HomeMy WebLinkAboutAppendix 1-SOBO Lofts-Site Plan Design Report
SITE PLAN DESIGN REPORT
WATER, SEWER, AND STORM DRAINAGE
IMPROVEMENTS
SOBO MIXED USE BUILDING
BOZEMAN, MONTANA
December 2016
Prepared by:
TD&H ENGINEERING
234 E. BABCOCK, SUITE 3
BOZEMAN, MT 59715
Project No. B16-070
12/19/16
2
Purpose and Introduction
The purpose of this report is to explain how water, sanitary sewer, and storm drainage
improvements will be designed to meet City of Bozeman Design Standards and provide
service to the proposed development. This report will provide information on the design of
the above mentioned infrastructure.
The proposed development is a redevelopment of approximately 0.65 acres near downtown
Bozeman. Currently, the site consists of one residence (716 West Babcock) and the vacated
Pizza Hut building (718 West Babcock). The proposed improvements consist of demolishing
the existing site and constructing one mixed-use building with 42 1-bedroom apartments and
3,000 square feet of retail space. In addition to the structure, this project includes new
sidewalks, two exterior parking lots, and parking on the buildings ground level. This design
report describes how new connections to the existing infrastructure will accommodate this
development.
Water
The project site has two existing water services extending off W. Babcock Street. These
services will be abandoned and plugged at the main. A new domestic water service (4-inch,
to be verified by mechanical engineer) and fire service (6-inch, to be verified by sprinkler
designer) will be extended to the building. Water and fire services will be installed per the
City of Bozeman Design Standards and Modifications to Montana Public Works Standard
Specifications (MPWSS). Construction of new water main is not anticipated with this
project. The anticipated demands for the project are summarized in Table 1 and calculations
are provided in the Appendix.
Table 1.
Estimated Water Demands
Average Day Max Day Peak Hour
Demand 15,826 gpd 36,400 gpd 33.0 gpm
Sanitary Sewer
The project site has three existing sewer services extending off the alley south of the site.
These services will be capped and abandoned in place. A new sewer service (4-inch) will be
extended to structure and connect to the existing main in W. Babcock Street. The sewer
service will be installed per the City of Bozeman Design Standards and Modifications to
MPWSS. Construction of new sewer main is not anticipated with this project. The
anticipated demands for the project are summarized in Table 2 and calculations are provided
in the Appendix.
Table 2.
Estimated Sewer Demands
Average Day Peak Hour
Demand 8,745 gpd 25.9 gpm
3
Storm Drainage
The proposed site development includes buildings, asphalt, and concrete. The small site will
be primarily covered in hardscape. To accommodate existing and increased storm runoff
from the site, a below grade retention structure is proposed. The retention structure will
include 36-inch diameter perforated corrugate metal pipe. It is anticipated the pipe will be
located or tied directly into native gravel. Site runoff from the lower parking lot and
commercial space roof will be retained while runoff from the larger residential roof will
discharge directly to the City storm drain system. The roof drains will be sized for the 25-
year design flow and in accordance with the Uniform Plumbing Code, whichever is more
restrictive. Post vs. pre-development was analyzed using a 10-year design storm. As a result
of the proposed retention ponds, the post development runoff is equal to the pre development
runoff even though the proposed residential building runoff will discharge offsite undetained.
The retention pipe was sized per the City of Bozeman Design Criteria, utilizing a 10-year, 2-
hour storm and the rational method. Once retained, water from the 10-year, 2-hour storm
will be contained and allowed to infiltrate through the perforated pipe and into the native
gravel. The 100-year storm overflow path will convey water directly to adjacent streets.
Calculations are included in the Appendix.
