Loading...
HomeMy WebLinkAbout03-06-17 City Commission Packet Materials - A1. Glen Lake Commerce Preliminary Plat16533, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 1 of 27 16533, City Commission Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Public Hearing Dates: City Planning Board, February 7, 2017 at 7:00 pm in the City Commission Room, 121 N. Rouse Avenue, Bozeman, Montana. Bozeman City Commission, March, 6, 2017 at 6:00 pm in the City Commission Room, 121 N. Rouse Avenue, Bozeman, Montana. Project Description: A major subdivision preliminary plat application to subdivide a 5.49-acre parcel into 15 lots for industrial development, one common open space lot, and dedicated right-of-way. Project Location: The property is addressed as 93 Griffin Drive and is legally described as a Lot 1A, Minor Subdivision 154A, located in the SW ¼ of Section 31, Township 1 South, Range 6 East, P.M.M., City of Bozeman, Gallatin County, Montana. The property is zoned M-1 (Light Manufacturing District). Recommendation: Approval with conditions and code provisions. City Commission Recommended Motion: “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for Application 16533 and move to approve the Glen Lake Commerce Subdivision Preliminary Plat with conditions and subject to all applicable code provisions.” Report Date: February 24, 2017 Staff Contact: Mitch WerBell, Assistant Planner Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues The applicant requested two deviations from drive access separation standards as allowed by the Bozeman Municipal Code. The City Engineer granted one of the requested deviations. This report includes related findings on page 18. The project representative stated that the project team is actively working with the Map Brewing landowner to coordinate the alignment of the northern drive access with the adjacent property, which would eliminate the requirement for a deviation or subdivision variance. At the February 7, 2017 Planning Board public hearing, Staff discussed potential revisions to an originally recommended condition pertaining to potential environmental hazard mitigation. Planning Staff worked collaboratively with the City Attorney’s Office and the Engineering 54 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 2 of 27 Division to modify the recommended conditions and related findings to include some alternative directives. This report includes the recommended conditions of approval, as revised on February 24, 2017, on pages 9-11. Project Summary The Department of Community Development received a preliminary plat application for the subdivision of a 5.49-acre tract of record to create 15 light manufacturing lots, one common open space lot for stormwater, and dedicate 1.046-acres for right-of-way. Major subdivisions require review and a recommendation by the Planning Board. State statute requires a public hearing before a City Commission decision. At its January 18, 2017 meeting, the Development Review Committee (DRC) voted unanimously to recommend approval of the application with the conditions and code provisions identified in this report. On February 7, 2017, the City Planning Board voted 9:0 to recommend that the City Commission approve the preliminary plat subject to all conditions and code provisions. One member of the public testified in support of the application at the February 7, 2017 public hearing. Planning Board Resolution #16533 and meeting minutes are attached to this report. The applicant did not request any subdivision variances with this application. The City did not receive any written public comment as of the writing of this report. The governing body must make a final decision on a major subdivision preliminary plat within 60 working days of the date it was deemed adequate; in this case by April 13, 2017. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; or 4. Continue the public hearing on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. 55 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 3 of 27 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 2 Alternatives ......................................................................................................................... 2 SECTION 1 – MAP SERIES .......................................................................................................... 4 SECTION 2 – REQUESTED VARIANCES ................................................................................. 9 SECTION 3 – RECOMMENDED CONDITIONS OF APPROVAL ............................................ 9 SECTION 4 – CODE PROVISIONS REQUIRING PLAT CORRECTIONS ............................ 11 SECTION 5 – DRC ADVISORY COMMENTS ......................................................................... 14 SECTION 6 – RECOMMENDATION AND FUTURE ACTIONS ............................................ 15 SECTION 7 – STAFF ANALYSIS and findings ......................................................................... 15 Applicable Subdivision Review Criteria, Section 38.03.040, BMC................................. 15 Primary Subdivision Review Criteria, Section 76-3-608 ................................................. 17 Preliminary Plat Supplements ........................................................................................... 21 APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY..................................... 25 APPENDIX B – DETAILED PROJECT DESCRIPTION .......................................................... 26 APPENDIX C – NOTICING AND PUBLIC COMMENT ......................................................... 27 APPENDIX D – OWNER INFORMATION AND REVIEWING STAFF ................................. 27 FISCAL EFFECTS ....................................................................................................................... 27 ATTACHMENTS ......................................................................................................................... 27 56 16533, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 4 of 27 SECTION 1 – MAP SERIES Exhibit 1 – Zoning 57 16533, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 5 of 27 Exhibit 3 – Plat 58 16533, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 6 of 27 Exhibit 4 – Utility layout 59 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 7 of 27 Exhibit 5 – Aerial 60 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 8 of 27 Exhibit 6 –Manley Road conditions (looking SE) 61 16533, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 9 of 27 SECTION 2 – REQUESTED VARIANCES The applicant did not request any subdivision variances with this preliminary plat application. SECTION 3 – RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to this project. Recommended Conditions of Approval: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. The final plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Monumentation, Certificates of Survey, and Final Subdivision Plats (24.183.1101 ARM, 24.183.1104 ARM, 24.183.1107 ARM) and must be accompanied by all required documents, including certification from the City Engineer that record drawings for public improvements were received, a platting certificate, and all required and corrected certificates. 3. The final plat must include a transfer of private improvements certificate to read substantially as follows: CERTIFICATE OF TRANSFER OF OWNERSHIP & COMPLETION OF NON- PUBLIC IMPROVEMENTS The following are hereby granted and donated to the property owners’ association noted below for the owners’ use and enjoyment: (LIST ITEMS). Unless specifically listed in the Certificate of Dedication, the City accepts no responsibility for maintaining the same. I, (Subdivider), hereby further certify that the following non-public improvements, required to meet the requirements of Chapter 38 of the Bozeman Municipal Code, or as a condition(s) of approval of the subdivision platted herewith, have been installed in conformance with any approved plans and specifications prepared in accordance with the standards of Chapter 38 or other City design standards, or have been financially guaranteed and are covered by the subdivision improvements agreement accompanying and recorded with this plat. Installed Improvements: (LIST ITEMS). Financially Guaranteed Improvements: (LIST ITEMS OR STATE ‘NONE’). The subdivider hereby grants ownership of all non-public infrastructure improvements to the property owners’ association created by Document Number ______________________(To be filled in when recorded) By: (Subdivider) Date: ____________________________ 4. The property owners’ association declaration of covenants, conditions, and restrictions must address the requirements for street trees (a City of Bozeman planting permit for street trees, and obtaining utility locations) before any excavation begins in the City of Bozeman right-of- 62 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 10 of 27 way. The covenants must include a planting note stating that the planting hole must be at least twice the diameter of the root ball, that the root flare of the newly planted tree is visible and above ground, and there should be a mulch ring 3’- 4’ in diameter around each newly planted boulevard tree. 5. Concurrent with recording the final plat for the subdivision, the applicant must transfer ownership of all common property and areas to the property owners’ association. 6. The final plat must contain the following notation on the conditions of approval sheet: “Ownership of all common open space areas and trails, and responsibility of maintenance thereof and for city assessments levied on the common open space lands must be that of the property owners’ association. Maintenance responsibility must include, in addition to the common open space and trails, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to other common open space areas. All areas within the subdivision that are designated herein as common open space, including trails, are for the use and enjoyment by the owners of the development and the general public. The property owners’ association is responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common open space areas and trails.” 7. If not already filed, the applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SIDs) prior to final plat approval for the following: a. Street improvements to Manley Road including paving, curb/gutter, sidewalk, and storm drainage; b. Street improvements to East Griffin Drive including paving, curb/gutter, sidewalk, and storm drainage; c. Intersection improvements to the intersection of Manley Road and East Griffin Drive; d. Intersection improvements to the intersection of West Griffin Drive and N. 7th Avenue; e. Intersection improvements to the intersection of East Griffin Drive and Bridger Drive; f. Railroad crossing improvements on East Griffin Drive. The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. This must be provided prior to final plat approval. 8. On-site wells that are not in use must be properly abandoned prior to final plat approval. 9. The property owners’ association documents must include full copies of the Phase I and Phase II Environmental Site Assessments conducted for this property. 10. The declaration of covenants, conditions, and restrictions must contain provisions referencing the identified and potential environmental hazards on the property. Said covenants must run with the land, bind all holders, owners, lessees, occupiers, and purchasers of the property, and must be included in all deeds, leases, and other instruments of conveyance of the 63 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 11 of 27 property. No modifications to the covenants are allowed without prior written consent of the City. 11. The final plat must contain a note on the face of the plat advising current and future property owners of the identified and potential environmental hazards on the property. Said plat note must reference the Environmental Site Assessments by project number and the associated declaration of covenants conditions, and restrictions. 12. Prior to any disturbance of subsurface strata and soils, the applicant must contact the Montana Department of Environmental Quality and obtain a formal determination of whether a remedial investigation work plan or institutional control is required for the existing contaminated surface soil. If the Montana Department of Environmental Quality requires a remedial investigation work plan or institutional control consistent with Montana environmental statutes and regulations for the existing contaminated surface soil, said work plan and/or institutional control must be submitted to the City with assurance of appropriate financing to secure any required remediation prior to construction and final plat approval. Thereafter, any on-site contamination must be managed in accordance with any required work plan and/or institutional control consistent with Montana environmental statutes and regulations. 13. The declaration of covenants, conditions, and restrictions must list the City and the Montana Department of Environmental Quality as intended beneficiaries, entitled to enforce the covenants related to identified and potential environmental hazards and remediation on the property. 14. The applicant must submit with the application for final plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions have been satisfactorily addressed, and must include a digital copy (pdf) of the entire final plat submittal. This narrative must sufficiently direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. SECTION 4 – CODE PROVISIONS REQUIRING PLAT CORRECTIONS A. Section 38.06.070, requires the city commission or their designated agent to certify approval of the plat of the subdivision. The applicant must eliminate the certificate of governing body from the final plat. B. Section 38.06.020, requires that all plats of subdivisions must contain a certificate of dedication or certificate of consent. The certificate of dedication on the final plat must include the specific names of the streets dedicated to the public for which the City accepts responsibility. C. Section 38.23.060, requires the provision of public and/or private easements for private and public utilities, drainage, vehicular or pedestrian access, etc. The final plat must provide all necessary utility easements, which must be described, dimensioned and shown on the final plat in their true and correct location. 64 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 12 of 27 D. Sections 38.27.020.B and 38.27.020.C, discuss exemptions to required park land dedication requirements and future requirements upon further development. The applicant must add a note to the conditions of approval sheet that states, “No park land dedicated with this subdivision. Development on land initially exempted from park dedication is required to provide park dedication if further development of the site does not continue to meet the criteria for exemption.” Any future residential use will require the transfer of park land or cash in-lieu. E. Section 38.27.090, requires the filing of a waiver of right to protest the creation of a park maintenance district with final subdivision plats when appropriate. Unless already filed, the applicant must sign and file a waiver of right to protest the creation of a park maintenance district at the Gallatin County Clerk and Recorder’s Office with the final plat. F. Sections 38.38.020 and 38.38.030, discuss the requirements for supplementary documents including property owners’ association documents and covenants. The applicant must provide the necessary declarations and recitals to facilitate the property owners’ association declaration of covenants, conditions, and restrictions. Any cost sharing agreements for maintenance must be included with the final plat. The final plat and property owners’ association (POA) declaration of covenants, conditions, and restrictions must not include any reference to “dedicated” open space. The POA must own and maintain the stormwater lot. The plat and POA documents must specifically designate Lot 9, Block 2 as common open space owned and maintained by the POA. The property owners’ association declaration of covenants, conditions, and restrictions must incorporate the stormwater maintenance plan, to inform the property owners of maintenance responsibilities associated with the stormwater detention pond on the common open space lot for the subdivision. Additionally, the applicant is encouraged to include the City Stormwater Division guidance document for maintenance of stormwater ponds in the POA documents. G. Section 38.23.180, states that the transfer of water rights or the payment of cash-in-lieu (CIL) of water rights shall be provided. Cash in-lieu of water rights must be paid prior to final plat approval. H. Section 38.24.060.B.4, requires all arterial and collector streets and intersections with arterial and collector streets to operate at a minimum level of service "C" unless specifically exempted. Section 38.24.060.B.4.b, allows an exception to the LOS standard if: 1. Granting a waiver would not be contrary to the public health and safety and is in the public interest; As the intersection level of service operates at a LOS “D” in the AM peak- hour condition primarily due to left turn traffic from Manley onto Griffin and traffic generated by this project will impact the intersection LOS primarily in 65 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 13 of 27 the PM peak hour condition as traffic leaves the project, the public health and safety are protected. 2. Improvements to the intersection LOS are within the next three years of the City’s capital improvement plan (CIP); The CIP lists this intersection for construction of improvements within three years. 3. All right-of-way necessary for the intersection improvements are obtained; The applicant must verify all right of way is in public control prior to approval of a waiver. 4. The Commission has approved a financing plan; The financing is provided through the City’s Impact Fee Program and the applicant must verify if a local share is required for this intersection other than what is planned in the City’s Arterial and Collector District Fund. I. Section 38.23.030.A states, the developer shall install complete drainage facilities in accordance with the requirements of the state department of environmental quality and the city, and shall conform to any applicable facilities plan and the terms of any approved site specific stormwater control plan. The city's requirements are contained in the design standards and specifications policy and the city modifications to state public works standard specifications, and by this reference these standards are incorporated into and made a part of these regulations. The applicant must provide detention volume in the proposed detention pond to accommodate runoff from the portion of Manley Road that can drain to the pond, which will be one half of Manley Road south of the pond. Upon construction of curb and gutter, Manley Road will no longer drain to borrow ditches. J. Section 38.24.010.A, states all streets shall be provided in accordance with the adopted growth policy and/or transportation plan. The arrangement, type, extent, width, grade and location of all streets shall be considered in their relation to existing and planned streets, to topographical conditions, to public convenience and safety, and to the proposed uses of the land to be served by such streets. Manley Road must be constructed to a full collector street standard where adjacent to the project prior to final plat approval. As an alternative, the applicant has been working with City Engineering staff to implement a special improvements district (SID) for Manley Road from the intersection of Manley and Griffin to the northern City Boundary on Manley. The SID must be approved by the City Commission and financing secured for the improvements to Manley Road prior to final plat approval. A mid-block pedestrian crossing of Manley Road with appropriate warning signals at the northern local street intersection and Manley Road must be constructed. The mid- block pedestrian crossing may be included in the SID project for Manley Road, if approved. 