HomeMy WebLinkAbout01-23-17 CC Mtg - A1. Resolution 4765, Budget Amendment for Street Impact Fee AppropriationsCommission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Commission Resolution No. 4765 – Amending the City’s Annual Budget
for Street Impact Fee Appropriations for the Fiscal Year Ending June 30,
2017 (FY17).
MEETING DATE: January 23, 2017
AGENDA ITEM: Action
RECOMMENDATION: Approve Resolution No. 4765 - Amending the City’s Annual
Budget for Street Impact Fee Appropriations.
BACKGROUND: The attached Resolution amends the current year budget to bring forward a
project that was scheduled in FY18 in the most-recently adopted Capital Improvements Plan for
Street Impact Fees. Item SIF130 – Kagy Boulevard Interim Improvements was listed with a total
cost of $500,000. The Engineering department would like to begin design and construction of
these items in the current budget year, so a budget amendment is necessary. The expenditures
will be funded with cash-on-hand.
More information about the project itself can be found in the related agenda item materials for
the Professional Services Agreement with Sanderson Stewart, following this item.
ALTERNATIVES: Do not fund the project at this time.
125
FISCAL EFFECTS: The current budgeted spending in the Street Impact Fee Fund will
increase by a total of $500,000. As payments are made to contractors, cash will decrease in the
fund. The Street Impact Fee Fund has sufficient cash available to fund the additional spending in
FY17.
Attachment: Resolution No. 4765
EXCERPT: FY18-22 Approved Street Impact Fee CIP, Item SIF130
Report compiled on January 11, 2017
126
Page 1 of 3
COMMISSION RESOLUTION NO. 4765
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA,
AMENDING THE CITY’S ANNUAL BUDGET FOR STREET IMPACT FEE
APPROPRIATIONS FOR THE FISCAL YEAR ENDING JUNE 30, 2017 TO INCLUDE KAGY
BOULEVARD INTERIM IMPROVEMENTS.
WHEREAS, the City Commission did, on the 20th
day of June, 2016, after due and proper legal
notice, conduct a public hearing and adopt a municipal budget for Fiscal Year 2016-2017 (Fiscal Year
2017); and
WHEREAS, City Commission did, on the 3rd
day of October, 2016, after due and proper legal
notice, conduct a public hearing and amend the municipal budget for Fiscal Year 2016-2017 (Fiscal Year
2017) Street Impact Fee Appropriations; and
WHEREAS, the Kagy Boulevard Interim Improvements (SIF130) were presented to and
discussed as a Capital Improvement Project by the City’s Impact Fee Advisory Committee on November
17, 2016; and
WHEREAS, the Kagy Boulevard Interim Improvements (SIF130) were listed for funding in
Fiscal Year 2018 in the Street Impact Fee Capital Improvement Plan adopted by the City Commission on
December 5, 2016 ; and
WHEREAS, the need to move the Kagy Boulevard Interim Improvements (SIF130) item from
Fiscal Year 2018 to Fiscal Year 2017 exists; and
WHEREAS, the City Commission did, on the 23rd day of January, 2017, after due and proper
legal notice, conduct a public hearing on proposed amending the municipal budget.
127
Resolution 4765, Budget Amendment for Street Impact Fee Appropriations – Kagy Boulevard Interim Improvements
Page 2 of 3
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, to wit:
Section 1 – Appropriation Changes
The City Commission of the City of Bozeman, Montana, does hereby authorize the following
changes to expenditures in the Street Impact Fee Fund:
Additions: This project and amount is added to the FY17 budget.
SIF 130 – Kagy Boulevard Interim Improvements $500,000
Total Appropriations Changes: $500,000
Section 2 – Use of Cash on Hand in the Street Impact Fee Fund
The increased appropriation will be funded with cash on hand in the Street Impact Fee Fund.
Section 3
Pursuant to Section 7-6-4030, M.C.A., this resolution, upon its passage, shall be in full force
and effect on July 1, 2016.
Section 4
That should it be found by any court of competent jurisdiction that any section, clause, portion,
sentence, word, or phrase of this resolution is deemed to be contrary to any existing law or regulations,
that in this instance, it is the intent of the City Commission of the City of Bozeman, Montana, that all
other portions, sections, words, clauses, phrases, or paragraphs of this document shall remain in full force
and effect.
128
Resolution 4765, Budget Amendment for Street Impact Fee Appropriations – Kagy Boulevard Interim Improvements
Page 3 of 3
PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a
regular session thereof held on the 23rd day of January, 2017.