4
Appendix
Overall Project Areas
Hard Gravel Landscaped Total Hard Gravel Unimproved Weighted
Surfaces Area Area Area Coeff. Coeff. Coeff. Average C
(sf) (sf) (sf) (sf) C C C CAVG
Existing 12550.49 0.00 15761.19 28311.68 0.9 0.8 0.1 0.45
Proposed 24776.22 0.00 3535.46 28311.68 0.9 0.8 0.1 0.80
Total Lot Area 28312.00 sf
Total Lot Area 0.650 acres
Basin A, Retention Area (North Parking Lot and North Building Roof)
Hard Gravel Landscaped Total Hard Gravel Unimproved Weighted
Surfaces Area Area Area Coeff. Coeff. Coeff. Average C
(sf) (sf) (sf) (sf) C C C CAVG
Proposed 6801.00 0.00 380.00 7181.00 0.9 0.8 0.1 0.86
Total Lot Area 7181.00 sf
Total Lot Area 0.165 acres
Basin B, Areas Directly Discharging from Site
Hard Gravel Landscaped Total Hard Gravel Unimproved Weighted
Surfaces Area Area Area Coeff. Coeff. Coeff. Average C
(sf) (sf) (sf) (sf) C C C CAVG
Proposed 17974.00 0.00 3156.08 21130.08 0.9 0.8 0.1 0.78
Total Lot Area 21130.08 sf
Total Lot Area 0.485 acres
SOBO MIXED USE BUILDING
C Value Determination
J:\2016\B16-070 718 West Babcock\DOCUMENTS\DESIGN REPORT\Storm Drain Calcs.xls
TD&H Storm Drain CalculationsProject: SOBO MIXED USE BUILDING10-year flow calculationsTc*Tc* 10 yr FlowSlope Distance Ct1Slope k Velocity Distancet2Velocity Distancet3Total C Area TotaliQ% ft min % fps ft min fps ft min min ac min in/hr cfsPre development5.20 139 0.59 6.49 1.00 0.619 2.03 0 0.00 3 0 0.00 6.49 0.45 0.65 6.49 2.717 0.80Basin B1.00 50 0.50 7.93 1.00 0.491 1.61 160 1.66 3 0 0.00 9.59 0.78 0.49 9.59 2.108 0.80Estimate average flow of 3 fpsFHWA HEC 22, Eqn 3-4Cf = 1.0 for 10-year storm eventK=0.457 Grassed Water Way (Roadside Ditch)K=0.619 Paved AreaK=0.491 Unpaved shallow concentrated flowTIME OF CONCENTRATION10 YEAR FLOW CALCOverland FlowShallow FlowPipe Flow3111871/fcSD)CC.(.T-=AiCQ=65.1064.0-=cTiSkV=28.3
TD&H Storm Drain CalculationsProject: SOBO MIXED USE BUILDING25-year flow calculationsTc*Tc* 10 yr FlowSlope Distance Ct1Slope k Velocity Distancet2Velocity Distancet3Total C Area TotaliQ% ft min % fps ft min fps ft min min ac min in/hr cfsCommerical Downspout2.00 137 0.90 1.91 1.00 0.619 2.03 0 0.00 3 0 0.00 1.91 0.90 0.076 1.91 7.081 0.48Residential Downspout2.00 177 0.90 2.17 1.00 0.619 2.03 0 0.00 3 0 0.00 2.17 0.90 0.285 2.17 6.524 1.67Estimate average flow of 3 fpsFHWA HEC 22, Eqn 3-4Cf = 1.1 for 25-year storm eventK=0.457 Grassed Water Way (Roadside Ditch)K=0.619 Paved AreaK=0.491 Unpaved shallow concentrated flowTIME OF CONCENTRATION25 YEAR FLOW CALCOverland FlowShallow FlowPipe Flow3111871/fcSD)CC.(.T-=AiCQ=64.2578.0-=cTiSkV=28.3
SOBO MIXED USE BUILDING
Commercial Downspout Sizing
Input Values
d = 0.50 ft
y = 0.465 ft
