Loading...
HomeMy WebLinkAbout03-27-17 City Commission Packet Materials - C7. Resolution 4793 - Amendment 2 with Dick Anderson for Sports Park Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Carolyn Poissant – Manager of Trails, Open Space, and Parks Design and Development Mitch Overton – Director of Parks and Recreation SUBJECT: Resolution 4793, Authorizing the Acting City Manager to Sign the Guaranteed Maximum Price Amendment Number 2 to the Contract with Dick Anderson Construction, Inc. for Maynard Irrigation Pipeline Relocation in the Bozeman Sports Park MEETING DATE: March 27, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution No. 4793 for Guaranteed Maximum Price Amendment No. 2 with Dick Anderson Construction, Inc. for Relocation of the Irrigation Pipeline at the Bozeman Sports Park (“Exhibit A”) for an amount not to exceed $335,250.89. BACKGROUND: Resolution No. 4521 was unanimously approved by the Commission April 14, 2014 for the allocation of Trails, Open Space and Parks (TOP) bond funding in an amount not to exceed $7,500,000 for the acquisition of park land and development of the Bozeman Sports Park Project (“Park Project”), which requires the assistance of a professional design and engineering team. The resolution allocated up to (i) $2,100,000 for the acquisition of approximately 80 acres of park land; (ii) up to $1,788,000 for infrastructure improvements as stated in the Commission motion adopted April 7, 2014; and (iii) the remainder for park design and development. The land purchase was completed in 2014 for $2,022,413 leaving $3,689,587 for design and construction of park improvements, reserving the $1,788,000 for infrastructure. The Commission approved Resolution 4680 authorizing the use of an alternate delivery contract for the hiring a General Contractor/Construction Manager (“GCCM”). The Bozeman Sports Park Master Plan has was approved by Commission July 11, 2016. Dick Anderson Construction, Inc. was approved by Commission as the GCCM for the project May 23, 2016. Guaranteed Maximum Price Amendment No. 1 for the Maynard Pipeline Relocation was approved by Commission January 9, 2017 for a total of 303,761.07, which includes a contingency of $22,600. During initial construction, it was determined that additional pipe and fittings not correctly specified in the engineering drawings are needed to complete the work to connect to existing farm irrigation systems. The GCCM has negotiated with the subcontractor and obtained an in-kind credit of $6000 toward the change order amount, in the spirit of the GCCM contract Section 2.1.2.1: 55 As such, the GCCM and staff’s recommendation is to approve the change order amount of $31,481.82, leaving a 5% contingency for the remainder of this work of ($10,000) for a new GMP total of $335,250.89 as per Attachment 1 of Exhibit A. Construction phase General Conditions Costs and 5.5% cost of the work will be paid to Dick Anderson Construction, Inc. in accordance with the previously approved Agreement (Exhibit B), however, no additional General Conditions costs will be added to this change order amount, per Dick Anderson. UNRESOLVED ISSUES: ALTERNATIVES: Per Commission. FISCAL EFFECTS: The Agreement will allow the project to proceed as previously approved. ATTACHMENTS: Resolution 4793 - Exhibit A – AIA A133 – Exhibit A - Guaranteed Maximum Price Amendment No. 2 Exhibit B – AIA A133 – Agreement Between The City of Bozeman and Dick Anderson Construction, Inc. Report compiled on: March 17, 2017 56 COMMISSION RESOLUTION NO. 4793 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING GUARANTEED MAXIMUM PRICE AMENDMENT NO. 2 TO THE CONTRACT WITH DICK ANDERSON CONSTRUCTION, INC. FOR THE BOZEMAN SPORTS PARK WHEREAS, on May 23, 2016, the City Commission approved the “Agreement for General Contractor / Construction Manager Services with Dick Anderson Construction, Inc. for the Bozeman Sports Park” ("contract"); and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any alterations or modifications of the specifications and/or plans of a contract be made by resolution; and WHEREAS, the first portion of the work to be performed is the relocation of the Maynard irrigation pipeline, which has been approved by Commission Resolution No. 4754 as Amendment No. 1 to the contract; and WHEREAS, additional work beyond the scope of the previously approved contract needs to be performed, which includes additional pipe and fittings, as delineated in Amendment No. 2 to the contract; NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modification to the contract between the City of Bozeman, a municipal corporation, and Dick Anderson Construction, Inc. as indicated in Exhibit A - Guaranteed Maximum Price Amendment No. 2, attached hereto, is hereby approved; and the City Manager is hereby authorized and directed to execute the contract amendment for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 57 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 27th day of March, 2017. ___________________________________ CARSON TAYLOR Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 58 59 60 61 62