Loading...
HomeMy WebLinkAbout02-22-17 DRC AgendaDevelopment Review Committee Wednesday, February 22, 2017 10:00 am, Second Floor Conference Room, Alfred Stiff Professional Building – 20 E. Olive Street 1) Call meeting to order 2) Review A. 16432 Black Olive Site Plan (Krueger) Revisions 202 South Black Avenue. Southeast corner of the intersection of Olive Street and Black Street. Site plan application for the demolition of the existing office building and the construction of a 56 unit apartment building and related site improvements that includes: 16 studio apartments, 24 one bedroom apartments, 16 two bedroom apartments, 33 parking spaces, 4 carshare vehicles. 800 square feet of commercial use is proposed on the ground floor. B. 17020 Bozeman Sports Park, Phase 1 Site Plan (Boughan) South of Baxter Lane between Flanders Mill Road and Future Cottonwood Road. Site Plan application to construct phase 1 of the Bozeman Sports Park. Phase 1 consists of the installation of eight soccer fields with pedestrian and vehicular facilities. C. 17040 East Main Development Master Site Plan (Owens) 1107, 1113, 1117 East Main Street. A Master Site Plan with COA and Deviation Application to allow demolition of five (5) existing structures and addition of five (5) new office and mixed use structures and accessory uses across four (4) phases of construction, and the addition of circulation, parking for 222 spaces, and related site improvements. The 4.29-acre (186,855-square foot) site is zoned B-2 and located in the E. Main Entryway Corridor. The deviation requests a 20% reduced entryway corridor setback. D. 17041 East Main Development Phase 1 Site Plan (Owens) East Main Street (portions of multiple parcels adjacent to the east of existing Mountain View Office Building at 1019 E. Main Street). A Site Plan with COA Application to allow construction of a two-story 17,118-square foot office building with 59 on-site parking spaces and related site improvements as Phase 1 of the proposed East Main Master Site Plan (Application 17040). The site is zoned B-2 and located in the E. Main Entryway Corridor, with current access to E. Main Street provided by an easement to the west. E. 17039 PT Land Subdivision Phase 3 Pre-application (Rice) 1023 E. Baxter Lane. A Subdivision Pre-Application to further subdivide an existing restricted development lot of 32.5 acres into five lots for B-2 commercial development. Upcoming Reviews Tentative DRC dates in black A. 16525 Westbrook Subdivision Phase 2-4 Final Plat (Saunders) Ongoing B. 16540 West Winds Ph. 7 and 8 Final Plat (Jadin) Ongoing C. 17019 The Crossing Phase 4F Final Plat (WerBell) Ongoing D. 17046 The Lakes at Valley West Phase 3 Final Plat (Saunders/Jadin) Ongoing E. 17050 Yellowstone Theological Institute Final Plat (Krueger) Ongoing F. 17037 UPS Facilities Expansion Site Plan (WerBell) On hold per applicant. G. 17032 Crescent Cross Annexation and ZMA(WerBell) March 1 H. 17054 223 E. Main Street Building Site Plan (Jadin) March 1 I. 17070 19th and College Site Plan (WerBell) March 8 J. 17071 J&D Family Subdivision Phase 2 Preliminary Plat (Rogers) March 8 K. 17067 Costco Catamount Parcel Annexation(Rice) March 8 L. 17072 South Rows Site Plan (Owens) March 8 M. 17066 West Winds SW Subdivision Preapp (Saunders) March 8 N. 17078 Mandeville Creek Enhancement (Jadin) March 15 O. 16534 SOBO Lofts Site Plan(Rice) Revisions March 15 P. 17081 Eastlake Professional Center Minor Subdivision Pre-application ( Rice) March 15 Q. 17082 Parklands at Village Downtown Major Subdivision Pre- application(Jadin/Rogers) March 15 Concept Plan Reviews (DRC Members please provide written comment in Concept Plan Review File) A. 17064 Fen Way Duplexes (Garber) Due February 22 3343 Fen Way. Four, two household dwellings on one lot. B. 17068 McChesney Business Center (WerBell) Due February 22 204 North 11th Avenue. Proposed 4 building development with 13 live/work units. C. 17074 Lewis and Clark Lot 3 Office Concept Review (Garber) Due March 1 2246 Boothill Court. Proposed office building in the Lewis and Clark Commercial Master Plan. D. 17044 Cannery District Building K Concept Review (Krueger) Due March 1 117 E. Oak Street. Phase 2 of the Cannery District parking and circulation and the construction of Building K, an 11,243 Square foot commercial building. E. 17076 Obsidian Creek Condos Concept Review (WerBell) Due March 1 2916 Warbler Way. Proposed four two household dwellings. F. 17073 Hastings Shopping Center Concept Review (Owens) Due March 1 1601 W. Main Street. Façade Upgrade and reuse at Hasting Shopping Center. G. 17079 Midtown Apartment Concept Review (Rogers) Due March 1 515 W. Peach Street. 3 story 9 unit apartment building. H. 17084 The Nest Cottage Housing Concept Review (Rice) Due March 1 Westbrook Subdivision Ph. 2 north of Durston Road, South of Annie Street. 42 cottage units on 5.4 acres zoned R-4. This board generally meets every Wednesday at 10:00am. Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 406-582-3232 (TDD 582-2301).