope of servicesfor these design tasks is outlined below. The phase numbers correspond to the original Kagy Boulevard Interim Improvements scope of work. Phase 1- Project Initiation This phase of the project includes preparation of the scope of work and amendment. Phase 2 — Base Drawing Conversion/Setup A detailed topographic survey of the Kagy Boulevard corridor was conducted as part of the larger reconstruction project. The base drawings were converted from Microstation to Autocad for the Interim Improvements project, but the area will now need to be expanded to Greek Way for the addition of the water main replacement. This phase of the amendment includes exporting the additional area between 7th Ave and Greek Way into the Autocad base drawing. Phase 3 — Roadway/Water Main Design This phase of the additional work includes the design of die water main, services, hydrants, valves from the tee in 11a, Avenue intersection to the tee in the Greek Way intersection. It will also include curb and asphalt restoration areas as needed for the replacement. Phase 4 —Preliminary PS&E Submittal No additional work required under this phase. Phase 5 — Final PS&E Submittal Sanderson Stewart will add the water main replacement to the final PS&E documents at the same time review comments are being addressed from MDT. This will include final coordination with utilities, and preparation of final plans, specifications and engineer's opinion of probable cost. The final deliverable will include electronic copies of all submittal documents., as well as six hard copies. Phase 6 — Construction/Contract Administration This phase of project consists of construction bidding, contract administration and construction inspection tasks. It has been assumed that the water main replacement will require a longer construction contract, so additional time has been added for construction inspection (assume full time inspection for an additional 30 days) and construction testing coordination/review. Phase 7 — Construction Stakin:s This phase of the project consists of the construction layout. Additional time has been added for staking the water main at 25 -foot spacing, including all valves and services. The following items are not expected to be needed for this project and are therefore specifically excluded from this scope of work: • Topographic survey • Geotechnical analysis • Lighting and traffic signal design • Stormwater calculations and report • Stormwater Pollution Prevention Plan (SWPPP) permit • Right-of-way coordination • Wedand permitting and mitigation • Erosion control plans • Landscape and irrigation plans • Material testing (by Contractor or City Term Contract) • Bluetopping not included in scope with single lane widening Schedule The anticipated schedule for this project consists of the Final PS&E submittal within 2 weeks of receipt of all City and MDT review comments. EXHIBIT B Project Name: Blvd Interim Improvements Project Number. - ProjectManaBer: cbari Data: Client Name: zeman !Mill Client Contact Name: ay Client Contact Email: wzen anClient Contact Phone: coma Sam Julie Hann In Inm II I W W Q re Q W W O 0 Z Z UW O O W W or Z W K W ric U In 0 II In In 0 0 TASK DESCRIPTI N1 BILL` AR b53: N7] 33].93 $1y:44'" $19:6Y -5ti1:48 -' 33641 10�JECT I MPATION 101'Chrotconsuhnne n antll,belings 102Prolecl5c-nin9 I 2 2 599.54 _ _ 103 Pmlea Planning Su61rlell- cu Hi— 2 2 Sun Total Glrect Labor Cod 59454 §9951 Sub Total GVect Cost by Phles $99.51 Fee with JA Guinplier I TM 2 Mulllplle, 3.00 Given ice of: $299.00 201 DRAWINGS on 201 Pmjecl Mana ameervon ceras Bese Dmvin9 C nversicn anJ Selu 9 _ _ 9 $19400 _202 20310uaIIlY Content Rovlew Subtotal Lahr Hours q q Sub Total Direct Labor Cozl 519908 SutiGlenn Cosl by PbaRa - - _ Maga Fee oii 3u Mu11ip0er $19124 Mulliplior- 3.00 Given f...E 559],00 3W ROADWAYMATJERMAIN DESIGN 301 Meet Mana emenlana CmNbraOW 4 4 519400 302 Client Conalle8on and Meetings _ _ _ _303 Plan and Profile Sheets 304 TpI.lGreen. _ 305 Cross-sociions Gtatlitg _3061ntersesOon GeomeNrs aM _ 3W 519nIrg 801. 