Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution 4771 Intent to Create SID 740, Westside Street Improvements Project (Flanders Mill Megabuild)
i i i i i Nco.d' COMMISSION RESOLUTION NO.4771 I A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, RELATING TO SPECIAL IMPROVEMENT DISTRICT NO. 740; DECLARING IT TO BE THE INTENTION OF THE CITY COMMISSION TO CREATE THE DISTRICT FOR THE PURPOSE OF UNDERTAKING CERTAIN LOCAL IMPROVEMENTS AND FINANCING THE COSTS THEREOF AND INCIDENTAL THERETO THROUGH A PAYBACK TO THE CITY'S ARTERIAL AND COLLECTOR DISTRICT. BE IT RESOLVED by the City Commission (the "Commission") of the City of Bozeman,Montana(the"City"), as follows: i Section 1 s Proposed Improvements; Intention to Create District. The City proposes to undertake certain local improvements to benefit certain property located in the City. The Improvements consist of roadway improvements to West Oak Street between North Ferguson Avenue and Davis rf Lane and on North Ferguson Avenue between West Oak Street and Baxter Lane, including: widening of the road, installation of curbing, storm drainage improvements, street lighting, and pedestrian ramps, as more particularly described in Section 5 (the "Improvements"). The total estimated costs of the Improvements are $2,525,667.00; the City has committed $1,062,138.50 from the Street Impact Fee Fund and Flanders Mill Subdivision has committed$401,390.62 for its share of the improvements to North Ferguson Avenue,through a separate agreement with the city, leaving $1,062,138.50 of the costs of the Improvements to be funded through the District (hereinafter referred to as the District's Share of the Improvements). It is the intention of this S Commission to create and establish in the City under Montana Code Annotated, Title 7, Chapter 12,Parts 41 and 42, as amended,a special improvement district(the"District")for the purpose of Page 3 of 6 Y j Resolution 4771,Resolution of7ntent to Create SID 740 financing the District's Share of the Improvements and paying costs incidental thereto, including costs associated with the creation and administration of the District (collectively the "Incidental Costs"). The total estimated cost of the District's Share of the Improvements, including such Incidental Costs,to be financed by the Loan is $1,063,138.50. The Loan to be payable from special assessments to be levied against property in the District, which property will be specially benefitted by the Improvements in an amount not less than$1,063,13 8.50.To fund the costs of the District's Share of the Improvements,the Commission intends to provide the District a loan of approximately$1,063,138.50 fiom the Arterial &Collector District fund,the purpose of which is to fund the construction costs related to the District's Share of the Improvements and Incidental Costs. In doing so, the Commission intends to assess the district in the manner described in Section 7,below,to reimburse the Arterial&Collector District fund within 3 years, in an amount to equal the principal of the loan of$1,063,138.50 to the district plus interest of 2.5%annually. Over the 3-year term of the loan to the District, interest earnings of up to $46,993.76 are estimated to be paid from the District property owners and deposited to the Arterial & Collector District Fund. The City's Special Improvement District Revolving fund currently has money in excess of the statutory required minimum. The excess amounts are intended to satisfy any revolving fund contribution from the District that may be required under 7- 12-4222(l)(b), MCA. Section 2 Number of District. The District, if the same shall be created and established, shall be known and designated as Special Improvement District No. 740 of the City of Bozeman,Montana. Section 3 Boundaries of District. The limits and boundaries of the District are depicted on a map attached as Exhibit A hereto (which is hereby incorporated herein and made a part hereof) and includes all the properties within the boundaries of the District, the legal description of which is the Gallatin County Regional Park,detailed descriptions of which are contained in Exhibit B hereto Page 2 of 7 Resolution 4771,Resolution of Intent to Create SID 740 (which is hereby incorporated herein and made a art hereof), which boundaries are designated rP p � � and confirmed as the boundaries of the District. A listing of the District Property is shown on Exhibit C hereto (which is hereby incorporated herein and made a part hereof). Section 4 i 1 Benefitted Property. The District and territory included within the limits and boundaries described in Section 3 and as shown on Exhibit A and Exhibit B are hereby declared to be the i special improvement district and the territory which will be benefitted by the Improvements and F will be assessed for the costs of the Improvements as described in Section 1. The property included 6 within said limits and boundaries is hereby declared to be the property benefitted by the Improvement. Section 5 General Character of the Improvements. The linprovements to be constructed generally consist of expanding the existing street section on West Oak Street to an arterial standard street and constructing North Ferguson Avenue with gravel base course material, asphaltic cement surfacing,City standard curbs and gutters,pedestrian ramps,traffic control signage and pavement striping, storm drains, and all related improvements shall be included on these streets. The t Improvements shall also include the engineering design, construction,inspection