66 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 14 of 27 K. Section 38.24.110.B.1.a, states developers shall install transportation pathways, to provide adequate multimodal transportation facilities within the development, as part of the required development improvements. Transportation pathways shall be ADA accessible, and include the following types of facilities: Sidewalks. City standard sidewalks must be constructed where Manley Road is adjacent to the project as well as both sides of the local street through the project. The sidewalk adjacent to Manley Road may be included in the SID, if approved. L. Section 38.24.090.D.3, lists access separation standards: These standards apply to the minimum distance between public and/or private accesses and intersections, and the minimum distance between public and/or private accesses and other public and/or private accesses. The proposed local street does not meet the access separation standards where it intersects with Manley Road at two locations. The applicant applied for an access deviation per BMC 38.24.090.H.3. That access deviation request is granted for the southern intersection, but the deviation is not granted for the northern intersection. The northern intersection must be aligned with the Map Brewing Company access across Manley Road. Additionally, the City prefers the southern intersection to be aligned with the Mergenthaler access across Manley Road if possible, but that is not a requirement. SECTION 5 – DRC ADVISORY COMMENTS I. All notes, restrictions and conditions of approval must be relocated from the plat and transferred to the final plat conditions of approval sheet. II. The certificate of completion must be properly updated prior to final plat approval to list all completed and accepted improvements and financially guaranteed improvements. III. The applicant must contact the Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers regarding the proposed project, and any required permits (i.e., 310, 404, Turbidity exemption, etc.) must be obtained by the applicant and provided prior to final plat approval. IV. Plans and Specifications for water and sewer main extensions, streets, and stormwater improvements, prepared and signed by a professional engineer (PE) registered in the State of Montana shall be provided to and approved by the City Engineer. Water and sewer plans shall also be approved by the Montana Department of Environmental Quality. The applicant shall also provide professional engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. Building permits will not be issued prior to City acceptance of the site infrastructure improvements unless all provisions set forth in Section 38.39.030.B of the Bozeman Municipal Code are met. V. The City will accept ownership of the following improvements and will maintain these improvements in perpetuity, which must be called out on the Certificate of Dedication: 67 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 15 of 27 a. All water mains; b. All sanitary sewer mains; c. The local street through the project and associated drainage improvements within the right-of-way; d. Improvements to Manley Road. SECTION 6 – RECOMMENDATION AND FUTURE ACTIONS Project Name: Glen Lake Commerce Subdivision Preliminary Plat File: 16533 Development Review Committee The Development Review Committee (DRC) reviewed the proposed minor subdivision preliminary plat application on January 18, 2017. The DRC determined the application submittal contained detailed, supporting information that is sufficient to allow for the review of the proposed subdivision. As a result, the DRC found that the application, with the recommended conditions of approval, complies with the adopted growth policy, the Montana Subdivision and Platting Act and the Unified Development Code. Planning Board The Planning Board conducted a public hearing on the related subdivision on February 7, 2017 and made a recommendation to the City Commission. The Planning Board voted 9:0 to recommend that the City Commission approve the preliminary plat subject to conditions and code provisions. City Commission The City Commission will hold a public hearing and make a final decision on the major subdivision preliminary plat on March 6, 2017. The meeting will begin at 6 p.m. at 121 N. Rouse Avenue. SECTION 7 – STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. Applicable Subdivision Review Criteria, Section 38.03.040, BMC. In considering applications for subdivision approval under this title, the advisory boards and City Commission shall consider the following: 68 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 16 of 27 1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and Platting Act The preliminary plat was prepared in accordance with the surveying and monumentation requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As noted in recommended Condition of Approval No. 2, the final plat must comply with the Platting Act, Administrative Rules of Montana, and the Bozeman Municipal Code. 2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act The final plat must comply with the standards identified and referenced in the Unified Development Code (UDC). This report includes several code provisions requiring corrections before final plat approval. The applicant is advised that unmet code provisions, or code provisions not specifically listed as a condition of approval, do not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. After the required corrections are provided the subdivision will comply with the local subdivision regulations. 3) Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act Staff properly noticed the City Planning Board and Bozeman City Commission public hearings. Based on the recommendations of the Development Review Committee (DRC) and the Planning Board, as well as any public testimony received on the matter, the City Commission will make the final decision on the applicant’s request. The Department of Community Development received a preliminary plat application on December 21, 2016. Staff deemed the application acceptable for initial review in writing on December 29, 2016. The DRC reviewed the preliminary plat application on January 18, 2017 and determined the submittal contained detailed, supporting information that allowed for the continued review of the proposed subdivision. Staff scheduled public notice for this application on January 19, 2017 for publication in the legal advertisements section of the Bozeman Daily Chronicle on Sunday, January 22, 2017. Staff posted public notice on the subject property on January 23, 2017. Staff sent public notice to physically adjacent landowners via certified mail, and to all other landowners of record within 200-feet of the subject property via first class mail, on January 23, 2017. The City did not receive any public comment on this application as of the writing of this report. On February 1, 2017, Staff completed and forwarded the staff report for this major subdivision preliminary plat application with a recommendation of conditional approval for consideration by the Planning Board at its February 7, 2017 public meeting. The Planning Board made a formal recommendation that the City Commission approve the subdivision. Pursuant to Section 38.03.040.A.5.a(4), the City Commission must approve, conditionally approve or deny the 69 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 17 of 27 subdivision application by April 13, 2017, unless there is a written extension from the developer, not to exceed one year. 4) Compliance with Chapter 38, BMC and other relevant regulations Community Development Staff and the DRC reviewed the preliminary plat against all applicable regulations. The application after identified code corrections and conditions complies with the Unified Development Code and all other relevant regulations. This report includes Conditions of Approval and code provisions as recommended by the DRC for consideration by the City Commission to complete the application processing for final plat approval. All municipal water and sewer facilities will conform to the regulations outlined by the Montana Department of Environmental Quality and the requirements of the Design Standards and Specifications Policy and the City of Bozeman Modifications to Montana Public Works Standard Specifications. 5) The provision of easements to and within the subdivision for the location and installation of any necessary utilities The final plat will provide and depict all necessary utilities and required utility easements. As detailed under the Subdivision Review Criteria No. 2 above, and required by Section 38.23.060.A, the final plat and application materials must depict and address all easements, existing and proposed. The preliminary plat shows 10-foot wide utility easements along the street frontage of all lots. 6) The provision of legal and physical access to each parcel within the subdivision and the notation of that access on the applicable plat and any instrument transferring the parcel The final plat will provide legal and physical access to each parcel within the subdivision. All of the proposed lots have frontage to public streets with lot frontage meeting minimum standards shown on the preliminary plat. The plat notes a no access strip along all lots fronting Manley Road to reduce any risk of pedestrian and vehicular conflict along the curve of this collector street. The proposed local street will provide legal and physical access for all parcels. Primary Subdivision Review Criteria, Section 76-3-608 1) The effect on agriculture This subdivision will not significantly affect agriculture. The growth policy designates the subject property as an industrial area and the property’s M-1 zoning allows for a broad range of development. No agricultural uses remain in the immediate vicinity. The application materials note that agricultural activity has not occurred on this parcel for at least the last 40 years. 2) The effect on Agricultural water user facilities This subdivision will not affect agricultural water user facilities. The growth policy and zoning designate this property for industrial development. No agricultural water user facilities exist on the property. 70 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 18 of 27 3) The effect on Local services Water/Sewer – This subdivision will not significantly affect sanitary sewer or water infrastructure. Municipal water and sewer mains exist in the Manley Road right-of-way. The existing downstream sanitary sewer mains and wastewater treatment facility have adequate capacity to serve the subdivision. The applicant proposes installing a new sanitary sewer main with stubs to serve each individual lot through the subdivision. The new sewer line will connect to the trunk main to the north. The applicant plans to install a new water main with stubs to serve each individual lot through the subdivision. The new water line will connect to the existing 10- inch main near the northern and eastern intersections with Manley Road. The Engineering Division will review the final infrastructure design prior to final plat approval. Streets – The proposed major subdivision will include an internal public street with two intersections along Manley Road. The local street does not meet the access separation standards where it intersects with Manley Road at two locations. The applicant requested two deviations from access separation standards. Section 38.24.090.H allows modifications from access standards at the discretion of the City Engineer when a more efficient design can be accomplished without jeopardizing the public’s health, safety, and welfare. The City Engineer granted the deviation request for the southern access along Manley Road but not for the northern access. Map Brewing Company generates significant vehicular, bicycle and pedestrian trips during operating hours. Code Provision L requires the applicant to align the northern drive access with the Map Brewing drive access prior to final plat approval. A coordinated alignment will reduce the potential for vehicular conflicts from peak hour left turning movements and will allow for a proper mid block pedestrian crossing with the improvements to Manley Road. The adopted transportation plan designates Manley Road as a collector street. Collector streets provide a link between the arterial network and local streets. Collector streets both move traffic efficiently and allow for on-street parking in some situations to serve neighboring residential, commercial, and industrial areas. Manley Road currently does not meet the urban collector standards for on-street parking, curb and gutter, and boulevard sections. As the northeast quadrant of the City continues to develop, the Department of Public Works requires correction of existing deficiencies to support additional demands. Upgrading Manley Road to a full collector standard will improve safety for pedestrians and drivers and add needed on-street parking, sidewalks, lighting, boulevards, and stormwater control. The development code requires construction of perimeter streets to the most current standards adjacent to a project prior to final approval. The applicant and the Department of Public Works are designing a potential Special Improvement District (SID) for improvements to Manley Road from Griffin Drive to the northern City limits. The City Commission must adopt a resolution of intent to create the SID and the SID must be properly approved with sufficient financing prior to final plat approval. Creation of the Manley Road SID will satisfy Code Provision J. If the creation of the SID fails, Manley Road must be constructed in accordance with the collector street standard adjacent to the subdivision boundaries prior to final plat approval. Construction of Manley Road in its entirety 71 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 19 of 27 as a single phase will reduce costs and the potential for delays if construction mobilization occurs in multiple phases. The City’s recent transportation master planning document identified the intersection of Manley Road and Griffin Drive within one half-mile of the proposed subdivision as operating at a level of service (LOS) less than “C.” The intersection operates at a LOS “D” in the AM peak-hour condition primarily due to left turn traffic from Manley Road onto Griffin Drive. Traffic generated by this project will impact the intersection LOS primarily in the PM peak hour condition as traffic leaves the project. The public health and safety are protected. The Capital Improvements Plan identifies project SIF 110 as the construction of intersection improvements in Fiscal Year 2019. This project will add capacity to the intersection. Street Impact Fee and Arterial & Collector District funds will provide financing for the intersection improvements. The Arterial & Collector District provides the local share for capacity expanding infrastructure projects. The applicant will work with the Public Works Department to determine if a separate local share is required for this project. Code Provision H addresses the requirements for an intersection level of service waiver approval prior to final plat approval. Police/Fire – This subdivision will not significantly affect Police and Fire services. The City’s Police and Fire emergency response area includes the subject property. The applicant will obtain preliminary addresses for the new lots from the City Engineer’s Office to facilitate emergency response to the site once the final plat is filed. Stormwater – This subdivision will not significantly affect stormwater infrastructure. The applicant proposes a detention basin located on the common open space lot at the northwest corner of the subdivision. The detention pond will hold surface runoff captured by the curb inlets and stormwater mains. The applicant will construct the stormwater infrastructure and detention basin according to the City Design Standards and Specifications Policy. The detention facility will capture surface runoff from Manley Road once sized appropriately. The City has a standard requirement for a detailed review of the final grading and drainage plan, and approval by the City Engineer, as part of the infrastructure plan and specification review process prior to final plat approval. The code provisions note this requirement. Parkland – This subdivision will not significantly affect parkland. Section 38.27.020.B provides that land dedication or cash donation in-lieu may be exempted for certain subdivisions. Subdivision of land into parcels which are all nonresidential does not require parkland dedication. The proposed subdivision is zoned industrial and is therefore entirely nonresidential at this time. Subsection C of the above-referenced section requires park dedication if further development of the site does not continue to meet the criteria for exemption. Any future development of the proposed subdivision with accessory residential uses requires park dedication or cash or improvements in-lieu. The DRC advised the applicant accordingly. The City may recommend improvements in-lieu based on the close proximity to the East Gallatin Recreation Area. Code Provision D requires a note on the conditions of approval sheet of the final plat that states “No park land dedicated with this subdivision” to put future property owners on notice that 72 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 20 of 27 park land may be required. Improvements to Manley Road in association with this subdivision will improve access to the East Gallatin Recreation Area. 4) The effect on the Natural environment This subdivision will not significantly affect the natural environment. No significant physical or topographical features (e.g., outcroppings, geological formations, steep slopes) were identified on the subject property. The Code also requires the applicant to contact the Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) for the construction of the proposed streets. The applicant must obtain any required permits and provide them to the Engineering Division prior to any construction of the infrastructure. 5) The effect on Wildlife and wildlife habitat This subdivision will not significantly affect wildlife and wildlife habitat. The property falls within an area planned for industrial development. Prior uses heavily disturbed the site. No significant habitat exists for fish or large wildlife. The applicant contacted the Montana Department of Fish, Wildlife, and Parks about the proposed subdivision but did not receive a response. 