________________________________________
CARSON TAYLOR
Mayor
ATTEST:
_____________________________________
ROBIN CROUGH
City Clerk
APPROVED AS TO FORM:
________________________________________
GREG SULLIVAN
City Attorney
129
Street Impact Fee
Capital Improvement Plan
Financial Summary Current Year
FY17 FY18 FY19 FY20 FY21 FY22 Unscheduled
Projected Beginning Reserve Balance Dedicated to CIP $ 13,172,000 $ 8,548,426 $ (247,873) $ 691,644 $ (2,764,422) $ (1,473,291)
Plus: Impact Fee Revenues Dedicated to CIP $ 2,388,901 $ 3,123,750 $ 3,279,938 $ 3,443,934 $ 3,616,131 $ 3,796,938 $ ‐
Plus: Urban Funds:
Less: Carryover FY16 Capital Projects $ (2,067,000)
Less: Scheduled CIP Project Costs $ (4,945,475) $ (11,920,049) $ (2,340,421) $ (6,900,000) $ (2,325,000) $ (1,000,000) $ (36,236,584)
Projected Year‐End Cash Dedicated to CIP $ 8,548,426 $ (247,873) $ 691,644 $ (2,764,422) $ (1,473,291) $ 1,323,647 $ (36,236,584)
Beginning Balance of Payback Improvements: $ ‐ $ (1,436,000) $ (1,436,000) $ (1,436,000) $ (1,436,000) $ (1,436,000)
Graf Street Project $ (1,436,000)
SIF102 ‐ Payback District
SIF111 ‐ Payback District
SIF118 ‐ Payback District
SIF129 ‐ Payback District
Ending Balance of Payback Improvements: $ (1,436,000) $ (1,436,000) $ (1,436,000) $ (1,436,000) $ (1,436,000) $ (1,436,000)
Assumptions Made for Revenue Estimates: Current Year
FY17 FY18 FY19 FY20 FY21 FY22
Estimated Annual Street Impact Fee Revenues $ 2,388,901 $ 2,975,000 $ 3,123,750 $ 3,279,938 $ 3,443,934 $ 3,616,131
Estimated Annual Increase 0.0% 5% 5% 5% 5% 5%
Total Estimated Revenues $ 2,388,901 $ 3,123,750 $ 3,279,938 $ 3,443,934 $ 3,616,131 $ 3,796,938
Current Revenues Dedicated to CIP % 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Plus: Increase Dedicated to Street Capacity Expansion CIP 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Total % Dedicated to CIP 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Total Estimated Revenues Dedicated to CIP $ 2,388,901 $ 3,123,750 $ 3,279,938 $ 3,443,934 $ 3,616,131 $ 3,796,938
*Note: This schedule no longer contains the portions of project costs
that will be paid by other sources, with the exception of Federal
Urban Funds. See the "Funding Sources" discussion at the bottom of
each project item sheet.
Projected
Projected
CURRENT
45,000,000
40,000,000
35,000,000
30,000,000
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
0
Street Impact Fee Projects
130
CIP PROJECT FU PROJ. DEPARTMENT PROJECT NAME FY18 FY19 FY20 FY21 FY22 Unscheduled
Impact Fees Streets
SIF001 STREET IF ANNUAL RIGHT OF WAY ACQUISITION $250,000 $250,000 $250,000 $250,000 $250,000
SIF009 STREET IF KAGY (WILLSON TO 19TH) ‐
CONSTRUCTION
$8,000,000
SIF036 STREET IF COTTONWOOD (BABCOCK TO
DURSTON) ‐ CONSTRUCTION
$1,278,000
SIF039 STREET IF FERGUSON & DURSTON (INTERSECTION) ‐
CONSTRUCTION
$1,804,976
SIF046 STREET IF OAK (NEW HOLLAND TO FERGUSON) ‐
CONSTRUCTION
$1,400,000
SIF057 STREET IF OAK (FLANDERS MILL TO RYUNSON
WAY) ‐ CONSTRUCTION
$1,000,000
SIF058 STREET IF OAK & N 27TH (INTERSECTION) ‐
CONSTRUCTION
$488,584
SIF061 STREET IF OAK & FERGUSON (INTERSECTION) ‐
SIGNAL CONSTRUCTION
$1,076,265
SIF062 STREET IF DURSTON (FOWLER TO FERGUSON) ‐
CONSTRUCTION
$757,421
SIF063 STREET IF FOWLER & BABCOCK (INTERSECTION) ‐
CONSTRUCTION
$1,600,000
SIF073 STREET IF FOWLER & DURSTON (INTERSECTION) ‐
SIGNAL CONSTRUCTION
$1,616,000
SIF074 STREET IF OAK & DAVIS (INTERSECTION) ‐
ROUNDABOUT CONSTRUCTION
$1,409,206
SIF076 STREET IF FOWLER CONNECTION (HUFFINE TO
OAK) ‐ DESIGN (INCLUDES 3
INTERSECTIONS)
$500,000
SIF080 STREET IF FERGUSON (BAXTER TO OAK) ‐
CONSTRUCTION
$333,333
SIF086 STREET IF BAXTER & COTTONWOOD
(INTERSECTION) ‐ CONSTRUCTION
$2,000,000
SIF098 STREET IF OAK & COTTONWOOD (INTERSECTION) ‐
ROUNDABOUT CONSTRUCTION
$2,192,000
SIF102 STREET IF S 11TH AVE (KAGY BLVD TO GRAF ST
EXTENSION) ‐ CONSTRUCTION*
$1,600,000