and engineering certification of asphalt cement paving, gravel base courses and sub-grade preparation, storm drainage, and all necessary permits and appurtenances to complete the road installation. Section 6 t. Enizineer and Estimated Cost. Sanderson Stewart and C&H Engineering shall be the engineers for the District. The Engineers have estimated the costs of the Improvements to be $2,525,667, as shown on Exhibit D, attached hereto (and hereby incorporated herein and made a part hereof). The City has committed$1,062,138.50 in Street Impact Fee funds,to the costs of the Improvements. Flanders Mill Subdivision has committed $401,390.62 for its share of the Page 3 of 7 pj S G i Resolution 4771,Resolution of Intent to Create SID 740 improvements to North Ferguson Avenue, through a separate agreement with the city. The District's Share of the Improvements to be financed from the Loan is $1,062,138.50 and the Incidental Costs related to the district and the Bonds are estimated to be $1,000. The Loan is to be issued in the principal amount of$1,063,138.50. It is the City's intent to reduce the loan amount by any Oak Street right-of-way purchased from Gallatin County. The right-of-way purchase price has been estimated to be $161,605.00. Section 7 Assessment Methods. 7.1. Property to Be Assessed. All properties in the District will be assessed for their proportionate share of the costs of the District's Share of the Improvements from which they derive a benefit as determined and set forth herein.District's Share of the Improvements shall be assessed against the property in the District benefitting from these Improvements,based on the method as authorized by Section 7-12-4163,M.C.A., as particularly applied and set forth in Section 7.2 hereof. 7.2.Lot Frontage.The District's Share of the Improvements will be assessed using the lot frontage method of assessment. The Engineer has determined the frontage of each lot, tract or parcel, based on current recorded plats and certificates of survey for each lot, tract or parcel of land, on file at the Clerk and Recorder's office. The total lineal foot frontage of the District to be assessed, exclusive of streets, roads, and rights-of-way, is 2,255.42 feet fronting Ferguson Avenue and 2,529.59 feet fronting Oak Street. The total estimated cost of the District's Share of the Improvements to be funded through the District is $1,063,138.50 and shall be assessed against each lot, tract or parcel of land in the District for that part of the costs of the District's Share of the Improvements that the frontage of such lot,tract or parcel bears to the total frontage of all lots,tracts or parcels of land in the District, exclusive of streets, roads, and rights-of-way. The District's Share of the Improvements per lineal foot of frontage, exclusive of interest, shall not exceed Page 4 of 7 Resolution 4771,Resolution of Intent to Create SID 740 $222.18.The estimated principal assessment for each lot,tract or parcel of land for the District's Share of the Improvements is shown on Exhibit C hereto. 7.3.Assessment Methodology Equitable and Consistent with Benefit. This 1 Commission hereby determines that the method of assessment and the assessment of costs of the District's Share of the Improvements against the properties benefitted thereby as prescribed in this Section 7 is equitable and in proportion to and not exceeding the special benefits derived from the Improvements by the lots, tracts and parcels to be assessed therefore within the District. Section 8 �I r 6 Payment of Assessments. The special assessments for the costs of the District's Share of the Improvements shall be payable over a term not exceeding(3)three years, each in equal semi- annual installments of principal, plus interest, or equal semi-annual payments of principal and i i interest,as this Commission shall prescribe in the resolution creating the district. Property owners have the right to prepay assessments as provided by law. It is the City's intent to reduce the assessment amounts by any Oak Street right-of-way purchased from Gallatin County. The right- of-way purchase price has been estimated to be$161,605.00. Section 9 Method of Financing, Findings and Determinations. The total approximate costs of the District's Share of the Improvements and Incidental Costs will be financed by a loan to the District Rom the City's Arterial &Collector District fund in an amount of$1,063,138.50, the repayment of which shall become an obligation of the District.The principal of and interest on the Loan from the City's Arterial&Collector District fund will be repaid from special assessments levied against the property in the District. t t In determining to authorize such undertakings and agreements,this Commission has taken into consideration the following factors: Page 5 of 7 I. h it If I# if i i Resolution 4771,Resolution oflntent to Create SID 740 (a) Delinquencies. The property has no delinquent taxes. (b) The Public Benefit of the Improvements. The planned Improvements will preserve public safety by providing through lanes and drive approaches for those who reside along this street or use the street to access their residences and businesses. Section 10 Public Hearing, Protests. At any time within fifteen (15) days after the date of the first publication of the notice of the passage and approval of this resolution, any owner as defined in Section 7-12-4112(4),MCA, of real property within the District liable to be assessed for the cost of District's Share of the