6) The effect on Public health and safety With the recommended Conditions of Approval and required plat corrections, this subdivision will not significantly affect public health and safety. The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect the public health, safety and general welfare. The Development Review Committee reviewed the major subdivision preliminary plat and determined that, with conditions, it complies with the title. This staff report notes all other conditions deemed necessary to ensure compliance. The applicant submitted Phase I and Phase II Environmental Site Assessments (ESA) for the subject property. The applicant’s consultant, Terracon, identified an existing environmental condition in the Phase II assessment completed on April 28, 2016. The report indicates this property is subject to potential hazard from contaminates found in the surface soil, including petroleum constituents. The results of the ESA “do not require regulatory notification.” See page 4 of the Phase II ESA. The ESA suggests that the property was previously used for the temporary storage of sand and gravel and several soil and gravel piles were located on-site. One pile included weathered asphalt. The applicant’s consultant took soil samples from several of these locations and submitted the samples for laboratory analysis. The results showed petroleum constituents in the soil. The City’s Engineering Division expressed concern over what is not included in the assessments. The subject property is located adjacent to a heavily used railroad line in an industrial area. Additional dumping may have occurred on the property that was not identified in 73 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 21 of 27 the assessments. In addition, the applicant’s consultant did not drill and sample soils and groundwater below the surface with the Phase II assessment. The study found that the risk on contamination is low but precautionary measures should occur in the future. The applicant’s consultant incorporated the following recommendations in the ESA: 1) The soil & gravel piles are not suitable for future use at the site; 2) Future work involving the disturbance of soil piles should require notice for workers; and 3) Periodic review should occur for regulatory status and results of groundwater monitoring at Exxon facility to the south. Implementing the recommendations of the applicant’s consultant will help protect public health and safety. While the location and extent of environmental contamination of the property have not been fully assessed, the steps required in order to do so are included as recommended Condition of Approval No. 12. The Montana Department of Environmental Quality’s (DEQ) website states that DEQ “is charged with protecting a clean and healthy environment as guaranteed to our citizens by our State Constitution. Our ultimate goal to protect public health and to maintain Montana's high quality of life for current and future generations.” The recommended conditions related to remedial investigation work plans and other appropriate institutional controls are consistent with the DEQ goals and the regulations of Chapter 38 of the Bozeman Municipal Code. Recommended conditions of approval 9, 10, 11, and 13 require advisory notice for the identified and unknown environmental hazards on the property through the property owners’ association documents and on the face of the plat. The applicant routed application materials and received non-significant comments from the following agencies and utility providers: Department of Environmental Quality, Army Corps of Engineers, Department of Natural Resources and Conservation, State Historic Preservation Office, Charter Communications and NorthWestern Energy. The Gallatin Conservation District and Fish, Wildlife, and Parks did not provide comments. This report includes findings to justify the recommended site-specific Conditions of Approval for reasonable mitigation of impacts from the proposed major subdivision. In addition, all subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Montana Code Annotated (MCA). As a result, the Department of Community Development reviewed this application against the listed criteria and further provides the following summary for submittal materials and requirements. Preliminary Plat Supplements The Development Review Committee (DRC) completed a subdivision pre-application plan review on December 16, 2015. With the pre-application plan review application, the applicant requested waivers from Section 38.41.060 “Additional Subdivision Preliminary Plat Supplements” for several of the standard preliminary plat supplements. 74 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 22 of 27 The DRC granted waivers to the supplemental information under 38.41.060, BMC with the pre- application plan review application for: 14) educational facilities; 15) land use; 16) parks and recreation facilities; 17) neighborhood center; and 20) affordable housing. The DRC did not grant waivers for: 1) surface water; 2) floodplains; 3) groundwater; 4) geology- soils-slopes; 5) vegetation; 6) wildlife; 7) historical features; 8) agriculture ; 9) agricultural water user facilities; 10) water and sewer; 11) stormwater management; 12) streets, roads and alleys; 13) utilities; 18) lighting plan; and 19) miscellaneous. Staff offers the following summary comments on the supplemental information required with Article 38.41, BMC. 38.41.060.A.1 Surface Water No surface water features exist on the property. The City and the Montana Department of Environmental Quality require preparation and approval of a Stormwater Pollution Prevention Plan (SWPPP) prior to any infrastructure construction on the property. 38.41.060.A.2 Floodplains No mapped 100-year floodplains affect the subject property as depicted in the current Flood Insurance Rate Map No. 30031C0808D. 38.41.060.A.3 Groundwater Several piezometers identified groundwater on the property at a minimum of 9-feet below ground surface. Periods of high groundwater will not impact future development due to the average depth. Wells exist on-site. The existing wells that are not in use must be properly abandoned prior to final plat. The municipal water distribution system will serve the subdivision. Condition of Approval No. 7 relates to this matter. 38.41.060.A.4 Geology, Soils and Slopes No unusual geology, soils or slopes exist on the subject property. The underlying geology and soils will not limit infrastructure construction and future development in the subdivision. The property gradually slopes down to the northwest. Based on the existing topography, Staff does not anticipate any significant cuts and fills to accommodate future development. 38.41.060.A.5 Vegetation The vacant property does not contain any trees, shrubs, wetlands, or critical plant communities. Grasses cover the property. The applicant provided an approved Noxious Weed Management Plan to provide mitigation measures for noxious weeds existing on the property. 38.41.060.A.6 Wildlife The property falls within an area planned for industrial development. Proximity to an urban area and past agricultural uses limit the amount of wildlife on the property. Occasionally deer and small mammals visit the property, as is common in the Bozeman area. No significant habitat 75 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 23 of 27 exists for fish or large wildlife. The applicant contacted the Montana Department of Fish, Wildlife, and Parks about the proposed subdivision but did not receive a response. 38.41.060.A.7 Historical Features The applicant contacted the State Historic Preservation Office (SHPO) and received written comments prior to submitting this application. As no structures exist on the property, this subdivision will not impact any cultural properties. The SHPO advised the applicant to contact the office if any cultural materials are discovered during the physical construction. 38.41.060.A.8 Agriculture The Bozeman Community Plan and municipal zoning designate the subject property for industrial development. Agricultural uses existed on the property but ceased approximately 40- years ago. The property is currently vacant. 38.41.060.A.9 Agricultural Water User Facilities No agricultural water user facilities exist on or adjacent to the property. 38.41.060.A.10 Water and Sewer This application proposes new municipal water and sanitary sewer mains with individual stubs for each developable lot. The new facilities will connect with the existing municipal water and sewer mains in the Manley Road right-of-way. The existing downstream sanitary sewer mains and wastewater treatment facility have adequate capacity to serve the subdivision. The new municipal water facilities will include three new fire hydrants at the appropriate spacing at both intersections and along the internal local street. The Engineering Division will analyze the final municipal water and sanitary sewer layout and design during the infrastructure review stage prior to construction and final plat. As noted above, the Bozeman Municipal Code requires water rights or cash in-lieu for annexation, subdivision and site development pursuant to Section 38.23.180. The City must receive the associated cash in-lieu of water rights payment prior to final plat approval. 38.41.060.A.11 Stormwater Management The applicant proposes a detention basin located on the common open space lot at the northwest corner of the subdivision. The detention pond will hold surface runoff captured by the curb inlets and stormwater mains. The applicant will construct the stormwater infrastructure and detention basin according to the City Design Standards and Specifications Policy. The property owners’ association will own and maintain the common open space lot and stormwater facility in accordance with the Bozeman Municipal Code. Recommended Condition of Approval No. 5 and Code Provisions H address this matter. The Engineering Division will analyze layout and design of the storm sewer system during the infrastructure review phase prior to construction and final plat. Code Provision I requires the applicant to provide adequate capacity in the detention basin. 76 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 24 of 27 38.41.060.A.12 Streets, Roads and Alleys This subdivision requires the expansion of the municipal street and sidewalk network to provide legal and physical access to all parcels. This report includes findings for the MCA Section 76-3- 608 Primary Subdivision Review Criteria on the effect of this subdivision on local services. The proposed major subdivision will include an internal public street with two intersections along Manley Road. The City Engineer granted one deviation request for the southern access along Manley Road but did not grant an access spacing deviation for the northern access. Code Provision L requires the applicant to align the northern drive access with the Map Brewing Company drive access prior to final plat. Creation of the Manley Road SID will satisfy Code Provision J. If the creation of the SID fails, Manley Road must be constructed in accordance with the collector street standard adjacent to the subdivision boundaries prior to final plat approval. Code Provision H addresses the requirements for an intersection level of service waiver, which must be approved by the Director of Public Works prior to final plat. As required in Section 38.24.080, perimeter sidewalks must be constructed along all street frontages prior to final plat approval or must be financially guaranteed for a period not to exceed three years. 38.41.060.A.13 Utilities The plat indicates a 10-foot wide utility easement along all street frontages. As required by Code Provision C, all easements, existing and proposed, must be accurately depicted and addressed on the final plat and in the final plat application. With the code requirements, the plat will provide and depict all necessary utilities and required utility easements. 38.41.060.A.14 Educational Facilities The DRC did not identify any significant impacts to educational facilities and waived supplemental information. The code limits subsequent floor accessory residential uses in industrial zoning districts to no more than 50% of the gross floor area. Mixed-use and live-work buildings provide housing units primarily for residents involved in the daily operations of the primary industrial use. Staff does not expect significant numbers of school age children living in any future buildings on the subject property. 38.41.060.A.15 Land Use The DRC did not identify any significant impacts to land use and waived supplemental information. The proposed 15 industrial lots comply with the existing zoning designation of M-1, (Light Manufacturing District) and the underlying future land use designation in the growth policy. 38.41.060.A.16 Parks and Recreation Facilities The DRC did not identify any significant impacts to parks and recreation facilities and waived supplemental information. Section 38.27.020.B provides that land dedication or cash donation in-lieu may be exempted for subdivisions that are all nonresidential. The proposed subdivision is zoned industrial and is therefore entirely nonresidential at this time. Subsection C of the above- referenced section requires park dedication if further development of the site does not continue to 77 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 25 of 27 meet the criteria for exemption. Any future development of the proposed subdivision with accessory residential uses requires park dedication or cash or improvements in-lieu. Code Provision D requires a note on the conditions of approval sheet of the final plat that states “No park land dedicated with this subdivision” to put future property owners on notice that park land may be required. 38.41.060.A.17 Neighborhood Center Plan The DRC waived supplemental information regarding a neighborhood center plan. Pursuant to Section 38.23.020.A, BMC, only residential developments that are ten net acres in size or greater, shall have a neighborhood center. 38.41.060.A.18 Lighting Plan Section 38.23.150.B, requires street lighting for this subdivision. The application includes a street lighting layout plan with fixture cut sheets and a photometric analysis plan in conformance with code requirements. The applicant proposes LED street lights at both street intersections. 38.41.060.A.19 Miscellaneous The subdivision will improve access to public lands as Manley Road is upgraded to include pedestrian facilities and there are no identified hazards in proximity to the subject property. The Environmental Site Assessment indicated a minor risk of soil contamination on-site. Recommended Condition of Approval No. 8 requires the applicant to coordinate with the City Attorney to properly indemnify the City from any environmental related impact on the subject property. 38.41.060.A.20 Affordable Housing The DRC waived supplemental information regarding affordable housing. The Affordable Housing provisions in Article 38.43, BMC do not apply to industrial subdivisions. APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The subject property is zoned M-1. The intent of the M-1 light manufacturing district is to provide for the community's needs for wholesale trade, storage and warehousing, trucking and transportation terminals, light manufacturing and similar activities. The district should be oriented to major transportation facilities yet arranged to minimize adverse effects on residential development, therefore, some type of screening may be necessary. Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Industrial.” The “Industrial” designation provides for areas for the uses which support an urban environment such as manufacturing, warehousing, and transportation hubs. Development within these areas is intensive and is connected to significant transportation corridors. In order to protect the economic base and necessary services represented by industrial 78 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 26 of 27 uses, uses which would be detrimentally impacted by industrial activities are discouraged. Although use in these areas is intensive, these areas are part of the larger community and shall meet basic standards for landscaping and other site design issues and be integrated with the larger community. In some circumstances, uses other than those typically considered industrial have been historically present in areas which were given an industrial designation in this growth policy. Careful consideration must be given to public policies to allow these mixed uses to coexist in harmony. APPENDIX B – DETAILED PROJECT DESCRIPTION Project Background and Description The Development Review Committee (DRC) reviewed the pre-application plan for the Glen Lake Commerce Subdivision and provided written comments to the applicant on December 21, 2015. The applicant and landowner, Glen Lake Holdings, LLC, and project representative, TM Designs submitted this major subdivision preliminary plat application to the Department of Community Development on December 21, 2016. Staff deemed the application acceptable for initial review on December 29, 2016. The application proposes the subdivision of a 5.49-acre tract of record to create 15 light manufacturing lots, one common open space lot for stormwater, and dedicate 1.046-acres of right-of-way. Major subdivisions require review and a recommendation by the Planning Board. State statute requires a public hearing before a City Commission decision. At its January 18, 2017 meeting, the Development Review Committee (DRC) voted unanimously to recommend approval of the application with the conditions and code provisions identified in this report. The City Planning Board voted 9:0 to recommend the City Commission approve the subdivision on February 7, 2017. One member of the public testified in support of the subdivision at the February 7, 2017 public hearing. The applicant did not request any subdivision variances with this application. The City did not receive any written public comment as of the writing of this report. The final decision for a major subdivision preliminary plat must be made within 60 working days of the date it was deemed adequate; in this case by April 13, 2017. 79 16469, Staff Report for the Glen Lake Commerce Subdivision Preliminary Plat Page 27 of 27 APPENDIX C – NOTICING AND PUBLIC COMMENT In accordance with Chapter 38.40, BMC, Staff scheduled public notice for this application on January 19, 2017 for publication in the legal advertisements section of the Bozeman Daily Chronicle on Sunday, January 22, 2017. Staff posted public notice on the subject property on January 23, 2017. Staff sent public notice to physically adjacent landowners via certified mail, and to all other landowners of record within 200-feet of the subject property via first class mail, on January 23, 2017. The City did not receive any written public comment on this application as of the writing of this report. One member of the public testified in support of the subdivision at the February 7, 2017 public hearing. APPENDIX D – OWNER INFORMATION AND REVIEWING STAFF Owner: Glen Lake Holdings, LLC, c/o Dan Alexander, 145 Jeana Lei Court, Bozeman, MT 59715 Applicant: Glen Lake Holdings, LLC, c/o Dan Alexander, 145 Jeana Lei Court, Bozeman, MT 59715 Representative: TM Designs, c/o Todd S. Mitchell. P.E., 31 Saler Street, Belgrade, MT 59714 Report By: Mitch L. WerBell, Assistant Planner FISCAL EFFECTS No unusual fiscal effects have been identified. This subdivision will not change any presently budgeted funds. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Preliminary Plat Application Materials Planning Board Resolution 16533 February 7, 2017 Planning Board Meeting Minutes 80 81 BOZEMAN,' Community Development DEVELOPMENT REVIEW APPLICATION 1. PROIECT Devei Name: onment Glen Lake Commerce Subdivision A1 Description: 16 Lot Major Subdivision with Light lndustrial (M-1) Zoning 2. PROPERTY OWNER Name: Glen Lake Holdings, LLC; Dan Alexander Full Address: 145 Jeana Lei Court, Bozeman, MT 59715 Phone: 406-581-9705 Email: dana@storydist.com 3. APPLICANT Narne: Glen Lake Holdinqs, LLC; Dan Alexander Full Address: 145 Jeana Lei Court, Bozeman, MT 59715 Phone: 406-581-9705 Emaii: dana@storydist.com 4. REPRESENTATIVE Name: TM Designs; Todd S. Mitchell, PE Full Address: 31 Saler Street, Belgrade, MT 59714 Prrone: (406) 570-9121 Email: tmdesignsmt@outlook.com 5. PROPERTY AddStrreeeiss: Full 93 East Griffin Drive, Bozeman, MT 59715 Full Lesal Description: Lo1 1A,MinorSub. 154A. SW1/4of Section31,T1.S.,Fl 6.E.,P.M.fu{.,Cityof Bozeman,GallatinCounty,Montana Cu Zoning: rrent M-1, Light Industrial Current Use: VaCant Land Community Plan Designation: lndustrial Development Review Application A1 Paee 1 of 3 Revision Date 01-04-16 Required Forms: I Var;es by project type Recommended Forms Presentaticn of submitted pians and specifications 82 Overlay Distri ct: Urban Renewal District: ! rv"ighbo.hood Conservation I Ent.y*ry Corridor ffi ttor" I Downtow" flNorth 7th Avenue [] Northeast El None 6. STATISTICS (oNLy AppLICArroN rypns 2-12, 17, 24 AND 26) Gross Area: gcres, 5.490 Square Feet:239,144 Acres: {.Q$J Square Feet: 'l /$.$$Q Net Area: Dwelling Units: Nonresidential Gross Building Square Feet: 7. APPLICATION TYPES Check all that apply, use noted forms. [ 1. Pre-application Consultation [ 2. Master Site Plan D 3. site Plan [ +. Subdivision pre-application ffi 5. Subdivision preliminary plat I o. subdivision final plat I Z. Subdivision exemption I B. Condominium Review D s. Pun concept plan I f O. Pun preliminary pian I rr. Pun final plan [ 12. Annexation and Initial Zoning f, I :. administrative Interpretation Appeal f, l+. admlnistrative Project Decision Appeal I t5. Commercial Nonresidential COA [1 6. Historic Neighborhood Conservation Overlay COA 8. APPLICATION FEES AND MATERIALS Form None ! 17. Informal Review MSP E tB. Zoning Deviation SP fl 19. Zoning or Subdivision Variance PA fl zo. conditional Use Permit PP ! 21. Special Temporary Use FP SE Permit [ 22. Comprehensive Sign Plan CSP I ZS. Regulated Activities in RW Form INF None z/svAR CUP STUP B. Application materials shall be submitted for each application as shown in the specific guidance and checklists that is provided for each application t;rpe. A common deveiopment review application form and common notice materials may be provided for an applicatian that includes more than one application type. All other application materials shall be submitied for each individual application type per the project guidance and checklists. 9. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(sJ and the property owner[sJ fif differentJ for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant[s) only. As indicated by the signaturefs] below, the applicantfsJ and property owner[sJ submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by ihe City of Bozernan shall be in conf-armancewith the requirements af the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process [Section 38.34.050, BMC]" I [We] hereby certifythatthe above information is true and correct to the trest of my {ourJ knowledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct,According to the Final Flan - I ackncwledge that co[struction not in compliance with the approved final plan may resuit in delays cf occupancy cr ccsts to correct noncompliance. Applicant Signature: Printed Name: 0wner Signature: Printed Name: Owner Signature Printed Name: If signing as a corpo::ation, please provide the title and position of the individual signing on behalf of the corporation. Attach separate sheets for additional owner signatures. CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59777 phone 406-582-2250 fax 406-582-2763 planning@bozenran.net www. b ozem a n.n et Development Revieiar Application A1 Page 3 of 3 Revision Date 01-04-16 Required Forms: I Varies by proiect type Recommendetl Forms Presentatien of submitted plans anti specifications 84 BOZEMAN,, Community Development SUBDIVISION PRELIMINARY PLAT REQUIRED MATERIALS APPLICATION SETS 3 total sets are required that include 1 copy of every item belowbound or folded intoBlz x 11 or Ba/2x74 sets Z Complete and signed development review application form A1. E Plan sets that include all required items listed on the subdivision preliminary plat checklist form PP1. Standard application sets required 2 sets that include full size 24 x 1 set that include 11 x 17 inch plan sizes: 36 inch plans plans Z 2-digital versions of all materials IJPEG or PDF] on separate CD-ROMs orUSB drives. Individual files must be provided at SMB or less in size. Files shall be named according to naming protocol. All plans must be drawn to scale on paper not smaller lhan Blz x 11 inches or larger than 24 x 36 inches. The name of the project must be shown on the cover sheet of the plans. If 3 -ring binders Notes: willbeused,theymustincludeatableof contentsandtabbeddividersbetweensections. Plans that are rolled or not bound into sets will not be accepted. NOTICING MATERIALS EI Completed and signed property adjoiners certificate form N1 and materials. STATISTICS 1.. Subdivision Type: EI First Minor Subdivision from a Tract of Record E First Minor Subdivision from a Tract of Record with variance E Second or Subsequent Minor Subdivision from a Tract of Record E First Major Subdivision 2. Total Number or Lots: 16 3. Lots by Proposed Uses: PP lb Residential, singie household City Park Residential, multi household Manufactured Home Space Planned Unit Development Recreational Vehicle Space Condominium Unit Commercial Townhouse 15 Industrial 1 Common Open Space Restricted Developm ent Other: Preliminary Plat Required Materials PP Page 1 of 2 Revision Date 1-05-16 Required Forms: I A1, PP1, N1, SVAR (if variancel Recommended Forms: Required Forms: 85 E Base fee Plus Plus APPLICATION FEE $1,785 Minor or $ 2,840 Major $72 per lot $6.50 noticing fee per each physically contiguous [touching] property owner CONTACT US phone 406-582-2260 fax 4O6-582-2263 planning @b o ze ma n.net www,bozeman.net Alfred M. Stiff Professional Building 20 East 0live Street 59715 [FED EX and UPS Only] PO Box 1230 Bozeman, MT 59771 Prelirninary Plat Required Materials PP Page 2 of 2 Revision Date 1-05-16 Required Forms: I A1, PP1, N1, SVAR fif variance] Recommended Forms: I Required Forms: 86 PP1 SUBDIVISON PRELIMINARY PLAT CHECKLIST GENERAL INFORMATION The preliminary plat submittal must include the following 38.41.040, BMC for the specific requirements for each item. All information required with the pre-application pian, [Subdivision Pre-application PIan], BMC. See check]ist PA1. information. Piease refer to Section as outlined in Section 38.41.030 2. J. +. 5. 11. 12. 1. Name and location of the subdivision, scale, scale bar, north arrow, date of preparation, lots and blocks {designated by number], the dimensioqs and area cf each lot, and the use of each iot, if other than for single househaid. All streets, roads, aileys, avenues, highways, and easements; the width of the right-of-way, grades, and curvature of each; existing and proposed road and street names; and proposed location of intersections for any subdivision requiring access to arterial or collector highways- The names of adjoining platted subdivisions aed numbers of adjaining certificates of survey. An approximate survey of the exterior boundaries of the platted tract with bearings, distances, and curve data indicated outside of the boundary lines. When the plat is bounded by an irregular shoreline or a body af water, the bearings and distances of a closing meander traverse shall be given. The approximate location of all seciion corners or legal subriivision cornei's of sections pertinent to the subdivision boundary. 7. If the improvements required are to be completed in phases after the final plat is filed, the approximate area of each phase shall be shown on the plat. 8. Ground contours at Z-faot intervais if slope is under 10 percent; i-faat intervals if slope is between 10 and 15 percent; and 10-foot intervals if slope is 15 percent or greater. 9. List of waivers granted from the requirements of Section 38.47.050 [Additional Subdivision Preliminary Flat Supplements], BMC durlng the pre-application process. Request for exemption from Moatana Department of Environme*tal Quality Review as described in Section 38.41.040.11 fRequest for Exemption from MDEQ Review], BMC. AII appropriate certificates [refer to Chapter 38.05, BMC). All preliminary plat supplements required for all subdivisions; A letter af approval or preliminary approval from the City of Bozeman where a zoning change is necessary 1C. Preliminary Plat Supple:nents Required for AII Subdiyisions A. A map showing all adjacentsections of land, subdivision, certificates of survey, streets and roads B. Map of entiresubdivision on either anSl/z-inchx 11-inch,91h-inchx14-inch, or 11-inch x1,7-inch sheet C. A written staterneni describing any upon which the request is based. Proceduresl, BMC. See checklist SVAR requested subdivision variance[s] and the facts of hardship Refer to Chapter 38.35 fVariance, Deviation and Appeal D. Covenants, Restrictions and Articles of Incorporation for the Property Owners' Associaticn E. Encroachment permits or a ietter indicating intention to issre a permit where new streets, easements, rights-of way or driveways intersect State, Counfy, or City highways, streets or roads Preliminary Plat Cirecklist PP1 Page 1 of2 Revision Date 1-05-16 Required Forms: I ar, rul, PP, SVAR fifvariance] Recommended Forrns: I Required Forms: BOZEMAN*' G. A draft of such other appropriate certificates H. Provision for maintenance of all streets [including emergency accessJ, parks, and other required improvements if not dedicated to the public, or if private I Profile sheets for street grades greater than 5 percent i. If an authorized representative signs on behalf of an owner of record, a copy of the authorization shall be provided K. A Noxious Weed Managernent and Revegetation Plan approved by ihe Weed Control District for control of noxious weeds L, A preliminary platting certificate prepared by a Montana title company 13. AII preliminary plat supplements Comrnittee. Please refer to Section not waived at pre-application 38.41.060, BMC for the specific review by the Development Review requirements for each item. Additional Subdivision Preliminary Plat Supplements Waived A. Surface water tr B. Floodpiains n C. Groundwater n D. Geology, soils and slope f, E. Vegetation tr F. Wildlife n G. Historical features n H, Agriculture n I. Agr culture water user facilities tr J Water and sewer n K, Stormwater management tr L. Streets, roads and alleys tr M. Utilities I N. Educational facilities E o. Land use E P Parks and recreation facilities a a. Neighborhood center plan a R. Lighting plan tr Alfordable Housing E l. Miscellaneous n CONTACT US Alfred M. Stiff Professional 20 East OIive Street 59715 PO Box 1230 Bozeman, MT 59771- Building IFED EX and UPS On]y] phone 406-582-2260 fax 406-582-2263 pla nning@boze ma n. net www.bozeman.net Preliminary Plat Checklist PP1 Page 2 of 2 Revision Date 1-05-16 Required Fornrs A1, N1, PP, SVAR [ifvariance] Recommended Forms: I Required Forms: 88 BOZEMAN,' Community Development NOTICING MATERIALS Notice is required for certain projects in order for citizens to participate in decision making which affects their interests and provides opportunityto receive information pertinent to an application that would not otherwise be available to the decision maker. PLAN, MASTER SITE PLAN, CONDITIONAL USE PERMIT, VARIANCE, DEVIATION, FIRST MINOR SUBDIVISON AND SIMILAR REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the project site, attached to this checklist. Stamped, unsealed, plain [no return addressJ #10 envelopes preaddressed with the names and addresses ofthe adjoining property owners. MAIOR AND SUBSEQUENT MINOR SUBDIVISION REQUIRED B Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the proiect E site and not physically contiguous (touching a boundaryJ to the subdivision, attached to this checklist. Clearly label list ADJOINER NOT CONTIGUOUS. E Stamped, unsealed, plain [no return address] #10 envelopes preaddressed with the names and addresses of the adjoining property owners. Legible list of full names and addresses of all property owners physically contiguous Itouching E a b'oundary) including recorded purchasers und". contract for deed to be sent certified mail attached to this checklist. Clearly label list CONTIGUOUS. Stamped, unsealed, plain [no return addressJ #10 envelopes preaddressed with the names and U addresses ofthe physically contiguous property owners including recorded purchasers under contract for deed. E Two sets additional mailing labels with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed attached. NOTICE N1 SITE tr n D Current property owners of record can be the Gallatin County Courthouse 311 West NOTICING MATERIALS found at the Gallatin County Clerk and Recorder's Office in Main Street Bozeman, Montana. CERTIFICATION the owners, is a true and accurate list from the last declared Gallatin County tax records. I further understand that an inaccu y review of the project. Signatu CON'I'ACT US Alfred M. Stif f Professional 20 East 0live Street 59715 PO Box 1230 Bozeman, MT 59771 Building IFED EX and UPS Only] phone 406-582-2260 fax 406-582-2263 Glen Lake Commerce Subdivision Preliminary Plat Application Adjoiners List June, 2016 Adjoiners - Not Contiguous 206EG, LLC PO Box 13 Bozeman, MT 59771-0013 Mergenthaler Family Trust, LLC 1414 N. Montana Ave Helena, MT 59601-2962 City of Bozeman General Delivery Bozeman, MT 59715 State of Montana Montana Fish, Wildlife & Parks 1420 East Sixth Avenue P.O. Box 200701 Helena, MT 59620-0701 Map Brewing Company, LLC 510 Manley Road Bozeman, MT 59715-8784 Adjoiners – Contiguous Montana Rail Link Real Estate Department PO Box 16624 Missoula, MT 59808 90 TM Designs 2 November 15, 2016 City of Bozeman, Engineering Department Attn: Rick Hixson PO Box 1230 Bozeman, MT 59771-1230 RE: Deviation Request for Access Requirements Glen Lake Commercial Subdivision Dear Mr. Hixson: During the course of the DRC review of the pre-application for Glen Lake Commerce Subdivision, the need for a variance request was identified for the proposed drive access locations serving the proposed development. At the time of the pre-application, the property was going to be accessed by an alley intersecting Manley Road at two locations. The pre-application property layout has been modified to provide a dedicated street and right-of-way constructed to local street standards in order to address access issues and lot size and shape requirements. The proposed lot layout creates an intersection along Manley Road closer to the intersection with Griffin Drive than the required 330’ spacing as specified in the Table 38.24.090-3. This variance request has been prepared to address the intersection spacing along with alignments with existing accesses along Manley Road in the vicinity of the proposed development. In accordance with 38.24.090.H.3, Commercial developments… we are providing the following information. a. Traffic Volumes: According to the Traffic Impact Assessment prepared for Glen Lake Commerce Subdivision, the site will generate approximately 422 daily trips total. b. Turning Movements: The proposed development is anticipated to generate 54 and 51 peak am and pm turning movements into and out of the subdivision using the two proposed intersections. c. Traffic Controls: The proposed streets will have stop control at the intersections with Manley Road, on the local access street only. Manley Road will have continuous flow on the major legs of the intersections. Private accesses on the east and north sides of Manley Road do not have any traffic controls at this time. d. Site Design: The proposed development has been through a number of design iterations since initial concept planning began on the project. The pre-application design was modified to address lot configuration issues as well as to eliminate the alley access. 91 2 The current preliminary plat provides street access to the individual lots along with the necessary right of way necessary for the utilities. We have developed the layout to accommodate a number of issues relating to the shape of the property including constraints created by the curves in Manley Road, the rail right-of-way, existing underground utilities, as well as lot size, width and depth requirements. The current layout places the southeast intersection along Manley Road at a distance of 284 feet from Griffin Drive, which is less than the required 330 feet, measured from right-of-way line to right-of-way line. We have aligned the roadway in its current location to eliminate creating an intersection along the curve in Manley Road which may cause sight issues, and to address lot sizes required in the BMC. The intersection spacing is less than required, although the distance will not create turning movement or queue length issues on Manley Road based on the proximity to Griffin Drive and the proposed intersection location. e. Location and Alignment of Other Access Points: The location and alignment of the existing intersections and access points, along with the proposed intersections is shown in Figure 1 attached to this variance request. Given the site constraints of this property in proximity to Griffin Drive, the curves along Manley Road and lot configuration requirements, we are requesting your consideration of the variance and allow a modification to the required standards. If you have any questions or need any additional information, please do not hesitate to contact me directly at 406.570.9121 or via e-mail at tmdesignsmt@outlook.com. Thank you, Todd S. Mitchell, PE TM Designs 92 3 Figure 1. Existing and Proposed Intersections and Accesses. 