HomeMy WebLinkAboutResolution 4763 Approving Alteration-Modification of Contract for Change Order 1 with DLM Contracting for South University Area Sewer Main Interceptor Project i 3 � • 41 { COMMISSION RESOLUTION NO. 4763 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZE MAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH DLM CONTRACTING, INC.,BOZEMAN,MONTANA. i WHEREAS,the City Commission did,on the 1"day of August 2016,authorize award of the bid for the South University Area Sewer Main Interceptor project,to DLM Contracting,Inc.,Bozeman,Montana;and R WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. E NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana,that the proposed modifications and/or alterations to the contract between the City of Bozeman,a municipal corporation,and DLM Contracting,Inc.,as contained in Change Order No. 1,attached hereto,be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City;and the City Clerk is authorized and directed to attest such signature. PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 9`h day of January, 2017. l i THIA D ITS eputy Mayo 1 ATTEST: ROBIN CROUGH City Clerk i, . • , 1 O y�TIN CC•S,-' APPROVED AS TO FORM: GREG SULLIVAN City Attorney CHANGE ORDER No. 01 DATE OF ISSUANCE November 23, 2016 EFFECTIVE DATE OWNER City of Bozeman CONTRACTOR DLM Contracting,Inc. Contract: South University Area Sewer Main Interceptor and Water Main Extension Project Project: Entire Project OWNER's Contract No. n/a ENGINEER Morrison Maierle,Inc. ENGINEER's Contract No. 0417.072.02 You are directed to make the following changes in the Contract Documents: Description: Perform work outside of the contract and address issues with the boring operation as listed on the attached summary of work. Reason for Change Order: To add work to the project and address unforeseen conditions with the boring operation. Attachments: (List documents supporting change) 1. Summary of Work,2. Work Change Directive No. 3, 3.Work Change Directive No. 4. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: 90 days $ 1,434,620.00 Ready for final payment: 120 days (days or dates Net Increase(Decrease)from previous Change Net change from previous Change Orders No. 0 to Orders No. 0 to 0 No. 0 Substantial Completion: 0 $ 0 Ready for final payment: 0 (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 90 days $ 1,434,620.00 Ready for final payment: 120 days (days or dates Net increase(decrease)of this Change Order: Net increase(decrease)this Change Order: Substantial Completion: 35 $ 159,020.00 Ready for final payment:35 (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 125 days $ 1,593,640.00 Ready for final payment: 155 days (days or dates) Contractor certifies and agrees that there are no additional costs or claims for extra work, additional time, delays or omitted items, of any nature whatsoever, associated with the subject change order items,except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further,that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the cyAtrac d-that the work quantities and value were properly determined and are correct. 11-'1 - 2o1Lp C N (Authorized Signature) Date ENDED BY: APPROVED BY: ER- Signature) Date OWNER( uthorized Signature) Date EJCDC 1910-8-B (1996 Edition Page 1 of 2 C:\Users\Brad\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\26SK1 P72\Change Order No 1 (2).doc South University Area Sewer Main Interceptor and Water Main Extension Project Change Order No. 1 Summary of Work This change order consists of the following items: 1. Bollards for Fire Hydrants This portion of the work adds bollards around 2 fire hydrants as identified in the attached Work Change Directive No. 3. Cost $3,470 Time 0 days 2. Montana State University Sewer and Water Services This item adds connecting water and sewer services to the Miller Pavilion and providing a water service stub for future use. Cost $134,550 Time 21 days 3. Boring -- Subcontractor Costs This item addresses a portion of the cost of changes involved with modifying the boring operation for the crossing of South 191h Avenue. A fiber optic cable, which was not located for the design survey, conflicts with the planned boring operation. This conflict has required the contractor to locate the bore pit on the east side of South 191h Avenue rather than the west side of South 19th Avenue. This has caused schedule issues as well as increased difficulties in the boring operation as the area is much more constrained and the boring is going downhill rather than uphill. This item only addresses costs associated with the boring subcontractor for items listed above. The boring subcontractor's direct costs related to cold-weather impacts, if encountered, are not included in these costs. Additional costs of the general contractor are being tracked on a time and material basis and will be included in a subsequent change order. The full impact to contract time has not yet been established and additional time beyond what is included in this change order may be required. ' Cost $20,000 plus 5% general contractor markup for a total of$21,000. Time 14 days x k C:1Users\BradlAppDatalLocal\MicrosohlWindows\Temporary Internet Files\Content.Outlook\26SK1 P72\Summary of Work.docx Work Change Directive No. 03 Date of Issuance: October 28,2016 Effective Date: October 28,2016 Project South University Area Sewer Main Owner:City of Bozeman Owners Contract No.: Interceptor and Water Main Extension n/a Project Contract:Entire