HomeMy WebLinkAbout17- Change Order 4 - CK May Excavating - Story Mill Landfill LFG-SVE SystemCHANGE ORDER No. 4
PROJECT TITLE: City of Bozeman Landfill LFGfSVE System
CONTRACT DATE: January 18, 2016
OWNER: City of Bozeman
CONTRACTOR: CK Mav Excavatinu
Change Orders must include an itemized cost breakdown. You shall comply with the following changes
from the Contract Documents. (Show separate costs for materials, labor, equipment, and miscellaneous.
Show percent where applicable.)
Contract
Change
Item No.
Description
Cost Of Changes
"
Materials
Labor
Equipment
Cost
Contract
Change
Item No.
Description
Materials
Labor
Total Cost
Cost
Total Cost for CO No.4 $18,658.63
Rev. 6/04
Cost Of Changes
Contract
Change
Item No.
Description
Materials
Labor
Equipment
Cost
Replace AP -4
pumps with
AP -3 pumps,
CO -4
miscellaneous
18,658.63
plumbing and
piping
changes
Total
Cost for Chan a Order No.4
18 668.63
Total Cost for CO No.4 $18,658.63
Rev. 6/04
Original Contract Price: $1,025,233.00
Current Contract Price Adjusted by Previous Changes: $ 1,240,440.88
Cost this Change Order (+ or -): $18,656.63
New Contract Price including this Change Order: $1,259,099.51
The date for completion of all work will be November 30, 2016.
Description and Justification for Change:
Change Order No. 4 primarily deals with the removal of 7 AP -4 pumps from the LFG wells and exchanging
them for smaller AP -3 pumps and installation of the AP -3 pumps. Some additional minor plumbing
changes are also included in this change order.
SURETY CONSENT
The Surety hereby consents to the aforementioned Contract Change Order and agrees that its bond or
bonds shall apply and extend to the Contract as thereby modified or amended perthis Change Order. The
Principal and the Surety further agree that on or after execution of this consent, the penalty of the
applicable Performance Bonds or Bonds is hereby increased by S S18.658.63 (100 percent of the Change
Order amount) and the penalty of the applicable Labor and Material Bond or Bonds is hereby increased
by S $18,658.63 (100 percent of the Change Order amount).
COUNTERSIGNED BY MONTANA SURETY
RESIDENT AGENT
Merchants Bonding Company (Mutual)
Rev. 6/04
MERCHANTS
BONDING COMPANY..
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING,
INC., both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint,
individually,
Carly Schneidenbach; Kelly L Tenold; Ryan Elliott; Spencer Fred Thomas; Tyler McIntyre
their true and lawful Attorneys) -in -Fact, to make, execute, seal and deliver on behalf of the Companies, as Surety, bonds, undertakings
and other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of.
FIVE HUNDRED THOUSAND ($500,000.00) DOLLARS
This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the
Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Merchants
National Bonding, Inc., on October 24, 2011.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company
thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of
Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship
obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed"
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given
to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida
Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company
of any of its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 4th day of September 2015
....,...... • MERCHANTS BONDING COMPANY (MUTUAL)
.o`aP .....,,,<'_•- ,_a0.: :; ::.,!SJ,o •• MERCHANTS NATIONAL BONDING, INC.
-e_ v:GS •r--:_ -o-
•z:
2003 ,•'.o>' ;y:, 1933
By C%yL / 7"
STATE OF IOWA •"",n.,,,,„unr`p`o ,•
COUNTY OF Dallas as. • • • • President
On this 4th day of September , 2015 , before me appeared Larry Taylor, to me personally known, who being by me sworn did say that
he is President of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed
to the foregoing instrument are the Corporate seals of the Companies; and that the said instrument was signed and sealed in behalf of the
Companies by authority of their respective Boards of Directors.