93 MAJOR SUBDIVISION PRELIMINARY PLAT APPLICATION GLEN LAKE COMMERCE SUBDIVISION BOZEMAN, MONTANA DATE: FILE: DRAWN BY: QUALITY ASSURANCE: DRAWING REVISIONS 12/18/16 DATE DESCRIPTION GLEN_LAKE_PROPOSED_DESIGN_121516.DWG - - - - - - - - - - - - - - - PARCEL 1A OF MINOR SUBDIVISION 154A TSM MASTER UTILITIES PLAN PROJECT OWNER: GLEN LAKE HOLDINGS, LLC PROJECT ENGINEER: TM DESIGNS 0 25 50 100 SCALE: 1" = 50 FT N LEGEND: PARCEL BOUNDARY LOT BOUNDARY UTILITY EASEMENT MAJOR CONTOUR MINOR CONTOUR WATER MAIN FIRE HYDRANT WATER VALVE SEWER MANHOLE SEWER MAIN CURB INLET STORM DRAIN PIPE MANHOLE/OUTFALL STRUCTURE CURB AND GUTTER CONCRETE SIDEWALK PROPOSED UNDERGROUND POWER PROPOSED UNDERGROUND GAS 94 95 PHOTOMETRIC CALCULA TYPE 1 LUMINAIRES AT 25'AFG CALCULATION: ILLUMINANCE AVERAGE: MAXIMUM: MINIMUM: 0.36 Fc 2.3 Fc 0.0 Fc GLEN LAKE COMMERCE INTERSECTION LIGHTING ANALYSIS 96 Table of Contents Page 1.0 ProiectDescription 2.0 Surface Water 3.0 Fioodplains 4.0 Groundwater 5.0 Geology, Soils and Slopes 6.0 Vegetation 7.0 \Yildlife 8.0 Historical Features 9.0 Agriculture 10.0 Agricultural rW'ater Users Facilities 11.0 StormwaterN{anagement 12.0 Iil7ater and Sewer 13.0 Stteets, Roads and Alleys 14.0 Utilities 15.0 EducationalFacilities 16.0 Land Use 1,1.0 Parks and Recreadon 18.0 NeighborhoodCenter 19.0 Lighting Plan 20.0 Miscellaneous 21,.0 AffordableHousing Appendlx A - Floodplain N{ap Appendlx B - SoiI Resource Report Appendix C - Agenry Correspondence Appendlx D - Utility Serrice Providers Correspondence 97 Glen Lake Commerce Subdivision Ad d iti o n a I Su p p le me ntol I nfo r mati o n August 2016 1.0 Project Descriptr.on Glen Lake Commerce Subdivision is a proposed major subdivision comprised of 15 for-sale lots and one corffnon open space lot located along Manley Road north of Griffirr Drive w.ithifl the City of Bozeman. The 5.49-acre parcel is currendy zoned M-1, Light Industrial, with anticipated uses including small commercial and industrial businesses and potential live-rvork units with upper floor tesidences. The proposed development is located along N{anley Road, north of Griffin Dd'r,e and south of Glen Lake and the East Gallatin Recreadon Area. The ptoperty is currently vacaflt land that has been historically used for pasture and graztng. There are taa structutes or buildings on the property. The property is surrounded by developed properdes wrthin the City limits and cafl be considered infill development. It is accessible from Manley Road with water and sewer facilities adjacent to the propertv, allow-ing connection to City sewices. This repot has been prepared to provide supplemental information relating to the development of Glen Lake Commerce Subdivision as required by the City of Bozeman and the Unified Development Code, Section 38.41,.050. 98 Glen Lake Commerce Subdivision Ad d iti o na I S u ppl e m e ntal I nfo r m ati o n August 2016 2.0 Sutface Water Glen Lake Commerce Subdrvision has no natutal surface water sources or conveyances located rvrthin the property boundary and will not affect any continuous or intermittent st{eams ot channels. There are few artificial drainage channels in close proximity to the boundary of the properq, including a ditch along Manley Road created by the roadway construction which may hold stormwater runoff during runoff events, but thete are no culverts ot outfalls that would create a drainage system. There is also a dratnage ditch along the western edge of the property which will convey stomwater runoff to the northwest, away from GIen Lake Commerce Subdivision. Glen Lake (East Gailatin Recreation Area) is located north of the proposed subdivision, across l\tanley Road. At its closest point, the water's edge is apptoximately 160 feet north of the property boundary. Glen Lake will have no impact resuiting ftom development of Glen Lake Commerce Subdrvision. A map of the proposed subdivision as well as existing surface water sources in proximity to the development is shown in Figute 2.1. Figure 2.L Surface watet in the vicinity of Glen Lake Comrnerce Subdivision. 2 99 Glen Lake Commerce Subdivision Ad d iti on al Su pple m e nta I I nfo r m ation August 2016 Construcdon of any aew buildings within the der.elopment will not impact any surface water and will be located wrthin the limits of the proposed subdivision. Street and utility construcdon will not impact any surface u,ater source beyond normal installation and reconstmction of drainage ditches associated with X,fanlev Road. There are no .tr.r^aiom to any surface water source tequfued for development of Glen Lake Commerce Subdivision. Thete are rlo wedands pteseflt on tfre properg/. The ptopetty is not located in any designated floodplain according to the cuffent Flood Insutance Rate l\{ap for the East Gallatin fuver and the area srurounding the proposed subdivision. The onl1, permit that has been identified for the proposed der.elopment and construction is preparation and approvil of a Stormwater Poilution Prevention Plan (SWPPP) required by the Montana Department of Environmental Quality and the CiW of Rozeman. A Stormwater N{anagement Plan will be prepared fot the ptoposed development prior to afly constmcdon activity on the property. 3.0 Floodplains The subject property is not located in any floodplain associated with a surface water source. The current tr1ood Insurance Rate N{ap (irJo. 30031C0808D) identifies the floodplain associated w-ith the East Gallatin Rir.,er as well as Glen Lake. The East Gdlaan fuver has been the subject of a detailed flood study in the wicinity of the proposed development and included Glen Lake, show the lake with a potential for shallow flooding less than 1 foot in depth. Floorling associated with the East Gallatin Rir-er will not affect the proposed development of the propcrty. A cop1, of the effective Flood Insurance Rate Map showing the subject properqr and floodplains in the area is included in Appendlx A. 4.0 Groundwater Groundw-ater on the subject property is greater that9 ft beiow ground surface. There are three piezometers on the properfy fiom previous investigations of the property that were used to detenline groundwater depth. No groundwater was identified in the piezometers at depths up to 9 feet during periods of normally high groundwater. Groundwater likely flows norfl to northrvest across the propetty towards Glen Lake and genera\ with the surtounding topography and grades in the area. 5.0 Geology, Soils and Slopes 5.1 Geology Accordrng to the Montana Bureau of Mines and Geology Open Report 457, '"Preliminary Geologic Map of the Eastet Part of the Gallatin Valley, Montana" (Lonn, English, 2002), the subject property is located in an area designated as Qa1. Alluvial Deposits of Active Channeis and Present Floodplains ftIolocene). 'Ile geology is descdbed as follows: 3 100 Glen Loke Commerce Subdivision Ad diti o n a I Su pple m e nto I I nfo rmati o n August 2016 'qVell-rounded, well-sorted, bouldery gravel and sand with some thin beds of clayey silt. Clast lithologies represent rock types of the endre watershed; along the West Gallatin River clasts are 5070 Precambrian metamorphic rock,45oh igneous rocks (mosdy mafic volcanics but including dacite polphy-r,v and granite) , and 5oh sandstone and quartzite. Clasts along tributary streams represeflt the local bedrock. Often mantled with silty material deposited dudng floods caused mosdy by ice jams pIifflin,1963). Older, undedytngf) deposits of Qaty, Qab, and Qat, ate lithologically indistinguishable ftom Qal, and total thickness of these deposits ranges from 70 to 80 feet Q2 to 25 metets) south of Bozeman Hot Springs to over 800 feet (246 metets) near Bel$ade (Hackett and others, 1960). Fligh permeability and porosity make this package an important aquifer locally. Howevet, shallow depth of aquifets hosted by thinner deposits may make tlem subiect to contaminadon. Potential for flooding and a high ground water table place severe lirrritations on constfl.rction and septic systems (Custer and otlers, 2001)" Thete are no limitations in the underly,ng geology that would affect normal construction and development of the Glen Lake Commerce Subdivision. 5.2 Soils S<rils in the vicinity of the property include Turner Loarla (457A) and Urban Land pL). Although thete is no chatactenzatton of UL in the Soil Resource Report, the subject property is surrounded by areas of Turner Loam and likely has similar ptoperties to that of UL. The Turner Loam is descdbed as moderately wet, urith 0 to 2 percent slopes, comprised of alluvium ofl stleam terraces. The typical provide includes Loam in the upper 6 inches of the ptofile, followed by clay loams to depths of 26 tnches, underlain by gavelly loam sand to depths of 60 inches. The soils are considered well draiaed and are included in hydtologic Soil Group B. Thete are yery few limitations to construction of roadways, u 'lities and buildings, primarily related to shrink-swell potential and roadway construction. The shdnk swell limitation can be overcome with ptoper soil removal and replacement with subbase and base course matedals. 5.3 Unusual Features There are flo unusual features on the property that would hindet der.elopment and construction of d:re proposed subdivision, roadrvalrs and subsequent buildings on the site. 5.4 Soils Map. A copy of the Soil Rcsoutce Report along with inforrnation relating to key soil features for construction is included in Appendix B of this report. 'l-lee soils map gellerated fot the propettv is shorvn in Figure 4.1 4 101 Glen Lake Commerce Subdivision Additionol Supplemental lnformation August 20L6 Figute 4.1NRCS Soils Map. 5.5 Cuts and Fills The general grade and topogtaphy of the ptoperty is gradually sloped to the northwest. Cuts and fills will be less than three feet in depth. Lny area requiring topsoil temoval, grading and restoration will be reseeded and revegetated to prevent erosion control. Indir.iduai lots will be landscaped as the site develops in accordance with Ciq, of Bozeman Landscaping requirements. 6.0 Vegetation The property is currently \racant rangeland vegetated with primady smooth brome grass. Thete are no trees, shrubs, marshes, or weflands on the site. There are no critical plant comrlunities on the property requiring protective measures. Noxious weeds on the property include Spotted Knapweed, Houndstongue and Hoarry Alyssum which ate curently berng treated in accordance rvith the approved !7eed Management Plan prepared ^s a part of the ptoposed der.elopment. 5 102 Glen Lake Commerce Subdivision Ad d itiona I Su p ple me ntal I nfo rm ati on August 2076 An aerial photograph of the properry is shown in Figure 5.1 7.0 Wildlife The properry does not provide any significant or criticai habitat for any fish ot wildlife species. The propefty is void of water and is iimited in its vegetadve cover for large marnmals or bird species. It is suspected that field mice and gophers are present on the property, and it may be utilized in some instances by deer trar,,ersing the area. The Fish, Wildlife and Parks was cofrtacted to request any information on habitat and wildlife on the property, but did not respond to the request. The proper$ is current\ vacant and unused. There rvill be no adverse impact on pets and human actir.,iry in the area. 1'he property is located in a primarilv comrnercial and industrial part of Bozeman. I)evelopment of the properry may help to increase pet and human actir-ity bv providing sidewalks and access connecting to existing trails north along Mariley Road and within Glen Lake Park. f'here are no effects to accessing public lands associated with development of the property. 8.0 Histotical Features The State Historic Presewation Office was contacted to inquire about any potential historic srtes of features ofl or around the property that may be impacted by the development. Their response indicated that there are ferr,' pteviousiy recorded sites in the r.icinitv of the proposed der.elopment. 'Ihere har.'e been few cultural resoutces inventory studies conducted in the area. The indicated that Figure 5.1 Aedal Photograph of Subiect Propetty. q.", 103 Glen Lake Commerce Subdivision Ad ditio n ol S u ppl e me nto I I nform atio n August 2016 any structure over 50 years old is considered historic. There are tto structures on the pfoperty. This development does not pose risk to any previously identified historic site. As is standard for any dgr.lrtment and construction project, the State Historic Preservation Office has requested that they be contacted in the event that any historic or cultural resource is identified inadvertendy during the course of construction. A copy of their lctter is include in Appendlx C of this tepott. 9.0 ,\gticulture The proposed development is on approximately 5.5 acres of currently racarrt and unused land in the City. It is surrounded by commercial andindusu:ial use properties ancl Glen Lake Park to the north. The properq is not a pafi of a viable farm unit, there are no agricultural water user facilities, and the property has not been used for any agricultural purpose for more than 40 years. There should be no impacts on agriculture from the proposed der.elopment. 10.0 Agncultural Water User Far-ilities There are no agricuitural water user facilities on the property and no w-ater user facilities will be impacted by the ptoposed development. 11.0 \Watet and Sewer The City's existing water main system is located in N{anley Road on the east and northem perimeter of the proposed development. A new water main will be extended through the development ifl the proposed public tight of way and street, and connected to the existing main on the east and notth sides of the properry. There are two paraliel 20-nch tmnk server mains in N{anley Road along the northern perimeter of the proposed development. A new sewer main with requiled manholes wili be extended through the development in the proposed public right of rvay and street, and connected to the existing main on the nordr sides of the property. The City of Bozeman's water and sewer department has indicated that there is adequate capacity in the water distribution system and the wastev/ater treatfnent system to serve the proposed development. A preliminary engineedng teport has been prepared as a separate component of the preiiminary plat application and includes anticipated demands for watet and wastervatet along with proposed utility layouts necessary to serve the developmert. 12.0 StormwaterManagement Glen Lake Commerce Subdivision will utilize an-onsite stormwater mallagement pond at the notthwestern corner of the der.,elopment on a lot designated as common open space. The stormwater pond has been designed in accordance with the Ciry of Bozeman's Design Standards and Specificadons Policy. A Stormwater Management Plan has been prepared as a separate report which is included in the preliminary plat application. 104 Glen Lake Commerce Subdivision Additional Supplemental lnformation August 2016 Pollution and erosion control will be provided with the development's stotfnwater management system designed to minirnize pollution with sediment control and treatment in vegetated swales and the pond itself. Runoff from the street will be conveyed in an open swale leading to the stormwater pond which will aid in removing oils and grease, urr6 .sdinents will be settled out of the stormwater prior to release from the site. Stormwater drainage swales will be constructed to miflimize velocities to prevent datnage and erosion during runoff e\-ents. 13.0 Streets, Roads and r\lleys The proposed development will have one public street tluough the ptopetty connecting to N{anley Road at nvo locations, one on tlle easteffi boundary and one on the northern boundary- The street will be constructed using the City's standardlocal secdon with a 3\-footback of cur:b to back of curb width, allowing for parking on both sides. The are no alleys or other vehicular facilities planned rvithin the development. Nlanley Road is designated as a collector street in the City's Transportation Plan. The proposed development will require two new intersecdons with l\{anley Road. There wili be no access to any Ciqr arteial roadway directly from the derrelopment. Constmction of dre new roadway serving the development will require minor modification to Manley Road as the intetsecdons are constructed. Traffrc internrption during the construcdon of the intersections rvi1l be minimized to the extent feasible, and wi-ll require ^ separate taffrc control plan which will be prepared with the plans and specifications for the project following pteliminary plat approval. A Ttaffic Impact Study has been prepared for the proposed development in accordance with Bozeman's Unified Deveiopment Ordinance and the Design Standards and Specificadons Policy. The study analyzed *ip genetation and distdbution from the ptoposed development and the impacts to existing roadrvays and intersections. The traffic generated by the proposed development does not lower the Level of Service of interseclions in the area, including Manle,v Road and Griffin Drive, to less that C. The *affrc impact study was prepared by Abelin Trufftc Services and has been included in the preliminary plat apphcation and provides more detail regarding the analysis and conclusions of the study. 1,4.0 Utilities Private utilities will be provided to the der.elopment by Northrfi/estern Energy and Charter Communications in Bozeman. Northwestem Enetgy has been contacted tegatding the proposed development and lot configuration and has indicated that they have adequate capacity and ability to provide electrical service appropriate for industrial uses within the development, and can provide natural gas service from their existing 8-inch tlansmission main located along the northern propefty boundary. Charter Communications has been contacted regatding providing telecommunicadons serwices including telephone and data. They have indicated that they have the flecessary infrastmcture in the viciniw of the property and supply the development with the required services. Private utilities will be installed in a ioint trench with services provided to each individual lot. The trench and utilities will be located rn 10-ft easements provided along the front of each lot and as designated on the preliminary plat drawing prepared for the derreloprnent" Northwestern Enetgy will provide gas and electdcal services from their existing inftastructure along N{anley Road at the 105 Glen Loke Commerce Subdivision Additionol Supplemental lnformation August 2016 northwestern comer of the proposed development. Charter Communicadons will provide services from their existing infrastmcture located along Griffin Ddve. Copies of the letters transmitted to and received from the utility service providers are included in Appendlx D of this supplemental reporl 15.0 EducationalFacilities Waiver gtanted in pre-applicadon process. 16.0 Land Use Waiver gtanted in pre-application process. 17.0 Parks and Recreadon Waivet granted in pre-application ptocess. 18.0 NeighborhoodCenter rWaiver granted in pre-application process. 19.0 Lighting Plan The lighting plan for GIen Lake Commerce Subdivision includes intemection lighting for the local street and Manley Road. Two new streedights will be added to the local roadway, one at each intersection, in accordance urith the City of Bozeman's Design Standatds and Speciflcations Policy. Additional intersecdon khung may be added to Manley Road once the roadway is reconstructed to collector road standards. the lighting plan for Glen Lake Commetce Subdivision is included in the preliminary plat application. 