Improvements may make and file with the City Clerk until 5:00 p.m., MT,on the expiration date of said 15-day period(Monday,April 10,2017),written protest against the proposed Improvements,or against the creation of the District or both. Such protest must be in writing, identify the property in the District owned by the protestor and be signed by all owners of the property. The written protest must be delivered to the City Clerk, who shall endorse thereon the date and hour of its receipt.The Commission will at its next regular meeting after the expiration of the fifteen (15) days in which such protests in writing can be made and filed, proceed to hear and pass upon all such protests so made and filed; which said regular meeting will be held on Monday, the 170' day of April, 2017, at 6:00 p.m., in the Commission Meeting Room, Bozeman City Hall, 121 N. Rouse Avenue,in Bozeman,Montana. Section 11 Notice of Passage of Resolution of Intention. The City Clerk is hereby authorized and directed to publish or cause to be published a copy of a notice of the passage of this resolution,as contained in Exhibit E attached hereto (which is hereby incorporated herein and made a part hereof),and as provided in Section7-12-2121,MCA,in the Bozeman Daily Chronicle,a newspaper of general circulation in the county on March 26, 2017 and April 2, 2017 in the form and manner Page 6of7 Resolution 4771,Resolution oflntent to Create SID 740 prescribed by law, and to mail or cause to be mailed a copy of said notice to every person, firm, corporation, or the agent of such person, firm, or corporation having real property within the District listed in the owner's name upon the last completed assessment roll for state, county, and school district taxes, at the owners last-known address, on or before the same day such notice is first published. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 20t"day of March,2017. CARSON TAYLOR Mayor B ATTEST: ' ' OF. ■ 0i 6 Ak ROBIN CROUGHCity Clerk 1883 TIN CO r10 AP PR VED AS TO FORM: GR ULLIVA City Attorney Page 7of7 �T--I, v 1 . QU.ESTRIA lit �j 3,7. 0• ly J r •y tI 0 w, r Im •� �s AXTE _ C7 ���BAXTER LN -AU -LOLQ WAY ; LOLO WAY .._ . F Z J LEMHI TRAIL.-DR w TSCHACHE LN' Z'_ r b - � I MONIDA ST r_ L, C O N T WI -ARK S I � R E G,1'9 N At r •,� PAR K' ` z BREEZE LN J [ U) W OAK:ST =-- . �4ey y (UY ;UAIpU,_ S1 l ce f.a 70N Legend ruiT a fQ Ferguson : RENOVA EN i ,M Parcels Wti 1� 1 EXHIBIT B Ferguson Avenue&west Oak Street SID OUMANnMG StD pkQ?DPp ERry PLO Y ADDRESS OWNER OWNERZ OWNER ADDRESS LITT STATE ZIP PARCEL NUMBER LEGAL DESCRIPTION ASSESSMEMS TAXES ASSESSMENTS 503,T02S,ROSE,COS 22023,Tract 3A-1 1705 Vzouera Pkm Gallztln CoUnty 311 W Main Street,R.$04 Borman,MT597154574 RG67622 Remainder 0 S S EXHIBIT C Ferguson Avenue&West Oak Street SID ASSESSABLE LOT FRONTAGE Ferguson ASSESSABLE LOT FRONTAGE ADDRESS OWNER 1 OWNER 2 OWNER ADDRESS CITY STATE ZIP Ave(Lineal Feetl West Oak St(Lineal Feet) Total Assessment 1705 Vaquero Pkwy Gallatin County 311 W Main Street,Rm 304 Bozeman,MT 59715-4574 2255.42 2529.59 $ 1,063,138.50 1 1 EXHIBIT D FERGUSON AVENUE-BAXTER LANE TO OAK STREET Construction Costs w/10%Contingency (Estimated Cost Details Attached) Cost of Improvements $ 1,116,076.15 i City Share (1/3 of Improvements) $ 357,342.50 SID Share(1/3 of Improvements) $ 357,342.50 Flanders Mill Subdivision Share $ 401,390.62 i! (1/3 of Improvements+100%of Asphalt Trail) WEST OAK STREET-FERGUSON TO NEW HOLLAND Construction Costs w/5%Contingency (Estimated Cost Details Attached) Cost of Improvements $ 1,409,592.00 City Share (50%) $ 704,796.00 SID Share (50%) $ 704,796.00 ) I TOTAL Cost of Improvements(Oak& Ferguson) $ 2,525,668.15 TOTAL SID Amount(Oak&Ferguson) $ 1,062,138.50 NOTE: See attachment for detailed estimate ( I is i ) Y ►2A SANDERSON t!• , STEWART Exhibit A Oak Street Improvements Scope of Work— Construction Phase for Ferguson Avenue to New Holland Drive 3/9/17 Sanderson Stewart is pleased to provide this scope of work for the Oak Street Improvements project. Tlus phase of the project will consist of limited bidding services, construction administration and inspection. A detailed scope of services for these design tasks is outlined below. Phase 1-Project Initiation This phase of the project includes preparation of the scope of work and amendment. Phase 2—Construction/Contract Administration This phase of project will consist of limited construction bidding services, contract administration and construction inspection tasks,including the following: • Prepare cost breakdown of engineer's opinion of probable cost and contractor's bid for each intersection and the mainline for funding allocation • Process contract documents (assume three copies) • Facilitate pre-construction meeting,prepare agenda and distribute minutes • Shop drawing review • Construction observation and documentation(assume full-time observation for 10 hours each day and a 120-calendar day construction contract) • Attend weekly construction meetings and prepare minutes • Respond to Contractor BFI's • Construction testing coordination and review • Process pay applications submitted by Contractor and necessary change orders, verify material quantities on all contractor pay requests • Process the Certificate of Substantial Completion,coordinate final inspection and prepare punch lists. • Prepare as-built(record)drawings • Conduct two-year warranty walkthrough and prepare punch list. Phase 3—Construction Staldng This phase of the project consists of the construction layout,anticipated to include