131
CIP PROJECT FU PROJ. DEPARTMENT PROJECT NAME FY18 FY19 FY20 FY21 FY22 Unscheduled
SIF104 STREET IF COTTONWOOD & BABCOCK
(INTERSECTION) ‐ SIGNAL CONSTRUCTION
$1,148,269
SIF105 STREET IF COTTONWOOD (DURSTON TO OAK) ‐
CONSTRUCTION
$1,240,000
SIF106 STREET IF TRANSPORTATION DEMAND
MANAGEMENT CONTRACT
$50,000 $50,000
SIF108 STREET IF S 3RD AND GRAF ‐ SIGNAL CONSTRUCTION $800,000
SIF109 STREET IF OAK (ROUSE THROUGH CANNERY
DISTRICT) ‐ CONSTRUCTION
$133,000
SIF110 STREET IF MANLEY & GRIFFIN (INTERSECTION) ‐
CONSTRUCTION
$1,600,000
SIF111 STREET IF HIGHLAND (MAIN TO KAGY) ‐
CONSTRUCTION & DESIGN*
$5,000,000
SIF112 STREET IF HIGHLAND & MAIN INTERSECTION
IMPROVEMENTS
$120,000
SIF113 STREET IF GRIFFIN (7TH TO ROUSE) ‐ CONSTRUCTION $3,000,000
SIF114 STREET IF FOWLER CONNECTION (HUFFINE TO
OAK) ‐ CONSTRUCTION
$3,750,000
SIF115 STREET IF COLLEGE (11TH TO 19TH) ‐
CONSTRUCTION
$550,000
SIF116 STREET IF BRIDGER DR & STORY MILL RD
(INTERSECTION) ‐ CONSTRUCTION
$800,000
SIF117 STREET IF STORY MILL (GRIFFIN TO BRIDGER) ‐
CONSTRUCTION
$225,000
SIF118 STREET IF BABCOCK (11TH AVE TO 19TH AVE) ‐
CONSTRUCTION*
$750,000
SIF118 STREET IF BABCOCK (11TH AVE TO 19TH AVE) ‐
DESIGN*
$250,000
SIF121 STREET IF BAXTER & DAVIS (INTERSECTION) ‐
CONSTRUCTION
$2,000,000
SIF122 STREET IF BABCOCK & FERGUSON (INTERSECTION) ‐
CONSTRUCTION
$800,000
SIF123 STREET IF BRIDGER DR & STORY MILL RD
(INTERSECTION) ‐ DESIGN*
$200,000
SIF125 STREET IF COLLEGE (11TH TO 19TH) ‐ DESIGN $100,000
SIF127 STREET IF FOWLER RIGHT OF WAY PURCHASE $1,000,000
132
CIP PROJECT FU PROJ. DEPARTMENT PROJECT NAME FY18 FY19 FY20 FY21 FY22 Unscheduled
SIF128 STREET IF KAGY (WILLSON TO HIGHLAND) ‐ DESIGN $500,000
SIF129 STREET IF KAGY (WILLSON TO HIGHLAND) ‐
CONSTRUCTION*
$6,000,000
SIF130 STREET IF KAGY (19TH TO WILLSON) INTERIM
IMPROVEMENTS
$500,000
SIF131 STREET IF S 3RD AND GRAF ‐ SIGNAL DESIGN $150,000
SIF132 STREET IF STORY MILL (GRIFFIN TO BRIDGER) ‐
DESIGN
$50,000
SIF133 STREET IF GRIFFIN CORRIDOR DESIGN $250,000
SIF134 STREET IF OAK (COTTONWOOD TO FLANDERS
MILL) ‐ CONSTRUCTION
$1,300,000
SIF135 STREET IF OAK (FERGUSON TO RYUNSON WAY) ‐
CONSTRUCTION
$100,000
Summary for Impact Fees Streets (45 items)
Totals by year: $11,920,049 $2,325,000 $1,000,000 $36,236,584
FY18 FY21 FY22
FY20 Unscheduled
$2,340,421 $6,900,000
FY19
133
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF130
DEPARTMENT
STREET IF
PROJECT NAME
Kagy (19th to Willson) Interim Improvements
FY18
$500,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Intersection improvements at Kagy and 7th, Kagy and 11th and Kagy and 19th, minor geometric improvements such as Two Way
Left Turn Lane (TWLTL).
Describe the criticality (i.e., importance) of this project to the operation: The LOS on Kagy has degraded far beyond what is
acceptable. Peak hour backups are now stretching across the entire corridor between 19th and Willson, affecting adjacent
roadways and the overall performance of the network.
How is capacity affected by this project: Improvements will improve LOS at the key intersections which will increase capacity.
How is connectivity affected by this project: Connectivity already exists in this area, it is capacity that is being increased.
What regulations or standards are attained with this project: The Level of Service (LOS) Standard (BMC).
How is this project leveraged with other stakeholders/projects/funds: At the present time there is no viable way to leverage
these funds with other stakeholders.
Are there other affected projects: Kagy corridor improvements.
ALTERNATIVES CONSIDERED
Do nothing, wait until the full project can be funded.
ADVANTAGES OF APPROVAL
Will provide some improvement to capacity and LOS on Kagy until the full project can be built.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs.
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
FY20 FY21 FY22
134