20.0 Miscellaneous 20.a. Public Lands Access to public lands, specifica\ Glen Lake Park @,ast Gallatin Recreadon Area), will be improved with der.elopment of the Glen Lake Cornmerce Subdivision. Access will be improved with reconstrucdon of Manley Road to collector standards and the installation of sidewalks, connecting existing trails leading into the park, as well as motor vehicle and bicycle traffic improvements associated v-ith the roadway leading to the park. 20.b. Hazards There are rro known lnazar:ds on the subject property that would limit development of the proposed subdivision. I 106 Glen Loke Commerce Subdivision Additional Su pplemental I nformation August 2016 2l.A AffordableHousing \Yair.er granted rn preappiicatjon P r{)c e s's. 10 107 PANtsL OBOEU FIRM FLOOD INSURANCE RATE MAP GALLATIN COUNTY, MONTANA AND INCORPORATEDAREAS PAI{EL 808 0F 1725 (SEE MAP INOEX FOR FIRM PANEL LAYOUD CONTAINS: COMMUNTY NUMBER GALUTIN COUNTY 3OOO27 BOZEMAN, CITY OF 3AOO28 PANEL SUFFIX s08 0808 D 0 Notie to User: The lrap Numb€r shown below should be usedwhen placlno map orders; the Communliy Numb€r shown aboveshoud beused on nsurance applimtions tor the gublecl @mm!nlty MAP NUMBER 30031c0808D EFFECTIVE DATE SEPTEITIBER 2,2011 Federal Emergcncy Managcment Ageucy COUNTY I.TED ARI res extracted using F-MIT On-Line. This map does not reflect changes or amendments which may haw been made subsequent to the date on the title block For the latest product information about National Flood lnsurance 108 fiood maps check the FEMA Flood Map Store at TMDesigns February 29,2016 Montana Department of Environmental Quality Water Protection Bureau P.O. Box 200901 Helena, MT 59620-0901 RE: Proposed Commercial Subdivision, Permitting Requirements Glen Lake Commercial Subdivision Dear Water Protection Bureau: Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercial development located in Bozeman, Montana, near Glen Lake Park, north of Griffrn Drive on the west side of Manley Road. I have enclosed a map of the proposed development location showing in the vicinity of the project and the proposed subdivision layout. In accordance with Bozeman Municipal Code for projects of this nature, I am writing to request your review of the proposed project and to identift any known issues or permitting requirements that the Water Protection Bureau may identi$r. The subject property is currently vacant land located across Manley Road from Glen Lake Park. The development should have no impact on Glen Lake or any habitat that I am aware of. Would you please provide, in writing, any comments you may have, or any known permitting requirements that you tbresee for this project" If you have any questions or need any additional information, please do not hesitate to contact me directly at 406.57A.9121 or via e-mail at lgdgprgnsmt@outlook.com. 31 Saier Street I Belgtade, Montana 5977+ I (406) 570-9121 Thank you. ToddslMitdhell, 6l-lt/"1,PB r/ TM Designs 109 DHg MEMO To: Todd S. Mitchell, PE, TM Designs From: Barbara Kingery, PE, DEQSubdivision Section Subject: Request for Comments on Glen Lake Commercial Subdivision Date: April 7,2016 DEQ received your request for comments regarding Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercialdevelopment located in Section 31,f .! S., R. 6 E., in Bozeman, Montana, near Glen Lake Park, north of Griffin Drive on the west side of Manley Road. The project is located in Bozeman, Montana, near Glen Lake Park, north of Griffin Drive on the west side of Manley Road. The project will include 16 lots used for commercial purposes. This development is subject to the requirements of the Sanitation in Subdivisions Act for the approval for water, wastewater, storm water and solid waste to serve these lots. Please contact the Subdivision Review Program at 406-444-5360 for additional information. Steve Bullock, Governor I Tom Livers, Director I P,O. Box 200901 I Helena, MT 59620-0901 I (406) 444-2544 I www.deq.mt.gov 110 RE: mg April 19, 2016 Todd S. Mitchell, PE TM Designs 31 Saler Street Belgrade, MT59774 tmdesignsmt@outlook.com Proposed Commercial Subdivision, Permitting Requirements Glen Lake Commercial Subdivision Thank you for the information and request for comments regarding the above referenced proposed project. This development is subject to the requirements of the Sanitation in Subdivisions Act for the approval for water, wastewater, storm water and solid waste to serue these lots. Please contact the Barb Kingery, Subdivision Lead, Subdivision Review Program, for specific application requirements at 406-444-5360 for additional information. Additionally, Exhibit A provided with your request indicates that the proposed commercial subdivision will hookup to the city of Bozeman's sanitary sewage system. ln this case, a Montana Pollutant Discharge Elimination System (MPDES) individual surface water permit for the discharge of domestic, process, or non-process wastewater(s) generated by the future facility may not be required. Please check with the city of Bozeman to see if there are any additional requirements from the City including but not limited to local limits required as part of the pretreatment program at their wastewater treatment plant. However, there are a number of general MPDES permits issued by DEQ that may be required before, during, and after construction activities at the site. I am enclosing a Water Protection Bureau Fact Sheet that will allow you to plan permit needs according to the scope of the project and project site conditions. lf you determine that the project requires further consultation with Water Protection Bureau staff after looking at this fact sheet, please contact the Water Protection Bureau at (406) 444-3080. Director's Office (406) 444-L760 REF# 16-074 Enclosure Steve Bullock, Govemor I Tom Livers, Director I P.O. Box 200901 I Helena, MT 5962O.0901 I (406) 444-2544 I w\,vw.deq.mt.gov Regulatory 111 TM Designs February 29,2016 U.S. Army Corps of Engineers 10 West 15th Street, Suite 2200 Helena, MT 59626 RE: Proposed Commercial Subdivision, PermittingRequirements Glen Lake Commercial Subdivision Dear US ACOE: Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercial development located in Bozeman, Montan4 near Glen Lake Park, nofth of Griffin Drive on the west side of Manley Road. I have enclosed a map of the proposed development location showing in the vicinity of the project and the proposed subdivision layout. In accordance with Bozeman Municipal Code for projects of this nature, I am writing to request your review of the proposed project and to identiff any known issues or permitting requirements that the U.S. Army Corps of Engineers may foresee. The subject property is currently vacant land located aoross Manley Road from Glen Lake Park. The development should have no impact on Glen Lake or any habitat that I am aware of. Would you please provide, in writing, any comments you may have, or any known permitting requirements that you foresee for this project. If you have any questions or need any additional information, please do not hesitate to contact me directly at 406.570-9121 or via e-mail at tmdesignsmt@outlook.com. 31 Saler Steet I Belgtade, L{ontana 5971.4 I ft06) 574-9D1 112 DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, OMAHA DISTRICT HELENA REGULATORY OFFICE 1O WEST 15TH STREET, SUITE 22OO HELENA, MONTANA 59626 REPLY TO ATTENTION OF March 29,2016 Regulatory Branch Montana State Program Corps No. NWO-201 6-00660-MTH Subject: Glen Lake Holdings, LLC (TM Designs) - Commercial Subdivision - Glen Lake (Gallatin County) Todd Mitchell TM Designs 31 Saler Street Belgrade, Montana 59714 Dear Mr. Mitchell. We are responding to your request for comments regarding the above-referenced project. Specifically, you are proposing development of a commercial subdivision. The project is located within Section 31, Township 1 S, Range 6 E, Principal Meridian, Latitude 45.7018311776653', Longitude -111.038862565916', Gallatin County, Montana. The mission of the U.S. Army Corps of Engineers (Corps) Regulatory Program is to protect the Nation's aquatic resources while allowing reasonable development through fair, flexible and balanced permit decisions. ln particular, under Section 404 of the Clean Water Act, we work to protect the biological, physical, and chemical integrity of the Nation's aquatic resources. Projects are evaluated on a case-by-case basis to determine the potential benefits and detrimentsthat mayoccuras a resultof the proposal. ln allcases an applicant mustavoid and minimize impacts to aquatic resources to the greatest extent practicable. Under the authority of Section 404 of the Clean Water Act (CWA), DA permits are required forthe discharge of fill material into waters of the U.S. Waters of the U.S. include the area below the ordinary high water mark of stream channels and lakes or ponds connected to the tributary system, and wetlands adjacent to these waters. lsolated waters and wetlands, as well as man-made channels, may be waters of the U.S. in certain circumstances, which must be determined on a case-by-case basis. Based on the information provided, it appears that no fill or dredged material will be placed either temporarily or permanently in a water of the United States (WUS). Therefore, at this time no DA permit will be required for this project. lf, however, your final design prescribes the placement of fill or dredged material in any jurisdictional areas, you must submit an application form prior to doing any work. The Montana joint application can be found at http://www.nwo.usace.armv.mil/Missions/RequlatorvProqram/Montana.aspx. This determination does not eliminate the requirement to obtain other applicable federal, state, tribal and local permits. erinteo onlS Recycled Paper 113 TMDesigns February 29,2016 Montana Department of Natural Resources and Conservation 1625 Eieventh Avenue Helena, MT 59601 RE: Proposed Commercial Subdivision, Permitting Requirements Glen Lake Commercial Subdivision Dear DNRC: Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercial development located in Bozeman, Montana, near Glen Lake Park, north of Griffin Drive on the west side of Manley Road. I have enclosed a map of the proposed development location showing in the vicinity of the project and the proposed subdivision layout. In accordance with Bozeman Municipal Code for projects of this nature, I am writing to request your review of the proposed project and to identifu any known issues or permitting requirements that the Department of Natural Resources and Conservation may foresee. The subject property is currently vacant land located across Manley Road from Glen Lake Park. The development should have no impact on Glen Lake or any habitat that I am aware of. Would you please provide, in writing, any comments you may have, or any known permitting requirements that you foresee for this project. If you have any questions or need any additional information, please do not hesitate to contact me directly at 4A6.570.972I or via e-mail at tmdesignsmt@outlook.corn. TM Designs 31 Salcr Street I Belgade, h{ontana 59714 I (406) 570-9121 ToddS. Mitchell, 114 DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION HELENA WATER RESOURCES REGIONAL OFFICE - STATE OF MONTANA PHONE: (4061 444-6999 TELEFAX NUMBER: 1406) 444-9377 April 8. 2016 Mr. I'odd Mitchell. t'.E. 'l'lv1 Designs I625 llleventli Avenue I lclcna. M l' 59601 I{B: Pro.iect ltcvicw & Conrment - (ilen Lake Comrnercial Subdivision. Dcar Mr. Mitchell: Pcr your rccprest, thc IINItC Iielena Regional Office has conrpleted a cursory rcvicw of thc proposed Glen Lake Cornmercial Subdivision pro.iect locatccl in Boz.enran. Montana. Our review fbcusccl solcly on the projects' potential impacts to flood risk and thc regulatory llooclplain requirenrents. Additional impacts relating to \yater rights, rvetlands, etc. are beyond tlre scope and purviclvof tliis review, and shor,rld be sought fiorr the appropriatc agcncy progranls. I{cvicrv of thc Ef1'cctive t'EMn Flood Insurance ltatc Maps (FIItMs), lrfl-cctivc IVIap Panel 30031C0808D. inclicates the proposed Gien Lake Conrniercial Subdivision project is not locatecl in a Zonc A spccial flood hazard arca. We rccomrnend you contact the City of l]ozemart Floodplain Adnrinistrator to cliscuss the project and confirm the permitting requirements. In solrlo crlscs, cornmuuiiics rcgulatc to fioclclplairr bor,rnclrrries beyoucl tliose shown on the FIllviA IrlRMs. Therefore, it is alu,ays sclrnd practice to discuss projects with the local offlcials, if you have"n't already, Prior to beginning rvork on the proposed project. all applicable eounty, state. and lecleral perntits shoLrld be obtainecl. It is the responsibility ol'the applicant to detcrrnine which pcrmits arc required lbr the proposed project. Please contact nre at 4A(t.444.9724 directly if you r.vould like to discuss thcse cornments or havc additional questions. Sirrcerely', John Connors, P.E., C'FM Ilelena Regional Ol'flce lingineer Montana DNItC. Water ltcsourccs Division 1,T24 9TH AVENUE PO BOX 201501 HELENA, MT 59520.1601 115 File Search Request Form Todd Mitchell, PE TM D".ig* 31 Saler Street ContactMontanHisatorv Name: Big* Sky. Big Land. Big Organization: Address: City: State: Telephone: Ern"ilt Belgrade MT 406-570-9121 Zip code:l 59714 Montana State Historic Preservation Office 1410 8th Ave, PO Box2AL2A2 Helena MT 59620 SEND TO: tmdesignsmt@outlook. com DamonMurdo dmurdo@mt.gov (4051444-7767 Project Name: Glen Lake Commercial Subdivision Proposed major subdivision of 5.49 acres of currently vacant land into 16 lots project Description; within the City of Bozeman, under Light lndustrial Zoning. This is an infill development project in an area of Bozeman consisting of primarily commercial and industrial properlies. Land use: Vacant property, proposed subdivision County: Gallatin Agency lnvolved: (Private,FWP,BLM) Private owner Land Ownership: Glen Lake Holdings, LLC Project Area Location lnformation Township(N/S) Range (ElW) Section(s) Township 1 South, Range 6 East, SW 1/4 of Section 31. See attached maps for project vicinity, proposed development and USGS quad map. Please complete this form ond ottach o copy of the appropriate quad map showing the project location. Feel free to ottach additionol project information if available. Allfields must be completed in order to process your request. All sections must be added up and entered in to the box below before o file seorch will take place. An invoice will be sent with your file search results. Total Sections to be searched: 1- Total amount to be paid to SHPO: Szs Ver.2013 File Search Fee Structure 1-3 Sections (525) 4-300 Sections tSS/Section) > 300 Sections (Sl0/Section) 116 T]SGS MAP -x2"' {A EXHIBIT A GLEN LAKE COMMERCIAL SUBDTVISION ilr\\tr' .'.{) . a,' , .t ,TION ll -!il i \\ I -f-.] ftl I T --?__a J46'I ,!, ^a , ,L , .F, \I -,I....,JJT - '-it; ' - -:: --:.\'.- ;;i ' l ti rl \-- \! \J a T r a -t n-f 7/t 1 t\J I t f\, I r 4t {:- l.-F.- Ct nr --Tl-fi .,lr rl 1 lfl f'I ., l 'h \r. r I ri J Pl t" l* l.l[,.:.'r,[,-: l:"- -- ,i i \$r/t . \L4 { I i--1t I l.o ,b* lPo *tt lr tt lr I 117 PREPARE,D F{)II: PREPARED BY' FIBRUAR\' 20I 6 GLEN LAKE COMMERCIAL SUBDIVISIOI{ EXHIBIT A - PROJECT LOCATION Gltn Lakc floldings, !-LC TM Designs llinor Subtlivision 154 A. Lot 1-4., located in the S\\'j Scction 31, T' I S'. R' 6 E" P.Nf .M., CitY of Bozcman, Gallatin Count--!' \Iontana o*.€f#,: m zofue i* E ', \\: r r' 1.. 1s t-" sl:sr h".; ! {t *dX* r.r$ \ -------*e=-P6!i Ei; - cRlT'FtN DRIVE \ (n".) xm-frffi nc - i st\a ' ,'\ '-.i:r , \ f tl . e er rul(ir IOE &. VICINITY \BOZEMAN MAP - \ rlf ***gaT .s* 't 4 t11l;r}f 118 Todd Mitchell From: Sent: To: Subject: Attachments: lYlorrtana Ilir' 5kr. llig L;rrrrl. liil l I tstun. Murdo, Damon <dmurdo@mt.gov> Monday, March 28,2016 2:46 PM Todd Mitchell RE: data request 201 6032807.pdf; CRReS.pdf; CRlS.pdf Todd Mitchell TM Designs 31 Saler Street Belgrade MT 59714 RE: GLEN LAKE COMMERCIAL SUBDIVISION, BOZEMAN. SHPO Project #:201,6032807 Dear Mr. Mitchell: I have conducted a cultural resource file search for the above-cited project located in Section 31,, T1S R6E. According to our records there have been a few previously recorded sites within the designated search locale. ln addition to the sites therehavebeenafewpreviouslyconductedcultural resourceinventoriesdoneintheareas. l'veattachedalistofthese sites and reports. lf you would like any further information regarding these sites or reports you may contact me at the number listed below. It is SHPO's position that any structure over fifty years of age is considered historic and is potentially eligible for listing on the National Register of Historic Places. lf any structures are to be altered and are over fifty years old we would recommend that they be recorded and a determination of their eligibility be made. As long as there will be no disturbance or alteration to structures over fifty years of age we feel that there is a low likelihood cultural properties will be impacted. We, therefore, feel that a recommendation for a cultural resource inventory is unwarranted at this time. However, should structures need to be altered or if cultural materials be inadvertently discovered during this project we would ask that our office be contacted and the site investigated. lf you have any further questions or comments you may contact me at (406) 444-7767 or by e-mail at. I have attached an invoice for the file search. Thank you for consulting with us. Sincerely, Damon Murdo Cultural Records Manager State Historic Preservation Office File: LOCAL/SU BDIVISIONS/2016 March 28,20L6 119 ylorrtd;igSk,v. BigLantl.B, ffl srArE HISTuRIC nRESERVATIuN uFFIC Cultural Resource Annototed Bibliography System CRABS Township, Range, Section Report Report Dr 03/28/2t wnship: 1 S HUFSTETLER 3 2006 Range: 6 E Section:31 :RABS Document Number: GA 4 28442 Agency Document Number: SCOTT CULTURAL RESOURCES TNIE'NTORY AND EVALUATION OE THE STORY MILL CENTER :RABS Document Number: GA 6 29445 Agency Document Number: Range: 6 E Section:31 SHANE S TRILEAE: VISUAL LMPACT ASSESSMENT FOR A CELLULAR COMMUNICATION TOWER IN BOZEMAN, GALLATIN COUNTY, MONTATIA :RABS Document Number: GA 5 33553 Agency Document Number: lilARK A!