Calculated Values (Equations from Fluid Mechanics by Chow)
Theta (Θ) 5.21 rad 2*arccos(1-y/(d/2))
Area (A) 0.19 ft2 (1/8)*(Θ-sinΘ)d2
Wetted Perimeter (P) 1.30 ft 0.5Θd
Hydraulic Radius (R ) 0.15 ft (.25)*(1-(sinΘ)/Θ)d
Top Width (T) 0.26 ft (sin 0.5Θ)d
Mannings Equation (Equation from Fundamentals of Mechanics by Munson)
n = 0.013 (For PVC per COB Design Standards)
S0 =0.02 ft/ft
Q = 0.86 cfs 1.49/n*A*R2/3*S0
0.5
V = 4.50 ft/s
J:\2016\B16-070 718 West Babcock\DOCUMENTS\DESIGN REPORT\Storm Drain Calcs.xls 4 OF 6
SOBO MIXED USE BUILDING
Residential Downspout Sizing
Input Values
d = 0.67 ft
y = 0.623 ft
Calculated Values (Equations from Fluid Mechanics by Chow)
Theta (Θ) 5.21 rad 2*arccos(1-y/(d/2))
Area (A) 0.34 ft2 (1/8)*(Θ-sinΘ)d2
Wetted Perimeter (P) 1.75 ft 0.5Θd
Hydraulic Radius (R ) 0.20 ft (.25)*(1-(sinΘ)/Θ)d
Top Width (T) 0.34 ft (sin 0.5Θ)d
Mannings Equation (Equation from Fundamentals of Mechanics by Munson)
n = 0.013 (For PVC per COB Design Standards)
S0 =0.02 ft/ft
Q = 1.87 cfs 1.49/n*A*R2/3*S0
0.5
V = 5.46 ft/s
J:\2016\B16-070 718 West Babcock\DOCUMENTS\DESIGN REPORT\Storm Drain Calcs.xls 5 OF 6
10-yr
C Area 2-hr Q V Length
ac (i) in/hr cfs cf 36" Culvert
Basin A 0.86 0.16 0.41 0.058 417 59
SOBO MIXED USE BUILDING
Retention Calculations - 10-Year, 2 hr Event
AiCQ=QV•=7200
J:\2016\B16-070 718 West Babcock\DOCUMENTS\DESIGN REPORT\Storm Drain Calcs.xls
Preliminary Design Report Update
Updated 12/19/16, units increased
to 42 1-bedroom units with 3,000 sf
of Commercial.
42
42
15,065.4
15,826
15,826
15,826
36,400
659.4 11
11 33
42 7,985
7,985
8,745
0.08862
0.08862
No Change, 4.3
8,647.18 37,280
25.9
SOBO MIXED USE BUILDING
Sewer Capacity Check
Input Values
d = 0.33 ft
y = 0.11 ft
Calculated Values (Equations from Fluid Mechanics by Chow)
Theta (Θ) 2.46 rad 2*arccos(1-y/(d/2))
Area (A) 0.02 ft2 (1/8)*(Θ-sinΘ)d2
Wetted Perimeter (P) 0.41 ft 0.5Θd
Hydraulic Radius (R ) 0.06 ft (.25)*(1-(sinΘ)/Θ)d
Top Width (T) 0.31 ft (sin 0.5Θ)d
Mannings Equation (Equation from Fundamentals of Mechanics by Munson)
n = 0.013 (For PVC per COB Design Standards)
S0 =0.02 ft/ft
Q = 0.06 cfs 1.49/n*A*R2/3*S0
0.5 28 gpm
V = 2.52 ft/s
J:\2016\B16-070 718 West Babcock\DOCUMENTS\DESIGN REPORT\Sewer Capacity Check.xls 1 OF 1
SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B16-070 BASEMONTANAWASHINGTONIDAHO
GREAT FALLS-BOZEMAN-KALISPELL-SHELBY
REV DATELEWISTONSPOKANE
Engineering
tdhengineering.com
NORTH DAKOTAWATFORD CITY REVISION
718 WEST BOZEMAN
BOZEMAN, MONTANA
STORM WATER BASINS B16-07012-14-16.DWGC1.1MMN1KLSBASIN ABASIN BCOMMERCIALROOFRESIDENTIALROOFJ:\2016\B16-070 718 West Babcock\CADD\CIVIL\DWG\B16-070 Base.dwg, 12/19/2016 11:03:51 AM, MMN1