tiPRrAr0 WENDY WOODY
oy" Commission Number 784654
°gin_., My Commission Expires
'owP June 20, 2017
Notary Pubtr , County, Iowa
(Expiration of notary's commission
does not Invalidate this instrument)
I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,
which is still in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 14th day of December , 2016 .
unun'ryq
001444
P 0q',9�9y�:
•z:
1933 c;
dao:
POA 0014 (6/15)
Secretary
Change Order Na 4
Bozeman Landfill LFGISVE System
Item
Description
Date
Subcontractor
Materials
Employee
Equipment
Total
Sub-
contractor Total
Sub Units Sub Rate Markup Equipment
Description
Cost
Material
Markup
Cost plus
15%
Total
Name Position Rate flours Employee
Equipment Total
Desetiption Rate Hours Equipment
Labor and
Equipment
&Material
CO 2
Purchase six new AP3 pumps
6.00
1,895.00
1.05
11,938.50
Matt Smith &
Cody May
$11,938.50
AP3 FTG Kit I at six each
1
6
55
1.05
346.50
Mau Smith
$346.50
New Pumps Freight
1
170.11
1.0-51
178.62
Cody May and
Matt Smith
$178.62
Freight out 7 AP4 Pumps,
including disassembly of old pumps
at shop, and building cote for
shipment
11
372
1.151
427.80
Labor
$75.00
20
$1,500.00
$1,927.80
Credit 7 APT Pumps firm QED
1 -10335-75 1.00 -10,335.75
-$10,335.75
Re -assemble AP3 Pumps onto
Bundied Tubing.
Labor
$75.00
10
$750.00
$750.00
Re -Install AP3 pumps into six
existing wells, Including Misc.
Mmeruls required.
I 1 168.69 1.05 177.12
Labor
$75.00
18
$1,350.00
$L527.12
Purchase mid Install Quick fit
fittina at Vaults.
1 122.22 1.05 128.33
Function
$75.00
4
$300.00
$428.33
Purchase and Install New 60"Vault
1 2995 1.05 3,144.75
Labor
$75.00
6
$450.00
305 CAT Excavatio:
$134.45
3
$403.35
$3,998.10
New Teflon Coated Level Indicator
Replacement Item
1 341.64 L05 358.72
Lubar
75
2
$150.00
$508-72
$0.00
Change Out Fittings at AT Wells
L2,3,4, .,it 5 deep to improved
2'Vaive
5.00 95.00 1.05 498.75
Labor
$75.00
7
$525.00
$1,023.75
Purchase, Haul mid Place One Load
of 3" Roadmix and One Load of
LS' Roadmixat 4,000 Gallon UST
22.00 8.75 1.05 202.13
305 CAT
Excavator
$134.45
1
$134.45
Dump Track
$110.00
3
$330.00
$666.58
Rc-V..p Air Supply .1 Flme
1.00 200.00 1.05 210.00
Labor
$75.00
4
$300.00
$510.00
$0.00
]retail Vent Valving on GW Wells
#1,6,11,16,15,17,9.&3
1.00 462.88 1.05 486.02
Labor
$75.00
4
$300.00
$786.02
Excavate and change out existing 4"
Bmterfly Valve at 4,000 Gal. UST.
1.001 221.45 1.051 23252
Cody
$75.00
5
$375.00
CAT 305.5
$134.45
4
$537.80
$1,145.32
Fusion Machine Rental
1.00 60.00 1.05 63.00
Matt
$75.00
12
$900.00
$963.00
Increase of Bend C05
1.00
462.50
1.00
462.50
$462.50
Reconciliation of Bond Cost four
Base Contract Unit Pricing of
$65,941.03
1.001
1,648.52
1.00
1,648.52
$1,648.52
Gross Receipts Tax CO2
1.00
185.00
1.00
185.00
$185.00
Additional Contract time rexpuested C
15 days
Total Change Reqrest #5
7,b2921
. $7,0$4.43
;,
.x$1,271.35
•$18,658.63