{D MITZI ROSSILLON CULTURAL RESOURCE^S INVE,NTORY OF NORTH ROUSE AVENUE, GALLATIN COWTY, T,TONTATIA wnship:1 S Range: 6E Section:31 CARPENTER 4 2001 wn-ship: t S HOPE 20L2 120 site # Twp 24c,1r589 I S Rng Sec Qs Site Tlpe1 dlsiora. Ha11ro;d Site Nu Ll T14pe 2 Time Period Hlsioric More Than One Owner Private NR Status Unresolrred 24GL11 36 1S 6E Historic Residence Nufl Historic More Than one P rivat e IneI igib le 2 AGA}?'7 2 1S 5E 31 Historic Residence Nul I Historic More Than 0ne Private undetermi ned 24CAr1 42 5E 31 Historic Residence Nu.I.I Historic More fhan One Privat e Ineliglble 24cAl11 4 1S 6E Historic Residence N"u11 Historic More Than One Private undetermined 24GA1096 1S 5E Historlc Rai-lroad Nu1 I Historic More Than One Private /OFFICIg Sky. [ontana Big Land. Big History. STATE Cultural HISTORIC Re source PRESERVATION Information Sy stems CRIS Township, Range, Section Report Report Di 03 /28 /2 _ na^:da 3] SE 121 February 29,2016 Gallatin Conservation District PO Box 569 Manhattan,MT 59741 RE: Proposed Commercial Subdivision, Permitting Requirements Glen Lake Commercial Subdivision Dear Gallatin Conservation District: Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercial development located in Bozeman, Montana, near Glen Lake Park, north of Griffin Drive on the west side of Manley Road. I have enclosed a map of the proposed development location showing in the vicinity of the project and the proposed subdivision layout. In accordance with Bozeman Municipal Code for projects of this nature, I am uriting to request your review of the proposed project and to identifu any known issues or permiuing requirements that the Gallatin Conservation District may identifu . The subject property is currently vacant land located across Manley Road from Glen Lake Park. The development should have no impact on Glen Lake or any habitat that I am aware of. Would you please provide, in writing, any comments you may have, or any known permitting requirements that you foresee for this project. If you have any questions or need any additional information, please do not hesitate to contact me directly at 406.57A.9121 or via e-mail at tmdesignsmt@outlook.com. Thank you, Todd s. Mitchell, PE TM Desisns 31 Saler Street i Belgtade, Nfontana 59714 | (406) 570-9121 122 TMDesigns February 29,2016 Montana Department of Fish, Wildlife and Parks Fisheries Division P.O. Box 200701 Helena, MT 59620-0701 RE,: Proposed Commercial Subdivision, Permitting Requirements Glen Lake Commercial Subdivision Dear Fisheries Division, FWP: Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercial development located in Bozeman, Montana, near Glen Lake Park, north of Griffrn Drive on the west side of Manley Road. I have enclosed a map of the proposed development location showing in the vicinity of the project and the proposed subdivision layout. In accordance with Bozeman Municipal Code for projects of this nature, I am writing to request your review of the proposed project and to identifr any known issues or permining requirements that the Fish, Wildlife and Parks may foresee. The subject property is currently vacant land located across Manley Road from Glen Lake Park. The development should have no impact on Glen Lake or any habitat that I am aware of. Would you please provide us any comments you may have in writing, or any known permitting requirements that you foresee for this project. If you have any questions or need any additional information, please do not hesitate to contact me directly at 406.570.9121 or via e-mail at tmdesignsmt,.g,ioutlook.com. 31 Saler Street I Belgrade, Montana 597"14 I (406) 570-91,27 TM Designs 123 TMDesigns February 29,2016 City of Bozeman, Engineering Department Attn: Rick Hixson PO Box 1230 Bozeman, MT 59771-1234 RE: Proposed Commercial Subdivision, Permitting Requirements Glen Lake Commercial Subdivision Dear Mr. Hixson: Glen Lake Holdings, LLC is preparing a preliminary plat application for a commercial development located in Bozeman, Montana, near Glen Lake Park, north of Griffin Drive on the west side of Manley Road. I have enclosed a map of the proposed development location showing in the vicinity of the project and the proposed subdivision layout. In accordance with Bozeman Municipal Code for projects of this nature, I arn writing to request your review of the proposed project and to identil) any known issues or permitting requirements that the Engineering Department may identify. The subject property is currently vacant land located across Manley Road from Glen Lake Park. The development should have no impact on Glen Lake or any habitat that i am aware of. The project is also not located in a floodplain according to the current floodplain mapping in the vicinity of the project. I have enclosed a copy of a Firmette created for the project using the current DFIRM available from FEMA. Would you please provide, in writing, any comments you may have, or any known permitting requirements that you foresee for this project. If you have any questions or need any additional information, please do not hesitate to contact me directly at 406-570.9121 or via e-mail at tmdesignsmtr?or-rtiook.com. 31 Saler Street I Belgrade, N{ontana 59714 I (406) 570-9121 124 Appendix D Utility Service Providers 125 lToffiEneryv031' Form No. 2927 llellrcrlng a 8/|ght Futrrc lesidential (new): )ommercial (new): iubdivision (new): Jtility Relocation: lervice Removal: iervice Conversion: -ighting: rrigation: [emporary Electric: Application for New Servict Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Glen Lake Holdinos. LLC Electric X Electric X Electric Electric Electric x 0ustomer lnformation )ustomer/Company Name (Billing Name): ,lew Service Address: 93 East Griffin Drive )id you have a previous service with NorthWestern Energy at another address? _ Yes If yes, Address: j-mail Address: tmdesionsmi6or rtlook com )rimary Phone: &06\ 570-9121 iecondary Phone: )urrent Billing Address: 145 ,leana Lei Corrrt Building lnformation: Residential _ House _ Mobile Home _ Garage _ Multiplex Housing (# of units _) Residential Load lnformation: Voltage _120t24O - Other Panel size: _(Amps) Gommercial/lrrigation Load lnformation: City: Bozeman City: BOZEMAN State: MT State: MT XNo Zip: 59715 Zip: 59715 Panelsize. (Amps) H.P.:_(lrrigation) Square Footage: _ sq.ft. Commercial _ Office _ Retail I\ortlilWbstern E Delivering o Bright "ryy Future August 9, 2016 Todd Mitchell Glen Lake Holdings, LLC 145 Jeana Lei Court Bozeman, MT 59715 Dear Todd Mitchell, NorthWestern Energy received a letter and preliminary plat map for Glen Lake Commerce, 16 commercial lots. At this time, NorthWestern Energy has no comments related to this project. Power and gas shall need to be supplied from the north west corner of the development, please ensure that all easements have been acquired to meet this need. There is the potential to be within Manley Road right-of-way, but this needs to be verified by the developer. Please contact NorthWestern Energy in the future if you require a Will-Serve letter. I have provided a preliminary map of the placement of our facilities. Please review and comment as needed. Sincerely, Cammy Dooley Engineer cam my.dooley@northwestern.com o 406-582-4680 F 406-585-9634 N orthWestern E nergy.com 127 U !!! ! ly C u_tu e rt Re.q1t lp me nt Random Sepq4tjon 1. Oae Cufuerl lor tl"ctt;. and Coftnunicolicns. ?. Secooa Culaert for !\ictu.ci Css. Cross Secfion Plan View l{orthWestern Frrrg], Electric Construction Standards - Dislri bfii on Ll n d ergrou n d TRENCH SPECIFICATIONS & TRENCH EXAMPLES - IITILITY CULVERT S1.,\NDAI{D NO. 30-c-8 Itll\.'N().1 l,'01/2009 il6 {rl l0()() |sHt t or+ ,' 1?" Ty|.iccl N-:2 Dcrb:e ha!! Ccrru pted lotye!bylene Cii/ve, fs \ Vt;th fnd Cops ond BonC I J ! i i I L__ * Q_Sppctwa_y !i ar != i ci .CI (i *l I 128 Construction Notes: The purpose for a utility culvefi, as shown in these standards, is to provide for a sleeve under a roadway for future utility facilities. Often roads and approaches are constructed well in advance of the utilities. In these cases, a utility culvert can be installed to avoid having to open cut or bore under the roadway in order to install the utilities at alater date. For growth related extensions the cost of the installed utility culvert(s) will be born by the developer. The intent of this standard is for NWE to provide the customer with the appropriate utility culverl drawing, together with additional notes to tailor the design drawing for the specific application. These utility culvert drawings are not necessarily approved by any other utility. Get all other utilities approval prior to installing a utility culvert for them. These drawings are general in nature. Location specific details are not included. Do not install any utility culvert(s) without flrst getting speciflc design and location approval from the local NWE Operations Field Engineer, and also any other utility that may be expected to use the culverl(s). Specific design details include, but are not limited to: (1) Culvert diameter, (2) culvert length, (3) culvert orientation with respect to each other and other facilities, (4) culvert location, etc. A culvert intended for natural gas can only be used for a natural gas line. No other type of facility will be allowed in it. A culveft intended for electric supply may under some circumstances share the space with communications facilities. If space cannot be shared r.vith communications, then install two separate culverts, one for electric supply and one for communications. See Standard 30-C-2 for rules governing Deliberate Separation and Random Separation between electric supply and communications facilities. Separation between, and burial depths of, utility culverts is important and must be followed as per these drawings and/or any modiflcations by the appropriate utility representatives. Utility culverts must be installed so that they are straight and that there is a line of sight through them. Cap the ends of each culvert and mark each end with a durable above ground marker. Also, take good field notes that tie each end to a known landmark. Backfill material and compaction requirements must meet the specifications of the road design. It is the culvert installers responsibility to obtain and meet these specifications. NorthiWeste,m Errer'gr Electric Construction Standnrds - Distributiax Linderground TRENCH SPECIFICATIONS & TRENCH EXAI}TPLES TITILITY CULVERT SlANDARD N(), 30-c-8 RI:V NU.l 2t0U2AA9 06i0lil0u6 | Snr.:of+ 129 :4Charter 08l2e/16 RE: Glen Lake Commerce Subdivision Dear Todd Mitchell, I am writing in reply to the preliminary plat for the Glen Lake Commerce Subdivision along the North side of Griffin and West side of Manley Rd. Charter Communications intends to analyze this project and determine whether services can be delivered to this t6 lot area. There are many factors that aid in this decision and will be evaluated as the project progress'. Thank you for submitting the preliminary plat so ure can begin this process. Sincerely, Andy Molenda Technical Service Supervisor 130 131 132 133 134 135 136 137 138 139 140 141 142 City Planning Board and Zoning Commission Tuesday, February 7, 2017 6:00 PM City Commission Chamber – 121 N. Rouse Avenue A. 06:03:05 PM (00:00:05) Call meeting to order Present were: Zoning Commission Erik Garberg, Chair Jordan Zignego George Thompson Chris Mehl, Commissioner Liaison Planning Board Paul Neubauer, Chair Jordan Zignego Jerry Pape, Jr. George Thompson Paul Spitler Henry Happel Brianne Dugan Lauren Waterton Chris Mehl 143 B. 06:03:39 PM (00:00:39) Changes to the Agenda. Erik Garberg stated the minutes will not be acted on. C. Approve Meeting Minutes from Joint Zoning Commission/Planning Board Meetings on 1/17/2017. The minutes of the December 6, 2016 meeting were not included in the packet. There were no minutes for the January 17, 2017 meeting since it was cancelled. D. 06:03:52 PM (00:00:52) Public Comment – Please state your name and address in an audible tone of voice for the record. This is the time for individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes No comment was received under this agenda item. E. Action Items 1. 06:04:05 PM (00:01:05) Review & Consideration of Draft Article 5 UDC update (Joint Zoning Commission and Planning Board) Presentation and work session to review the draft Article 5 – Project Design. Site design includes block frontage standards, site planning and design elements, and building design. Public hearing on Article 5 is tentatively scheduled for February 21, 2017. (Rogers) 06:04:17 PM (00:01:17) Tom Rogers stated this is a joint meeting of the City Planning Board and Zoning Commission and characterized this as a work session. He noted staff has presented parts of this code revision to the Design Review Board and will take the input of the various advisory groups then come back with a revised draft for consideration. 06:07:16 PM (00:04:16) Responding to Paul Spitler, Tom Rogers stated that many of these changes are substantive rather than procedural. Paul Spitler asked that the substantive changes be identified during the presentation. 06:08:05 PM (00:05:05) Tom Rogers reviewed the status of this revision process, noting that the new code will look significantly different from the current code. The Community Development Director will make a presentation to the Commission on February 13 to review the adoption process for the new code. In the meantime, he will be making presentations to boards regarding the revisions. 144 Tom Rogers turned to review of Article 5, noting it combines the development code and the design objectives plan into one document. He noted it details block frontage, site planning and design elements, and building design and also identifies when, where, why and how those provisions apply. Responding to questions, Tom Rogers stated that the design objectives plan has some very simple basic site planning and design elements that are regulatory in the entryway corridor. Those standards are now being applied everywhere in the community. He then confirmed that the provisions applying to franchise architecture will apply throughout the community rather than being limited to the entryway corridors. Tom Rogers stated this section does not apply to single-family detached households and two-household attached units, but does apply to three or more attached dwellings, apartment buildings, commercial and industrial buildings. He noted that these revisions include provisions for flexibility in design and development. He stated no changes are being proposed to the neighborhood conservation overlay district requirements. He turned attention to the major entrances, or gateways, to the community, noting a 25-foot setback is being required instead of the 25-foot or 50-foot setback currently in place. This additional setback allows for bicycle and pedestrian paths and the requirements of the Montana Department of Transportation. 06:18:05 PM (00:15:05) Erik Garberg noted that these revisions have expanded the requirements for the entryway corridors and historic preservation and applied them to all commercial districts. He noted this has resulted in additional development standards rather than simplifying them. 06:19:28 PM (00:16:28) Chris Saunders stated the Commission removed an artificial boundary on what was considered historical and adopted a clearer standard on how to demonstrate something is historical, but these regulations are not automatically triggered throughout the community. 06:21:09 PM (00:18:09) Erik Garberg noted that eliminating the boundary of the NCOD makes the application of the historic preservation less simple in its application. 06:22:03 PM (00:19:03) Chris Saunders responded that a generally applicable standard adds some complexity but simplifies the process by providing consistency in application. 06:25:53 PM (00:22:53) Tom Rogers noted a site plan is required for any commercial building; however, it is important to balance development and redevelopment of a site. The revisions will allow for investment in a property without triggering full compliance with the code provisions. 06:29:05 PM (00:26:05) George Thompson asked how these regulations would impact redevelopment of the current Heeb’s site and the old Greyhound Bus Depot; Tom Rogers responded by identifying the level of review required for each. 06:32:25 PM (00:29:25) Tom Rogers turned attention to how the provisions apply. He then responded to questions from Erik Garberg regarding how these provisions apply and how rezoning may trigger those provisions. 145 06:39:49 PM (00:36:49) Tom Rogers discussed various block frontages, including storefront frontage, landscape frontage, and mixed frontage. He noted that departures are available to various standards, allowing flexibility in design. Responding to questions, he stated that Boise, Idaho, and Ellensburg, Washington, have provisions for departures, and both communities have found those provisions work well. 06:51:19 PM (00:48:19) Responding to Erik Garberg, Tom Rogers stated that departures are not the same as a variance. He noted that the departure criteria vary for the different block frontages. He noted that variances are still available for subdivisions and other zoning related pieces. 06:56:45 PM (00:53:45) Jerry Pape asked that staff look at specific items in the existing code, including how to allow franchise architecture, weather protection, and the two front yard issue. He identified examples of each of those and how they have impacted past projects. He suggested that the departure process may help to address some of those issues. 07:02:06 PM (00:59:06) Erik Garberg declared a break of the joint City Planning Board/Zoning Commission meeting for the scheduled Planning Board meeting. 07:02:22 PM (00:59:22) Paul Neubauer called the Planning Board meeting to order. E. Action Items 2. 07:02:36 PM (00:59:36) 16533 Glen Lake Commerce Subdivision. Major Subdivision Preliminary Plat. (WerBell) Lauren Waterton disclosed that she had worked with the applicants on some early concepts but is no longer involved in the project. 07:03:09 PM (01:00:09) Mitch WerBell entered his staff report and findings into the record. He noted this is a major subdivision to subdivide 5.5 acres located northwest of the intersection of Manley Road and Griffin Drive into fifteen lots for commercial development. He stated it is in compliance with the land use map. He noted that access will be from Manley Road, which must be upgraded to city standards in conjunction with this application. Mitch WerBell reported the City Engineer approved a deviation request for access spacing for the eastern side but did not approve the request for the proposed location for the northern access. As a result, that access must be aligned with the Map Brewery access to alleviate vehicular and pedestrian conflicts. He noted some mitigation for projected transportation impacts prior will be required prior to final plat approval. He stated improvements to the intersection of Griffin Drive and Manley Road are scheduled for 2019; and the Director of Public Works has indicated a willingness to grant a waiver from the requirement to bring that intersection up to Level C standards in conjunction with this application. 146 Mitch WerBell stated that staff has found this subdivision complies with the State law and code requirements, and has recommended approval subject to conditions and code provisions. He noted no public comment has been received to date. He concluded by noting there is limited amount of annexed and undeveloped land for industrial development at this time, and staff has found this application is in conformance with the adopted growth policy. 07:09:51 PM (01:06:51) Responding to questions from George Thompson, Mitch WerBell stated that improvements to the intersection of Griffin Drive and Manley Road were identified as a high priority for the City through the capital improvements program process and are independent of this application. He noted that the Manley Road improvements will include on-street parking but he is not certain about bike lanes. 07:11:27 PM (01:08:27) Responding to questions from Henry Happel, Mitch WerBell stated he has seen some concept drawings of the development in the subdivision, but the view of the subdivision from Manley Road is not known at this time. He stated that the lots will be subject to plan review process, but noted it is too early to speculate on whether the buildings on the lots adjacent to Manley Road will face it or not. 07:13:03 PM (01:10:03) Jerry Pape stated he feels the industrial use is an appropriate use in this area. He voiced concern about the railroad crossing on Griffin Drive and how it may impact development of this area. Mitch WerBell responded it is his understanding that the improvements to the intersection are designed to reduce the vehicle stacking at the railroad crossing. 07:15:14 PM (01:12:14) George Thompson asked if the intersection improvements are to include a traffic signal. Mitch WerBell responded there will be turn lanes, but he is not certain if it will be signalized. 07:15:49 PM (01:12:49) George Thompson asked about landscaping and berming along Manley Road, particularly if parking lots abut the roadway. Mitch WerBell responded that parking will be from the local street and will be directed toward the rear. He noted that landscaping will be required in conjunction with site review, and the code will require screening of the parking and upgrading of Manley Road that includes boulevard landscaping and street trees. 07:18:09 PM (01:15:09) Responding to questions from Paul Spitler, Mitch WerBell stated that if an SID is approved, the final plat may be approved prior to construction of the improvements; however, if it fails, Manley Road must be constructed adjacent to that subdivision prior to final plat approval. He briefly highlighted some of the uses allowed in the M-1 zone, which include industrial uses but limited commercial and residential uses. 07:20:08 PM (01:17:08) Paul Neubauer stated he is not concerned about the use of SIDs in this instance since it is an industrial development. 