Loading...
HomeMy WebLinkAbout17- Improvements Agreement - Golden Gate Property's LLC - Golden Gate Condominiums, Phase 1 (Trash Enclosure and Landscaping Improvements) Send Original to: City of Bozeman Department of Community Development P.O. Box 1230 Bozeman,MT 59771 IMPROVEMENTS AGREEMENT FOR GOLDEN GATE CONDOMINIUMS, PHASE 1 (TRASH ENCLOSURE AND LANDSCAPING IMPROVEMENTS) THIS AGREEMENT is made and entered into this `�� day of March 2017, by and between Golden Gate Property's LLC,2149 West Durston Road,Unit#31,Bozeman, MT 59718, hereinafter called the "Landowner", and the City of Bozeman, a self-governing municipal corporation and political subdivision of the State of Montana,with offices at City HaII, 121 North Rouse Avenue, P.O. Box 1230,Bozeman, MT 59771-1230,hereinafter called the "City". WHEREAS, the Landowner desires to obtain final building occupancy approval for buildings known as "PHASE 1", as part of Zoning Application 15531, GOLDEN GATE CONDOMINIUMS SITE PLANAND CERTIFICATE OFAPPROPRIATENESS, located on property described as "LOT R2, GOLDEN GATE CONDO, LOCATED IN THE NEIA NW1/4 OF SECTION 16, T2S, R5E, MASTER LOYAL GARDENS, PHASE 1 A, PLAT J-462, CITY OF BOZEMAN, GALLATIN COUNTY,MONTANA."; and WHEREAS, the Landowner desires to obtain final building occupancy approval for i GOLDEN GATE CONDOMINIUMS, PHASE I, prior to the installation of all required site improvements; as such, the Landowner desires to enter into an improvements agreement with the City and provide financial security guaranteeing the completion of certain site improvements;and p WHEREAS, it is the intent and purpose of both the Landowner and the City to hereby enter into this Agreement to memorialize the terms and conditions for which final building occupancy approval may be granted. R r Golden Gate Condominiums,Phase I-- Improvements Agreement Page 1 of 10 a NOW, THEREFORE, in consideration of the mutual covenants and conditions contained herein,it is hereby agreed as follows: 1. Property Description This Agreement pertains to, and includes, those properties that are designated and identified as being: LEGAL DESCRIPTION LOT R2, GOLDEN GATE CONDO,LOCATED IN THE NEI/4 NWI/4 OF SECTION 16, T2S, R5E, MASTER LOYAL GARDENS,PHASE 1A,PLAT J-462, CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA. 2. Improvements This Agreement specifically includes the following required improvements for Golden Gate Condominiums,Phase I(the"Zoning Application 15531"):trash enclosure and landscaping improvements(the above are referred to as the"Improvements"). The cost of the Improvements has been estimated by the Landowner's agent, MossCreek Landscaping, Inc., 9200 Thorpe Road, Bozeman, MT 59718, at Sixteen Thousand and Sixty Six Dollars ($16,066.00) and Chase Skogen Construction, Inc., 2149 W. Durston Road, Unit 31, Bozeman, MT 59718, at Five Thousand Two Hundred Dollars ($5,200.00). The estimate is attached and hereby made a part of this Agreement, as Exhibit"A". 3. Financial Guarantee, Time for Completion of Improvements, Additional Restrictions A. The Landowner must maintain adequate financial security guaranteeing the completion of the Improvements until such Improvements are accepted by the City. The Landowner's performance under this Agreement is specifically guaranteed and secured by a Cash Bond: $31,899.00. The cash bond constitutes the "Financial Security." B. Notwithstanding the time frame for completion of the Improvements stated in subsection A of this section, the City agrees the Landowner may defer completion of the following Golden Gate Condominiums,Please 1—Improvements Agreement Page 2 of 10 Improvements to not later than six (6) months of the execution of this agreement: trash enclosure and landscaping improvements. C. Landowner acknowledges and agrees the Financial Security is specifically provided for the benefit of the City to guarantee and secure completion of the Improvements within the timeframes specified above and that the Financial Security may be drawn upon by the City without notice to the Landowner and used by the City for completion of the Improvements in its sole discretion but only if the Landowner fails to comply with the terms and conditions of this Agreement. D. The Landowner agrees that no delegation of performance required by this agreement shall relieve the Landowner of any duty to perform or any liability for the breach of that duty to complete said Improvements required for the property. E. Upon submission of fully documented invoices for the work performed, said work to be inspected and certified for payment by Landowner's professionals and the City and or its agents as necessary,the City may release a portion of the Financial Security for the work completed by the referenced invoices. 