Project Date of Contract: August 16,2016 contractor:DLM Contracting,Inc. Engineer's Project No.: 0417.072.02 You are directed to proceed promptly with the following change(s): Item No. Descriplion - 1 Install bollards around the two fire hydrants on the project. City of Bozeman Standard Detali 02660-8. Attachments(list documents supporting change):Emall from Brad Lewis dated October 28,2016. Purpose for Work Change Directive: ® Authorization for Work described herein to proceed on the basis of Cost of the Work due to: ❑ Non agreement on pricing of proposed change ❑ Necessity to expedite Work described herein prior to agreeing to changes on Contract Price and Contract Time. ® Authorization to proceed prior to execution of change order. Estimated change In Contract Price and Contract Times: Contract Price T 3,470.00 ®increase❑decrease Contract Time 0 __®Increase Odecrease --- ---- days— If the change involves an increase,the estimated amounts are not to be exceeded without further authorization. Recommentled for�yyaLDy-6 �e qulfw—r /V. -- pled f Oete lo S I I Cv iApifrovdd by F g Agency(if applicable) Oslo: Work Change Directive—Page 1 of 1 Work Change Directive 3.doc Revised January 2010 Work Change Directive No. 04 Date of Issuance: November 3,2016 Effective Date: November 3,2016 Project:South University Area Sewer Main Owner:City of Bozeman Owner's Contract No.: Interceptor and Water Main Extension n/a Project Contract.Entire Project Dale of Contract: _ August 16,2016 Contractor DLM Contracting,Inc. Engineer's Project No.: 0417.072.02 You are directed to proceed promptly with the following change(s): Item No- Description 1 Install water and sewer services to the Miller Pavilion Attachments(list documents supporting change): 1, Summary of Work(1 page) 2. Ag Station Water and Sewer Plan Set(12 pages) 3. Redlined Plan Sheet SERV-1. 4. Email dated 10/17/16 from Brad Lewis regarding pricing. Purpose for Work Change Directive: ® Authorization for Work described herein to proceed on the basis of Cost of the Work due to: ❑ Non-agreement on pricing of proposed change. ❑ Necessity to expedite Work described herein prior to agreeing to changes on Contract Price and Contract Time. ® Authorization to proceed prior to execution of change order. Estimated change in Contract Price and Contract Times: Contract Price 3 134,550.00 ®increase❑decrease Contract Time 21 ®increase[]decrease days If the change involves an increase,the estimated amounts are not to be exceeded without further authorization Rec niencrm orAppm gtnear Dale / Authorized for Owner by: Date --------------- -------- ---- Accepted Cont"I Date Approve y Fund e (ff a 1fTe Dale: Work Change Directive— Page 1 of 1 Work Change Directive 4.doc Revised January 2010 Work Change Directive No. 04 Date of Issuance: -November 3,2016 Effective Date: November 3,2016 ------------ Project:South University Area Sewer Main Owner.City of Bozeman Owner's Contract No.: _ Interceptor and Water Main Extension n!a Project Contract:Entire Project Dale of Contract: _ _ August 16,2016 Contractor:DLM Contracting,Inc. Engineers Project No.: 0417.072.02 You are directed to proceed promptly with the following change(s): Item No. Description - 1 Install water and sewer services to the Miller Pavilion Attachments(list documents supporting change): 1. Summary of Work(1 page) 2. Ag Station Water and Sewer Plan Set(12 pages) 3. Redlined Plan Sheet SERV-1. 4. Email dated 10/117M6 from Brad Lewis regarding pricing. Purpose for Work Change Directive: ® Authorization for Work described herein to proceed on the basis of Cost of the Work due to: ❑ Non-agreement on pricing of proposed change. ❑ Necessity to expedite Work described herein prior to agreeing to changes on Contract Price and Contract Time. ® Authorization to proceed prior to execution of change order. Estimated change in Contract Price and Contract Times: Contract Price$ 134,560.00 ®Increase❑decrease Contract Time 21 Sincrease❑decrease days If the change Involves an Increase,the estimated amounts are not to be exceeded without further authorization. Recommen a orAWovaLh ine : -- Dale Aulhofize or y: — — -- Date Acwp ed for Conbeclor Dale Approved by Funding Agency(if applicable): Dole: Work Change Directive—Page 1 of 1 Work Change Directive 4.doc Revised January 2010 Work Change Directive No. 04 Date of Issuance: November 3,2016 Effective Date: November 3,2016 Project:South University Area Sewer Main Owner.City of Bozeman Owner's Contract No.: Interceptor and Water Main Extension Project nta Contract:Entire Project Date of Contract: August 16,2016 Contractor:DLM Contracting,Inc. Engineer's Project No.: 0417.072.02 You are directed to proceed promptly with the following change(s): Item No. Description 1 Install water and sewer services to the Miller Pavilion Attachments(list documents supporting change): 1. Summary of Work(1 page) 2. Ag Station Water and Sewer Plan Set(12 pages) 3. Redlined Plan Sheet SERV-1. 