the following: • Stake Subgrade cuts for streets one time;25-foot spacing;2-3 foot offset from back of curb • Stake curb and gutter one time;25-foot spacing,PC's,PT's,center of drive approaches • Stake roundabout curbs—All features one time • Centerline Bluetops;25-foot spacing;finished grade of Oak Street • Stake line and grade of multi-use path and boulevard walks one time—2-foot offsets to edge i • Stake hack of curb at storm inlet relocations • Stake new SD manhole with double offsets • Stake ponds and culvert ends at invert elevation • Stake horizontal layout of curb ramps with vertical benchmark for grade one time • Stake signs,signals and light poles one time E • Layout striping one time • Stake utility services and relocated utilities i f The following items are not expected to be needed for this project and are therefore specifically excluded from this scope of work: • Material testing(By Contractor or City Term Contract) • SWPPP permitting and operation(By Contractor) l s Schedule The anticipated schedule for this project will be based on the anticipated 120-calendar day construction contract. I; IE. I; 1 f I I€ li f �i I is i f t EXHIBIT B •a e• e- d�; Project Name: Oak St-Far uson to New Holland Dr Project Number: 1S022.04 Project Manager. Danielle Schad Date: 3MI2017 Client Name: City o3 Bozeman Client Contact Name: Bob Murray Client Contact Email: bmuma @bozeman.nel Client Contact Phone:582-2280 kta Datem U, Skph Calk Gag KOV, Ken, du:a 0 u u o 0 w w rc o' 3 o d 0 z d nw w w w a u 5 w w 2o_ � !LISI�111.20 7ASK Of:4CRIP71(.7sBLL RATE 55750 519.]] 519.7] 2],22 S1].03 519.38 52H Ir 326A/ 51053 1D0 PR ECT INITIATION 101 CW C'9e AmW a,d Md" 2 101",IV1 4 2 12 10J Pr'e<I Ptn 2 Sub4dal Lb.Haan 1 8 2 Sub Total Okecl Lebr Cosl $51.50 5198.16 599.54 20 Sub Total CUM Phse Fee with 3.0 Muftiple, 51,653.60 Mvhlp84 r+ 13.00 1 Glvanfee0f: f1,fi54.00 200 CONSMUCTION2CONTRACT ADMNISTRAMN 201 Prajacl Manapa,anl and CoodS,aua, 25 25 S1,244.25 202 Weekly Caabucem Meeergs aid lAindes SO I S.1.20D25 203 Coal B,aakdasn d EV Estkaato and Gmlralor Bid 4 24 ]a SM.36 204 Respbnd to Cmtrat.We 86 cc S4,280.22 205 Procasa CaNrect Doamlads 4 4 R S277.1fi 208 PrsC Meat an ig,Apada d Mh m 4 5256,02 207 Slop 01-11 g RCAe]r 8 D 5398.16 208 CauNKeon Npedbn ad Dooa-b 6m 24 f 6 $26.41500 209 Ctlape Orders and Ca6,a1 Madnalblo 24 0 '4u 51.81Q40 210 PayF.U.to ReNev 24 a 0 $,620.40 2t1 SIAsMneal Com"KIon Wak4Nu end ud 4 256.02 212 Final Wak41w and eNN1 4 6 S256.02 213 Txoyea Weva,ty Wek4hru"a*d n 2 $156Ae 214 A►beae 2 IJ SIS6.06 215 Prcqod Qwe 2 6 $213,42 Snbldd labor Haag 259 40 24 8 91] 4 1252 Sub Total Dbeol Leber Coal SI2,880.1J $1,990.80 1 S41,942,22 216 Sab-,I t-I.l-8 Msmimt (shop daswg(e .mist.cmrandionl S3,000.00 217 Dr I E+ se $3,500.00 Sub Total 01-t Es"-sl,d SUMOO Bob T-101.19 Cost by Phase $46,44122 Feo wish 1.0 Nvld 0[r $132.326.66 NulO Iler= 1.00 Giwn fea ol'. $132,327A0 3W CONSTRUCTION MIO PROPERTYSTAKING 301 Project I.lanagrunenl and C rd,allan i 12 t2 S472.56 302 Der)rf i Y s slakiy 8 9 62S5.59 30J SVW SubOredo Slakkg 1 60 61 SI,736,e7 304 Street C..&-Sk"M S"kV-Frnbhed Gravel 64 61 51,822Afl 305 Curb 6 G."er SIakMO k Wig ADA tarps 2 88 90 52,861,a2 3D8 ML WSe pa016 SW wek T."YKk#[g ADA ramps-FkdgW Gage Ckly 2 52 54 SI,SJ6.f0 301 R..I b.stAig(DW,Lau) 64 64 $1,872.08 306 St-Dren Slekhp(bkls,MH,Vp V.pond Yed%g) 1 36 17 S1,052.75 309 SS 6 W I-ata" 6 6 $170.82 310 SVI*V1agrioge/elgnah 1 26 27 $768,05 311 Lght;Dire a 8 $227.76 3121Aaxa,we htase.fms 6 PLSS canna 1 20 21 $597.23 Wb-ld21 Lab.Hoes 9 12 432 457 Sub Total Dlnd Labor Cml 5250.47 5d]2.56 512.299.0/ 1 1 513,022.U1 31301-1C a(Aennchar d"a to lhaob-hack.aibu yokels eta) 51,850.00 sub Total Oben Es nsa aM Subeoneuaa6 51,850.Oa Sub Total DImd Cost by Phase 1l e1107 Fes with 3.0 M.wp11[r SA0,916.21 WTp8er+ T 7 Uo Given lee o(: $40,91fi.00 Total Hours 1 26] 42 34 1] 12 432 917 4 1716 Total Dlrect Labor CW $51,50 313,2M.59 $2,C,M 4 56T.29 .7711 S4I256 1 $12.799.01 1 $20.106.99 1 S7808 1 SWAM" Total Olract n Es and subconsunnni 18.350.00 Total Project Direct Coat $63,865.49 Total Proposed Fee' $174,897.00 lft _ III � 190 Ramshorn Drive BOZEMAN, MT 59718 PHONE: 406.582.9841 FAX: 406.582.9843 project name: Oak Street Improvements -Ferguson to New Holland bid date: 2/21/2017 REVISED BUDGET ESTIMATE item IDESCRIPTION QUANTITY UNIT 7 UNrr PRICE TOTAL SCHEDULE I-SURFACE&UTILITY IMPROVEMENTS BASE BID 101 MOBILIZATION AN INSURANCE 1.00 LS $145,000.00 $145,000.00 102 STORMWATER MANAGEMENT AND EROSION 1.00 LS $15,000.00 $15,000.00 CONTROL 103 TRAFFIC CONTROL DURING CONSTRUCTION 1.00 LS $25,000.00 $25,000.00 104 EXPLORATORY EXCAVATION 10.00 HR $350.00 $3,500.00 105 CLEAR AND GRUB 1,00 LS $6,500.00 $6,500.00 106 REMOVE AND STOCKPILE TOPSOIL 7,007.00 CY $3.00 $21,021.00 107 SAWCUT AND REMOVE EXISTING ASPHALT 4,294.00 SY $4.50 $19,323.00 108 REMOVE AND DISPOSE OF EXISTING CURB AND GUTTER 3,005.00 LF $1.00 $3,005.00 109 REMOVE AND DISPOSE OF EXISTING SIDEWALK 2,774.00 SF $1.00 $2,774.00 110 REMOVE AND DISPOSE OF EXISTING DRIVEWAY 230.00 SF $1.00 $230.00 111 REMOVE PORTION OF N YELLOWSTONE AVE HANDICAP RAMP 1.00 LS $2,500.00 $2,500.00 AND REPLACE CURB TO FULL HEIGHT 112 REMOVE PORTION OF MEAGHER AVE HANDICAP RAMP AND 1.00 LS $2,500.00 $2,500.00 REPLACE CURB TO FULL HEIGHT 113 RELOCATE EXISTING FIRE HYDRANT 2.00 EA $4,000.00 $8,000.00 114 REMOVE 36"RCP FETS AND INSTALL NEW 60"STORM MANHOLE 1.00 LS $6,500.00 $6,500.00 115 36"RCP STORM DRAIN PIPE 72.00 LF $111.00 $7,992.00 116 36"RCP STORM DRAIN FES 1.00 EA $888.00 $888.00 117 REMOVE 