Loading...
HomeMy WebLinkAbout03-27-17 City Commission Packet Materials - C4. Amendment 1 with Sanderson Stewart for Kagy Boulevard Improvements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Kagy Boulevard Interim Improvements Project - Amendment No. 1. MEETING DATE: March 27th, 2017 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign Amendment No. 1 with Sanderson Stewart. BACKGROUND: Attached is a copy of the partially executed Amendment No. 1 with Sanderson Stewart for the Kagy Boulevard Interim Improvements Project. The document is in the City’s standard format. The draft Water Facility Plan calls for the existing 6” water main in Kagy Boulevard be upsized to 10” to accommodate future flows in the area. The existing main is located near the location of the proposed curb line for the interim widening improvements. It was decided to add the water main to the interim project so that if the flows in the area require the larger main before the ultimate buildout project is complete, the curb won’t need to be removed and replaced for the installation of the main. This amendment will add the design and construction phase services for the installation of the water main. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: $24,215 from the Water Fund. Attachments: Amendment No. 1 Report compiled on: 3/15/17 24 25 26 27 28 29 30 31 32