4. Email dated 10/17/16 from Brad Lewis regarding pricing. Purpose for Work Change Directive: ® Authorization for Work described herein to proceed on the basis of Cost of the Work due to: ❑ Non-agreement on pricing of proposed change. ❑ Necessity to expedite Work described herein prior to agreeing to changes on Contract Price and Contract Time. ® Authorization to proceed prior to execution of change order. Estimated change in Contract Price and Contract Times: Contract Price$ 134,550.00 ®increase❑decrease Contract Time 21 ®increase❑decrease days If the change involves an increase,the estimated amounts are not to be exceeded without further authorization. Recommen a r-ApprouaLb� r. Dale /3 d Authorized for Owner by: Date Accepted for Contractor by: Dale Approved by Funding Agency(if applicable): Date: Work Change Directive— Page 1 of 1 Work Change Directive 4.doc Revised January 2010 f South University Area Sewer Main Interceptor and Water Main Extension Project Work Change Directive No. 4- Summary of Work The work included in this work change directive includes the installation of water and sewer services to the Miller Pavilion and an additional water service line to be extended for future connection to the Farrier School Building. The following is an explanation of the attachments and a summary of the work: 1. Ag Station Water and Sewer Plan Set. This plan set includes water and service work beyond what is included in the change. Only work identified in this work change directive is included in the work. 2. The water service to Miller Pavilion shall be as shown in the plan set with the exception that service is to be installed in a separate trench from the sewer service. 3. Redlined Plan Sheet Serv-1. This plan sheet shows the revised grade of the sewer service for Miller Pavilion. 4. Sewer Service—Additional Changes a. Connection to existing sewer service stub shall be done with City Standard Detail 02730-3. b. Cleanouts are to be located as shown on the drawings. The cleanout at the point of connection does not require monument box and concrete, extend PVC so plug is at grade. c. Existing Miller septic tank to be pumped and filled with gravel. 5. Water Service—Additional Changes a. Install 1" water service from existing curb stop to Station 2+83 in same trench as Miller Pavilion service. Install cap/plug at end of service and buried marker post. This service is to be used for future extension to the Farrier School Building. f END x 4 3 itt P' 1 n i Q� J�t MONTANA STATE UNIVERSITY o� BOZEMAN,MT MONTANA STATE UNIVERSITY AG STATION WATER AND SEWER w PPA#15-0028 a PROJECT LOCATION HORTICULTURE MILLER FIELD RSE LIVESTOCK WINGS W ARN o PAVILLION o Q PROJECT LOCATION o z 0 LOCATION MAP F rr�i sun ""-�---- ------ NO SCALE y o 0 FARRIER NE I! #E BUILDING SHEET INDEX ■' RSESHOEING) [� HORTICULTURE SHEET T[TLE FARM COVER COVERSHEET ���� C-1 GENERALNOTESPROJECT LOCATION L� POLY SERVA MILLER PAVILION SERVICES SfA 0+39 TO THE GREENHOUSES SERV-2 FARRIER SCHOOL SERVICES STA 0+39 TO STA 5+00 SERV.3 FARRIER SCHOOL SERVICES STA 5+00 TO THE END SERVO HORTICULTURE FARM WATER SERVICE -, D.1 HORTICULTURE FARM DETAILS D-2 UTILITY LINE DETAILS AND TYPICAL TRENCH D3 WATER SERVICE CONNECTION DETAILS D-0 FARRIER SCHOOL DETAILS D-5 MILLER PAVILION DETAILS 4/ I Da HORTICULTURE FARM CONNECTION DETAILS PPAk15-0028 -- --' MMIi0747.060 OSCAR THOMAS seEu NUTRITION CENTER COVER -- DATE 9/IR/2016 DERERALNDJESL Y 1. ALL CONSTRUCTION TYONN ON THIS PROJECT SHALL BE COMPLETED N ACCORDANCE Li ABBREVIATIONS Tian ME YONTANA PUIRIC MOTIFS STANDARD SPECIFICATIONS.(wisl)EOMkl, DATUM-0rc or THI MAN AND Ott OF B0%EYAN mmincATIMS TO 4MTANA PUBLIC WORKS SCAN MD yam+ SPEGPICA 5 WITH ADDENDUM.DUD THE M12 UNIFORM PLNIBNG CODE. Ml AD ANCHOR BOLT Cdf CM TENSION,ENIERIM PC POINT OF CURVE BINOMMK: K IIIDNMT AT NTTRSICTIM 3 MAINTAIN IB"(KILT)SEPARATION WTWEEN ALL WATER MAN AM ALL SEWER U.N. ADM Atl... F FLAHOC PC` PLAIT CONTROL PANG OF FOWER AVENUE ANTI GRFElO 91XCCi 3. ME CLINIRACTM SHALL RESiME ALL RDApWAY$UBACCS NO EQUAL OR AB v AOOK fAB FABRICATE PE PWN CND ARROW B.I-NBSRWI' BETTER ONTAIION MAN EXISTED PI90R TO EXCA AFON.AS DETERMINED BY DINER AC AsTHMLIIC CONCRI.TE ALRANATINC CURPENT as NUT IBM.T..PH. PCN —TA.I. AHD 111E ENCNEC, . F-I AM AODBONAL FC rt[nBLE COUP NO Imp IMP[NdCUUR A. THE LOCAWM,OERM AND SIM OF ETTSNC UTILITIES SHOWN CN THESE PLANS IS A. AOAACGT.ADJUST FG FI.AIACE CpNU11G ADAPTER PH PPC NAN4R DEAN LIAR. THE CONTRACION SHALL FIELD KWFY THE EXISTENCE.LOCATION, AOPW ADAPTER N FOM GRAIN PI FIT K NUGTOR,POUR if NIOK.ECTIOH OEOTH,43L LINE AND GRADE OF EXISTNL UTILITIES CONNECTIONS PRIOR TO AFF ABOVE FNS1E0 ROAR FDN I.N.ON PJP 1.OLOW JOWT Ful --- ToMSiE Enoll. ME CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY DAAAAOC TO ME EXISIIMC FACILITIES DUE TO FAKDRE TO LOCATE OR PROMDE PROPER ANCHOR FEY I'll END TVNTN PL M1E PROPCIHT LIN N PP.OIECTION WHEN LOCATION IS KNOW. ALUM ALUMINUM IET MN[D END TENMINAL - PLANT. AAr vAxxp[ I5.S A UST B RENEESENTATIKS 10 CONTACT FOR INFORMATION REGARDING FAgV1E5 L ALTEMAR F.CXT FIRE f>KOIQRSHgR PIIL PLANT YONITFAWO PANG N A5 EA 014E /NIB A—m IIATIONAL 9TANOAPDS NSnIUTE FF DNISNm ILOOR PNL tANO '� MMTAHA ONE CALL SYSTEM USDA ALL VA 1-CURB NIA-5553 AM•RO% APPROnMAR fG FINISH ORIOE PRCST PPECA51 OmnF aMnx LNC 6. ME COxMAC1M SHALL M.USI ALL VALVE BOLES.CURB BOfIES.AND 4ANNOLES APVO AF`PROKD iNYO FIRE N-ANT PRO'. PRBAOINJl.IE9 DICE?xCMµT sAWNHi TO FINAL CRAOE UPOM COYPOCH Of ALL CONSTRUCTION. ANY BOATS OR MANHOLES ARCH ARq RTEC-1 ARCHITEOTURK FL ILltw UNC NUUNA PREUWnARY NPNM m axe DAMAGED OIL OTHERWISE DISTURBED BY ME CONTRACTOR ON ANY SVBCONIRAMOR ASNI ASPHALT F. RCbBLC PREY PREPARE.PHEPMATTON SHALL BE REPAIRED AT THE EXPENSE OF ME CONTRACTOR.TINS WORK SMALL BE A. AVENAQ GO TUN¢ PRO _RTY RIB PAIx W'QWF IWCI 9ld0pITAL ro F PROJECT,SEPARATE PAYSHALL B DUEL NOT BE MADE AT RL rtow uR PRv PISsSURE PFQUNNG vALK rAltR Ix T All BACKML FOR URLf1Y TRENCHES SHALL BE TYPE'A'.UTUZ no TYPE I tlEDONO UNLESS OPECTEO OMEPWSE BY ENGINEER.SPECIFIED BEDDING SHALL BE L