42.75"x26.63"FES AND CONNECT TO NEW ARCH PIPE 2.00 EA $750.00 $1,500.00 118 43.75"x26.63"PCP STORM DRAIN ARCH PIPE 568.00 LF $150.00 $85,200.00 119 43.75"x26.63"RCP STORM DRAIN ARCH FES 2.00 EA $1,200.00 $2,400.00 REMOVE EXISTING 48"RCP STORM DRAIN PIPE AND FES AND 120 CONNECT NEW 48"RCP TO EXSITING DAVIS STORM DRIAN 1.00 LS $2,500.00 $2,500.00 MANHOLE BOX 121 48"RCP STORM DRAIN PIPE 197.00 LF $225.00 $44,325.00 122 48"RCP STORM DRAIN FES 1.00 EA $1,800.00 $1,800.00 123 REMOVE EXISTING 48"STORM DRAIN MANHOLE STATION 51+18 1.00 LS $500.00 $500.00 124 NEW 48"STORM DRAIN MANHOLE ON EXISTING 18"STORM 1.00 LS $5,000.00 $5,000.00 DRAIN 125 DOUBLE STORM DRAIN CURB INLET 7.00 EA $4,000.00 $28,000.00 126 48"SINGLE STORM DRAIN INLET 4.00 EA $2,850.00 $11,400.00 127 CONNECT TO EXISTING 12"STORM DRAIN PIPE 1.00 EA $1,000.00 $1,000.00 128 18"RCP STORM DRAIN PIPE 136.00 LF $35.00 $4,760.00 129 15"RCP STORM DRAIN PIPE 360.00 LF $33.00 $11,880.00 130 15"RCP OR PVC STORM DRIAN PIPE 431.00 LF $33.00 $14,223.00 131 12"RCP STORM DRAIN PIPE 74.00 LF $30.00 $2,220.00 132 12"RCP OR PVC STORM DRAIN PIPE 321.00 LF $30.00 $9,630.00 133 18"RCP FETS 3.00 EA $280.00 $840.00 134 15"RCP FETS 6.00 EA $264.00 $1,584.00 135 12"RCP FETS 2.00 EA $240.00 $480.00 136 LOCATE END OF EXISTING 15"CULVERT AND CONNECT TO NEW 1.00 LS $1,500.00 $1,500.00 15"RCP CULVERT W/CONCRETE COLLAR 137 UNCLASSIFIED EXCAVATION 8,655.00 CY $3.00 $25,965.00 138 FERGUSON POND EXCAVATION AND GRADING 1.00 LS $4,000.00 $4,000.00 139 IMPORTED FILL 11,983.00 CY $16.00 $191,728.00 140 GEOSYNTHETIC REINFORCED FABRIC-MIRIFII 3801 OF EQUAL 21,398.00 SY $6.50 $139,087.00 141 18"THICK 3"MINUS SUBBASE-EXTENDS 9"BEHIND CURB 21,398.00 SY $11.00 $235,378.00 S:\Knox\OAK STREET IMPROVEMENTS-NOV 18 2016\REVISED BUDGET ESTIMATE- FEB 21 2017 REVISED BUDGET ESTIMATE- FEB 21 2017 1 of 4 4:08 PM 2/21/2017 III 190 Drive BOZEMANMAN,MT 59718 T' PHONE: 406.582.9841 FAX. 406.582.9843 project name: Oak Street Improvements-Ferguson to New Holland bid date: 2/21/2017 REVISED BUDGET ESTIMATE item# IDESCRIPTION QUANTITY I UNIT UNIT PRICE TOTAL SCHEDULE I-CONTINUED 142 6"THICK 1.5"MINUS CRUSHED BASE COURSE-EXTENDS 9" 21,398.00 SY $4.05 $86,661.90 BEHIND CURB 143 4"ASPHALT PAVING-2 LIFTS 16,175.00 SY $18.18 $294,061.50 144 2.5"ASPHALT PATH 2,798.00 SY $11.35 $31,757.30 9"THICK 1.5"MINUS CRUSHED BASE COURSE BENEATH 3,357.00 SY $6.90 145 ASPAHLT PATH-EXTENDS V BEYOND EDGE OF ASPHALT $23,163.30 6"FIBER REINFORCED CONCRETE FLATWORK W/ 3"SECTION 18,500.00 SF $5.40 146 OF BASE-INCLUDES HANDICAP RAMPS $99,900.00 148 PEDESTRIAN PATHWAY THROUGH MEDIAN-STATION 33+00 1.00 EA $2,000.00 $2,000.00 PEDESTRIAN PATHWAY THROUGH MEDIAN-STATION 38+70 AND 2.00 EA $2,000.00 44+10 $4,000.00 149 TRUNCATED DOME PANELS 620.00 SF $400.00 $248,000.00 9"THICK CONCRETE ROUNDABOUT TRUCK APRON-INCL 6"OF 3,921.00 SF $15.00 150 BASE $58,815.00 151 CONCRETE CURB AND GUTTER 5,606.00 LF $14,00 $78,484.00 152 ROUNDABOUT MOUNTABLE CURB 291.00 LF $20.00 $5,820.00 153 ROUNDABOUT SPILL CURB 183.00 LF $20.00 $3,660.00 154 MEDIAN CONCRETE CURB 4,920.00 LF $20.00 $98,400.00 155 MEDIAN TYPE A CURB 1,280.00 LF $20.00 $25,600.00 156 3"CONCRETE MEDIAN PAVING-ICL 3"OF BASE 13,680.00 SF $4.50 $61,560.00 157 ADJUST WATER VALVE 8.00 EA $500.00 $4,000.00 158 ADJUST EXISTING MANHOLE TO GRADE 10.00 EA $500.00 $5,000.00 159 1.3'MANHOLE BARREL SECTION 2.00 EA $1,500.00 $3,000.00 160 2.7'MANHOLE BARREL SECTION 2.00 EA $2,000.00 $4,000.00 161 4.0'MANHOLE BARREL SECTION 2.00 EA $2,500.00 $5,000.00 162 INSTALLATION OF EXISTING BARREL ESTION 2.00 EA $1,000.00 $2,000.00 163 1.5"MINUS CRUSHED BASE COURSE BLENDED AT 9.00 CY $50.00 $450.00 YELLOWSTONE AVE PARK APPROACK AND PARK PATH 164 CLASS I RIP RAP 1,398.00 CY $45.00 $62,910.00 165 REPLACE TOPSOIL 5,000.00 CY $5.00 $25,000.00 166 RE-SEED EMBANKMENT BOULEVARD,MEDIAN,AND DISTURBED 1.00 LS $10,000.00 $10,000.00 AREAS 167 HAUL OFF EXCESS TOPSOIL 2,007.00 CY $5.00 $10,035.00 168 6"PVC UTILITY CONDUIT-18"MIN.DEPTH 280.00 LF $9.00 $2,520.00 169 MISC.WORK 1.00 LS $50,000.00 $50,000.00 TOTAL BID-SCHEDULE 1 $2,402,431.00 SCHEDULE II-SIGNAGE&STRIPING IMPROVEMENTS BASE BID 201 REMOVE EXISTING SIGN AND POST 36.00 EA $250.00 $9,000.00 202 REMOVE SINGLE SIGN FACE FROM EXISTING POST 2.00 EA $250.00 $500.00 203 RESET EXISTNG CUSTOM PARK SIGN 1.00 EA $1,500.00 $1,500.00 204 RELOCATE EXISTING SIGN TO NEW LUMINAIRE 1.00 EA $350.00 $350.00 205 RELOCATE EXISTING SIGN W/NEW POST 3.00 EA $550.00 $1,650.00 206 NEW OM4-2 SIGN W/POST 14.00 EA $550.00 $7,700.00 207 NEW ON4-2/W1-6 SIGN CLUSTER W/POST 2.00 EA $550.00 $1,100.00 208 NEW ON4-2/W1-7 SIGN CLUSTER W/POST 1.00 EA $550.00 $550.00 209 NEW OM4-2/R11-2 SIGN CLUSTER W/POST 4.00 EA $550.00 $2,200.00 210 NEW R3-5 SIGN ON SIGNAL MAST 3.00 EA $250.00 $750.00 211 NEW D3-1 SIGN ON SIGNAL MAST 4.00 EA $250.00 $1,000.00 212 NEW R4-7 SIGN W/POST 5.00 EA $550.00 $2,750,00 213 NEW R44 SIGN W/POST 1.00 EA $500.00 $500.00 215 NEW R3-17/R7-1 SIGN CLUSTER W/POST 4.00 EA $550.00 $2,200.00 216 NEW R7-1 SIGN W/POST 1.00 EA $500.00 $500.00 S:\Knox\OAK STREET IMPROVEMENTS-NOV 18 2016\REVISED BUDGET ESTIMATE- FEB 21 2017 REVISED BUDGET ESTIMATE- FEB 21 2017 2 of 4 4:08 PM 2/21/2017 lllhA � 190 Ramshorn Drive BOZEMAN, MT 59718 lz PHONE: 406.582.9841 FAX: 406.582.9843 project name: Oak Street Improvements -Ferguson to New Holland bid date: 2/21/2017 REVISED BUDGET ESTIMATE Item IDESCRIPTION QUANTITY I UNIT UNIT PRICE TOTAL SCHEDULE II-CONTINUED 217 NEW R3-17 SIGN AND RE-USE R7-1 SING ON EXISTING POST 2.00 EA $450.00 $900.00 218 NEW(2)D3-1/(2)D3-1/R4-7 SIGN CLUSTER