4. Inspection Representatives of the City shall have the right to enter upon the property at any reasonable time in order to inspect it and to determine if the Landowner is in compliance with this Agreement, and the Landowner shall permit the City and its representatives to enter upon and inspect the property and Improvements at any reasonable time. 5. Default Time is of the essence of this Agreement. If the Landowner shall default in or fail to fully perform any of its obligations in conformance with the time schedule under this Agreement, and i such default or failure shall continue for a period of ten (10) days after written notice specifying the default is deposited in the United States mail addressed to the Landowner at Golden Gate Property's LLC, 2149 West Durston Road, Unit 31, Bozeman, MT 59718 or such other address as Golden Gate Condominiums,Phase I—Improvements Agreement Page 3 of 10 H the Landowner shall provide to t City from time to time, without being completely remedied, satisfied, and discharged, the City may elect to enforce any of the following specified remedies: A) The City may, at its option, declare the Financial Security to be forfeited, take possession of funds secured by the Financial Security pursuant to any lawful means, and secure the complete construction and inspection of the Improvements. The City's representative, contractors, and engineers shall have the right to enter upon the property and perform such work and inspection,and the Landowner shall permit and secure any additional permission required to enable them to do so. In the event that any funds remain from the financial guarantee upon completion of all Improvements, such funds shall be promptly returned to the Landowner. B) The City may enforce any other remedy provided by law. 6. Indemnification To the fullest extent permitted by law, Landowner agrees to release, defend, indemnify, and hold harmless the City, its agents, representatives, employees, and officers (collectively referred to for purposes of this Section as the City) from and against any and all claims, demands, actions, fees and costs (including attorney's fees and the costs and fees of and expert witness and consultants), losses, expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or damages of whatever kind or nature connected therewith and without limit and without regard to the cause or causes thereof or the negligence of any party or parties that may be asserted against, recovered from or suffered by the City occasioned by, growing or arising out of or resulting from or in any way related to: (i) the negligent, reckless, or intentional misconduct of the Landowner in regards to the property; (ii)any negligent,reckless, or intentional misconduct of any of the Landowner's agents in regards to the property. Such obligations shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist. The indemnification obligations of this Section must not be construed to negate, abridge,or reduce any common-law or statutory rights of the indemnitee(s)which would otherwise exist as to such indemnitee(s). Landowner's indemnity under this Section shall be without regard to and without any right to contribution from any insurance maintained by City. Should any indemnitee described herein be required to bring an action against the Landowner to assert its right to defense or indemnification under this Agreement or under the Landowner's applicable insurance Golden Gate Condominiums,Phase 1—Improvements Agreement Page 4 of 10 policies required below the indemnitee shall be entitled to recover reasonable costs and attorney fees incurred in asserting its right to indemnification or defense but only if a court of competent jurisdiction determines the Landowner was obligated to defend the claim(s) or was obligated to indemnify the indemnitee for a claim(s) or any portion(s)thereof. In the event of an action filed against City or any of the indemnitee(s) resulting from the City's performance under this Agreement, the City or an indemnitee may elect to represent itself and incur all costs and expenses of suit. Landowner also waives any and all claims and recourse against the City or its officers, agents or employees, including the right of contribution for loss or damage to person or property arising from, growing out of, or in any way connected with or incident to the performance of this Agreement except"responsibility for his own fraud,for willful injury to the person or property of another, or for violation of law,whether willful or negligent"as per 28-2-702, MCA. These obligations shall survive termination of this Agreement and the services performed 1 hereunder. I 7. Attorney Fees In the event it becomes necessary for either party to this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement, then the prevailing party shall be entitled to reasonable attorney's fees and costs,including fees,salary,and costs of in-house counsel including City Attorney. 8. Warranty The Developer acknowledges that the required landscaping must be maintained in a healthy, growing condition at all times. The Landowner is responsible for regular weeding, k mowing of grass, irrigating,fertilizing,pruning,and other maintenance of all plantings as needed. Any plant that dies must be replaced with another living plant that complies with the approved L landscape plan. f Golden Gate Condominiums,Phase l—Improvements Agreement Page 5 of 10 Si E 9. Governing Law This Agreement shall be construed according to the laws of the State of Montana. In the event of litigation concerning this Agreement, venue is in the Eighteenth Judicial District Court, Gallatin County, State of Montana. 