BD le'. FIN. FINISH, PS PR65LIRC_?CH.PM.SIPP`Al IIHKx AN, FROM A"BENEATH TIE PIPE TO B'ABOVE THE TOP OF PPE �T :M1 BUTTDI VKK M FLOGR AT PANT.POINT OFMCY IA.Q (SEE NAIVES See 03331-1). ME COST OF INS ADID00-RCDONC SHALL BE I EIW BCIW:EN FDIC FACE OF CONCRETE PVC Poll d TQC RocvALA/cIFaH R INDUZ N THE UNIT PRICE SD FOR WATER AND/OR SEWER MAIN NI B BOTOM FACE ILO• PBCP I REINFpRCEQ RASTC tT PAKNENI B. ME CONTRACTOR IS ALSPOIJSeII FOR CONTROLLING DUST AND EROSION RLDG DUAOYIG ISR FABRICATED STEEL RM RACNs -r uBTwe MAPR c PIa CONSTRUCTION AT MS EXPENSE. SIR"SNALL BE WATERED TO CONTROL DUST LVL( 9IK QGgE FT FOOT,FOCI NC ROIYMFEO CONCKI[ -� wW WHEN MOERED BY THE MINEER. Bw OGOLY RC FOOTING,PYMC PV RDHFOICED-CONGER PRE ----- 11Nc FLxa 9. ALL DIMPBED AREAS STALL BE SEEDED BY ME CONTPACTOR OM BEAN,KNCHYAN( i M F FA.10 FACE ID ROAD,ROOF GRAIN ---� cARIHGo InArx HNC 10. ME WNTRACIOR SHALL NDDFY ONE CALL O 1-II -A-A-5555 FOR WSIIE O HOT BOTTOM G GQ.CALICO ROG REDUCER •` Awm I R UTILITY LOCATION. OR EnSBNG MAIN S SHALL BE MARKED BEFORE OGCN0. Hj BFMINO DIAL GALLON 1.1 KOMFORCOIONT BATI Will iNE CONTRADMACCTOR. STALL N CONTRACTOR 5[RNQ O ALL E%ISR P IR THE S. A SAID F/y. z BRKI BMCNEi CALv OALVANIlED RFT A—ME �I• .Nc xuP4D IIWn mnC MrCO 5 NCTORSO.TITL CONTRACTOR SHALL 144COA1.T REPAIR HNC DAMAGE AT CHAIN MAHNG OALYS pALVANIIFD"Co. RONI R9NFORCE �m� DE NCONTMS CYRNSE On K MOCK ON GROUND PEL. AFLOGT[.RB.00ATION -_ _- CR•nxc NuaO nARLLxxor 2 THE CONTRACTOR SNAIL NOTIFY M[WAIOR OCYMTMENT A WWMUY O.3A FV/,V .,•H MOORS PYIM Tel BOIIHIM ANY'NI W] d CASE PQI ONTO MWAIWG RC00 PEWGEO TWY D IJ. NY EnSTING M MEW VALVES WWCM CONTROL 111E COBS HATER SCARY SHALL OW" M­ on PIPE MECHANICAL JOINT GSKT GS(EI RSI RONFOR SIEFL BC OPdUTEO BY OR PERSONNEL OIAY. OP CAST-NON PPE iLANDED.%MIT CS" GALVANISM STEEL PPE RT RIGHT [Q%KTNIICTIM ND_: CL�J LM1WiT CRC —IN- OF CONCICTE GV GAR VALVE R/W RICK-B-WAY one ORGULM GYB CYPSU WALIBOMO SAN SAN TORITMY 1. CONTRACTOR IS RESONS CUTNE BLE ION MTANNG STREET t PERMITS,W CESSARY, r^ W CONSNUCTION JOINT.CONTROL JONI HAS HEADED ED ANCHOR STUD SO SCEOULE PRIOR TO CONSTRUCTION. V G CENTER LINE NO HOSE BB son, SDEM- 2 ALL CONSTRUCT.REWED MAF11C SHALL BE ROURO TO AND FROM ME STE L CIDI CEUCrt AlFD DUCIRE NON M NUB DRAIN SCI SCCTIOtI MA COLLEC AND/OR ANTERIAL ROADWAYS W AS TO WEEP CONSTRUCTION 1RAFFIC rI aC cIl NDW MAROWARf. SHT SN[CI OF,LOCAL ROADWAYS ,^ CUI CLEM,LIEMANCC No IEAO@ yY 9MB.M ADO RAnnrt: 3 CONTRACTOR SHALL OOARY WIN ALL APPLICABLE DRTSON OF IM USTWK VI MP =AH'_D METAL PIPE HA HOD( sm SAM." REGULATIONS(OSHA)SAf1"IY STANDARDS.IF REWESIED BY ME WSPECTOP.ME WON SMALL PROMDE PROD'O'A PERMIT FRW SAID OMSM. CYU CONCRETE MASONRY LIMITS HN NOLLOw METAL SA SPACE WALED ® SwfMy CL[ANIMI A. INE CONTRACTOR'S OPERATIONS SHALL BE CONFIRM WMN ME PROIECT LIMITS. _ CO .EAIIMI HIM H ZONT. SPEC SH.a 1. YARNALS AND EQUIPMENT SHALL BE STORED ON NNE PROJECT SITE WHERE APPROVEO � J CCD CT W tl0IO1/N Ho IN)"SEPOWOR SM SPACING —^— YwQ w=RMa uu[ BY THE OtANEA.OR OFF-SR.IT SHALL BE UNDERSTOOD THAT ME KsPQNSBIUW FOR R`(1 COL COLUMN HIT WISE RACK HOUR SPHIi SUPPORT —•— IONWR SANICT LAVE PROTEC110N AND WIXFEPINC B EQUIPMENT AND 141MIAlS ON OR TSAR THE SITE COMB WIMI en HT HEIGHT.HEAT TRACE Sp SQUARE DULL BE FNTRELY THAT M ME CONTRACTOR AND THAT M CW4 WALL BE MADE U CONE CONCRETE M CONCENTRIC IN "DOE VALK SQ R SOU AM FOOT ACAl$I THE OWNER BY REASON OF ANY ACT OF AN EMROYCE OR 1RESPASSCR. Q CON N CONNECT.CONNECTION MVAC NFATM,K0"1 AND MR."Olen- Sp W SQUARE INCH 5. CONTRACTOR WALL VERIFY E%ISTNC CONNDONS PRIM TO CONSTRUCTION.ANY 0 COI11 CONSTRUCTION XYAt HICMNAY 55T SIAINLCSY INC. QSCREPANCES FOUND ARE TO BE BROUGHT TO THE ENONCEA S ATTENTION PRIM Tp Z CWi CONTINUE CMTINKQ CONIMVOUS MYD HYORMT STA STATION CKNIENCENCNT OR CONTINUATION OF CONSTRUCTION ACTIVITIES AIL 9. REFERENCE ALL SURVEY YONVMENIS,SECTION GONERS.T/A CMNER9,AND O CONTR fDN1AACIM ID INSIDE QALLCT1Jt SAWTwwY RwCR _ TM ApO11EMAlIMY NOT LISTED.SR'ABBNEMATIONs FOR PHMERTY CORNERS PRON TO BONG DISTURBED"CONSTRUCTION.ANY YOMILENTS F COdID COORDWATL C INVOIT ELEVATION 5E0 ITAM'UD I UYE ON DxAWN6 ANO text.NIBUSNED BY AN AND CORNERS DISTURO[D DURING CONSTRUCTION SHALL BE REPLACED BY A 13 - CGNR CONRUGTFD T NSOE FACE sTIF YnFRNEA PROFESSIONAL LAND SJNKYOR(PL.S)REGISTERED IN THE STAR OF MMTANA L• CP CONROL PANEL IN. NCI SR STEEL ANCRKAH IIAI....STAMGRDS INSTNR INC(ANS) T, A PPE-CONSIRI1C11ON MEEINC SHALL BE MELD WITH Ott OF Be' ♦Z CRC C. NO NIL NRUCNT YIRIKi SNUCIIME M Col TIE M REVL COOEQCiM.MONTANA STAR UNIVERSITY„h MOAWN-MAERLE.NC.,PRIOR TO ME C TO C CENTER TO CENTER INSIL INSTALL INSTALLATION SYY SPACTPICAL .. INNS IS A STANDARD ABGRVA CW UST M[ACFOe4 NOT SIMI OF CONSRUCTCN. Q B. THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTMTES IN A UANNER TO Z -L Yya OUT CLMAA INSW IHYTRUYEXT TOP AN INB O BO1IW AB ALL BRMAnOS ARE Ilyp M ME RATE MINIMIS WCONKFAENCE 10 THE ADJACENT BUSNTSSS MD/onRESIDENCES CislR COMIERSMI INSUL INSULAR W MN!