W/POST 4.00 EA $650.00 $2,600.00 219 NEW R1-5 SIGN W/POST 8.00 EA $550.00 $4,400.00 RECTANGULAR RAPID FLASH BECON W/NEW W11-15NJW16-7P 4.00 EA $5,750.00 $23,000.00 220 SIGN CLUSTER NEW(2)D3-1/(2)D3-1 SIGN CLUSTER AND REUSE R1-1 SIGN W/ 221 POST 3.00 EA $625.00 $1,875.00 222 NEW(2)D3-1/(2)D3-1/R1-1 SIGN CLUSTER W/POST 2.00 EA $650,00 $1,300.00 223 NEW W11-2M/16-7P SIGN CLUSTER W/POST 8.00 EA $600.00 $4,800.00 224 NEW W4-2 SIGN W/POST 1.00 EA $550.00 $550.00 225 NEW W20-5 SIGN W/POST 1.00 EA $550.00 $550.00 226 NEW W2-6/W13-1 SIGN CLUSTER W/POST 3.00 EA $550.00 $1,650.00 227 NEW R3-8 SIGN CLUSTER W/POSTS 6.00 EA $550.00 $3,300.00 228 NEW D11-1/M6-2 SIGN CLUSTER ON LUMINAIRE 8.00 EA $450.00 $3,600.00 229 NEW W11-2/W16-7P SIGN CLUSTER ON DIGNAL HAWK SIGNAL 8.00 EA $450.00 $3,600.00 POLE 230 NEW R10-23 SIGN ON HAWKS SIGNAL MAST 16.00 EA $450.00 $7,200.00 231 NEW(2)D3-1/R1-2 SIGN CLUSTER W.POST 4.00 EA $550.00 $2,200.00 232 NEW D11-1/M5-2 SIGN CLUSTER W/POST 3.00 EA $550.00 $1,650.00 233 NEW D11-1/M6-2 SIGN CLUSTER W/POLE 2.00 EA $550.00 $1,100.00 234 NEW R2-1 SIGN W/POST 2.00 EA $550.00 $1,100.00 235 NEW 6-4 SIGN W/POST 4.00 EA $550.00 $2,200.00 236 NEW R9-11 SIGN W/POST 1.00 EA $500.00 $500.00 237 NEW WHITE FLEXIBLE SURFACE MOUNT DELINEATORS 35.00 EA $350.00 $12,250.00 238 NEW YELLOW FLEXIBLE SURFACE MOUNT DELINEATORS 32.00 EA $350.00 $11,200.00 239 EPDXY TRAFFIC MARKINGS-WHITE 45.00 GL $250.00 $11,250.00 240 EPDXY TRAFFIC MARKINGS-YELOW 3.00 GL $250.00 $750.00 241 THERMOPLASTICS-WHITE 4,944.00 SF $30.00 $148,320.00 242 CURB EPDXY-YELLOW 9,00 GL $250.00 $2,250.00 243 PAVEMENT MARKING OBLITERATION-4"STRIP EQUIVALENT 4,492.00 LF $4.00 $17,968.00 244 MISC.WORK 1.00 LS $5,000,00 $5,000.00 TOTAL BID SCHEDULE II $309,313.00 SCHEDULE III-ELECTRICAL IMPROVEMENTS BASE BID 301 STRUCTURAL CONCRETE POLE FOUNDATION 30.60 CY $1,805.00 $55,233.00 302 CONDUIT, 1.5"PVC,TRENCH 505.00 LF $10.78 $5,443.90 303 CONDUIT,2"PVC TRENCH 5,255.00 LF $14.85 $78,036.75 304 CONDUIT,2"PVC,PUSH 60.00 LF $100.00 $6,000.00 305 CONDUIT,2.5"PVC,TRENCH 335.00 LF $19.58 $6,559.30 306 CONDUIT,2.5"PVC, PUSH 95.00 LF $25.00 $2,375.00 307 CONDUIT,3.0"PVC TRENCH 55.00 LF $22.50 $1,237.50 308 CONDUIT, 3.0"PVC PUSH 80,00 LF $30.00 $2,400.00 309 PULL BOX, COMPOSITE TYPE 1 11.00 EA $616.00 $6,776.00 310 PULL BOX,COMPOSITE TYPE 2 16.00 EA $1,023.00 $16,368.00 311 PULL BOX, COMPOSITE TYPE 3 1.00 EA $1,500.00 $1,500.00 312 CABLE, COPPER, 12C NO. 14AWG(SIGNALS) 1,270.00 LF $3.74 $4,749.80 313 CABLE, COPPER, 7C NO. 14AWG(SIGNALS) 1,305.00 LF $2.64 $3,445.20 314 CABLE, COPPER,5C NO. 14AWG(SIGNAL) 665.00 LF $2.35 $1,562.75 315 CABLE,COPPER,3C NO. 14AWG(OPTICOM) 275.00 LF $3.08 $847.00 316 CONDUCTOR, COPPER#6 AWG,CONTROLLER 120.00 LF $2.00 $240.00 317 CONDUCTOR, COPPER#8 AWG,CONTROLLER 1,245.00 LF $1.50 $1,867.50 318 CONDUCTOR,COPPER 410 AWG,LIGHTING&GROUND 21,635.00 LF $0.72 $15,577.20 319 CABLE RADAR DETECTOR 650.00 LF $3.96 $2,574.00 S:\Knox\OAK STREET IMPROVEMENTS-NOV 18 2016\REVISED BUDGET ESTIMATE- FEB 21 2017 REVISED BUDGET ESTIMATE- FEB 21 2017 3 of 4 4:08 PM 2/21/2017 IIIME: 190 Ramshorn Drive BOZEMAN, MT 59718 N TR PHONE: 406.582.9841 FAX. 406.582.9843 project name: Oak Street Improvements -Ferguson to New Holland bid date: 2/21/2017 REVISED BUDGET ESTIMATE Item IDESCRIPTION QUANTITY I UNIT UNIT PRICE TOTAL SCHEDULE III-CONTINUED 320 SUPPLY AND INSTALL TYPE P CONTROLLER CABINET 1.00 EA $45,321.00 $45,321.00 321 CONTROLLER CABINET PEDESTAL TYPE P 1.00 EA $1,650.00 $1,650.00 322 SUPPLY&INSTALL POLE MOUNTED CONTROLLLER CABINET 4.00 EA $5,750.00 $23,000.00 323 SUPPLY&INSTALL CONTROLLER TYPE P 1.00 EA $2,750.00 $2,750.00 324 SUPPLY&INSTALL TRAFFICWARE TS2 CONTROLLER 4.00 EA $7,250.00 $29,000.00 325 SUPPLY AND NSTALL EMERGENCY PREEMPTION DETECTOR 1.00 EA $2,860.00 $2,860.00 SYSTEM-MODEL 722 326 SUPPLY&INSTALL DETECTOR RADAR/PRESENCE 4.00 EA $9,900,00 $39,600.00 327 SIGNAL STD.TYPE 1-100 12.00 EA $825.00 $9,900.00 328 SIGNAL STD.W/30 FT MAST-TYPE 3A 3,00 EA $10,000.00 $30,000.00 329 SIGNAL STD.W/35 FT MAST-TYPE 3A 6.00 EA $10,560.00 $63,360.00 330 SIGNAL STD.W/40 FT MAST-TYPE 3A 2.00 EA $15,000.00 $30,000.00 331 SIGNAL STD.W/45 FT MAST-TYPE 3A 1.00 EA $25,000.00 $25,000.00 332 LIGHT STANDARD 40 FT MOUNTING HEIGHTS WI 10 FT MAST 15.00 EA $5,000.00 $75,000.00 ARM 333 ARM STANDARD 40 FT MOUNTING HEIGHTS WI 15 FT MAST 2.00 EA $7,000.00 $14,000.00 334 LUMINAIRE ASSEBLY LED 29.00 EA $500.00 $14,500.00 335 12"x12"x12"TRAFFIC SIGNAL IND. 8.00 EA $1,540.00 $12,320.00 336 12"x12"x12"HAWK SIGNAL INDICATIONS 24.00 EA $1,870.00 $44,880.00 337 MAST ARM ASTRO BRACKETS 6.00 EA $250.00 $1,500.00 338 PEDESTRIAN SIGNAL IND,12"SYMBOLS-COUNT DOWN 24.00 EA $1,485.00 $35,640.00 339 PEDESTRIAN PUSH BUTIONS-TACTILE 24.00 EA $2,090.00 $50,160,00 340 TYPE C SERVICE ASSEMBLY 4.00 LS $5,315.00 $21,260.00 341 CONSTRUCTION TRAFFIC CONTROL 1.00 LS $15,000.00 $15,000,00 342 REMOVE AND SALVAGE EXISTING LUMINAIRIES 1.00 LS $7,500.00 $7,500.00 343 MISC.WORK 1.00 LS $20,000.00 $20,000.00 TOTAL BID -SCHEDULE III $826,993.90 TOTAL BID-SCHEDULE 1 $2,402,431.00 TOTAL BID SCHEDULE II $309,313.00 TOTAL BID -SCHEDULE 111 $826,993.90 PROJECT TOTAL $3,538,737.90 5%CONTINGENCY $176,936.90 TOTAL W/5%CONTINGENCY $3,715,674.80 S:\Knox\OAK STREET IMPROVEMENTS-NOV 18 2016\REVISED BUDGET ESTIMATE- FEB 21 2017 REVISED BUDGET ESTIMATE- FEB 21 2017 4 of 4 4:08 PM 2/21/2017 i i III 190 Ramshorn Drive BOZEMAN,MT 59718 N PHONE: 406.582.9841 FAX: 406.682,9843 bidproject ate:d t name: FERGUSON AVENUE IMPROVEMENTS bid date: 2/13/2017 REVISED Item# DESCRIPTION QUANTITY