Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
Rick Hixson, City Engineer
SUBJECT: Kagy Boulevard Interim Improvements Project - Amendment No. 1.
MEETING DATE: March 27th, 2017
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Approve and authorize City Manager to sign Amendment No. 1 with
Sanderson Stewart.
BACKGROUND: Attached is a copy of the partially executed Amendment No. 1 with
Sanderson Stewart for the Kagy Boulevard Interim Improvements Project. The document is in
the City’s standard format.
The draft Water Facility Plan calls for the existing 6” water main in Kagy Boulevard be upsized
to 10” to accommodate future flows in the area. The existing main is located near the location of the proposed curb line for the interim widening improvements. It was decided to add the water main to the interim project so that if the flows in the area require the larger main before the
ultimate buildout project is complete, the curb won’t need to be removed and replaced for the
installation of the main. This amendment will add the design and construction phase services for
the installation of the water main.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission
FISCAL EFFECTS: $24,215 from the Water Fund.
Attachments: Amendment No. 1
Report compiled on: 3/15/17