$T BLOIX 3 AG-&ABOPEMATIONS FOR SSOAISD W011[QM90N5 9. ME CONTRACTOR STALL BE RESPMSBLL FOR PNORCTING ALL PUBLIC AND OJ CIWK INN WiEWM 1BC TOP BACK O CUnB (INSIWAENTAROx A.Coal ELECWRAL ETC)ARC PRI PROPERTY NSOM AS 0 MAY BE AFFECTED BY THESE OPERATIONS ALL GDR CUBIC"C", JIB ,ANCTIM RO% IT, i0P FACE SON ON OTHER LEMON sn'll AY APMLCASE, COSTS FOR PRORCING,REMOMNG AND RESTORING EXISTING NPRDVELENIS SHALL BE O (II G CU IH CU C NCH JS JOST TOW RUPORART.ITMPCRATNE •SYMBOL USED ONLY WERE REQUIRED PM OMIT. BORNE SOLELY BY THE CONTRACTOR S CUL. CULVERT Jr JOINT IN iWCK A' IQ. ME CONTRACTOR SHALL AT ALL TIMES TAKE WNAICKR YEASDRES ARE CU YO CUBIC YARD L ANRE THRU n"Quen 5 M GENERAL EA STING STRUCTURES AND FACILITIES ARE NECESSARY TO ASSURE ME PROPER CONTAINMENT AM DISPOSAL OF POLLUfAN15 M L L 0 DRAIN IDS POUNDS T.O. TOP Of NOTE nNf.'D AS JOQS AM AFL SHOwN INL101T UNE ME SITE INTH ACCORDANCE WI ANY AND ALL APPLICABLE LOCAL STATE,MID FEDERAL ■■ d PENNY(NHL 9E� if IINEM i[CT T.P. OJISDC TOP OF FINE TISCH,OR AS SCREENED—MOUND. NLW STRUR- pEQULATI0AL5. MA MYOu 9 RM ANCHOR 1N1L WRL lOC ION M CONCRETE,TOP O CURB UREO ME SHORN W HEAVY LNC WDGNS 1. THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSIFUCTIM YAIERIAI$ aL IDOL DOUBLE LONG LOIgNOINAL 1ST TOP O STEEL HAOMMTENTLY DEPOSITED ON LASING STREETS.SIDEWALKS M OTHER PUBLIC 1 C OCT -All. L. LOCAL PAN. TM TOP QF WALL PoOnTS-OF-NAY AND MAKE SURE S RCETS AM WAILWAYS ME CLEAN M CLEANED AT E END ll(T d DUCTILE Pon GRAN INLET LR LONG RADIUS IYP TYPICAL M EACH CONSTPORKINRUCT DAY. QA _ETEN LT LEFT UtlC UMFOMA BUILDING COD< LNS CONS.A"M WOIN DONE C TRAFFIC SONS AND SIRINBL SIWS BE RY AGENO, qw INSTALL AI AHO MOM!A TRA IN ACONTRO.P VN.H REAMSAPPLIC WE REGULATORY TOR.MS DIAL OIAWNAL LK l[VEL UO UNDEPOROUIU HAVING JJNSCCTITH A iR OR CONTROL PUN.TION M D BY THE CONSIGNS M,MAY oW oIUGSON LNR UMIYDH UlT uLTMATE BE INSTALLED A ME CITY M STATIC*CONSTRUCTION ARCM'TFMNMC SIGNS ME W OMJ DUCTILE-IRON WON—JOINT 4An MATERIAL UR URIC' ^E INSTALLm AONC ADJACENT MRIKWAYS M p0AO5 MSHERS WITH ELUTION TAPE OW DIRECTION MAT YAWMUY v YALYE MJLI RE TO BE INSTALLED WERE ANY CONSTRUCTION ACIIMTY CROSSES A SIDEWALK OR ON DOWIH MB YACRNE BOLT M VALK DO% PEDESMAN PAN IN ACCORDANCE WM ME SPECIFICATIONS AND ANY M ALL LOCAL OP DOOR NO MOTH CONTROL CENTER VERT VERTICAL REGU TONS. DAY. DNANINC 4M YDICK CONTROL I.C. Y0.UME IS NO PMKN4 M SIOBNC OFCONSTRUCTIONMA1FAlAL$IN ME PUBLIC STREETS G EACH THEM YEOHAMCAL MF'I KPP1' MANY DRIVEWAY IS ALLOWED UNLESS MMOUSLY APPROVED THRWOM THE COY O [i CAM I.C.CXNAU51 FAN We MANLIFA""C" VN MINT THRWON RODE 14. TAN. I SURFACES ICE TO EQUAL STALL ER C D ALL ROADWAY,MNPRIOR TO CWALK.EFG EL LLCV EIEVAnON AN MANU MHQUZMPE,UANUTACTUPCR W WOM IIIA FI RIONE M BETTER CONOTIM THAN LUSTED PRIOR TO CONSTRUCTION GQ ELBOW 4N MANHQLE WO WOOD WORM.AS DEI,ON BY AGENCY.OWNER•ANO/M CNBNEEP. 5 GCC ELECWK.CLCCIWCAL NIry YMWUN W/ WITH IB ASPHALT,MNCRETE CURB.AT 9DF.WAIN SMALL B SAW CUT M NEAT CUT AS j ELLS ENCLOSE NSC NISCGLM OUS W/0 WM0.11 APPPQYED BY THE CNONEM. •/���,. [NM CH TER YJ YECNANICAL JOINT W WAICNLInC 18. NO FM4FM CMMETE SHALL BE PLACED WITHOUT A FINAL FORM INSPECTION BY 4 0' COGE OF PAYMENT YPWSS Mel PUM W9RAS STANDABX WECFICATIONS(SE NOTE A) WA MAF MESH,WATER NAN ME OWNER AND/OR HIS AUIMMIEED REPRE5ENTAME tT. ME CONMACTM SHALL UTILIZE COMPACTION EQUIPMENT 91NTABF FOR ME SOIL T Ty9 E JS'� - CG EQUAL EQUALLY NC x0I IN ODINWACi M5 WAIFRSTOP.WATER SURFACE TYPES AND SURFACE MATERIALS ENCOUNTERED ON THE PROECT. 1f OIL SP EQUALLY SPACED M UMBER AS WflDED STE.WRWCHT STEEL 1B. CONTRACTOR IS RESPONSIBLE FOR WRUWNG MAT,IF REWIRED,THERE IS A COUP COUPUGT NDN MAT A, WT NOCHI STORM WARM POLLUTION PREVENTION PLAN(SAPPP) AND NOTICE OF WENT(NO) w OU EQAVALDIT N1` HOT TO SCALE YFIP WAIOR Ell, EACH WAY OCR ON CENIEP vN :AIFP vALK MPROKD BY ME MOMTANA OCPMMENi O ENMRONYENTAI QUALITY(HOED)M E [%C EXCAVATE OD ON CLm dAN[ldH wxI WIIOm NONE FABRIC LOCAL OOYTRTANC AGENCY AS APNNIMRIATE IF MERE IS NOT AN APPROVED SWPPP AND NOI.ME CONTRACTOR SHALL BC RESPONSIBLE FOR OBTANINC THE NECESSARY PPAN15-0028 CAN EMAUST In OUTSIDE PACE WwM YELpEG DUPE NEST APPR0VAL5 FROM YDEQ M THE LOCAL COKRNINC AGENCY. - CAP "PANS IAV pP DYERHEAO POWER YFIIR Unnew, YUt 11. CONMACTM SHALL REPUCE ALL DISTURBED CURB/PAWNCNT MAXJNGS AS MMIN0747.060 t PP n EINAMSM JOINT OPHO OPGTNC H9 YARD 20 WWICTM(1RLTO WORK WHIN AVAAABIE RIOIT Of WAY AND CASEMENTS, SHEET CONTRACTOR TO 011 PERMISSION TO USE PRIVATE PROPERTY FOR STAQUAL ETC. DATE Y 9/14/2016 EXISTtNG STA 3+13.8 6.SS SERVICE STA 2+16.8 6-SS CO 113 6"SS CO#14 STUB STA'0+39.15 1+19.5 RIM EL 4878.99 RIM EL. 4878.81 I CO #12 - ,f - _ / 0 EL 4879-07 0� 45' SEND EXISTING STUB SE"M 6,GWISEICIT STA 4+07.81 V RIM EL-,4880.04 10 r�tw�OOL STA0'55 STA 2+ 3=3' RT 6'SS CO #i's ---,COMBINE (4) ICES 1.5" 9(r WATER. RIM EL 4878.60 INTO COMMON 4L�A 4+73.0 11 E.r.Im SEE DETAIL., SERVCE BEND _4 45! BEND > md AGRICULTURAL - STA 0+39 6 11' RT ROAD SECTION 4 11 EL- 7Z 165�"JWA%MR RESTORATION Z4 SERVICE C CTIO STA 0+10 TO 6+ To NG C) --T TO Ni; SEE DETAIL MILLER PAVILION P� 4� c HORrZ.SCALE -N- STA 2+83 66' RT MILLER PAVILION oz BACKFLOW PREVENTS Ct 1.5'WATER METER AND WATER SERVICE CONNECTION ZT, 4+7A.0 6-SS CO #16 AND PRESSURE RIM EL. 4878.24 REDUCING VALVE SEE DETAIL z SrA 1.16. SG 4.12.1.- 0 ON ON ---- fig-RMSCALE ';�'-Co-1 -7 z —STA 311—.04 WMTOP TYPE 'T' PIPE BEDDING TYPE "A" TRENCH BACKFILL VERTSCALE sE INSTALL 458 LF OF — 2 1 1 u) 0 z o --1.5" TYPE "K" COPPER— (D INSTALL 438.4 LF OF 4.15 6" SCH 40 PVC o i6i u NEI ss. = 9— —4 2.83 3'RT:z R N�em �M SEW-2 L 1.1*WIM SOME Mi.Oti.OMM/ 10 Im PAMM OCID S'M SCH 40 W.tzar. STA 0+39.6 SS 0 1.25- rw,CIA, Ag TO Elm On S'A 2+13 *T ss STW I�H-0— S AND V m Ift M.QKM RZTALL 80.2 LF 0' UK 40 so 0 PC1= lw our. gem �X 4 —w.otm OKN— �7A PPA#IS-0028 MMI#0747.060 SHEET SERV-1 DATE 9/14/2016 �•- STA 2+16.6 STA 3+13.8 Q' EXISTING 6"SS CO N4 6" SS SERVICE 6" SS CO #3 RIM EL 4878.81 STA 5+00.0 d STUB RIM EL 4878.99 6" SS CO p6 STA 1+19.8 t i IM EL. 4878.53 (TA 0+3 6•SS CO N2 't �"SS CO „f STA a+10.8 CONNECT T RIM EL. a879.07 6"SS CO#5 COI�yI _....,/� EXISTING -TUB- -... ---- --.. ,"- RIM EL 4878.71 - - RIM EL 4880.04. __- ' s 1 -a11 $ -- --- �.