UNIT UNITPRICE TOTAL WATER 1-1 6"CL 51 DI HYDRANT LEAD PIPE 25.00 LF $44,00 $1,100.00 1-2 6"FIRE HYDRANT ASSEMBLY 1.00 EA $4,350.00 $4,350.00 1-3 10"X 6"TAPPING SLEEVE 1.00 EA $2,000.00 $2,000.00 1.4 REMOVE EXISTING BLOWOFF AND PLUG AT MAIN 1.00 EA $750.00 $750.00 1-5 WATER TESTING 1.00 LS $0.00 $0.00 SANITARY SEWER TOTAL $8,200.00 2-1 ADJUST MANHOLES WITH GRADE RINGS 6.00 EA $500.00 $3,000.00 2-2 ADJUST MANHOLES WITH 12"BARREL SECTION AND GRADE RINGS 1.00 EA $1.000.00 $1,000.00 2-3 ADJUST MANHOLES WITH 18"BARREL SECTION AND GRADE RINGS 1.00 EA $1,250.00 $1,250.00 STORM SEWER TOTAL $5,250.00 3-1 18"PVC PIPE 213.00 LF $35.00 $7,455.00 3-2 12"PVC PIPE 132,00 LF $25.00 $3,300.00 3-3 FLARED END TREATMENTS 2.00 EA $550.00 $1,100.00 3-4 38"X 38"X 6"CONCRETE HEADWALL 1.00 EA $1,250.00 $1,250.00 3-5 24"X 36"INLET 2.00 EA $2,750.00 $5,500.00 3-6 36"COMBINATION MANHOLE/CURB INLET 1.00 EA $2,570.00 $2,570.00 3-7 36"OUTLET STRUCTURE 1.00 EA $2,150.00 $2,150.00 3-8 GRADE STORM WATER POND 1.00 EA $4,000.00 $4,000.00 Earthwork Quantities TOTAL $27,325.00 4-1 STRIPPED TOPSOIL w/in ROW 9,821.00 CY $3.75 $36,828.75 4-2 CUT w/in PROPOSED ROADWAY(Assumes topsoil has 6,997.00 CY $3.75 $26,238.75 4-3 FILL w/in BOULEVARD(Finished Grade to bottom of exiE 5,228.00 CY $4.00 $20,912.00 STREET IMPROVEMENTS TOTAL $83,979.60 4-1 INTEGRAL CURB AND GUTTER 4,941.00 LF $14.00 $69,174.00 4-2 CURB 144.00 LF $20.00 $2.880.00 4-3 CONCRETE ISLAND(6"THICK REINFORCED CONCRETE) 354.00 SF $10.00 $3,540.00 4-4 SINGLE ADA RAMP 12.00 EA $1,100.00 $13,200.00 4-5 GUTTER CROSS PAN 864.00 SF $11.00 $9,504.00 4-6 ASPHALT(4"Thick) 2,772.00 TONS $74.80 $207,345.60 4-7 1 1/2"MINUS GRAVEL SUBBASE(6"Thick) 2,161.00 CY $23.00 4-8 6"MINUS SUBBASE 24"Thick 138,320.00 ( ) 8,645.00 CY $16.00 $138,320.00 4-9 8 oz.WOVEN GEOTEXTILE ROAD FABRIC(i.e.MIRAFI 500X) 15,069.00 Sy $1.35 $20,343.15 4-10 BIAXIAL GEOGRID(i.e.TERRAGRID RX1200) 15,069.00 SY $5.00 $75,345.00 4-11 REINFORCED CONCRETE SIDEWALK(6"Thick) 1,631.00 SF $6.00 $9.786.00 4-12 SIDEWALK SUBBASE(1 112"MINUS GRAVEL BASE)(4"Thick) 20.00 CY $25.00 $500.00 4-13 8'WIDE ASPHALT TRAIL(2.5"Thick) 300.00 TONS $74.80 $22,440.00 4-14 TRAIL SUBBASE(1 1/2"MINUS GRAVEL BASE)(9"Thick) 652.00 CY $27.00 $17,604.00 4-15 MILL EXISTING ASPHALT 8,160.00 SF $1.00 $8,160.00 TOTAL $647,844.75 S:\Knox\FLANDERS MILL SUBDIVISION FERGUSON EXTENSION-MARCH 30 2016\REVISED QUANTITIES-FEB 9 2017\FERGUSON AVE IMPROVEMENTS-FEB 13 2017 REVISION 2-2 09 PM FERGUSON AVE IMPROVEMENTS-FEB 13 2017 REVISION 2A 2 09 PM 2:11 PM 2/13/2017 i �I i Exhibit E NOTICE OF PASSAGE OF RESOLUTION OF INTENTION TO CREATE SPECIAL IMPROVEMENT DISTRICT NO. 740 CITY OF BOZEMAN, MONTANA NOTICE IS HEREBY GIVEN that on March 20, 2017 the City Commission (the ` "Commission") of the City of Bozeman, Montana (the "City"), adopted Resolution 4771, a Resolution of Intention to create Special Improvement District No. 740 (the "District") for the purpose of undertaking certain local improvements to Ferguson Avenue between West Oak Street and Baxter Lane and on West Oak Street between Davis Lane and Ferguson Avenue and financing the costs thereof and incidental thereto through a loan to the District from the City's C arterial and collector district fund. A complete copy of the Resolution No. 4771 (the"Resolution")is on file with the Bozeman City Clerk. The Resolution more specifically describes the nature of the improvements, the boundaries and the area included in the District, and other matters pertaining thereto and fturther particulars. The Resolution and accompanying exhibits may be also viewed on the City's website at www.bozeman.net. 1 The City proposes to undertake certain local improvements to benefit certain property located in l the city. The Improvements consist of roadway improvements to Ferguson Avenue between West Oak Street and Baxter Lane and on West Oak Street between Davis Lane and Ferguson Avenue, including: widening the road, installation of curbing, storm drainage improvements, and pedestrian ramps, as more particularly described in Section 5 of Resolution 4771 (the "Improvements"). The total estimated costs of the Improvements is $2,525,667.00; however,the City has committed $1,062,138.50 from the street impact fee fund and Flanders Mill x Subdivision has committed $401,390.62 for its share of the improvements to North Ferguson Avenue, through a separate agreement with the city, leaving $1,062,138.50 to be funded by the district (hereafter referred to as the District's Share of the Improvements). It is the intention of the City Commission to create and establish in the City under Title 7, Chapter 12, Parts 41 and 42, MCA, as amended, the District for the purpose of financing the District's Share of the Improvements and paying costs incidental thereto, including costs associated with the creation and administration of the District (collectively the "Incidental Costs"). The total estimated cost of the District's Share of the Improvements, including such Incidental Costs, is $1,063,138. Subject to the limitations in Sect. 7-12-4222, MCA the general fund of the City may be used to provide loans to the special improvement revolving fund or a general tax levy may be imposed on all taxable property in the City to meet the financial requirements of the revolving fund. } To fund the costs of the District's Share of the Improvements, the Commission intends to provide the District a loan of approximately $1,063,138 from the City's Arterial & Collector District Fund, the purpose of which is to finance the construction warrants