308 SidevulNs, Crosswalks antl AOA ,on r0.1ils 310 Guelily ConlrW ftevlaw 1 2 311 Water Main Design 4 4 32 16 _ §1,525.16 Gublolal Labor Hours 1 4 5 32 16 50 be Sub Total Direct Lai Cosl Mw 19J 08 $2q 8.115 $69056 $43152 $1,]2424 3111nbm11'rr-se I I 5100.00 ..in Total D nG Fain enxe antl subconsullanl 5 WODO ,. Teel Direct Cosby Phase 51,02444 Fao w11M1 3,0 l.I UIII P IIer $5,2]2.]2 Mulliplior- 3.00 Given lee of $5,273.00 400 PRELIMINARY PS&E SUBMITTAL 401 Prescribe nagamenlandC f-ftn 4021Pr Cllenl Consullallm and Mus i _ 403 Comlaele eliminary Tualin cooks e Special Provisions dOd 405 Spaslnwllons Manual and Dltl Coulmenls —----— 406 Cost Estimate _ Conbol F.A. 4WlDuallly Sunlolal lab Ho urs 40BI Direct Expense Sub Total Direct Expense and 3ubconsultanl Sub Total Dlrecl Cast by Phase fee with 1.r 'i IAYIIIp fic, GlVan faoeE 5o0FINAL PS&ESUBMRTAL l 501P,ed Mene9emenl antl CwNinallm - 4 4 $19900 _ 502 Cllenl Consultation and Meelings 503 Atltlress Rovlew CanmonI and Com bele Finet Oeslgn 504 S ¢tial Pmvlsions 4 4 J Wella 5Jg9W 505 3 edhcaOons Manual and Oid Oowmenis 4 SOB Cosl Es6male 2 4 6 $20842 50]Ouallly Conten, Review 1 1 _ 2 $1032] UVIOrtaMabor Hours 1 4 11 4 20 Sub Total Direct Labor Cost 55350 Make SM7.47 $10890 $amw 508 Dlrecl Expense 10000 Sub Total Direct Expanse and snnconsullant 510D.n0 hase Bub TaDirect Cast by Far- 51,000.93 FeeMulliplior 51,81679 Feowlln ri Mul6pllep 1 3.00 Clven ltt of. Project Name: Kogy Blvd tried. Improvements - Project Number: 16001.01 Project Mena get, Danielle Schad Data 31612017 Client Name: City of Bozeman Client Contact Name: Bob Murray Client Contact Email: bn unavrmbo od an Client Contact Phone: 582-2280 Jmia v u an an an an WK o rc i Le an of an s% a u ? ? o I w rc j an an an ad 3an v o on - on 1 <s o a 600 CONSTRUCTIONICONTRACT ADMINISTRATION 601 Prgecl Management and Coordination 602 Client Consultation and Meanings 603 Cpnlrea Rid Assistance w4 Pre -tilt Meeting 605 Addordum Pre 21im 606 Caniracling BA, 60]Pre_Con 11-1.ng 608 6M1 onsoad Review 2 2 SOi fiW ConaWdlan lnspedlon and ocwmenlallon _ 170 00 $4 HIS 70 610 Change Orders and CanVad MWifeations 611 P' Connote Review 612 Substantial Cum IeBon Walk-Ibm and Admin _ 613 Fina$ Welk -Nm and Admin _ 614 Warardt, Walk -Nm and Admin 615 As'Ina S 6161Projecl Closeout Su Iola)laW, Hours 2 q]0 A2 Sub Total Direct Labor cost $9954 $4,489]0 $4569.24 617'Ditett E--- sc I M. Sub Total 0lmd Felons. and Subconsu11an1 530000 Total GireU Cost by Phase $A 6B9,24 Fee with 3 0 Multiplier 1 $14,067.72 Multiplier= 3.00_li Given So of. $14.06800 700 CONSTRUCTION STAKING 701 Pmj-IManagementand 4 4 $905.66 702 !,dina8on _ Subgrado Stolon, CUN Gullet and Sldaselk Slaking _ 703 1 704 SWping and Signage Ina n9 705 Wale, Main Staking I 6 8 $2,128 Sublatal taMrHwrs 12 a Sub Total Olreat Labor Cost $316.92 1 16S2 705 Direct Experts& I $200.00 Snb Total afraid Expense and Subconsultam $tan ag Sub Total Direct Coal by Phase $516.93 Fee nd, 3.0 Mullipbar i$d,150.7fi Mulllplier- 3.00 vo Gln lac o0 $1,151.00 it Total Hands 2 10 22 32 20 1B2 HS ToW Direct Labor Cost $107,00 $497.70 $109499 I $fl9D.56 $549.40 54,606.62 $7,9A1.2L Total Direct Expense and Subconsultant $oUr Total Project Direct Cost 58,641.22 Total Proposed Fee with 3.0 Multiplier 1 $24,215.00