- STA 0+5'5 STA 4+15 M ES COMBINE (4) SERVICE LINES TO MILLER PAVILION 1 i COMBINE t`WATER W • - -� 1 INTO COMMON TRENCH ,I:.I t 4, SERVICE WITH SS TRENCH m va SEE D•DETAIL SEE SHEET SERv--1- i I jam- SEE DETAIL pSTA 0+39.6 9' RT AGRICULTURAL 0.+ SERVICE ROAD SECTION 7 a INRESTORATION AGRICULTURAL W p S TO EXISTING STA 0+10 TO 6+85 MILLER PAVILION ROAD SECTION 1--1 CURBSTOP SEE OETAIL m RESTORATION p O Nr STA 0+111 TO 6+85 I"y 6 1 HORIZ SCALE { • SEE DETAIL 1 ETA 1r19A - I--STA 2r19A - ---- Sr1�38 -/ - 6LV.E979A7 - 0.[Y..�0.99 1 IA {ltl`.If7671 E� e .p10 4SSO _ __ HOR17-SCALE E%Is G CmasToF- -WA 0r39. S Or]9.9- - -_ •_-_-. - '� ]e to e W = 9 ---- -_ e1Lv:weo.s4 --EU•"w°001 -- TYPE "1" PIPE BEDDING-_- wv9c1 _TYPE "A" TRENCH BACKFILL INSTALL 480 L•F OF - - vERr.sGLE -1" TYPE "K" COPPER - - w N�9r 2: -- -- - --INSTALL 460.4 LF OF--- - - - --- -- _ 6" SCH 40 PVC - -_- -- - - -- -- -------- _ - - .fir �5 --- - ---- - ------ ---- --- --- - 94011 99317_ SCH 96DQ.97.0 V 9.PC sm 40 4M sag 4579 _ ss O tb11- - - _-9N.OUR'w70w.__ �- -MOIL nA V- --- --. - �- �WNKCf 10 Ef.ETMO INS'WL 97A V -ss O 1.2�w-- _-_ - MV.OUTI -G957OG 8CWE11 ---MD C SS9•to SIU9 �6'rIIC 3cm 40 -_W.OUR 4=M S7U0 �R 1.2� -- __--.- -; ---IMiGI1L W.9 V- SSS O 1.21.w_- - .9M.OUR.08 4 ---- -- -_W.OUR 4996.90 4w COY OE95 ~�R Alf- --- `I, C.t�.: y$ 9$ 8$ MMIA0747.060 >,0 1N9 2K9 9.0 9.99 a.90 .wo .wo SHEET SERV-2 DATE 9/14/2016 • �w l STA 7+71.2 STA 7+89.4 Q r SS CO N10 487E 45' BEND Z Q. - ♦f �.' >•m STA 7+66.6 7+72.8' 7.3 4`-' BEND Fc S. 1"WATER METER, STA 7+53.1� SACKFLOW M.NTER.* .0 45' BEND STA 5+00.0 - k PRESSURE REDUCING VAL STA 7+36 1 6 SS CO N6 6-SS CO N9 IA' ULTURAL RIM EL'4879.03 FARRIER SCHOOL & 45' BEND SECTION -. - -. RESTORATION 1.-�?I•• " ' RIM-EL. 4879.56 r STA 0+10 TO 6+85 SEE DETAILtp •�_,J__ _ .-�•—• -- STA 4+15 ----- , COMBINE I' WATER STA 5+75.0 SERVICE WITH SS TRENCH SEPARATE UTILITY, / - 4.6. STA 6+99.3 D3 SEE DETAIL m LINES INTO / - 45'BEND SINGLE TRENCHES - .a a- ---w--"—'-�--• STA 6+00 0 STA 6+85.4 6" SS CO #7 6-SS CO N6 �.I O � 0 RIM L. 4878.50 & 45' BEND RIM EL. 4877+46 1 HORIZ SCALE L n y AGRICULTURAL ROAD SECTION ' RESTORATION STA 0+10 TO 6+85 r SEE DETAIL® ti i MILLER PAVILION TYPE "1" PIPE BEDDING —_TYPE "A" TRENCH BACKFILL --— INSTALL 300 LF OF---— Hoarz,SCALE o —}-- - - - - ae ., Z -- - _ 1" TYPE "K" COPPER— + StA 7++36.1 F 4550 SG 10 INSTALL 360.4 LF 01vAmw acv.s7e.n .eeo MA Slf k00.D ELENf575.71 ELEV:a575.S3_.._._ _-_.—.1— - _ VERT.SCALE K = - q� f. _ 6" DIA. SCH 40 PVC m 5 _ N O ° x• A.ft ixFc[t p C.Wm _. — ccO Cccu wSWL ml Lr M75 fU175 _ ei'xW tl15'7°LL 70.7 Lr Y PVC'l a Y PC SCN f0—- 54 O lass $I PB7ALL 55.f ss O 1.25s— -- —...mwm m7m UNE —_— Y PVC 9Gl 40- w10 SWOLE VOC11 ss s 1.75s_ 1 wV.01M N7ss1 IhV.OUT. — wrt Y PVO 50N 10—1- - w50U11 1000 V I W.0U7,457tAD I ss e lass -- °• e p1 a I - � - --- 'an e 5 INV.DYf:455P.ff N•Jg7 PE gg 1 .. A MMI#0747.060 t a SHEET .� �w .� - SERV-3 i °" •,° DATE 9/14/2016 STA 0+39 �+ - I"WATER SERVICE CONNECTION HORTICULTURE - C° TO EXISTING CURBSTOP ROAD SECTION F=, �. •� RESTORATION Z STA 1+00 TO 2+80 SEE DETAIL m F •'i;� V NORTICULTUPE STA 3+00 7.6 L7 0 LANDSCAPE RESTORATON u - ,"WATER SERVICE 2-F 80 TO 3+15 a STUB AND CURBSTOP m SEE DETAIL AND CURB BOX -v FOR FUTURE RESTROOMS W STA 3+10.5 'Z iJ HORTICULTURE ,'WATER ILOW PREVENTEV 4- _ __ LANDSCAPE HORR.SCALE IVATEr UE7ER,AND PRV RESTORATION Ta o m .o INSIDE OF HOT B0% .` Lta -N- SEE DE'AILe " - SEE OETA1f. , }, wr�r I CONNECTION To '� HORTICULTURE INTERNAL PLUMBING BUILDING HORTICULTURAL PLDG SEE DETAIL SEE DETAIL® O Ply o CA u 0 U ---_ — TYPE "1" PIPE BEDDING I= _ —STA��x_ HORQSCAL Q -- - -- - --TYPE "A" TRENCH BACKFILL — Rrouuii 0 e —_ — - - - — INSTALL J15 LF OF. �"s.ao za•ET r acNrEow PtmNTTER o i " -- ---1" TYPE K" COPPER-- wesTOR w I"Rmx _ __ _- - beG VERT.SCALE STA wao O,� : f CONNECT TO E%CMNG - - a -I.T GU BSM Rol RNGC �1 I PPAM15002S o.® WO T.eo Tao i x ane MMIb0747.060 SHEET � SERV-4 9/14/2016 z� PRESSURE REDUCING VALVE-SET TO 70 PSI d` HOTBOX H63N WATTS LF25AUB-Z3 OR APPROVED EQUAL Z ENCLOSURE 1"WATER METER THERMAL EXPANSION TANK 101-1 EXTROL 15 PER COB —STRAINER(TYP) OR APPROVED EQUAL ~ \ 1"WATTS LF009QTS OR APPROVED . �..ra....e..w..�...wa.. �" EQUAL B.F.P.(TYP) �.rnriri wa.w..sx PROVIDE HEAT TRACE TAPE 1000W PROVIDE 2"THICK MINERAL "^ WRAPPED AROUND WATER HEATER FIBER PRE-FORMED SERVICE TO A DEPTH OF INSULATION WITH PVC W 48"BELOW CONCRETE PAD • JACKETING AND HEAT TRACE TAPE ^^ WRAPPED AROUND SERVICE - THROUGH BUILDING WALL EXISTING GRADE T CONCRETE PAD "� O 82"X 38"X 4" MIN \ 6"WAWASHED ROCK BASE 1"WATERSERVICE 6"X8 7 Z) TO CURB STOP FOR BLOCK OUT U FUTURE RESTROOMS FOR DRAIN HOTBOX HB3N ENCLOSURE DETAIL (n ji QQQjjj124 NOT 70SWE SERV4 0 HOT�XPROFILEVIE NOTToSCME SERV 4 0 0 z 0 z 0O aj 0 L- O ca ■■ e F E PPAN150028 MMIN0747.060 5 SHEET s DA DATE 9/14/2016 �C UTILITY TRENCH .w..nm ww uu-w ara x xowo• ■ TYPE K TYPE K ■ acvwr wR pmc va x�oxa wnl `/V) I COPPER COPPER I A WATER SVC. WATER SVC. >_. x• �n rlo I 0.50' J' IiA � ■ 0.50' SOLID SHELF ■ g I ■ I SANITARY SEWER CLEANOUT r2l\ NVMSGIIE SERV 1-3 ■ ■ ■ ' O I ■ 2 O 1.00' ■ 6"DIA ' F ■ PVC SCH. ■ LEWE=SVC, cc O a = of - 4- Q L L- NOTES: O co x 1.THE WATER PIPE SHALL BE PLACED ON A SOLID SHELF EXCAVATED ATONE SIDE OF THE 1. 