related to the District's Share of the Improvements and Incidental Costs. In doing so, the Commission intends to levy assessments against each property in the District pursuant to Sect. 7-12-4163, MCA Exhibit E (street frontage assessment method)to reimburse the special improvement district revolving loan fund in an amount to equal the principal of the loan of$1,063,138 plus interest at approximately 2.5% annually over the 3 year term of the loan. On Monday, April 171, 2017, at 6:00 p.m., in the Commission Room of City Hall, 121 North Rouse Avenue, Bozeman, Montana, the City Commission will conduct a public hearing regarding adoption of a resolution creating the District and pass upon all written protests against the creation or extension of the District,or the Improvements. Written protests against the creation or extension may be filed by an owner of real property within the proposed District whose property is liable to be assessed for the Improvements. Such protests must be delivered to the City Clerk at the City Hall, 121 North Rouse Avenue, Suite 202,Bozeman, Montana not later than 5:00 p.m.,M.T., on Monday,April 10, 2017. Further information regarding the proposed District or other matters in respect thereof may be obtained from the City Engineer, PO Box 1230, Bozeman, Montana, 59771 or by telephone at (406) 582-2280. Dated: March 20,2017 BY ORDER OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,MONTANA ' 1 J Of BO ti • .4V •y ROBIN CROUGH City Clerk c••,. 1883 . ' `•• . • r NCO.�No Legal Ad Publication Dates: Sunday March 26"',2017 Sunday April 2nd, 2017 AFFIDAVIT OF MAILING STATE OF MONTANA ) ss County of Gallatin ) Robin Crough,Bozeman City Clerk,being first duly sworn, says: That I deposited in the U.S. Post Office at Bozeman, Montana, on the 24th day of March, 2017, a copy of the Notice of Passage of Resolution 4771 (A resolution of intent to create the Oak & Ferguson Street SID (SID No. 740) to owners of real property located in Special Improvement District No. 740, as those properties are listed in Exhibit "C" of Reso.Wion,4271, directed to the owners at the addresses shown on Exhibit'B". $0 ZE .•Ar . � n Ro in Crough c� City Clerk �'yli+ ,a83• tio�. 9 TIN CO Subscribed and sworn to before me this 24th day of March,2017. otarial.Seal} tJ�lcry PEARL MICHALSON `o— p� ��Sp Nolary Public Printed name ?eerL a;Natnsi,l�•. �.- for the State of Montana Notary Public for the State of Montana =,t `— i icsiding at: =,9 EA 1 .Pzy. c ei r,an, Montana Residing at Bozeman,Montana of Mp ,. y omI I sion Expires: My Commission expires: 0 2 March 10,2020 BOZ E MAN MT City Clerk March 24, 2017 RE: Notice of Passage of Resolution of Intent to Create the Special Improvement District 740, Notice of Right to Protest, and Notice of Public Hearing on Monday, April 17, 2017 Dear Property Owner, On Monday, April 17, 2017 at 6:00 PM in the Commission Room at Bozeman City Hall, the Bozeman City Commission will hold a public hearing to consider written protests to the formation of the Special Improvement District 740 to fund street reconstruction improvements to North Ferguson Avenue between West Oak Street and Baxter Lane and on West Oak Street between Davis Lane and North Ferguson Avenue. You are being mailed this letter because you are considered an owner of real property within the proposed district. At a public hearing on March 20, 2017,the Bozeman City Commission adopted Resolution 4771, a resolution of intent to create Special Improvement District 740 (the "District"). Attached to this letter you will find a copy of the notice of passage of Resolution 4771. The Resolution of Intent No. 4771 is on file in the City Clerk's office located at City Hall, 121 North Rouse Avenue, Suite 202 and can also be found on the City's website at www.bozeman.net by following the steps provided: I want to button, view document center, Commission Documents, Resolutions, 2017 Resolutions, and by clicking on Resolution No. 4771. The District, if created, will comprise the area shown on Exhibit A of Resolution 4771 (map also attached) and will be for the purpose of constructing street and storm drainage improvements to North Ferguson Avenue between West Oak Street and Baxter Lane and on West Oak Street between Davis Lane and North Ferguson Avenue. If created, the costs of the District will be assessed bi-annually to all owners of real property within the District based upon the amount of frontage of each lot or parcel, expressed in linear feet. Total assessment amounts by parcel can be found in Exhibit C (attached). Owners of property have 15 days from March 26, 2017 to make a written protest against the creation of the District. On April 17, 2017, the City Commission will conduct a public hearing at 6:00 PM in the Commission Room at Bozeman City Hall, 121 North Rouse Ave., Bozeman, MT to Bozeman, MT 59771-1230 1 TDD: 406-582-2301 THE MOST LIVABLE PLACE. BOZ E MAN MT City Clerk consider a resolution to create the District. Please see the attached Notice. During this public hearing the City Commission will accept public comment and consider all valid written protests submitted prior to the established deadline of 5:00 PM on Monday, April 10, 2017. For more information on the creation of the District please contact the City Engineer Rick Hixson at 582-2284. Sincerely, �,. Robin Crough, City Clerk 1L•• • • .��� City of BozemanTrN co•�l- Enc. Notice of Passage of Resolution 4771 O121 North Rouse Avenue :• 1 • O 406 i © 406 44 www.bozeman.net TDD: 406-582-2301 THE MOST LIVABLE PLACE.