10. Modification or Alterations No modifications or amendment of this Agreement shall be valid, unless evidenced by a writing signed by the parties hereto. 11. Invalid Provision The invalidity or unenforceability of any provision of this Agreement shall not affect the other provisions hereof, and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted. 12. No Assignment It is expressly agreed that the Landowner shall not assign this Agreement in whole, or in part, without prior written consent to City. 13. Successors Except as provided in paragraph twelve(12),this Agreement shall be binding upon, ensure to the benefit of,and be enforceable by the parties hereto and their respective heirs, successors and assigns. 14. Filing The Landowner shall have this Agreement recorded in the Office of the Gallatin County Clerk and Recorder within ten(10)business days of the signature of the Community Development Director. Golden Gate Condominiums,Phase I—Improvements Agreement Page 6 of 10 LANDOWNER XZ& BY: TITLE: Golden Gate Property's LLC STATE OF :ss County of n ) On this day of M 2017,before me,a Notary Public of the State of mti , personally appeared tI a�C , known to me to be the Landowner that executed the foregoing Improvements Agreement, and acknowledged to me that (s)he executed the foregoing instrument as OU-W r of Golden Gate Property's LLC, and acknowledged to me that (s)he executed the same for and on behalf of Golden Gate Property's LLC. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and year first above written. (SEAL) I �X f ~ KATHERINE MAINES P inted Name Here) �� AtNE yq�, Notary Public tARi 2� :for the State of Montana No ublic for the State of �° q4.N- Residing at: Residing a , SEAL..� Belgrade, Montana 'N�9' My Commission Expires: My Commission ) s. 'fioF Mo `>' July 22, 2020 (Use 4 digits for expiration r) Golden Gate Condominiums,Phase I—Improvements Agreement Page 7 of 10 THE CITY OF BOZEMAN BY: MART MATSEN, DIRECTOR OF COMMUNITY DEVELOPMENT CITY OF BOZEMAN STATE OF MONTANA ) :ss County of Gallatin ) On this 'Z day of M Nia" 2017, before me, a Notary Public for the State of Montana, personally appeared Martin Matsen, known to me to be the person described in and who executed the foregoing instrument as Director of Community Development for the City of Bozeman, whose name is subscribed to the within instrument and acknowledged to me that he executed the same for and on behalf of said City. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my seal on the day and year first written above. (SEAL) (Printed Name Here) Notary Public for the State of Montana Residing at e07z- ►MJ My Commission Expires: 3- I - l FS ;S(A JO 9 AKRISTA JO ASLIN (Use 4 digits for expiration year) FQ. S� Notary Public Q.NOTAR/qJ li=for the State of Montana * -- Residing at: =N,; A� Q,, Bozeman, Montana 9OF MOP` MY Commission Expires: March 01, 2018 Golden Gate Condominiums,Phase 1—Improvements Agreement Page 8 of 10 EXHIBIT A Chase Skogen Construction,Inc. Estimate 2149 W Durston#31 Bozeman,MT 59718 Date Estimate# 2/17/2017 15 Name/Address Clime Skogen Construciton Project Description Qly Cost Total Fumish&install dumpster enclosures at Golden Gate Condo's 2 2,600,00 5,200.00 1 1 r. Total ss,2ao.00 Golden Gate Condondidu»ts,Phase I—Improvements Agreement Page 9 of 10 p MOSSCREEK LANDSCAPES,rNC. Estimate 9200 Thorpe Rd. Bozeman,MT 59718 Dale Estimate# 12/6/2016 797 Name/Address t Chase/Skogen Homes (� 2149 Durston Rd 9 31 Bozeman,MT59718 Qty Description Total LANDSCAPE&SPRINKLER PROPOSAL-4805 GOLDEN GATE CONDOS 1 Automatic Rainbird Sprinkler System w/drip system for planting beds 5.280.00 6,400 Kentucky Btuegruss sod installed w/finish grade 3,840.00 200 Steel Edging installed 800.00 2.450 Typar weed fabric installed 882.00 24 1 1/2"Washed Gravel 1,200.00 2 Moss Boulders 320A0 20 Screened Black Topsoil(CY) 360,00 PLANT MATERIAL 3 Blue Chip Juniper Shrubs(2 gal) 132.00 2 Mugho Pine Shrubs(2 gal) 110.00 36 Shrubs(2 gat) 1,152.00 17 Ornamental Grasses&Perennials(I gal) 306.00 2 Spruce Trees(8-10') 560.00 2 Cologreen Juniper Trees(5 gal) 192.00 1 Emerald Lustre Maple Trees(1.5"cal) 236.00 1 Litileleaf Linden Trees(1.5"esi) 236.00 2 Quaking Aspen Trees(1.5"cal) 460.00 PRICE DOES NOT INCLUDE ANY TOPSOIL OR ROUGH GRADING-This price assumes that all topsoil will be onsite and in place,with a reasonable rough grade established. If not additional charges will apply at the following rates:S80/hr for bobcat/dump truck work,$501hr mini-skid steer,S14-16/CY for Unscrecned Topsoil&S16-20CY for Screened Topsoil,LaborPoremen@S45/hr, Laborers+Q$35/hr. PAYMENT:Upon acceptance 1/2 of total balance is due,and final 1/2 due no later than 30 days after project completion. Any unpaid balance is subject to late fees and/or finance Total $I6,B66.00 charges. A Finance charge of 1.5%(18%ANNUM)will be charged on accounts past 30 days. Total Amount per estimates= $21,266.00 Total Amount guaranteed= $31,899.00 Co/den Cate Condominiums,Phase 1—Improvements Agreement Page 10 of 10