2 2 i £: COMMON TRENCH WITH A CLEAR HORIZONTAL DISTANCE OF NOT LESS THAN 6" 1'I'—MINUS CRUSHED _ 3s 12 INCHES FROM THE SEWER OR DRAIN LINE, 5 2.THE BOTTOM OF THE WATER PIPE,AT POINTS,SHALL BE NOT LESS THAN 12 INCHES(305 MM) GRAVEL BASECOURSE"III—�I I I—I II I I I - ABOVE THE TOP OF THE SEWER OR DRAIN LINE. I—III=III=1M�—III= 12" UNCRUSHED � x� 3.JOINT SERVICE TRENCHES MAY CONTAIN UPTO2 SEWER SERVICES AND 2 WATER SERVICES, =III-III_III=I SUB—BASE COURSE 4.ALL REQUIREMENTS OF CITY STD.DETAILS NO.02660-6 AND NO.02730.2 SHALL BE MET. 5.CONTRACTOR SHALL MAKE EVERY EFFORT TO PROVIDE A MINIMUM 18'OF VERTICAL SEPARATION AG ROAD SECTION NOTTOX" n COMPACTED SU B G RAD E BETWEEN WATER AND SEWER SERVICES,DEFENDANT ON VERTICAL LOCATION OF EXISTING MAINS. + + SERV 1-4 COMMON SERVICE TRENCH — PLACE GRASS SEED SERV 1-3 WITH TOP SOIL y h _ - 8" PLACED TOP SOIL Nj 8 _—_—_—_ "I I—I I—I I I I—�I MM so7 0 0 I—I I II—I I- =fit- s. COMPACTED SUBGRADE SHEET ;I I I=1 I-1 1-1 11-1 D-2 HORTICULTURE LAN ON /41 DATE y STA6-33 �+AT6 ��+4 NmrosalE 9/14/2018 z= O� H W rlNe®.N.f O v;,� °LW 1 vvnnw omcs 7 BALL VALVE(TYPICAL) i p°oMCY - N[ia O '^ 7 PRESSURE GAUGE(TYPI 0 unr ° nap V, PRESSURE REDUCING VALVE-SET TO 70 PSI Ic,c:rar 1YWLWrt ~( O WATTS LF25AUB-z3 OR APPROVED EQUAL STRAINER OR(TYPICAL)I5" -t'OR .5'WATER METER PER CRY OF BOZEMAN Q� V OR i.S•WATTS LF0090TS OR i/f 4ND I' • p Ym 2.OOTR NWMV �/�I APPROVED EQUAL BF G.(TYP) f y (n VOR VALVE OFF = VALVE IXf WKL—� ► ,fi ': TOOR'.S.BUILDING rnP�co weu rwreao Wul. O �-y Z TXERMAL PIPE AIR GAP TO FLOOR C �E%PANSION -_DRAINITYPICAL) TANK 701-t Z7 EC LAL OR APPROVEDEW ANac nn - Nwi na• - MPNm rMrsm FOUNDATION \—PROVIDE SLEEVE NOTES: r RmP I+� WALL—�• TN0.000X FLOOR t)PROVIDE REMOTE WATER METER READER AND T"� Y Nrc �� Z N—[ O. L: t'OR DOMESTIC LOCATE AS REQUIRED BY LOCAL UTILITY. U L L ji �—DOMESTIC WATER MI BACK FLOW PR AND O M SXALL BE MOUNTED 1B• 9rrt.Mt nRL �s�.+a n4c O Co SERVICE MINABOVEFLOOR AND NO MORE THAT IS•MAX \ C C 1 1- ABOVEFLOOR G G TYPICAL SERVICE CONNECTION �\ 11'wo cN.o suwu n ND r co+w szwnT ■■ e XDrrascuE Nmo nKIYDL rasa ura-iron su ra Au Hoop roeMAndn rn or cmaNw NARA aw+NG w.mee-n nNmum ouww Roxc Wm°a urwxca ARra mm WATER SERVICE INTERIOR CLEARANCES n NOT TO SCALE SERV 1.4 sroF� INSTALLATION REQUIREMENTS: , G3 4. wAiEP SEawceur¢iNsruuilanRNu mxraRarotIEPEDuae[rnearnEarr aFeaasAxvurm slPeameNNNr ~-. - '�? 7 T£AWCE LWE9 DNlL BEIYPENCOR'FRfOP ri'.r•,IIIT,ANDTBEPNCTS.PEiMIT0000 BTNAlAW0RAW010N0 r®0D11YgifA10UPLERDDAE61ICR:IMCC IAEB ° 4%CI�Jn STMG ff1NE50ElW'ANSNOf EUS DrALLONED Na000]M: C 4 StPAIGIimRPER 111BR&91PLLBEDBB]ftltl I?ANOSBWA�O : MN .E 1 �IVICE lAEOLiNLLBEFAED TUIOERBNDOfiA iNEROS 1wIX BNG N4INE WIMIW WYlEUB®ASBEDON'uFR(%YOOR16 TOilEPEQIIPEYENr90f WNfNNn611C t C ty: x I-DSiNmN000AM1Y^ftIIT}NIODOESNCL OOMNNANr WTEWN URGER MW Nr• •' S MFIM RE%IIESMN.MRCgD WAIMP WIOPRDOP RCE ttNEiPATIM4 E L NMEPS IINLL BERKINLFO BYDFGTY WATERDE9ARRSNIATfN010YEP6E%RENBE PPAk150028 1. M93M�DNE 9NNl�D4LTRLLEDIMiR ITNlS RRHINOMLROAILAPMiDYELOY Iar wATpi0EMJ0lENi a mrtAcrattoFBOIINNI wArtaoEPuluOrtrmAPaPw®usluccarEacar¢cnals MMIli0747.060 4 WARRBEPWCELRIE WYBE PLOIX;EDi0AHW1FRfl]E MW11f WATER 36NKt 6IL8 gLDyD11QB N�0r1_ENApEWRMNLQLQIH!_ ID NETEa MLuww Mrorzcnox,ANDInmMNcsEPwa u4ENwrNWEE iNEEANFsr SHEET D-3 DATE r. _ 9/14/201.6 CONNECT 1" WATER SERVICE TO BUILDING CONNECT TO EXISTING SUMP CONTENTS 7- "• - ! " SANITARY LINE WITH SEE DETAIL LxISTING SEPTiL ,'�D TANK E"Z I ® \ OFF OF BUILDING (1.000 GAL) PULL RISER - AND FILL WITH WASH POCK O � /ABANDON IN -L4CE \. DISCONNEC- ELECTRICAL TERMINAL FARRIER SCHOOL / REMOVE PUMP a CHAMBER PIT ., 7+72,8' 7.3' FIT AND CAP ALL LINES frl � M+rl 1" WATER METE., - - -' fit•\ �{ BACKFLOW PREVENTER, k PRESSURE REDUCING VALVE I i •*= ,. - W "'GGG SEE DETAIL BELOW FOR LOCATION APPROXIMATE I Q ROUTING OF 1° WATER LINE TO I I -+ •-T- F1 W O CONNECTION INSTALL r' O VI "NON POTABLE WATER" _v- .7�..- •, ta•l L /'1 r TERMINATE SIGN ON NOSE BIB ELECTRICAL NEAR ENTRY DOOR CONNECTION T CHAMBER PIT ` +V, :. a AT BUILDING - OUTSIDE UTILITY ROOM ! t FARRIER SCHOOL DETAILS /1 o NOT TO SCALE SERV 3 z RELOCATE EXISTING FARRIER SEPTIC SYSTEM TERMINATION rd1 BLOCK OF 3 LOCKERS NOT TO SCALE f FOP, WATER METER, SERV 3 BACICFLOW PREVENTER r~n 0 ` s AND PRESSURE RFDUCING Z ex VALVE, SEE DETAILS 0'i D—s O cut Ma 5 CONNECT 1" WATER SERVICE LINE INTERNAL PLUMBING ■1" TO EXISTING COLD WATER SUPPLY INTERNAL PLUMBING SEE DETAIL -5 J D-5 ' r t. . nasou oc Al F - - - PPANiS-0028 ! MM1110747.060 SSH^HEEAAr ! FARRIER ELECTRICAL TERMINATION Im FARRIER WATER SERVICE CONNECTION FARRIER WATER SERVICE CONNECTION � D4 HOT TO SCALE SERV 3 NOTTOSCALE SERV 3 NOTTOSC"LE SERV 3 DATE ,R. 9/14/2016 DISCONNECT WELL 1 - ' - 1 j� - SUPPLY LINE EXISTING DUST SUPPRESSION ®. AND CAP AT 90' BENU SYSTEM TO REMAIN IN PLACE ISOLATED FROM PUBLIC WATER SUPPLY ~ INTERNAL PLUMBING CONNECT 1"WATER SERVICE LINE TO EXISTING COLD WATER SUPPLY- AFTER BACKFLOW PREVENTER r I 1FO�� Cn O INTERNAL PLUMBING - -_ •{�, �'I A V FARRIER WATER CONNECTION in i ` �► {� QI WTTOSCALE SERV 3 NUTL: EXISTING WATER SYSTEM TO REMAIN IN PLACE FOR NON POTABLE USE rD ECT WELL' LINEyBENDF WELL LINE W O MILLER INTERIOR PLUMBING �1 N07TOScue SERV 1 0 BRING IN 1.5"WATER SERVICE INTO PAVILION" : 'b NEAR COLUMN, 15.5' FROM CONNECTION z o =A w 0 r 4z - LOCATION, 42.5' WEST OF SE BLDG CORNER PLACE WATER METER, - BACKFLOW PREVENTER AND 0 e _ PRESSURE REDUCING VALVE ��L i; PER DETAIL 4 m � - MEN �5 CONNECT 1.5" WATER SERVICE LINE _ _ i. I � �•�'* TO EXISTING COLD WATER SUPPLY I I INTERNAL PLUMBING AFTER BACKFLOW PREVENTER ` - - "~- �'• 4 (/• .