07:21:29 PM (01:18:29) Todd Mitchell, TM Designs on behalf of the applicant, noted this property has been subject to several different proposals for development. He feels this design meets code 147 requirements as much as possible, given its shape and size. He noted this is an infill project in an area that has been growing. It is accessed via Manley Road and City services are readily available to the site. He turned attention to the conceptual site development, noting the lots adjacent to Manley Road will be accessed from the interior roadway and may or may not have parking lots between the buildings and the street. He noted the building facades are to be presentable to Manley Road. He turned attention to the dirt and asphalt that has been previously deposited on the site. He noted some preliminary environmental evaluations have been completed, and no real concerns about potential issues were identified. Also, the tank farm across Griffin Drive has some environmental issues; but they are not impacting this property. Todd Mitchell turned attention to infrastructure improvements as required by the code. He acknowledged that the intersection of Manley Road and Griffin Drive does not function well in the morning but functions better in the afternoon. He noted the intersection is now on the City’s CIP, which provides some flexibility in timing of those improvements. He noted Manley Road is designated as a collector but has not been improved to date. He recognizes that it needs to be improved and suggested it be improved to collector standards all the way to either the northern edge of Gallatin Park or to the city limits through an SID. He turned attention to the locations of the accesses to the site and potential safety issues with various locations. He voiced concern that the requirements to improvement Manley Road have been waived for all other projects along that roadway to date and, while he recognizes this applicant must participate in those improvements, his preference is that the improvements be addressed on a broader basis through the SID process. As a result, he has taken on the initial steps in the process for creation of an SID and has provided the information to City staff. Todd Mitchell stressed that the intersection of Manley Road and Griffin Drive serves a large portion of the community and not just this development. He noted the intersection has not been improved for many years even though traffic volumes have increased, and recognized that it is time to do so. He asked that the final plat be approved and development be allowed to occur once the SID has been created so that this project can continue to move forward. 07:38:59 PM (01:35:59) Lauren Waterton noted the right-of-way for Manley Road at the intersection is 55 feet wide instead of the required 90 feet. 07:39:22 PM (01:36:22) Todd Mitchell responded there is an additional 20 foot easement along this property, although it has not been dedicated. He stated the additional 15 feet would be required from the Mergenthaler property. He noted parking is not desired at the intersection and suggested that it be eliminated to the curve so the road improvements can fit within the 75 feet of right of way available. 07:41:44 PM (01:38:44) Responding to Paul Spitler, Todd Mitchell stated it is too early to identify the types of uses will be developed on this site. He noted that these lots are small, with some of them being only a quarter acre. He recognized the range of uses in the M-1 zone is pretty broad. 07:42:46 PM (01:39:46) George Thompson voiced appreciation for the renderings. He voiced support for the SID approach, noting it makes sense to improve the entire roadway. He then noted that improvements to the access to the East Gallatin Recreation Area could also be beneficial. 148 07:45:06 PM (01:42:06) Paul Neubauer opened the public comment portion of the meeting. 07:45:23 PM (01:42:23) Patrick Kainz, owner of MAP Brewing Company, stated he feels the SID is critical to this entire corridor, and recognized he is part of the parking and traffic issues. He feels those improvements will benefit people in the community. 07:46:38 PM (01:43:38) Dan Alexander, developer, stated a couple engineering soil labs have shown interest in this site as well as the Montana Fish Company. He stated these are businesses using space elsewhere in the community that may not be optimal, and this would allow them to construct the type of facilities they need. He is willing to work with the City’s Engineering Department in the infrastructure improvements. 07:48:05 PM (01:45:05) Paul Neubauer closed the public hearing. 07:48:19 PM (01:45:19) It was moved by Jerry Pape, seconded by Chris Mehl, that having reviewed and considered the application materials, public comment and all the information presented, the findings presented in the staff report for Application 16533 be adopted and approval of the Glen Lake Commerce Subdivision preliminary plat with conditions and subject to all applicable code provisions be recommended. 07:48:51 PM (01:45:51) Jerry Pape stated he is interested in seeing this property developed. He noted there is not much M-1 zoned property in Bozeman, and it is surrounded by a number of uses and amenities. 07:50:41 PM (01:47:41) Chris Mehl voiced his agreement with the staff report and findings. 07:51:12 PM (01:48:12) The motion carried unanimously. 07:51:27 PM (01:48:27) Paul Neubauer declared a break. 08:00:59 PM (01:57:59) Paul Neubauer called the joint Planning Board/Zoning Commission back to order. F. FYI/Discussion 1. Water Facility Plan status update (Saunders) 2. Fire Facility Plan status update (Saunders) 3. Transportation Plan status update (Saunders) 4. Strategic Plan status update (Saunders) 5. Growth Policy status update (Saunders) 08:03:27 PM (02:00:27) Chris Saunders noted the City has roughly a dozen facility and other plans that guide different elements of the community, and staff is actively working on updates to five of them. He noted the strategic plan is a new document, and a public open house is scheduled for February 15 on 149 this document. It has had a substantial amount of public input and has provided an opportunity to work on a wide range of issues. He noted the City Manager’s office has taken the lead in creating this document. Chris Saunders turned attention to the transportation plan, noting the public review document has just been released. He stated this document has received a substantial amount of public comment, and that input has been summarized. He noted the document has implemented the Wikimap, which allows for public comment and ease of adding likes or dislikes. He noted that staff is also considering whether the same type of process can be used for the growth policy update. He noted the transportation plan was last updated in 2009, and the public comment is still open on the update. Chris Saunders addressed the water facility plan, which was last updated in 2006. He noted the update is approximately 95 percent complete, and it should be ready for public release in about ninety days. He noted the facility plans set large scale policy issues and where building can occur, but they also get into many details. He stated several expansions will be needed in the water facilities to support the community. Chris Saunders stated the fire facility plan was also last updated in 2006. This plan looks at locations for fire stations and deficiencies in coverage. He does not anticipate a public draft for roughly six months. Chris Saunders turned attention to the growth policy update, noting that funding was approved for this fiscal year. He stated staff plans to draw from public input and data gathered from the other plan updates. He noted the City has released an RFP to provide assistance in analyzing the data and determining what land inventory is needed to support the future needs of the community and received eleven responses back. He stated the dynamics in the valley are changing as Belgrade and Four Corners develop and with the explosion of e-commerce. He noted that all of these issues impact the land use inventory for the community. He suggested that the Board members assist in the update process by looking at the neighborhood plans and determining if they need to be included in the growth policy or if they need to be eliminated. Chris Saunders stated he anticipates the strategic plan and transportation plan update adopted by the Commission within the next three months. He is also working with the consultant on updating the impact fee schedules for water, sewer, transportation and fire, which will take a significant amount of his time. 08:17:58 PM (02:14:58) Chris Mehl asked how the Planning Board members can best provide input on what to include in the growth policy update. 08:18:42 PM (02:15:42) Chris Saunders suggested input can be provided in a formal meeting or in a committee setting, noting that staff is willing to work in either format. He noted that in the next few months, there will be a lot of UDC public hearings held, and there are projects to consider. He suggested some special meetings could be held if the Board so chooses. 150 08:19:59 PM (02:16:59) Paul Neubauer voiced his interest in getting further through the UDC revision process, but he feels that reviewing the neighborhood plans and their viability would be a good first step. He noted that it appears the Board’s role in the growth policy update will be greater in the summer based on Chris Saunders’ presentation. 08:21:06 PM (02:18:06) Chris Mehl noted it would be good to have someone from the Board look at the eleven responses received. He noted the Board could also influence the RFP for the growth policy update. 08:21:53 PM (02:18:53) Responding to questions from Jerry Pape, staff confirmed the economic development plan was approved. Jerry Pape indicated a willingness to serve as Board liaison on the committee to review the responses for analyzing the economic data, noting he would be a fairly antagonistic representative. 08:22:49 PM (02:19:49) Paul Neubauer also volunteered to serve on the committee. 08:23:32 PM (02:20:32) Chris Mehl asked how the Board wants to prepare for the growth policy update, and if it wants to hold additional meetings to begin providing input. 08:24:46 PM (02:21:46) Henry Happel asked about the relationship between the strategic plan and the community plan update and whether the community plan update process should be started before the strategic plan is adopted. 08:25:25 PM (02:22:25) Chris Mehl responded he does not believe the community plan update will be started before the strategic plan is adopted since the RFP process will be the first step. 08:26:27 PM (02:23:27) Chris Saunders noted there are six themes in the strategic plan, and one of them is a well planned city. 08:27:32 PM (02:24:32) Responding to Henry Happel, Chris Mehl noted the Planning Board provides recommendations to the Commission. He stated they can be reactive and meet as necessary or can be proactive. He acknowledged that the Board makes that choice. 08:29:26 PM (02:26:26) Paul Spitler stated he feels the community plan update is the most important issue for this Board to grapple with, particularly when looking at how much the community has grown. He is interested in getting in front of the plan update and taking a leadership role. 08:30:54 PM (02:27:54) George Thompson suggested that the Board devote its meeting on either the first or third week of the month to community planning issues so that it gets updates at least monthly. He noted this would allow the Board to focus on key topics. 08:32:08 PM (02:29:08) Chris Saunders recognized there are timelines to be met and noted it may be possible to manage work flow so that projects can be reviewed at one meeting each month. 151 08:32:30 PM (02:29:30) Jerry Pape stated it is important to understand how this Board can make a meaningful contribution to the process and noted they need to understand when, how much material is to be digested, and who has the time to do it. 08:33:15 PM (02:30:15) Chris Saunders noted that staff could provide a fifteen-minute highlight of each of the neighborhood plans for Board consideration. 08:34:53 PM (02:31:53) Jerry Pape suggested that the Board get rid of the non-productive paths after determining what the end product should look like. He then asked staff to identify the five most significant issues the Board can contribute on. 08:36:09 PM (02:33:09) Chris Saunders confirmed that staff could provide a series of key questions that they would appreciate a response on. 08:36:34 PM (02:33:34) Lauren Waterton noted the Planning Board has few roles under state statute, and updating the community plan is one of them. She feels the first step should be understanding what the statutes require in the plan and what is in there. Structurally, it is important to consider the neighborhood plans and whether they should be included in the community plan or not. She suggested the first fundamental question to consider might be whether the Board feels neighborhood plans are a good idea or not. 08:38:31 PM (02:35:31) Chris Mehl noted staff could send the statutes applicable to the plan to all Board members and then the Board can discuss whether the plans make sense and how they should be modified or updated. 08:39:49 PM (02:36:49) Jerry Pape questioned how much time the Board needs to spend responding to the future and how much time it needs to spend on responding to the past. He suggested that there are bugs in the system or things that are broken and stressed there is no need to fix those things not broken. He feels for the Board to be effective, it is important to ensure the neighborhood plans are appropriate and cover all of the issues they should. 08:41:15 PM (02:38:15) Paul Neubauer noted the Planning Board members are interested in working on the community plan update, and agreed that the Board should devote any lulls in their workload to that effort. He noted the first step may be for board members to familiarize themselves with current statutory requirements and with the current plan. He asked Board members to expect two meetings a month to begin working on this issue. 08:43:35 PM (02:40:35) Jerry Pape stated he does not want to get buried in state statue, but he does not want to violate it. 08:43:50 PM (02:40:50) Chris Saunders noted state statute is pretty general but provides latitude for local control. 152 08:44:05 PM (02:41:05) Paul Spitler noted it is important to identify the big issues that need to be addressed in the community plan and, in drafting the RFP and selecting consultant, being mindful of the issues that the consultant should have expertise in. 08:44:57 PM (02:41:57) Paul Neubauer thanked staff for the update. E. Action Items 1. Review & Consideration of Draft Article 5 UDC update (continued) (Joint Zoning Commission and Planning Board) Presentation and work session to review the draft Article 5 – Project Design. Site design includes block frontage standards, site planning and design elements, and building design. Public hearing on Article 5 is tentatively scheduled for February 21, 2017. (Rogers) 08:46:33 PM (02:43:33) Tom Rogers noted the next meeting’s agenda includes a continuation of this review and asked for a two-hour block to do so. He stated work sessions before the Commission are not yet scheduled because he wants to complete the sessions with advisory boards. 08:50:14 PM (02:47:14) Responding to Paul Neubauer, Tom Rogers stated he had envisioned two meetings to get through the work session, after which he will continue to refine the document based on input received. He recognized it is a large, complicated process that will result in a preliminary working draft of the entire document. 08:52:26 PM (02:49:26) Jerry Pape asked about regular business items for the next meeting, noting it is important to provide a block of time for this work session rather than breaking it to review specific projects. 08:52:59 PM (02:49:59) Tom Rogers responded he does not know what notices have been published. He expressed an interest in working with the public first, then conducting the work session. 08:53:39 PM (02:50:39) Erik Garberg stated Zoning hearings need to be scheduled for 6:00 p.m., noting that Planning hearings can be scheduled for 7:00 p.m. if necessary. He acknowledged that breaking the work session is not productive. 08:54:39 PM (02:51:39) Chris Mehl stated that advertising for both the Zoning and Planning hearings can be for 6:00 p.m., noting that the Planning hearings can then begin immediately after the Zoning hearings are done. The joint work session can be conducted after the hearings are completed so it is uninterrupted. 08:55:23 PM (02:52:23) Paul Neubauer stated this work session will be continued to February 21. 153 D. Public Comment – Please state your name and address in an audible tone of voice for the record. This is the time for individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes 08:55:35 PM (02:52:35) Susan Riggs, consultant for the Downtown Bozeman Partnership, drew attention to the provisions for variances, relaxations, deviations and departures. She noted they are nice for flexibility, but noted they can also be very complicated in the downtown area. She asked if deviations will be only for historic remodels or will they be available for new construction. She also raised concerns about the confusion that might arise from looking at the zoning map and frontage map in the new document, recognizing that the urban design manual will help to address some of that confusion. She expressed concern about eliminating the historic preservation guidelines, which could hold important information for single-family and duplex units. She concluded by encouraging everyone to look at how these plans will work in the downtown area. 2. Review of draft Bozeman Design Manual (Zoning Commission) **Continued to a future date** Presentation and comment on the draft Urban Design Manual. (Owens) F. FYI/Discussion G. 08:59:20 PM (02:56:20) Adjournment 154 _ Restaurant - (Describe:Other _) Primary Heat Source _ Electric _ Natural Gas _ Other Voltage (1-phase) I Subdivision _ Residential X Commercial (# ol Lots 16 ) Natural Gas Load btu/hr (total load of all natural gas appliances) Voltage (3-phase) _3 240 I 480 iease Note: Customer load sheets and design information is typically required for commercial electric and natural gas service installations. Load sheets may bt 'ovided by Northwestern Energy. )ompleted By: Todd Mitchell Date: 5-26-16 ru 126 plann ing@bozema n. n et www,bozeman.net Noticing Materials Page 1 of 1 Revision Date 1-05-16 Required Forms: I fVf Recommendcd Forms: I Required Forms: 89 Community Development 87 Wetlands CR J?4.Zone Map Amendment fnon ZMA Annexation) PUDC E ZS. UOC TextAmendment ZTA PUDP [ 26. Growth Policy Amendment GPA PUDFP Z Zl . f.noaificarionlPlan MoD Amendment ANNX fl 28. Ext"nsion ofApproved Plan EXT AIA [ 29. Reasonabie Accommodation RA APA fl 30.othe., CCOA NCOA A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an estimate. Development Review Application A1 Page 2 of 3 Revision Date 01'04-16 Required Forms: I Varies by proiect type Recommended Forms Presentation of submitted plans and specifications 83