�_-r INTERNAL rLUMBING i PPANIS-0028 MILLER PAVILION WATER CONNECTION n MMIS0747.060 NOT TO SCALE SERV 1 SHEET e = MILLER METER LOCATION D-5 NOT TO SCALE SERV 1 DATE 9/14/2016 z= Q HORTICULTURE FARM O� IN LL RAIN VALVE AT 90' BEND FOR TEMPORARY AND SEASONAL USE PROVIDE(2)NEW 20A I BREAKERS z RUN (2) NEW CIRCUITS PROVIDE(2) 20A OUT TO HOT B0%: 12/2 GFI DUPLEX NM—B EACH CIRCUR. RECEPTACLES r i" WATER SERVICE INTERNAL PI LIMBING^ INSIDE HOT BOX I U j PROVIDE LB& 1"PVC SCH 40 DOWN ^ _ EXTERIOR WALL AND INTO CROUNO. ROUTE CONDUIT UNDERGROUND AND STUB UP INTO HOT BOX THROUGH CONCRETE SUB. PROVIDE(2) 20A HORTICULTURE WATER CONNECTION (T1 GFI DUPLEX RECEPTACLES INSIDE HOT NOT TO SCALE SERV 4 BOX �1 U HORTICULTURE ELECTRICAL DETAILS /T1 rvoTToscALe SERV4 p z 0 f= I z O f I _ 0�L: #6 1" WATER SERVICE INTERNAL PLUr,I C.!I 1;. ' +1 ■■ a 5 ■1 �� - CONNECT 1"WATER SERVICE LINEt1�1�j TO EXISTING COLD WATER SUPPLY r c DISCONNECT LINE TO FROST FREE HYDRANT CONNECT 1" WATER SERVICE LINE POST "NON POTABLE WATER' TO E J SIGN ON HYDRANT PPAM15-0028 XISTING COLD WATER SUPPLY AND CAP LINE TO FROST FREE MMI#0747.060 HYDRANT SHEEP e HORTICULTURE WATER CONNECTION � D-6 ? HORTICULTURE WARR CONNECTION DATE CONNE�ON� "mT°scAL� SERV 1 DATE 140T10 SCALE SERV 4 9/14/2016 EXISTING f i STA 2+t6.8 STA 3+13.8 6' SS SERVICE fi' 14 SS CO + /STUB 71, 1+19 B 6" SS 48 (.99 RIM EL 4878.B1 I F RIM EL. 4B78.99 STA 0+39.6 6"SS CO #12 '�� --_ 6" SS CO #11 RIM EL 4879.07 STA 4+07.6 CONNECT TO / EXISTING STUB 4' BENDS ti O iAWUER SOgOL i C L•; RIM EL. 4880.04 a snEa sorv-x� - I s " ySTA 0+55 �- —~ A y+H3 3' RT7 6" SS CO #15 W `- IM EL 4878.60 `.1 �OMBINE (a) SERVICES 1.5" 90' WATER `i ,.,/ U I 0` INTO COMMON TRENCH SERV CE BEND Q W I I SEE DETAJI, --•. ,.— —� ,_•_—.p— „ � _ T6 Q'1 W AGRICULTURAL--- !__ -.—•. __.--_-. z i I STA 0+39.6 it' Ri ROAD SECTION (T� .�.,' 1.5"WATER RESTORATION -I Q, SERVICE CONNECTION STA 0+10 TO 6+85 1 ' MILLER PAVILION TO OWING N, SEE DETAIL m O j I Ty CU OP '( HOR2.SCALE MILLER PAVILION } I 3 -N- .1 rteT STA 2+83 66' RT W WATER SERVICE CONNE .•1 1.5"WATER METER AND SEE DETAILS dZ 1}7 BACKFLOW PREVENTS or AND PRESSURE y 5 REDUCING VALVE I SEE DETAIL aaA f CD-17 c0-1 ---- CD-H I _ ..--- - --I U �. - -___--• SG 1.19► sm Sl 1 -- STA]13J -_ _ - STA Ol2T .._.__1. N6D p 4eeo [i[V:MA.e7 {-ElLWe70.M E{EM4er4e1 _ - 00-14_I -_.__ -TYPE "1T TRENCH BEDDING- _ HORI2.SCALE - _ _ _ -•SEA N70A Z _--- - -_W-11 ---- I -- - w �1��_ FtMAf7036_ m t6 o xa Q STA 0.32.6 EASfINC NRBSNP..I,• -, -EEN:40eo.o4 -- - __- .. ..._.. .._. _._ BEDDING--------. STA 0+39.6 "A" R NCH BACKFILL, ..,.—L - - -- -- ---- 1 0 = 9 — — � '�-' VERT.SCALE N INSTALL 458 LF OF - - -- - �_._ - i x Z N . a: .1 5 TYPEK COPPER 0. s` _ . __ _I-- ----1 IN 438.4 LF OF - -4r Iw j V cu ,me �- .� 6" SCH 40 PVC -- --- i - _I _- ---- - - --- - -- 0 PC scn 40 -Jul ; 5 ss•s.esz � q �'s..f�'•_ i .' -- --- -- tWATER sE1M"L'F -- --- -- - EET - _ w+.T i07a9e PANLpN._.I S NSTAl1•4A O' I uc /V V- 1 —1sa As9• 4eTo _ i --- -' --- ..._. - - - -«. --- -- _— - -6arxu9zov- e� - s IACSC1,a_. b •t.as% i srA o+9e.e - I-— pr --- ss a t.xsz N9.•tR:4ewns CON"ECT Tu ENbTNe - ... ss STU9 ... 0YTle11nA V t76snee SEWER ^f-' -� '-e•MC NX 40•.— tlx.our:rero.o]AAo 6•u Smcc STu6 --- -1nI.ovn se6s,eo400 Inv,ours 4eeeeo . _-_ PPA 33 9I Ei 33 IBl I I SHEET 9/14/2016 James R. Nickelson From: Brad <brad@dlmcontractinginc,com> Sent: Monday, October 17, 2016 3:48 PM To: James R. Nickelson Subject: RE:Ag Services James, Your most recent plan makes a lot more sense and saves significant amount of cost. However, I don't see the "common trench" working in any case for the sewer and water. The material is too difficult to shore/excavate to make safe with any significant elevation differences. We will use separate ditches for the entire stretch. Estimate for the proposed Miller work=$129,300 Additional 1" Waterline to Sta. 2+83 (Main Line Ditch only) =$5,250 This is based on DLM being able to utilize existing road base and gravel materials for subbase course, Road top course will be imported. Hopefully, this manages to be within the MSU budget. With the dewatering pumps currently running near this location, it would be ideal to install this soon. EI LC CONTRACTING INC Brad Lewis, Vice-President (406) 586-2881 Cell: (406) 539-0718 Fax: (406) 586-2868 From: James R. Nickelson [mailto.jnickelson@m-m,net] Sent: Monday, October 17, 2016 2:11 PM To: Brad Lewis (brad@dlmcontractinginc.com) Subject: Ag Services Brad, Based on your latest estimate we need to re-think things. Attached is a revised profile. Scope of work includes the following: - Miller water service per original plan (if there is now merit to the common trench idea —from station 2+20 to 2+83 a separate trench will be needed to meet separation requirements) i - Miller sewer service — use city detail 02730-3 at point of connection to go up at 45 degrees and then lay at 1% to building - Provide separate price to add 1" water in miller water trench to station 2+83 James James R. Nickelson, PE o® Morrison iiiIii Maierle Direct 1406.922.6824 From: mhodges@m-m.net [mailto:mhodges@m-m.net] Sent: Monday, October 17, 2016 7:57 AM To:James R. Nickelson <jnickelson@m-m.net> Subject: MUN_Scanner .,"Mmunrcallon rs lilt!properly of lylornson-Marerle inc and may conlarn confrdeunal or privileged urformalron Unnulhunzed use of this connnunrcalrnn is :.Uicr!y ornh,b,Psd and nary be unlawful If you have recerved this communication m error.please immedrately notify file sender by reply e-mad and duslroy all f ill, communication aml auy attachments 2